HILLSTONE DC LOAD BANK

Similar documents
OPERATING MANUAL TYPE HLB for ISSUE 2

Hillstone PowerBank HPB54 Series ( 400A 700A )

Switching DC Power Supply

Installation, Operation and Maintenance Manual. EVC Controller (from February 2007)

Pro Booster 802Li. Please read and fully understand the instructions in this manual before operation. Keep this manual safe for future reference.

Rescue Pac. Please read and fully understand the instructions in this manual before operation. Keep this manual safe for future reference

ST - II Series POWER SUPPLIES USER INSTRUCTIONS

Compact Sine Inverter

RE-PR3-E-86&105 3-Phase Panel Mount 86 and 105kW

Cruising Charger Series OWNER S MANUAL

Model 1693, 1694 Switching DC Power Supply

X100P Load Bank. Read all instructions before using the load bank. Contents

Power Inverter 400 MW Owner s Manual

DC Master 24/ A

Table of Contents 文管中心 發行章

BATTERY SAVER LOW RIPPLE HO

SOS SERIES SOS1 SOS2. Spares On Site Battery Cabinet Installation Guide rEV3

POWER ACCESSORIES SOCKET ASSEMBLIES CIGARETTE LIGHTER PLUGS BATTERY DISCHARGE PROTECTOR VOLTAGE REDUCERS VOLTAGE CONVERTER VOLTAGE BOOSTER INVERTERS

Art. No. EC-315. Art. No. EC-330. Art. No. EC-340 SWITCH-MODE BATTTERY CHARGER CONTENTS IMPORTANT SAFETY PRECAUTIONS... 2

XS400 Load Bank. Read all instructions before using the load bank. Contents

27.6 Vdc 1 Amp Switch Mode Power Supply for Fire EN54-4:1997 +A1 +A2

CX-SERIES ADVANCED BATTERY CHARGER

BRIVIS DUCTED INVERTER SERVICE MANUAL DRCi

Sentry Battery Charger. Installation and Operations Manual Section 75

World Leaders in Diesel Fuel Injection Test Equipment. IFT-c. Injector Function Tester Controller. Operating and Servicing Manual

1 T835 Installation. 1.2 Rack Wiring. 1.1 Rack Mounting

OPERATION INSTRUCTIONS

Installation and Operating Instructions. Solar System Controller ISC3020

MODEL 520 REMOTE START ENGINE MANAGEMENT SYSTEM

10 AMP ON BOARD BATTERY CHARGER

EC200 ELECTRONIC CONTROL SYSTEM

Nature Power Inverters. True Sinewave Inverter Modified Sinewave Inverter. Owner s Manual

Melody 1 Platform Lift

INSTALLATION INSTRUCTIONS

POWERSOURCEPURE INSTRUCTIONS. Pure Sine Wave Inverter. RINV1200P REINV1200P RINV2200P REINV2200P

LPC 20 MODEL #: LOW PROFILE CHARGER AUTOMATIC SINGLE OUTPUT BATTERY CHARGER INSTRUCTION MANUAL

OPERATION & MAINTENANCE INSTRUCTIONS

12v / 24v Diesel Transfer Pump Kit

Contents. Overview. Safety Instructions. Before Installation. Installation. Operation. Maintenance. Replacement Parts. System Specifications 8 01

User s Manual. Automatic Switch-Mode Battery Charger

EC400 Power Control System

LS0512 Solar Charge Controller

PI1500X Power Inverter User s Manual

User Guide IGD Series

OPERATION & MAINTENANCE INSTRUCTIONS

Model 1900, 1901, 1902 Switching DC Power Supply

GP-1000 Inverter. Go Power! Electric Inc. PO Box 6033 Victoria, BC V8P 5L4 Tel: Fax:

Dycon D2430 EN54-4 Fire Alarm Power Supply Series

Battery Chargers Sealed or Valve Regulated Lead Acid Batteries Model: PSC AP

OPERATION & MAINTENANCE INSTRUCTIONS

Chargestar P24 / P32 Battery Charger Startmaster P300 Starter / Charger

Deltran Battery Tender 6V/12V 4Amp 5 & 10 Bank Battery Management System TABLE 1. Length of Cord, Feet AWG Size of Cord

2603 Battery Pal 3 AMP, 1 2 VOLT BATTERY CHARGER

SB ISS.04. Operation Manual AGMDPRO Automatic Spray Gun

Installation and Operating Instructions. Solar System Controller ISC1000

Operations and Service Manual. X30208 Load Bank

OWNER S MANUAL Please read this manual before operating your power supply

Installation and Operating Instructions. Solar System Controller ISC3030

LC BATTERY CHARGER OPERATION & MAINTENANCE GUIDE

MB V 3-IN-1 JUMP STARTER WITH SPIRAL WOUND BATTERY

Go Power! Manual. GP-Smart Charger

Hydraulic Projects Ltd

Katharometer Power Supply Units

Automatic Battery Charger Switching mode with Micro-controlled Input: Vac / Output: 12Volt DC

Pump Sentry. Models 812 PS & 1612 PS INSTALLATION INSTRUCTIONS

MP V 8A Electronic Smart Charger. Instruction and Information Manual

Battery Capacity Analyzer

Department of Defense

OPERATIONAL INSTRUCTIONS

SECOND GENERATION Use this guide with unit serial number prefix beginning with BWF using Terra Power separator.

BK10 10 CHANNELS BANK CHARGER For 12V lead-acid batteries

Technical Description

OPERATING AND MAINTENANCE MANUAL. Primary Current Injection Test Set. 750ADM-H mk2

Reviewed: DD Month University Code of Practice for Electrical Safety. PART B - Design and Construction of Electrical Equipment within the University

SMT. Installation and Operation Manual. Model:SMT WITH MPPT TECHNOLOGY

230VAC Power Inverter 400W Owner s Manual

EUROTHERM ONTROLS. Two phase thyristor power switches. Product data

Third Generation NITE Phoenix

SAVE THESE INSTRUCTIONS

LEAD ACID BATTERY CHARGER

Elmdene International Ltd

AUTO CHARGE 4000 MODEL #: LOW PROFILE CHARGER AUTOMATIC DUAL OUTPUT BATTERY CHARGER INSTRUCTION MANUAL

GSL Electronics Modified Sine Wave Power Inverters

12V POWER PACK WITH 230V/A.C. OUTPUT INVERTER INSTRUCTIONS

GL1200T Cut & Seal. (GL1200 Seal only)

AUTO CHARGE 11 MODEL #: XX. AUTOMATIC BATTERY CHARGER U.L. Configuration INSTRUCTION MANUAL

AXS. Installation and Maintenance. AXUS Swift Circular Long Cased Axial Flow Fans. 1.0 Introduction. 3.0 Installation And General Advice. 2.

RS-3 PRO RS-1007 PRO. CAT IV Analog Clamp meter Series. Users Manual. For detailed specifications and ordering info go to

Automatic Battery Charger Switching mode with Micro-controlled Input: Vac / Output: 12Volt DC

12V 1 AMP (1000 ma) Automatic Battery Charger & Maintainer

SOLAR LIGHTING CONTROLLER SUNLIGHT MODELS INCLUDED IN THIS MANUAL SL-10 SL-10-24V SL-20 SL-20-24V

M Series Condensate Recovery Unit

SP6. Automatic Battery Charger. Model

Safety Precautions. Damages resulting from failure to observe these safety precautions are exempt from any legal claims whatever.

ACC Series Power Conditioner OPERATION & INSTALLATION MANUAL

LS0512R Solar Light Controller

Time Electronics Ins-Cal. Insulation Tester Calibration System. Technical Manual

24V 3A EN54 Ancillary Power Supply

Installation and Operating Instructions. MPPT Solar System Controller ISC3040

8-STAGE AUTOMATIC BATTERY CHARGER MCU CONTROLLED - HIGH FREQUENCY SWITCHMODE MODELS: KACHG1207, KACHG1212, KACHG1220, KACHG2410. Instruction Manual

Transcription:

OPERATING MANUAL for HILLSTONE DC LOAD BANK Type ref. HLD 240 480 100 Serial No. M36771 ISSUE 1 1

CONTENTS Introduction page 3 Safety Considerations page 3 Connecting procedure page 4 Operating instructions page 4 Specification page 5 Rating tables page 5 Maintenance procedure page 6 Fault finding procedure page 6 Certificate of Conformity page 7 The information contained in this document is considered correct at the time of printing and given in good faith. Hillstone Products bears no responsibility for the accuracy of the data given or any responsibility resulting from the use of the equipment UNITS 1 & 2 Freetown Business Park Hudcar Lane, Bury Lancashire England BL9 6HD Tel +44(0)161 763 3100 Fax +44(0)161 763 3158 www.hillstone.co.uk Email sales@hillstone.co.uk 2

INTRODUCTION The load bank is designed for load testing of single phase AC or DC equipment at load currents up to 200 amps at a nominal voltage of 240V, or 200 amps at a nominal voltage 480V DC. Ten switched steps are available with a minimum switch step of 1A. The equipment incorporates a dual voltage feature which allows equipment to be tested up to 240 volts and up to 480 volts. The unit comprises of pre set, high powered resistors channels of various rating, with each individual channels selectable via panel mounted switches and internal contactors. Cable termination is provided via power locks on the front of the load bank and an earth stud. Care must be taken when selecting the correct power lock for the test voltage. The load bank is force cooled using a mains powered 415V three phase fan. Failure of the auxiliary mains supply or fan failure will automatically de energise the load contactors thereby preventing damage to resistor elements. The load bank is also fitted with an emergency stop button which will de energise the load contactors and the fan. Under normal operation the fan should be kept running for 5 minutes after test to ensure the resistors are cooled sufficiently. SAFETY CONSIDERATIONS 1. The equipment is designed for use in a clean, dry, indoor environment and should only be operated by competent electrical engineers who are completely familiar with the operation and specification of the load bank. 2. As with any electrical equipment the load bank should not be used in close proximity to recently charged batteries where a build up of explosive gases may have occurred. 3. Operators must ensure that interconnecting cables are correctly rated to carry the required load current and adequately insulated to prevent the possibility of electric shock. 4. An earth connection must always be made when testing AC loads. 5. All resistors are rated for operation when force cooled and therefore can only be used when the fan is running 6. Do not attempt to remove the power locks with the load circuit energised. 7. When in use the load bank should be cordoned off using safety barriers. 8. The load bank should only be operated in an area with adequate ventilation. 9. During operation care should be taken as the exhaust air outlet will be hot. 10. Do not smoke in the proximity of batteries. 11. Operators working with batteries should not wear rings, jewellery or metal watch straps. 12. Only insulated tools should be used when working on battery connections. 13. Refer to UPS or the battery manufacturers operating instructions for additional safety precautions. 14. Ensure all personnel are familiar with the location of the nearest safety kit and eye wash facility. 15. During operation the load bank should not be covered or positioned to restrict air flow. 16. Caution: Metal surfaces will become hot during operation 17. Always run the fan for several minutes after a test, with the load switched off to cool the resistor elements. 3

CONNECTION PROCEDURE 1. Ensure the equipment or battery to be tested is compatible with the load bank operating voltage range. 2. Do not attempt to operate the load bank above the maximum operating voltage. 3. Check the power source ( battery or UPS output ) is isolated before connecting any cables to the load bank. 4. Check all switches are in the off position. 5. Ensure the interconnecting cable is adequately rated and correctly insulated to prevent any possibility of electric shock. 6. For any tests above 240 volts the power locks must be connected to the red 480V power lock and the black 0 volt power lock 7. For tests carried out below 240V only then can the power locks be connected to the red 240V power lock and the black 0 volt power lock. 8. The power locks must not be removed when the battery or power source is connected. 9. Check all cables are connected to the correct power lock terminals for the test voltage. 10. Ensure the interconnecting cable connections are secure. 11. If testing an AC load, connect an earth cable on the earth stud provided. 12. Ensure the auxiliary mains supply is available at 415 volts three phase. 13. Connect the auxiliary mains lead to the 415 volt auxiliary supply. 14. Connect the load bank to the battery or UPS output. 15. Observe correct polarity when connecting a battery for discharge testing. 16. Where practical always earth the load bank during use. OPERATING INSTRUCTIONS Operators should read the safety considerations and connection procedure before carrying out the following operating instructions. 1. Ensure the mains supply switch is in the OFF position. 2. Ensure the auxiliary supply is 415 volts AC three phase 50 Hz. 3. Ensure all switches are in the OFF position 4. Turn on the mains control ON/OFF rocker switch. 5. Ensure the fan is running correctly and the inlet and exhaust ventilation are not obstructed. 6. If the red LED below the mains ON/OFF switch is illuminated, then the fan motor needs reversing. This can be changed by removing the auxiliary supply, changing over 2 of the phases from the auxiliary supply, then reconnecting the auxiliary supply. 7. Press the Start push button. 8. Select the required load current by operating the appropriate load channel switches. 9. Do not exceed the maximum rating of the load bank. 10. The load bank can be used to perform a constant current battery discharge test by manual selection of the load channels during the test, as the battery voltage falls. 11. At the end of a test, switch off all load channel switches and press the red stop push button. 12. At the end of a test, the mains control rocker switch should be left on for a few minutes to allow the fan to run until the resistors have cooled. 13. Ensure the power source (battery or UPS output) is isolated. 14. Always disconnect the cable connections at the battery terminals or UPS first. 15. The test cables can now be removed from the load bank. 4

SPECIFICATION Maximum operating voltage DC 520 Volts or 260 Volts Nominal operating voltage 480 Volts or 240 Volts Maximum load current 221 Amps @ 520 Volts DC 221 Amps @ 260 Volts DC Load cable set 5 metres DC Shunt 300A/75mV, 1A = 4mV Aux mains cable 5 metres complete with trailing socket Size 1070 mm long x 800 mm wide x 1100 mm high Weight 174 kgs RATING TABLES 480V connection (520VDC MAX) Approximate Current and Power At Different Voltages Channel Ohms I @ 520V DC Only W @ 520V DC Only I @ 480V W @ 480V I @ 440V W @ 440V I @ 380V W @ 380V 1 691.9 0.75 391 0.7 333 0.6 280 0.5 209 2 346.0 1.5 782 1.4 666 1.3 560 1.1 417 3 172.9 3 1,564 2.8 1,333 2.5 1,120 2.2 835 4 115.2 4.5 2,347 4.2 2,000 3.8 1,681 3.3 1,253 5 57.6 9 4,694 8.3 4,000 7.6 3,361 6.6 2,507 6 38.4 13.5 7,042 12.5 6,000 11.5 5,042 9.9 3,760 7 19.2 27 14,083 25 12,000 23 10,083 20 7,521 8 9.6 54 28,167 50 24,000 46 20,167 40 15,042 9 9.6 54 28,167 50 24,000 46 20,167 40 15,042 10 9.6 54 28,167 50 24,000 46 20,167 40 15,042 Totals 2.34 222 115,403 205 98,332 188 82,626 162 61,628 240V connection (260VDC Max) Approximate Current and Power At Different Voltages Channel Ohms I @ 260V DC Only W @ 260V DC Only I @ 240V W @ 240V I @ 200V W @ 200V I @ 120V W @ 120V 1 345.9 0.75 195 0.7 167 0.6 116 0.3 42 2 173.0 1.5 391 1.4 333 1.2 231 0.7 83 3 86.5 3 782 2.8 666 2.3 463 1.4 167 4 57.6 4.5 1,174 4.2 1,000 3.5 694 2.1 250 5 28.8 9 2,347 8.3 2,000 6.9 1,389 4.2 500 6 19.2 13.5 3,521 12.5 3,000 10.4 2,083 6.3 750 7 9.6 27 7,042 25 6,000 21 4,167 12.5 1,500 8 4.8 54 14,083 50 12,000 42 8,333 25 3,000 9 4.8 54 14,083 50 12,000 42 8,333 25 3,000 5

10 4.8 54 14,083 50 12,000 42 8,333 25 3,000 Totals 2.34 222 57,702 205 49,166 171 34,143 102 12,291 6

MAINTENANCE PROCEDURES The load bank should not require any special maintenance, however as with any electrical equipment periodic checks should be carried out to ensure the equipment is in a safe and satisfactory condition. The following periodic checks are recommended ; 1) Check the inlet and outlet grills are free from obstruction. 2) Check the controls and terminal shrouds are undamaged. 3) Check the fan rotates freely without obstruction. 4) Check internal wiring for lose connections or damage. FAULT FINDING PROCEDURES The following fault finding procedure is intended to identify simple operational errors and has been categorised into two possible problem areas as follows ; FAN COOLING NOT OPERATIONAL Check the auxiliary power source is available and switched ON. If the red LED below the ON/OFF switch is illuminated then the phase sequence of the auxiliary supply is incorrect and must be reversed. Check the auxiliary mains cable connections. Check the auxiliary mains fuse in the front panel mains socket Check the fan motor operates. Check for air blockage. Check fan blades are secure to motor shaft. LOAD BANK DOES NOT PROVIDE SUFFICIENT LOAD CURRENT Check the power source to be tested is at the required voltage. Check the load cables are secure. Check the load cable connectors are inserted correctly. Check the required current channels have been selected. Compare the current values with the specification table. Identify individual current channels for reduced output. Any faults not corrected by carrying out the above procedures may require the internal wiring or components of the load bank to be inspected for damage. Important Note: Isolate the load bank from all sources of power before removing any covers. Testing the load bank with the covers removed should not be carried out as it presents a risk of injury or death by electric shock. Repair or replacement should be carried out by the manufacturer. 7

Units 1 & 2 Freetown Business Park Hudcar Lane, Bury, Lancs. BL9 6HD. UK Tel:+44(0) 161 763 3100 Fax:+44(0) 161 763 3158 Certificate of Conformity Customer Hillstone Hire Customer order number 36771 Hillstone Manufacturing ref Equipment type ref Equipment description M36771 HLD240 480 100 Load bank Quantity supplied 1 Date of manufacture February 2012 Note: This document certifies that the whole of the items detailed above have been manufactured, tested and inspected and unless otherwise stated conform in all respects with the requirements of the contract or order and in accordanc with the following. Low Voltage Directive 2006/95/EC EMC directive 2004/108/EC: BSEN61000 6 3 2007 amendments for 2011 BSEN61000 6 1 2007 BSEN61000 6 4 2007 amendments for 2011 Hillstone Products Quality Assurance procedures ISO9001:2008 8