TWV Conference. MG Mike Lenaers. 6 February Sustaining the Joint Force/Improving the Future Force. Unclassified

Similar documents
PM Medium Tactical Vehicles

NDIA Tactical Wheeled Vehicles (TWV) Conference 8 February 2010 COL Mark Barbosa, G-8

Advancing the TWV Fleet 10 May 2016

PM Medium Tactical Vehicles

2011 NDIA TWV Conference

NDIA TWV Conference. DISTRIBUTION STATEMENT A: Approved for Public Release

Project Manager COL Dave Bassett

TWV INTRODUCTION BACKGROUND

PM Light Tactical Vehicles

MTV Overview. Product Manager Medium Tactical Vehicles. LTC Frank Bridges. DISTRIBUTION STATEMENT A: Approved for Public Release

Transparent Armor Cost Benefit Study

ARMY TRUCK PROGRAM (TACTICAL WHEELED VEHICLE ACQUISITION STRATEGY) REPORT TO THE CONGRESS

Establishment of Light Tactical Vehicles Program Office

EXECUTIVE SUMMARY. The Army Tactical Wheeled Vehicle Investment Strategy. Deputy Chief of Staff G-8 30 October 2009

Transparent Armor Cost Benefit Study

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

Tactical Wheeled Vehicle (TWV) Fuel Economy Improvement Breakeven Analysis. Presented at SCEA/IPSA

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Family of Heavy Tactical Vehicles

PM Light Tactical Vehicles

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED UNCLASSIFIED

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

Report Documentation Page

Jim Smerchansky Chief Engineer Marine Corps Systems Command

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

Tactical Vehicle Cons & Reps Cost Estimating Relationship (CER) Tool

GRADE TOOLS. Vendor Managed Tool Systems INDUSTRIAL. Product Catalog. Special Tool Systems

LtCol Tom Atkinson Program Manager

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 11 R-1 Line #130

Fleet Characterization Combat Element Logistics Head Significant logistics support is required to transport fuel and supplies to the combat elements a

2009 NDIA Combat Vehicles Conference

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. Quantity of RDT&E Articles

Jennifer Johnson Lead Systems Engineer PdM Vehicle Systems Sebastian Iovannitti Systems Engineer PEO CS&CSS

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

Gaining Ground. Michael Fabey/AW&ST

Shaping the future of the TWV Fleet

Heavy Truck Efficiency: Implementing the Opportunities. 20 February, 2008 Michael Ogburn Rocky Mountain Institute

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

Mine Resistant Ambush Protected (MRAP) Safety

PE BB Cont. Cont. S400B, Predator MALET Cont. Cont.

THIS IS OSHKOSH DEFENSE.

UNCLASSIFIED R-1 ITEM NOMENCLATURE

Navy League - Sea Air Space. Ship to Shore Connector (SSC) 3 May 2010

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

LESSON ASSIGNMENT. After completing this lesson, you should be able to: be able to:

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 6 P-1 Line #51

PHASE 4 OVERLANDER PROTECTED MOBILITY VEHICLE LIGHT

The number one threat to Soldiers in Iraq and

TARDEC Hybrid Electric Program Last Decade

Aviation S&T: Joint Multi-Role Technical Demonstrator

IBIS TEK PRICING INFORMATION FOR DoD PERSONNEL ONLY OR PV MRO EFFECTIVE MARCH 23, 2009

Protecting the Warfighter

Joint Light Tactical Vehicle Power Requirements

VOLUNTARY DIESEL RETROFIT PROGRAM. STAPPA and ALAPCO Fall Membership Meeting October, 2003

UNCLASSIFIED. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Aircraft Engine Component Improvement Program

Garrison / Home Station. EDREs / CTC Rotations. Theater / AOR / RAF. Retrograde / Reset

Air Force Operational Energy

Bridging Team Efforts Supporting Current & Future Forces. UNCLASSIFIED: Dist A. Approved for public release

LAND DOMAIN. Defence Led UNCLASSIFIED 2

Alternatives to an Open Competitive Commercial Collection Program Presented by Robert Craggs RAM/SWANA Conference

Electric Drive Approach to Mobile Power Platforms

PM AAA NDIA Conference 25 October 2011

Fire Power Forum. DISTRIBUTION A: Approved for Public Release.

TARDEC OVERVIEW. Tank Automotive Research, Development and Engineering Center. APTAC Spring Conference Detroit 27 March, 2007

Mine-Resistant, Ambush-Protected (MRAP) Vehicles: Background and Issues for Congress

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED R-1 ITEM NOMENCLATURE

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) MAY 2009 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7

Smart Rivers Conference September 15, 2011 New Orleans, Louisiana

M-ATV/COUGAR/BUFFALO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

MULTI-MISSION FAMILY OF VEHICLES M-ATV INNOVATION DRIVES FORWARD

Aviation S&T: Future Vertical Lift & JMR Tech Demonstrator

ARDEC Rapid Design Projects for Field Support Part 1

Deployments and Operations Working Group

UNCLASSIFIED. Cost To Complete Total Program Element MQ1: MQ-1 Gray Eagle - Army UAV (MIP) FY 2016 Base

Exhibit R-2, RDT&E Budget Item Justification

Maintaining Readiness in an Austere Environment While Enhancing Operations for the Future

Captain Brian Gilbert NDIA Combat Vehicle Conference

AFRL-RX-TY-TM

Testing in the Design Phase. Regis Luther

UCLA Lake Arrowhead Conference. October 18, 2010

Joint Light Tactical Vehicle (JLTV): Background and Issues for Congress

Purpose of Presentation

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2000

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

INTERNATIONAL 7000-MV WORK ZONE TO COMBAT ZONE

UNCLASSIFIED BUDGET ITEM JUSTIFICATION (EXHIBIT P-40) P-1 LINE ITEM NOMENCLATURE: C-12

Public Works Department

MindSphere The IoT operating system for smart cities. Hakan Olcay, Energy Efficiency Coordinator at Siemens

Future C4ISR Technologies on Ground Platforms

CRYPTOCURRENCY MORATORIUM SMALL MINER RATE IMPACT. September 4, 2018

How Does Aging Manifest Itself?

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Alternative Fuels

Design Development and Testing of the Ground Renewable Expeditionary ENergy System

Transcription:

TWV Conference Sustaining the Joint Force/Improving the Future Force MG Mike Lenaers 6 February 2007 1

THE HMMWV From Hummer to Groaner HUMMER 21000 15000 Growth in the Number of Up Armored HMMWVs 12K 18K +20K 9000 M998 HMMWV 4x4 High-Mobility Multipurpose Wheeled Vehicle 3000-3000 Mission Creep 5K 3K 4K 2001 2002 2003 2004 2005 2006 Groaner 16000 12000 Growth in the Weight of Up Armored HMMWVs 28% 48% 58% 68% 8000 M1151A1 with the Objective Frag Kit 5 4000 0 Base HMMWV M998 6,390 POUNDS ADDED M1114 Base M1114 / M1151 with Frag Kit 5 M1114 / M1151 M1114 / M1151 with Frag Kit 5 & Actual Weight GPK Measured in Theater (Max) with Frag Kit 5 & GPK THAT S OVER 2/3 OF AN ORIGINAL HMMWV M1114 with the Objective Frag Kit 5 2

Mission Creep on All Vehicles Gunner Shield Gyrocam RHINO II IED Mine Roller Kit Cyclone Interrogation Arm 3

Made for OIF / OEF? Works great here But what about here? 4

Failures FMTV Frame Cracks (LSAC) HEMTT Cab Cracks (AoA) UAH Frame Cracks 5-ton Cab / Firewall Cracks (AoA) M915 Cab Cracks (AoA) 5

Refurbishing AoA Vehicles in SWA HMMWV Vehicles Desired Annual Refurbishment Rates: 8.5% of fleet per year (1,800 HMMWVs per year) Heavy Tactical Vehicles * ** Desired Annual Refurbishment Rates: HET system (M1070 Tractor and M1000 Trailer): 50% of Fleet/year (236 HET systems/year) HEMTT and PLS: 25% of Fleet per year (741HEMTTs and 387 PLS per year) Medium Tactical Vehicles * ** Desired Annual Refurbishment Rates: FMTV: 25% of fleet per year (595 FMTVs per year) M939: 25% of fleet per year (310 M939s per year) Line Haul Tactical Vehicles* ** Desired Annual Refurbishment Rates: M915s: 50% of fleet per year (686 vehicles per year) * Estimated: 70% Firm Fixed Price, 30% Time and Materials ** Three Request for Proposals and Three separate Four Year IDIQ contracts 6

M1114 M1114 UAH HMMWV W / FRAG M998 Kit 5 & GPK

M1114 W / FRAG Kit 5 & GPK 8

We will need to RESET Armored Vehicles upon return Can we go to a Long Term Armor Strategy during RESET? What is the Cost? Will we have the dollars? A Kit = Frame, Attachments, Hard to Install Armor, commo wiring, mounting points for Gunner s Protection Kit + will need non-armor panels and glass (Install during RESET vs old cab) B Kit = Armor Panels and Armor Glass B Kit A Kit A Kit B Kit 9

10 ARFORGEN REQUIRES RAPID RESET BETWEEN CYCLES Align Soldier assignments with a unit s operational cycle (~36 months) Soldiers arrive, train, deploy, and depart together Improves cohesion and training effectiveness ~ 36 Mos. Lifecycle Manning (Tactical Units) 2 mo 4 mo AC RC 42 + 28 Creating Predictably Forces CREATE A FLOW OVER TIME WITH 83% AC BCTs BEING READY Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 70 Brigade Combat Teams ARFORGEN CHALLENGES: Very short RESET window Soldiers not available Keep costs reasonable Super Service Mandatory Parts Replacement Touch Units Once in 3 Years

11 AC RC 42 + 28 Creating Predictably Forces CREATE A FLOW OVER TIME WITH 83% AC BCTs BEING READY Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 70 Brigade Combat Teams ARFORGEN Support a Continuing Requirement Opportunities: 14 AC + 5 RC BRIGADES RESET EACH YEAR ARFORGEN Will provide predictability for RESET parts R&D Cost 7% Production Cost 21% Operating and Support Cost Disposal Cost 72% Where are the Dollars? Parts or Labor?

PM HBCT Condition Based Maintenance (CBM+) Condition Based Readiness Analysis (CoBRA) Functional data from electronic control modules Platform sensors and Data Automatic data collection, storage and transmission (transparent to the unit) Unique item tracking to key components Vehicle Configurations Maintenance and Logistics analytical tools and reports Correlate Maintenance actions with data collected Risk reduction with Fort Knox Fielding Establishes the foundation for the LCMC CBM+ Capability Vehicle Configurations x20 Ft. Knox x9 x29 Operational HBCT BTN to be selected from 2BCT, 4ID x40 x9 x20 x30 FY06 Effort: Funded by $7M RDTE Bill + $3.2M Congressional Add Gets existing data off of data bus for analysis Completion of that analysis is unfunded - $5M (FY08) Balance of original scope 12

We appreciate your advice 13