Item Code Description Unit Qty Total

Total Ex. Tax/VAT. (Rs.) (if any) in Rs. (Bought out/direct) length 587M 226M

NEPAL ELECTRICITY AUTHORITY (An Undertaking of Government of Nepal) Project Management Directorate

List of materials for 1Km. Of L.T line 1-Ph., 2-Wire AB cable (1 X 25+1X16) sq.mm using 8M X 200 KG. PSC Pole

NEPAL ELECTRICITY AUTHORITY (An Undertaking of Government of Nepal) Project Management Directorate

PROPOSED COST SCHEDULE OF MATERIALS FOR CONSUMER JOB AND OTHER JOBS

Schedules 1 to 4, Lot B: Extension of the Lessos Substation

NEPAL ELECTRICITY AUTHORITY (An Undertaking of Government of Nepal)

TENDER FOR FOR 2 X 1010 KVA, 1500 RPM, 415 V DG SETS FOR CONSTRUCTION OF NEW CDRI CAMPUS AT SITAPUR ROAD, LUCKNOW (U.P.) SUMMARY OF PRICE BID

BILL OF QUANTITIES - ABSTRACT

TENDER DOCUMENT PART-II

ANNEXURE-I : LIST OF ITEMS H.O. PURCHASE ITEM LIST:

SCHEDULE OF QUANTITY

BILL OF QUANTITY (BOQ) FOR ELECTRICAL WORKS BOGAPURAM BRANCH

NEPAL ELECTRICITY AUTHORITY (A Government of Nepal Undertaking)

LIST OF EDD DESCRIPTION/ SPECIFICATION AS 19 TH OCTOBER 2016

Corrigendum-I. Bill of Quantity

SCHEDULE OF QUANTITIES ITEM DESCRIPTION

Estimate of Under Ground Electrification Work

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED SARDAR PATEL VIDYUT BHAVAN RACE COURSE, VADODARA TENDER FOR

BID No.SE/O&M/Amt./T/14-15/T-27 DPDC Full Turnkey SN Description Unit Unit Rate (Rs) Qty

S P E C I F I C A T I O N

Sub-Transmission & Distribution System

Max value Max life Range from. ($000) (Years) Pole Type

TENDER SPECIFICATION. Rayalaseema Thermal Power Project (Muddanur) V.V.Reddy Nagar, Kalamalla Post,Cuddapah Dt, AP

Tender Schedule for Electrical Works at Varagani Branch. Sl. No. Particulars Quantity Unit Rate Amount

NEPAL ELECTRICITY AUTHORITY (An Undertaking of Government of Nepal)

FINANCIAL BID NAME OF WORK : ELECTRIFICATION WORK AT THE NEW OFFICE PREMISES OF SBI EXCLUSIF KOZHIKODE BRANCH

Working Estimate for Construction of Goat Shed II at Jaring

B.O.Q FOR ELECTRICAL WORK (Including Fitting & Fixtures) OF STAFF QUARTERS AT BUUBANESWAR FOR UNITED INDIA INSURANCE CO. LTD

Sub-Transmission & Distribution System

NEPAL ELECTRICITY AUTHORITY (An Undertaking of Government of Nepal) Project Management Directorate

S P E C I F I C A T I O N

BOQ FOR ELECTRICAL WORK OF CANARA BANK RENGALI BRANCH

ESTIMATE FOR ELECTRICAL WORKS AT CHINCHOLI BRANCH

Tender Schedule. Sl. No. Particulars Quantity Unit Rate `

Estimate For Electrical Works PROPOSED RUDSET INSTITUTE AT BERHAMPUR

33kV Connection up to 90MVA

Set /

INDIAN INSTITUTE OF TECHNOLOGY KANPUR


AN ISO 9001 & COMPANY TENDER DOCUMENT. TENDER No: DLI/CON/696/411 FOR

Urgent Support to the Agriculture and Electricity Sector in the Gaza Strip

PRICE BID - PART: I I

TECHNICAL SPECIFICATIONS FOR HARDWARE & ACCESSORIES -ACSR DOG CONDUCTOR FOR TRANSMISSION LINE

Total Cost Abstract. Project Name : - RDPL, Jaipur. Grand Total

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT

S. K. Industrial Corporation

BHARAT HEAVY ELECTRICALS LIMITED, JHANSI

(High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT. Enquiry Date:

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT

Name of work : Electrification of PG Block Second Floor in V.P.S.V Ayurveda college Kottakkal.

MOTHER DAIRY A UNIT OF GUJARAT CO-OPERATIVE MILK MARKETING FEDERATION LIMITED PURCHASE ENQUIRY

S P E C I F I C A T I O NS

TENDER DOCUMENT. (TENDER No: NRO/CON/696/660) FOR

AFTER GAZETTING (WORKING DOCUMENT FOR A 3 YEAR PERIOD) DATE PAGE PARAGRAPH DESCRIPTION ORIGINATOR APPROVED

MOTHER DAIRY A UNIT OF GUJARAT CO-OPERATIVE MILK MARKETING FEDERATION LIMITED PURCHASE ENQUIRY

KYN28A-12 (GZS1) A.C METALCLAD REMOVABLE SWITCHGEAR FOR INDOOR USE CHINATCS

Technical Specifications

33KV INDOOR SWITCHGEAR

Michigan State University Construction Standards SECONDARY UNIT SUBSTATIONS PAGE

Overseas Information. Tender Information

२१७१ २-१ ४४ २०१८ २-१ २१०९-४ २०१८ २९ ०६ २०१८ २ २ १२४९ २-१ ४४ २०१८ २१ ०७ २०१८ ३ २ १७०५ २ / -१ ४४ २०१८ १० १० २०१८ १ २ ३ २ ३ १३ २०१८-१९

Earthing UNIT. Learning Objectives. Introduction. To understand purpose of Earthing. To learn system of earthing.

GUWAHATI MUNICIPAL CORPORATION WATER WORKS :: PANBAZAR GUWAHATI

Section SWITCHBOARDS. Introduction. Part 1 - General. Related Work

Conductor. Isolators. Technical Specification:- Sr.N Description of Item Offered value. DC Resistance at 20 C (Ohms/Km) Weig ht (Kg.

INDIAN INSTITUTE OF TECHNOLOGY KANPUR

SYLLABUS FOR ELECTRICAL SUPERVISOR CERTIFICATE OF COMPETENCY (SCC MV) Electrical Engineering Paper (Written Test)

Key features. DESIGNS: - Conservator type - Hermetically sealed

MAIN INCOMER -1 (500 KVA TRF.)

Estimate For The Electrical Works At Pittakayagulla Branch Sl.N Particulars Quantity Unit Rate Amount

TENDER DOCUMENTS SUPPLY OF ELECTRICAL EQUIPMENT FOR BHADRAK MUNICIPALITY FOR THE YEAR LAST DATE OF RECEIVED OF TENDER DOCUMENTS :

VOLUME :II PRICE BID BOOK NO.

PART A: FINANCIAL BID

S P E C I F I C A T I O N TENDER NO. BHEL/ NR/SCT/ KOSTI /ELEC/ 836


TENDER DOCUMENT TENDER No.: NRO / CON / 592 / 537 FOR SUPPLY & INSTALLATION. DG Sets & Sychronising Panel

Bills of Quantities and Schedule for the Electrical Works at M/s.Bank of India, Madurai CPC Branch, East Aavani Moola Street, Tamil Nadu.

DRY TYPE TRANSFORMERS

Vacuum Switchgear Type VMX Spares Manual

ECS CONNECTION OF LARGE LV SERVICES TO SECONDARY DISTRIBUTION SUBSTATIONS

DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED. (A Govt of West Bengal Enterprise)

PART B: FINANCIAL BID

B.O.Q ELECTRICAL WORK OF CANARA BANK, BUDHARAJA BRANCH

TABLE OF CONTENTS. Important Notices Underground Plant Protection Information. Commercial/Industrial Information Sheet

2018 Consultant s Handbook Division 26 Electrical 2413 Switchboards

to UPS outgoing DB. c With 2 nos. 6 Sq.mm + 1 no. 2.5 Sq.mm. PVC insulated copper wire from UPS outgoing DB to CDB / Main panel to LDB /

University of Houston Master Construction Specifications Insert Project Name

TECHNICAL SPECIFICATION FOR SHACKLE HARDWARE FITTINGS SUITABLE FOR TENSION STRING TO BE USED FOR 11KV LINE

TENDER. Enq. No. IIITMK/ 0648/18 Date: 07/09/18 Due on:17/09/20183pm

SNO DESCRIPTION QTY UNIT RATE AMOUNT MAIN PUMP 1

: A N N E X U R E - "A" : (400KV Charanka substation) Supply of Major spares and devices

TECHNICAL SPECIFICATION OF 11KV SF6 / VCB METAL ENCLOSED, INDOOR (PANEL TYPE) / OUTDOOR RING MAIN UNIT (RMU). (IEC standard equipment)

UBC Technical Guidelines Section Edition Commissioning of Electrical Systems Page 1 of 5

Switchgear Skid, C1192


Medium Voltage Standby non-paralleling Control GUIDE FORM SPECIFICATION

Material Base Rate DISTRIBUTION TRANSFORMER MSEDCL. Three Phase Dist. Transformer 16 KVA, 11/0.43 KV No

APPENDIX C FACILITY ILLUSTRATION

Transcription:

NEPAL ELECTRICITY AUTHORITY (An Undertaking of Government of Nepal) PROJECT MANAGEMENT DIRECTORATE SASEC Power System Expansion Project Distribution System Augmentation and Expansion Project BIDDING DOCUMENT FOR Lot 2: Expansion of Distribution Networks in the Western Region of Nepal (Design, Supply and Install) Single-Stage, Two-Envelope Bidding Procedure Issued on: Invitation for Bids No.: ICB-PMD-DSAEP- 072/73-01, Lot 2 ICB No.: ICB-PMD-DSAEP- 072/73-01, Lot 2 Employer: Nepal Electricity Authority Country: Nepal VOLUME III OF III Distribution System Augmentation and Expansion Project Project Management Directorate Nepal Electricity Authority Shankhamul, Kathmandu Phone No: +977 1 4785217

Letter of Price Bid [Bidder s Letterhead] Date:... ICB No.:... Invitation for Bid No.:... To:... We, the undersigned, declare that: (a) (b) (c) (d) (e) (f) We have examined and have no reservations to the Bidding Document, including Addenda issued in accordance with Instructions to Bidders (ITB) 8; We offer to design, manufacture, test, deliver, install, precommission and commission in conformity with the Bidding Document the following Plant and Services:............... ; The total price of our Bid, excluding any discount offered in item (d) below is:..or, when left blank, is the Bid Price indicated in the Grand Summary. Our bid shall be valid for a period of... days from the date fixed for the submission deadline in accordance with the Bidding Documents, and it shall remain binding upon us and may be accepted at any time before the expiration of that period; If our bid is accepted, we commit to obtain a performance security in accordance with the Bidding Document; We have paid, or will pay the following commissions, gratuities, or fees with respect to the bidding process or execution of the Contract: ** Name of Recipient Address Reason Amount......................... (g) (h) We understand that this bid, together with your written acceptance thereof included in your notification of award, shall constitute a binding contract between us, until a formal contract is prepared and executed; and We understand that you are not bound to accept the lowest evaluated bid or any other bid that you may receive.

NEPAL ELECTRICITY AUTHORITY PROJECT MANAGEMENT DIRECTORATE Expansion of Distribution Networks in the Western Region of Nepal ICB-PMD DSAEP 072/73-01, Lot 2: Distribution Network Improvement Section 4-Bidding Forms Schedules of Rates and Prices Schedule No. 1 - Plant and Mandatory Spare Parts Supplied from Abroad Insurance, Clearing CIP Nepal Border (Excluding Taxes & Estimated forwarding & Taxes & Duties Country of Duties) Item Description Transportation to site Origin Unit Quantity FC LC LC Remarks FC Unit Rate Amount Unit Rate Amount 1 2 3 4 5 6 7 8=7*4 9 10=9*4 11 12 1. SUB STATION A. MATERIAL (SUB STATION) I. Supply and Delivery of Materials 1a. 33/11 kv, 3ph, 3 MVA Power Transformer including accessories complete Set 6 1b. 33/11 kv, 3ph, 6/8 MVA Power Transformer including accessories complete Set 6 2. Kiosk Box Set 12 3. 100 KVA, 33/0.4 kv St. Transformer including accessories complete Set 12 4. 33 kv Vacuum Circuit Breaker Set 26 5. 33 kv Disconnecting Switch with earth Switch including accessories complete Set 25 6. 33 kv Disconnecting Switch without earth Switch including accessories complete Set 35 7. 33 kv Lightning Arrestor including accessories complete Set 34 8. 33 kv Current Transformer including accessories complete,ratio of CT is according to Drawing. Set 26 9. 33 kv Potential Transformer including accessories complete Set 12 10. 33 kv Control and Relay Panel Set 26 11. 33 kv AVR and OLTC Panel including accessories complete Set 6 12. 33 kv Power Fuse Set 12 13. 33 kv Post Insulator including accessories complete Nos 21 14. 33 kv Outdoor Busbar with required insulators, all complete. Lot 12 15. 12 kv Incomer Vacuum Circuit Breaker with Control Panel & including PT, CT, ratio of CT is according to Drawing. Set 12 16. 12 kv Outgoing Vacuum Circuit Breaker with Control Panel l & including,ct ratio of CT is according to Drawing. Set 42 17. 12 kv Bus coupler including accessories complete & including PT,CT Set 0 18. 110 V Battery Charger Set 12 19. 240 Ah, 110 V Maintenance Free Battery including accessories complete Set 12 20. 12 kv Power Cable 1X400 sq. mm AL including accessories complete m 3600 a) Cable Termination Kit (Outdoor Type) Set 12 b) Cable Termination Kit (Indoor Type) Set 12 21. 12 kv Power Cable 1X150 sq. mm AL including accessories complete m 8400 a)cable Termination Kit (Outdoor Type) Set 41 b)cable Termination Kit (Indoor Type) Set 41 22. Control Cables including accessories complete Lot 12 23. Gantry Structure including accessories complete Ton 303

24. 1.5 Ton Air conditioners including accessories complete Set 48 25. 250 W Mercury Vapour Lamp including accessories complete Set 48 26. Steel Tubular Street Light Pole including accessories complete Nos 48 27. 11 m Steel tubular pole with channels, clamps and 9 kv Lightning Arrestor (including earthing) including accessories complete Set 39 28. 20" Color TV LCD including accessories complete Nos 12 29. AC/DC Disribution Board including accessories complete Nos 12 30. Lightning Mast including accessories complete Set 24 II. Spare parts & Maintenance Equipments/Instruments B.1 For Transformers B.1.1 33 kv Bushing with Current Transformers Nos 12 B.1.2 Dial type Thermometer Nos 12 B.2 For 33 kv Circuit Breaker B.2.1 Complete set of replacable vacuum chambers Nos 24 B.2.2 Bushing Nos 12 B.2.3 Tripping, closing and auxilliary coils Set 12 B.3 For 33 kv Disconnecting Switch B.3.1 Porcelain insulator Nos 24 B.3.2 Main contact assemblies including grounding blades Set 24 B.3.3 Auxilliary contacts Set 24 B.4 For 33 kv Control & Relay panel B.4.1 Indicating Lamps (No of Connected in 33kV Panel in one s/s) % 240 B.4.2 Fuse for each type (No of Connected in 33kV Panel in one s/s) % 240 B.4.3 Colour cap for each colour for indicating lamp (No of Connected in 33kV Panel in one s/s) % 480 B.4.4 Over current/earth fault relay Nos 12 B.5 For 12 kv Circuit Breakers B.5.1 Complete set of replacable vacuum chambers Nos 24 B.5.2 Tripping, closing and auxilliary coils Set 24 B.5.3 Indicating Lamps (No of Connected in 11kV Panel in one s/s) % 480 B.5.4 Fuse for each type (No of Connected in 11kV Panel in one s/s) % 480 B.5.5 Colour cap for each colour for indicating lamp (No of Connected in 11kV Panel in one s/s) % 960 B.5.6 Over current/earth fault relay Nos 12 B.5.7 Current Transformer (For incoming feeder) Nos 12 B.5.8 Current Transformer (For outgoing feeder) Nos 12 B.5.9 11 kv Potential Transformer Set 12 B.6 Mantenance Equipments/Instruments B.6.1 Laptop Nos 12 B.6.2 Multimeter (AC and DC) Nos 12 B.6.3 500 V Battery operated Meggar Nos 12 Total Base Cost 1A (I+II) 2. 33KV,11KV 0.4KVLINE,11/0.4 TRANSFORMER A. MATERIAL COST Ia. 33 KV line Construction (UG Cable line Construction) 1 33 KV, U/G, Single core, Aluminium,300 sq mm XLPE cable including complete acessories. rkm 15 2 36 kv, 630A straight through Joints indoor type including necessary parts set 5 3 33 KV outdoor XLPE Cable termination kit with complete accessories. set 1 4 Flexible Pipe/ Conduit for single core xlpe cable including complete acessories. rkm 15 5 30 kv Lightning Arrestor complete acessories. set 1 6 33 kv Power Fuse including complete acessories. set 1 7 36 kv,630a Cable Joint cabinet, above ground level, out door set 2 Ib. 33 KV line Construction (13 m Steel Telescopic pole, 0.1 sq in ACSR) 1 13 m long Steel Telescopic pole nos. 100 2 0.1 sq in ACSR Conductor kms. 13

3 33 KV pin Insulator set with spindle set 300 4 11 KV Disc Insulator nos. 288 5 Tension Set with ball & socket eye set 96 6 BackStrap for Insulator string (50x6x404) & nut-bolt nos. 48 7 Joint Sleeve(For Dog Aluminium &Steel ) set 6 8 Aluminium Binding Wire kg 30 9 Universal PG clamp (For dog Conductor) nos. 96 10 Stay Set Complete (Stay plate 600x600x6mm,Stay Rod 19 mm dia,turn Buckle.Stay eye bolt with nuts/washers. Thimble of suitable size,stay Clamp with NutboltsPreformed wire for Stay (suitable size)) set 16 11 Staywire kg 84 12 Stay Insulator nos. 16 13 Steel Cross arm( 3300x100x50x6mm) with suitable nutbolt set 150 14 Steel Cross Bracing angle (2872x50x50x6mm) with suitable pole clamp and nutbolt set 100 15 Steel Bracing angle (2416x50x50x6mm) with suitable pole clamp and nutbolt set 100 Ic. 33 KV line Construction (11m Steel Telescopic pole, 0.1 sq in ACSR) 1 11 m long Steel Telescopic pole nos. 2840 2 0.1 sq in ACSR Conductor kms. 447 3 33 KV pin Insulator set with spindle set 7242 4 11 KV Disc Insulator nos. 7668 5 Tension Set with ball & socket eye set 2556 6 BackStrap for Insulator string(50x6x404)&notbolt nos. 852 7 Joint Sleeve (For Dog Aluminium &Steel ) set 1278 8 Aluminium Binding Wire kg 3550 9 Universal PG clamp (For dog Conductor) nos. 2556 10 Stay Set Complete (Stay plate 600x600x6mm,Stay Rod 19 mm dia,turn Buckle.Stay eye bolt with nuts/washers. Thimble of suitable size,stay Clamp with NutboltsPreformed wire for Stay (suitable size)) set 1420 11 Staywire kg 7384 12 Stay Insulator nos. 1420 13 Steel Top Cross arm Channel (100x50x7.5x300 mm) with suitable pole clamp and nutbolt set 1988 14 Steel Cross arm (1900x100x50x7.5mm) and suitable pole clamp, nutbolt set 1988 15 Steel Cross Bracing Plate (40x6x760 mm) and pole clamp, nutbolt set 3976 16 Steel Cross arm( 3300x100x50x6mm) with suitable nutbolt set 852 17 Steel Cross Bracing angle( 2872x50x50x6mm) with suitable pole clamp and nutbolt set 852 18 Steel Bracing angle( 2416x50x50x6mm) with suitable pole clamp and nutbolt set 852 19 Steel Lattice Towers (Type of Tower is as per site condition) Ton 8 Total Base Cost I (a+b+c) IIa. 11 KV line Construction (UG Cable) 1 12 KV,U/G, Single core, Aluminium,300 sq mm XLPE cable including complete acessories. rkm 12 2 12kV,630A straight through Joints indoor type including necessary parts set 4 3 11 KV outdoor XLPE Cable termination kit with complete accessories. set 8 4 Flexible Pipe/ Conduit for single core xlpe cable including complete acessories. rkm 12 5 10 kv Lightning Arrestor complete acessories. set 4 6 11 kv Power Fuse including complete acessories. set 4 7 12 kv, 630A Cable Joint cabinet, above ground level, out door type,including necessary parts set 4

IIb. 11 KV line Construction (PSC pole, 0.12Sq inch Covered Conductor) 1 11 m long PSC pole nos. 140 2 0.12Sq inch Covered Conductor kms. 22 3 11 KV pin Insulator set with spindle set 357 4 11 KV Disc Insulator nos. 126 5 Tension Set with ball & socket eye set 126 6 BackStrap for Insulator string(50x6x404)&notbolt nos. 63 7 Covered Conductor Accessories a Dead End Clamp nos 168 b Performed Ties nos 441 c Insulated Universal Piercing Connectors nos 168 d Mid span Insulated Joining Sleeve nos 63 e Insulated End Cap nos 42 8 Stay Set Complete (Stay plate 600x600x6mm,Stay Rod 19 mm dia,turn Buckle.Stay eye bolt with nuts/washers. Thimble of suitable size,stay Clamp with NutboltsPreformed wire for Stay (suitable size)) set 70 9 Staywire kg 364 10 Stay Insulator nos. 70 11 Steel Top Cross arm Channel (100x50x7.5x300 mm) with suitable pole clamp and nutbolt set 98 12 Steel Cross arm(1200x100x50x50x6mm) with pole clamp and nutbolt set 98 13 Steel Cross bracing Flat (40x6x660 mm) and pole clamp, nutbolt set 196 14 Steel Cross arm(2390x100x50x50x6mm) with suitable nutbolt set 42 15 Steel Cross Bracing angle 2723x50x50x6mm) with pole clamp and nutbolt set 42 16 Steel Bracing angle( 2071x50x50x6mm) with pole clamp and nutbolt set 42 17 Upset Steel Cross arm (1700x100x50x50x6mm), bracing Flat (40x6x877mm) with suitable nutbolt set 1 IIc. 11 KV line Construction (PSC pole, ABC cable (3 150 mm2 + 50 mm2 ) 1 11 m long PSC pole nos. 168 2 11 k V ABC cable (3 150 mm 2 + 50 mm 2 ) km 8 1.0 HV ABC Acessories 1.1 Anchor clamp for messenger 50 sq mm with bracket for 150 sq mm ABC nos 70 1.2 Suspension clamp for messenger 50 sq mm with bracket for 150 sq mm ABC nos 98 1.3 Insulated Cable Caps for 150 sq mm nos 42 1.4 Cable connector for 150 sq mm (Jointing Sleeves) nos 56 1.5 Insulated Piercing Connectors 150 sq mm nos 56 1.6 Insulated Tension Joining Sleeve nos 21 1.7 Junction Sleeve for 50 sq mm messenger wire nos 21 2.1 Termination Kit nos 35 2.1 Pole Bracket nos 168 2.1 GI Support Hook nos 168 2.1 Eye Hook nos 182 3.1 Stay Set Complete (Stay plate 600x600x6mm,Stay Rod 19 mm dia,turn Buckle.Stay eye bolt with nuts/washers. Thimble of suitable size,stay Clamp with NutboltsPreformed wire for Stay (suitable size)) set 56 3.2 Staywire kg 364 3.3 Stay Insulator nos. 56 IId. 11 KV line Construction (PSC pole, 0.1 sq in ACSR) 1 11 m long PSC pole nos. 680 2 0.1 sq in ACSR Conductor kms. 107 3 11KV pin Insulator set with spindle set 1734 4 11 KV Disc Insulator nos. 612 5 Tension Set with ball & socket eye set 612 6 BackStrap for Insulator string(50x6x404)&notbolt nos. 306 7 Joint Sleeve(For Dog Aluminium &Steel ) set 306

8 Aluminium Binding Wire kg 850 9 Universal PG clamp (For dog Conductor) nos. 612 10 Stay Set Complete (Stay plate 600x600x6mm,Stay Rod 19 mm dia,turn Buckle.Stay eye bolt with nuts/washers. Thimble of suitable size,stay set 340 Clamp with NutboltsPreformed wire for Stay (suitable size)) 11 Staywire kg 1768 12 Stay Insulator nos. 340 13 Steel Top Cross arm Channel (100x50x7.5x300 mm) with suitable pole clamp and nutbolt set 476 14 Steel Cross arm(1200x100x50x50x6mm) with suitable pole clamp and nutbolt set 476 15 Steel Cross bracing Flat (40x6x660 mm) and pole clamp, nutbolt set 952 16 Steel Cross arm(2390x100x50x6mm) with suitable pole clamp and nutbolt set 204 17 Steel Bracing angle( 2723x50x50x6mm) with suitable pole clamp and nutbolt set 204 18 Steel Bracing angle( 2071x50x50x6mm) with pole clamp and nutbolt set 204 19 Upset Steel Cross arm(1700x100x50x50x6mm), bracing Flat (40x6x877mm)with suitable nutbolt set 5 IIe. 11 KV line Construction (TP pole, 0.1 sq in ACSR) 1 11 m long steel tubular pole nos. 2180 2 0.1 sq in ACSR Conductor kms. 343 3 11 KV pin Insulator set with spindle set 5559 4 11 KV Disc Insulator nos. 1962 5 Tension Set with ball & socket eye set 1962 6 BackStrap for Insulator string(50x6x404)&notbolt nos. 981 7 Joint Sleeve(For Dog Aluminium &Steel ) set 981 8 Aluminium Binding Wire kg 2725 9 Universal PG clamp (For dog Conductor) nos. 1962 10 Stay Set Complete (Stay plate 600x600x6mm,Stay Rod 19 mm dia,turn Buckle.Stay eye bolt with nuts/washers. Thimble of suitable size,stay Clamp with NutboltsPreformed wire for Stay (suitable size)) set 1090 11 Staywire kg 5668 12 Stay Insulator nos. 1090 13 Steel Top Cross arm Channel (100x50x7.5x300 mm) with suitable pole clamp and nutbolt set 1526 14 Steel Cross arm(1200x100x50x50x6mm),include suitable pole clamp and nutbolt set 1526 15 Steel Cross bracing Flat (40x6x660 mm) and pole clamp, nutbolt set 3052 16 Steel Cross arm(2390x100x50x50x6mm) with suitable pole clamp and nutbolt set 654 17 Steel Cross Bracing angle( 2723x50x50x6mm) with pole clamp and nutbolt set 654 18 Steel Bracing angle( 2071x50x50x6mm) with pole clamp and nutbolt set 654 19 Upset Steel Cross arm(1700x100x50x50x6mm), bracing Flat (40x6x877mm)with suitable nutbolt set 9 Total Base Cost II (a+b+c+d+e) IIIa. 0.4KV line Construction (COMPOSITE ABC 95MM2, PSC, TP) 1 Suspension set including steel band or pigtail for LV ABC Cable Nos 1220 2 Tension Set including steel band or pigtail for LV ABC Cable Nos 305 3 ABC3x95 +50 sq mm Km 64 4 cable connector Nos 4270 IIIb. 0.4KV line Construction (PSC, ABC 70MM2 ) 1 9m PSC pole Nos 625 2 Suspension set including steel bandor pigtail for LV ABC Cable Nos 500 3 Tension Set including steel band for or pigtail for LV ABC Cable Nos 125 4 ABC 4x70 sq mm Km 26

5 cable connector Nos 1750 6 Stay Set Complete set 250 7 7/12 SWG Stay Wire kg 1300 IIIc. 0.4KV line Construction (TP, ABC 70MM2 ) 1 9m steel tubular pole Nos 2225 2 Suspension set including steel band or pigtail for LV ABC Cable Nos 1780 3 Tension Set including steel band or pigtail for LV ABC Cable Nos 445 4 ABC 4x70 sq mm Km 93 5 cable connector Nos 6230 6 Stay Set Complete set 890 7 7/12 SWG Stay Wire kg 4628 Total Base Cost III(a+b+c) IVa. 11/0.4KV Transformer Installation (300KVA ) 1 11/.04 kv 300 kva 3 phase Transformer Nos 7 2 Design & Supply of Transformer Plateform for 300kva Transformer include DO,LA fitting Chanels, Clamps,Nutbolts set 7 3 9 kv L.A. ( 3 nos. per setno-3 set 7 4 D.O. fuse ( 3 nos. per set set 7 5 Earthing set set 14 6 400/230 V LT 1 Core,120 sq mm Aluminium, PVC Insulated Cable. m 175 7 Outdoor Distribution Panel Board with 500 A, TP-1, 250 A, TP-2 with copper busbar and hardware complete set for 300 kva Transformer Nos 7 IVb. 11/0.4KV Transformer Installation (200KVA ) 1 11/.04 kv 200 kva 3 phase Transformer Nos 22 2 Design & Supply of Transformer Plateform for 200kva Transformer include DO,LA fitting Chanels, Clamps,Nutbolts set 22 3 9 kv L.A. ( 3 nos. per setno-3 set 22 4 D.O. fuse ( 3 nos. per set set 22 5 Earthing set set 44 6 400/230 V LT 1 Core,120 sq mm Aluminium, PVC Insulated Cable. m 550 7 Outdoor Distribution Panel Board with 300 A, TP-1, 150 A, TP-2 with copper busbar and hardware complete set for 200 kva Transformer Nos 22 IVc. 11/0.4KV Transformer Installation (100KVA ) 1 11/.04 kv 100 kva 3 phase Transformer Nos 153 2 Design & Supply of Transformer Plateform for 100kva Transformer include DO,LA fitting Chanels, Clamps,Nutbolts set 153 3 9 kv L.A. ( 3 nos. per set) set 153 4 D.O. fuse ( 3 nos. per set) set 153 5 Earthing set set 306 6 400/230 V LT 1 Core,120 sq mm Aluminium, PVC Insulated Cable. m 3825 7 Outdoor Distribution Panel Board with 150 A, TP-1, 75 A, TP-2 with copper busbar and hardware complete set for 100 kva Transformer Nos 153 Total Base Cost IV(a+b+c) Total Base Cost 2A(I+II+III+IV) Total (1A+2A) Column 8 &10 to be carried forward to Scheddule No. 5. Grand Summary Name of Bidder Signature of Bidder

NEPAL ELECTRICITY AUTHORITY PROJECT MANAGEMENT DIRECTORATE Expansion of Distribution Networks in the Western Region of Nepal ICB-PMD DSAEP 072/73-01, Lot 2: Distribution Network Improvement Section 4-Bidding Forms Schedule No.2 - Plant and Mandatory Spare Parts Supplied from Within the Employer's Country Item Description Schedules of Rates and Prices Estimated Taxes & Duties Origin Unit Quantity LC LC LC LC Unit Rate Amount Unit Rate Amount 1 2 3 4 5 6 7 8=7*4 9 10=9*4 11 12 1. SUB STATION A. MATERIAL COST (SUB STATION ) I. Supply and Delivery of Materials 1a. 33/11 kv, 3ph, 3MVA Power Transformer including accessories complete Set 6 1b. 33/11 kv, 3ph, 6/8 MVA Power Transformer including accessories complete Set 6 2. Kiosk Box Set 12 3. 100 KVA, 33/0.4 kv St. Transformer including accessories complete Set 12 4. 33 kv Vacuum Circuit Breaker Set 26 5. 33 kv Disconnecting Switch with earth Switch including accessories complete Set 25 6. 33 kv Disconnecting Switch without earth Switch including accessories complete Set 35 7. 33 kv Lightning Arrestor including accessories complete Set 34 8. 33 kv Current Transformer including accessories complete Set 26 9. 33 kv Potential Transformer including accessories complete Set 12 10. 33 kv Control and Relay Panel Set 26 11. 33 kv AVR and OLTC Panel including accessories complete Set 6 12. 33 kv Power Fuse Set 12 13. 33 kv Post Insulator including accessories complete Nos 21 14. 33 kv Outdoor Busbar with required insulators, all complete. Lot 12 15. 12 kv Incomer Vacuum Circuit Breaker with Control Panel & including PT,CT Set 12 16. 12 kv Outgoing Vacuum Circuit Breaker with Control Panel l & including,ct Set 42 17. 12 kv Bus coupler including accessories complete & including PT,CT Set 0 18. 110 V Battery Charger Set 12 19. 240 Ah, 110 V Maintenance Free Battery including accessories complete Set 12 20. 12 kv Power Cable 1X400 sq. mm AL including accessories complete m 3600 a)cable Termination Kit (Outdoor Type) Set 12 b)cable Termination Kit (Indoor Type) Set 12 21. 12 kv Power Cable 1X150 sq. mm AL including accessories complete m 8400 a)cable Termination Kit (Outdoor Type) Set 41 b)cable Termination Kit (Indoor Type) Set 41 22. Control Cables including accessories complete Lot 12 23. Gantry Structure including accessories complete Ton 303 24. 1.5 Ton Air conditioners including accessories complete Set 48 25. 250 W Mercury Vapour Lamp including accessories complete Set 48 26. Steel Tubular Street Light Pole including accessories complete Nos 48 27. 11 m Steel tubular pole with channels, clamps and 9 kv Lightning Arrestor (including earthing) including accessories complete Set 39 28. 20" Color TV LCD including accessories complete Nos 12 29. AC/DC Disribution Board including accessories complete Nos 12 30. Lightning Mast including accessories complete Set 24 Country of EXW Price (Excluding Taxes & Duties) Insurance & Transportation to site Remarks

II. Spare parts & Maintenance Equipments/Instruments B.1 For Transformers B.1.1 33 kv Bushing with Current Transformers Nos 12 B.1.2 Dial type Thermometer Nos 12 B.2 For 33 kv Circuit Breaker B.2.1 Complete set of replacable vacuum chambers Nos 24 B.2.2 Bushing Nos 12 B.2.3 Tripping, closing and auxilliary coils Set 12 B.3 For 33 kv Disconnecting Switch B.3.1 Porcelain insulator Nos 24 B.3.2 Main contact assemblies including grounding blades Set 24 B.3.3 Auxilliary contacts Set 24 B.4 For 33 kv Control & Relay panel B.4.1 Indicating Lamps (No of Connected in 33kV Panel in one s/s) % 240 B.4.2 Fuse for each type (No of Connected in 33kV Panel in one s/s) % 240 B.4.3 Colour cap for each colour for indicating lamp (No of Connected in 33kV Panel in one s/s) % 480 B.4.4 Over current/earth fault relay Nos 12 B.5 For 12 kv Circuit Breakers B.5.1 Complete set of replacable vacuum chambers Nos 24 B.5.2 Tripping, closing and auxilliary coils Set 24 B.5.3 Indicating Lamps (No of Connected in 11kV Panel in one s/s) % 480 B.5.4 Fuse for each type (No of Connected in 11kV Panel in one s/s) % 480 B.5.5 Colour cap for each colour for indicating lamp (No of Connected in 11kV Panel in one s/s) % 960 B.5.6 Over current/earth fault relay Nos 12 B.5.7 Current Transformer (For incoming feeder) Nos 12 B.5.8 Current Transformer (For outgoing feeder) Nos 12 B.5.9 11 kv Potential Transformer Set 12 B.6 Mantenance Equipments/Instruments B.6.1 Laptop Nos 12 B.6.2 Multimeter (AC and DC) Nos 12 B.6.3 500 V Battery operated Meggar Nos 12 Total Base Cost 1A(I+II) 2. 33KV,11KV 0.4KVLINE,11/0.4 TRANSFORMER A. MATERIAL COST Ia. 33 KV line Construction (UG Cable line Construction) 1 33 KV,U/G, Single core, Aluminium,300 sq mm XLPE cable including complete acessories. rkm 15 2 36 kv,630a straight through Joints indoor type including necessary parts set 5 3 33 KV outdoor XLPE Cable termination kit with complete accessories. set 1 4 Flexible Pipe/ Conduit for single core xlpe cable including complete acessories. rkm 15 5 30 kv Lightning Arrestor complete acessories. set 1 6 33 kv Power Fuse including complete acessories. set 1 7 36 kv,630a Cable Joint cabinet, above ground level, out door type,including necessary parts set 2 Ib. 33 KV line DC Construction (13 m Steel Telescopic pole, 0.1 sq in ACSR) 1 13 m long Steel Telescopic pole nos. 100 2 0.1 sq in ACSR Conductor kms. 13 3 33 KV pin Insulator set with spindle set 300 4 11 KV Disc Insulator nos. 288 5 Tension Set with ball & socket eye set 96 6 BackStrap for Insulator string(50x6x404)&notbolt nos. 48 7 Joint Sleeve(For Dog Aluminium &Steel ) set 6 8 Aluminium Binding Wire kg 30

9 Universal PG clamp (For dog Conductor) nos. 96 10 Stay Set Complete (Stay plate 600x600x6mm,Stay Rod 19 mm dia,turn Buckle.Stay eye bolt with nuts/washers. Thimble of suitable size,stay Clamp with NutboltsPreformed wire set 16 for Stay (suitable size)) 11 Staywire kg 84 12 Stay Insulator nos. 16 13 Steel Cross arm( 3300x100x50x6mm) with suitable nutbolt set 150 14 Steel Cross Bracing angle( 2872x50x50x6mm) with suitable pole clamp and nutbolt set 100 15 Steel Bracing angle( 2416x50x50x6mm) with suitable pole clamp and nutbolt set 100 Ic. 33 KV line Construction (11m Steel Telescopic pole, 0.1 sq in ACSR) 1 11 m long Steel Telescopic pole nos. 2840 2 0.1 sq in ACSR Conductor kms. 447 3 33 KV pin Insulator set with spindle set 7242 4 11 KV Disc Insulator nos. 7668 5 Tension Set with ball & socket eye set 2556 6 BackStrap for Insulator string(50x6x404)&notbolt nos. 852 7 Joint Sleeve(For Dog Aluminium &Steel ) set 1278 8 Aluminium Binding Wire kg 3550 9 Universal PG clamp (For dog Conductor) nos. 2556 10 Stay Set Complete (Stay plate 600x600x6mm,Stay Rod 19 mm dia,turn Buckle.Stay eye bolt with nuts/washers. Thimble of suitable size,stay Clamp with NutboltsPreformed wire set 1420 for Stay (suitable size)) 11 Staywire kg 7384 12 Stay Insulator nos. 1420 13 Steel Top Cross arm Channel (100x50x7.5x300 mm) with suitable pole clamp and nutbolt set 1988 14 Steel Cross arm(1900x100x50x7.5mm) and suitable pole clamp, nutbolt set 1988 15 Steel Cross Bracing Plate (40x6x760 mm) and pole clamp, nutbolt set 3976 16 Steel Cross arm( 3300x100x50x6mm) with suitable nutbolt set 852 17 Steel Cross Bracing angle( 2872x50x50x6mm) with suitable pole clamp and nutbolt set 852 18 Steel Bracing angle( 2416x50x50x6mm) with suitable pole clamp and nutbolt set 852 19 Steel Lattice Towers(Type of Tower is as per site condition) Ton 8 Total Base Cost I(a+b+c) IIa. 11 KV line Construction (UG Cable) 1 12 KV,U/G, Single core, Aluminium,300 sq mm XLPE cable including complete acessories. rkm 12 2 12kV,630A straight through Joints indoor type including necessary parts set 4 3 11 KV outdoor XLPE Cable termination kit with complete accessories. set 8 4 Flexible Pipe/ Conduit for single core xlpe cable including complete acessories. rkm 12 5 10 kv Lightning Arrestor complete acessories. set 4 6 11 kv Power Fuse including complete acessories. set 4 7 12 kv,630a Cable Joint cabinet, above ground level, out door type,including necessary parts set 4 IIb. 11 KV line Construction (PSC pole, 0.12Sq inch Covered Conductor) 1 11 m long PSC pole nos. 140 2 0.12Sq inch Covered Conductor kms. 22 3 11 KV pin Insulator set with spindle set 357 4 11 KV Disc Insulator nos. 126 5 Tension Set with ball & socket eye set 126 6 BackStrap for Insulator string(50x6x404)&notbolt nos. 63 7 Covered Conductor Accessories a Dead End Clamp nos 168 b Performed Ties nos 441 c Insulated Universal Piercing Connectors nos 168 d Mid span Insulated Joining Sleeve nos 63

e Insulated End Cap nos 42 8 Stay Set Complete (Stay plate 600x600x6mm,Stay Rod 19 mm dia,turn Buckle.Stay eye bolt with nuts/washers. Thimble of suitable size,stay Clamp with NutboltsPreformed wire set 70 for Stay (suitable size)) 9 Staywire kg 364 10 Stay Insulator nos. 70 11 Steel Top Cross arm Channel (100x50x7.5x300 mm) with suitable pole clamp and nutbolt set 98 12 Steel Cross arm(1200x100x50x50x6mm) with pole clamp and nutbolt set 98 13 Steel Cross bracing Flat (40x6x660 mm) and pole clamp, nutbolt set 196 14 Steel Cross arm(2390x100x50x50x6mm) with suitable nutbolt set 42 15 Steel Cross Bracing angle 2723x50x50x6mm) with pole clamp and nutbolt set 42 16 Steel Bracing angle( 2071x50x50x6mm) with pole clamp and nutbolt set 42 17 Upset Steel Cross arm (1700x100x50x50x6mm), bracing Flat (40x6x877mm) with suitable nutbolt set 1 IIc. 11 KV line Construction (PSC pole, ABC cable (3 150 mm2 + 50 mm2 ) 1 11 m long PSC pole nos. 168 2 11 k V ABC cable (3 150 mm 2 + 50 mm 2 ) km 8 1.0 HV ABC Acessories 1.1 Anchor clamp for messenger 50 sq mm with bracket for 150 sq mm ABC nos 70 1.2 Suspension clamp for messenger 50 sq mm with bracket for 150 sq mm ABC nos 98 1.3 Insulated Cable Caps for 150 sq mm nos 42 1.4 Cable connector for 150 sq mm (Jointing Sleeves) nos 56 1.6 Insulated Piercing Connectors 150 sq mm nos 56 1.7 Insulated Tension Joining Sleeve nos 21 1.9 Junction Sleeve for 50 sq mm messenger wire nos 21 2.0 Termination Kit nos 35 2.2 Pole Bracket nos 168 2.3 GI Support Hook nos 168 2.5 Eye Hook nos 182 3.1 Stay Set Complete (Stay plate 600x600x6mm,Stay Rod 19 mm dia,turn Buckle.Stay eye bolt with nuts/washers. Thimble of suitable size,stay Clamp with NutboltsPreformed wire set 56 for Stay (suitable size)) 3.2 Staywire kg 364 3.3 Stay Insulator nos. 56 IId. 11 KV line Construction(PSC pole, 0.1 sq in ACSR) 1 11 m long PSC pole nos. 680 2 0.1 sq in ACSR Conductor kms. 107 3 11KV pin Insulator set with spindle set 1734 4 11 KV Disc Insulator nos. 612 5 Tension Set with ball & socket eye set 612 6 BackStrap for Insulator string(50x6x404)&notbolt nos. 306 7 Joint Sleeve(For Dog Aluminium &Steel ) set 306 8 Aluminium Binding Wire kg 850 9 Universal PG clamp (For dog Conductor) nos. 612 10 Stay Set Complete (Stay plate 600x600x6mm,Stay Rod 19 mm dia,turn Buckle.Stay eye bolt with nuts/washers. Thimble of suitable size,stay Clamp with NutboltsPreformed wire set 340 for Stay (suitable size)) 11 Staywire kg 1768 12 Stay Insulator nos. 340 13 Steel Top Cross arm Channel (100x50x7.5x300 mm) with suitable pole clamp and nutbolt set 476 14 Steel Cross arm(1200x100x50x50x6mm) with suitable pole clamp and nutbolt set 476 15 Steel Cross bracing Flat (40x6x660 mm) and pole clamp, nutbolt set 952 16 Steel Cross arm(2390x100x50x6mm) with suitable pole clamp and nutbolt set 204 17 Steel Bracing angle( 2723x50x50x6mm) with suitable pole clamp and nutbolt set 204 18 Steel Bracing angle( 2071x50x50x6mm) with pole clamp and nutbolt set 204

19 Upset Steel Cross arm(1700x100x50x50x6mm), bracing Flat (40x6x877mm)with suitable nutbolt set 5 IIe. 11 KV line Construction (TP pole, 0.1 sq in ACSR) 1 11 m long steel tubular pole nos. 2180 2 0.1 sq in ACSR Conductor kms. 343 3 11 KV pin Insulator set with spindle set 5559 4 11 KV Disc Insulator nos. 1962 5 Tension Set with ball & socket eye set 1962 6 BackStrap for Insulator string(50x6x404)&notbolt nos. 981 7 Joint Sleeve(For Dog Aluminium &Steel ) set 981 8 Aluminium Binding Wire kg 2725 9 Universal PG clamp (For dog Conductor) nos. 1962 10 Stay Set Complete (Stay plate 600x600x6mm,Stay Rod 19 mm dia,turn Buckle.Stay eye bolt with nuts/washers. Thimble of suitable size,stay Clamp with NutboltsPreformed wire set 1090 for Stay (suitable size)) 11 Staywire kg 5668 12 Stay Insulator nos. 1090 13 Steel Top Cross arm Channel (100x50x7.5x300 mm) with suitable pole clamp and nutbolt set 1526 14 Steel Cross arm(1200x100x50x50x6mm),include suitable pole clamp and nutbolt set 1526 15 Steel Cross bracing Flat (40x6x660 mm) and pole clamp, nutbolt set 3052 16 Steel Cross arm(2390x100x50x50x6mm) with suitable pole clamp and nutbolt set 654 17 Steel Cross Bracing angle( 2723x50x50x6mm) with pole clamp and nutbolt set 654 18 Steel Bracing angle( 2071x50x50x6mm) with pole clamp and nutbolt set 654 19 Upset Steel Cross arm(1700x100x50x50x6mm), bracing Flat (40x6x877mm)with suitable nutbolt set 9 Total Base Cost II(a+b+c+d+e) IIIa. 0.4KV line Construction (COMPOSITE ABC 95MM2, PSC, TP) 1 Suspension set including steel band or pigtail for LV ABC Cable nos 1220 2 Tension Set including steel band or pigtail for LV ABC Cable nos 305 3 ABC3x95 +50 sq mm Km 64 4 cable connector nos 4270 IIIb. 0.4KV line Construction (PSC, ABC 70MM2) 1 9m PSC pole nos 625 2 Suspension set including steel band or pigtail for LV ABC Cable nos 500 3 Tension Set including steel band or pigtail for LV ABC Cable nos 125 4 ABC 4x70 sq mm Km 26 5 cable connector nos 1750 6 Stay Set Complete set 250 7 7/12 SWG Stay Wire kg 1300 IIIc. 0.4KV line Construction (TP, ABC 70MM2) 1 9m steel tubular pole nos 2225 2 Suspension set including steel bandor pigtail for LV ABC Cable nos 1780 3 Tension Set including steel band or pigtail for LV ABC Cable nos 445 4 ABC 4x70 sq mm Km 93 5 cable connector nos 6230 6 Stay Set Complete set 890 7 7/12 SWG Stay Wire kg 4628 Total Base Cost III(a+b+c) IVa. 11/0.4KV Transformer Installation (300KVA) 1 11/.04 kv 300 kva 3 phase Transformer nos 7

2 Design & Supply of Transformer Plateform for 300kva Transformer include DO,LA fitting Chanels, Clamps,Nutbolts set 7 3 9 kv L.A. ( 3 nos. per set) set 7 4 D.O. fuse ( 3 nos. per set) set 7 5 Earthing set set 14 6 400/230 V LT 1 Core,120 sq mm Aluminium, PVC Insulated Cable. m 175 7 Outdoor Distribution Panel Board with 500 A, TP-1, 250 A, TP-2 with copper busbar and hardware complete set for 300 kva Transformer nos 7 IVb. 11/0.4KV Transformer Installation (200KVA) 1 11/.04 kv 200 kva 3 phase Transformer nos 22 2 Design & Supply of Transformer Plateform for 200kva Transformer include DO,LA fitting Chanels, Clamps,Nutbolts set 22 3 9 kv L.A. ( 3 nos. per set) set 22 4 D.O. fuse ( 3 nos. per set) set 22 5 Earthing set set 44 6 400/230 V LT 1 Core,120 sq mm Aluminium, PVC Insulated Cable. m 550 7 Outdoor Distribution Panel Board with 300 A, TP-1, 150 A, TP-2 with copper busbar and hardware complete set for 200 kva Transformer nos 22 IVc. 11/0.4KV Transformer Installation (100KVA) 1 11/.04 kv 100 kva 3 phase Transformer nos 153 2 Design & Supply of Transformer Plateform for 100kva Transformer include DO,LA fitting Chanels, Clamps,Nutbolts set 153 3 9 kv L.A. ( 3 nos. per set) set 153 4 D.O. fuse ( 3 nos. per set) set 153 5 Earthing set set 306 6 400/230 V LT 1 Core,120 sq mm Aluminium, PVC Insulated Cable. m 3825 7 Outdoor Distribution Panel Board with 150 A, TP-1, 75 A, TP-2 with copper busbar and hardware complete set for 100 kva Transformer nos 153 Total Base Cost IV (a+b+c) Total Base Cost 2A (I+II+III+IV) Total (1A+2A) Column 8 to be carried forward to Scheddule No. 5. Grand Summary Name of Bidder Signature of Bidder

NEPAL ELECTRICITY AUTHORITY PROJECT MANAGEMENT DIRECTORATE Expansion of Distribution Networks in the Western Region of Nepal ICB- PMD DSAEP 072/73-01, Lot 2: Distribution Network Improvement Section 4-Bidding Forms Schedule No. 3 - Design Services Item Description Unit Quantity Schedules of Rates and Prices 1 2 3 4 5 6 7=4*5 8=4*6 9 1 Preconstruction Survey, Design & Drawing 33KV, 11KV Transmission Line km 312 2 As built drawing, testing/commissioning complete 33KV, 11KV Transmission Line km 312 3 Preconstruction Survey, Design & Drawing 33/11KV Sub Station set 12 4 As built drawing, testing/commissioning complete 33/11KV Sub Station set 12 Total Column 7 and 8 to be carried forward to Scheddule No. 5. Grand Summary LC Unit Price FC LC Total Price FC Remarks Name of Bidder Signature of Bidder

NEPAL ELECTRICITY AUTHORITY PROJECT MANAGEMENT DIRECTORATE Expansion of Distribution Networks in the Western Region of Nepal ICB-PMD DSAEP 072/73-01, Lot 2: Distribution Network Improvement Section 4-Bidding Forms Schedule No.4 - Installation and Other Services Item Description Unit LC FC LC FC 1 2 3 4 5 6 7=4*5 8=4*6 9 1. SUB STATION B. Civil Construction and Installation cost (SUB STATION) I. Installation, Testing and Comissioning of Electrical Goods 1. Installation, Testing and comissioning of 3 MVA, 6/8 MVA,33/11 kv Power Transformer including accessories complete Set 12 2. Installation, Testing and comissioning of 100 KVA,33/0.4 kv Station Transformer including accessories complete Set 12 3. Installation of incoming,outgoing,busbar Gantry including accessories complete Set 48 4. 5. 6. 7. 8. 9. 10. Installation of 33 kv Vacuum Circuit Breaker,including installation suport Gantry all complete Installation of 33 Kv Disconnecting Switch with and without earth switch,including installation suport Gantry all complete Installation of 33 kv Lightning Arrestor,including installation suport Gantry all complete Installation of 33 kv Current Transformer,including installation suport Gantry all complete Installation of 33 kv Post Insulator,including installation suport Gantry all complete Installation of 33 kv Potential Transformer,including installation suport Gantry all complete Installation of 33 kv Control and Relay Panel,Tr. Panel including accessories complete Set 26 Set 63 Set 35 Set 26 Set 22 Set 12 Set 26 11. Installation of 33 kv AVR and OLTC Panel including accessories complete Set 4 Schedules of Rates and Prices Quantity 12. Installation of 33 kv power Fuse including installation suport Gantry all complete Lot 12 13. Constuction of 33 kv Over head Busbar using "Bear" Conductor,bay bar including accessories complete Set 12 14. Installation, Testing and Comissioning of 12 kv Circuit Breaker with Control panel and Bus coupler including accessories complete Set 52 15. Installation of 110 V Battery and Battery Charger including accessories complete m 12 16. 12 kv Cable laying works Set 11800 Unit Price Total Price Remarks

17. 12 kv Cable jointing Works including accessories complete Set 106 18. Installation of 1.5 Ton Air conditioners Nos 48 19. Installation of Street Light Pole with concreting including accessories complete Nos 48 20. Installation of 11m Steel Tubular Pole with concreting including accessories complete Nos 76 21. Installation of Kiosk Box including accessories complete Set 12 22. Installation of AC/DC Distribution Board Set 12 23. Installation of Lightning Mast including accessories complete Lot 24 24. Earthing Works including Supply materials & accessories complete Lot 12 25. Preconstruction Survey,Design & Drawing Lot 12 26. As built drawing,testing/comissioning complete Lot 12 II. Erection of Supplied Materials and Civil Works 1. Concrete foundation for Gantry column all complete (1 set=2vertical+1horizontal) Set 48 2. Concrete foundation for 33 kv Vacuum Circuit Breaker all complete Set 26 3. Concrete foundation for 33 kv Disconnecting Switch all complete Set 60 4. Concrete foundation for 33 kv Lightning Arrestor all complete Set 34 5. Concrete foundation for 33 kv Current Transformer all complete Set 26 6. Concrete foundation for 33 kv Potential Transformer all complete Set 12 8. Concrete foundation for 33 kv Post Insulator all complete Set 23 9. Cable trench: all type all complete Rm 770 9 Water pump pit along with supply and installation of Single phase motor, 1 HP Self priming, multistage motor complete Set 12 10 Surface dressing with crushed stone all complete Lot 12 11 Side Preperation, Soil Test all complete Lot 12 12 Concrete foundation for 3 MVA, 6/8 MVA,33/11 kv Power Transformer Lot 12 13 Concrete foundation for 100 KVA,33/0.4 kv Station Transformer Lot 12 14 Concrete foundation for Lightning Mast Lot 24 III. Civil works for Control Building 1 Earth work in excavation cum 15890 2 Earth filling work in proper grade and rammer with road roller or with rammer as per site requirement cum 32000 3 Back filling work from excavated materials cum 15890 4 Sand filling works cum 1300 5 One layer flat brick work sq m 12220 6 PCC 1:1.5:3 cum 2010 7 PCC 1:3:6 cum 1300 8 Boulder filling work with compaction work cum 702 9 Brick aggregate filling works with compaction cum 130 10 Crushed stone filling work with compaction work cum 1540 11 First class brick masonary work in 1:4 c/s mortar cum 3900 12 Stone masonary work 1:4 c/s mortar cum 5200 13 20mm thick 1:4 c/s mortar plaster work Sqm 3900 14 12.5mm thick 1:4 c/s mortar plaster work Sqm 22360 15 Double coat snowcem paint work Sqm 20800 16 Double coat distamper work Sqm 20800 17 Formwork Sqm 13000 18 20 mm thick terrazzo tiles of approved color on 25mm average selting bed of (1:4) c/s mortar Sqm 3900 19 Sal wood work in

* Chaukhat (100 mm X 75 mm) cum 82 * Panel in door (thickness 38mm) Sqm 1030 * Panel with glass (thickness of glass 4mm & frame 38X75 mm) Sqm 2580 20 Aluminium works *main door in two side hung shutter & with double pannel of 6 mm thick glass ( 101 X 45X1.8mm) swing door Sqm 60 *other doors in single hung shutter & with double pannel ( 101 X 45X1.8mm) swing door Sqm 120 *Aluminium sliding window (two track) with mesh WA (88x38x1.3 mm) Sqm 300 *Aluminium fixed window for battery room Sqm 7.2 21 Rolling shutter door (3mX2.5m) Sqm 90 22 3 or more coat enamel paint work Sqm 4576 23 Reinforcement work Kg 208000 24 Ventilation (9" exhaust fan) nos 52 25 50mm medium G.I. Pipe rm 4184 26 Cap plate (65x65x5) nos 1296 27 12 gauge barbed wire with 5 round with two diagonals in each bay above boundary wall at owner's premise rm 3720 28 R S angle 50x50x6 nos 1296 29 Chain link of 5x5 cm^2 mesh six with 3 nos of tension wire of 12 gauge Sqm 4320 30 Construction of gate fixed with plain sheet @ 53 kg/m^2 as directed by site engineer (4x1.8) Sqm 162 31 Vent Cowl nos 26 32 75 mm G.I. dia. Vent pipe rm 46.8 33 100 mm cast iron pipe in septic tank to soakpit rm 780 34 100 mm dia inlet and outlet T nos 78 35 23" white glazed orissa pan and 12.5 lt. Low level flushing cistern with its fitting as per site requirement nos 40 36 22" x 16" Wash basin with its complete set as per site requirement nos 40 37 16" x 22" looking mirror of best quality as per site requirement nos 40 38 17"x4.5"x13" size Urinal nos 0 39 Supply and flaxation of C.P. soap dish of 6"x6" as per site requirement nos 40 40 CP towel rod of 12"x24" with its fittings as per site requirement nos 40 41 Floor trap (4"x2") nos 40 42 CP shower rose as per site requirement nos 40 43 1 HP multi stage water pump of Crompton & Greaves or equivalent as per site requirement nos 26 44 1000 lt. polythene water tank as per site requirement nos 26 45 Making arrangement for permanent source of drinking water suply for sabstation staff in control building as per site requirement l/s 12 46 Gate valve of G.m *1/2 dia. Full way nos 78 *1" dia full way nos 26 47 NP3 pipe of 30 cm dia for road crossing and drainage pupose as per site requirement rm 104 48 1:2:4 PCC for approach road cum 810 49 Supply and fixation of medium class GI pipe with its fittings as per site requirement *6" dia GI pipe rm 270 *2" dia GI pipe rm 1040 *1"dia GI Pipe rm 780 *1/2"dia GI Pipe rm 780 50 Electrification of control building L/S 26

51 Furnishing office equipment (office table with drawer-1, revolveing chair-1, ordinary chair-4, steel almari 3'x5'-1,File Cabinet 3'x4'-1 L/S 12 52 Miscellenous civil works as per site condition L/S 26 Total Base Cost 1B(I+II+III) 2. 33KV, 11KV, 0.4KV LINE, 11/0.4 TRANSFORMER B. LABOUR COST Ia. 33 KV line Construction (UG Cable ) 1 33 KV,U/G, Single core, Aluminium,300 sq mm XLPE cable laying (3 Nos) including laying of conduits(3 Nos). km 5 2 Installation of cable straight through Joints including accessories complete. set 5 3 Installation 33 KV outdoor XLPE Cable termination kit with complete accessories. set 1 4 Installation of 30 KV L.A.(3Nos), power fuse.(3nos) including accessories complete set 2 5 Installation of Outdoor Cable Jointing Cabinets including accessories complete. set 2 6 Supply & Installation of Danger Sheets including accessories complete. rkm 5 7 Earthing works including Supply of Earthing Materials requied in U/G Cable terminations, Straight Through Joints, LA etc to complete the specified scope of lot 1 works. 8 Design & Construction of Cable Trench km 5 9 Design & Construction of Cable Joint stations/pits set 7 Ib. 33 KV line DC Construction (13m TTP, 0.1 sq.in. ACSR) 1 13 m long Steel Telescopic pole Transportation nos. 100 2 13 m long Steel Telescopic pole Erection. nos. 100 3 Stringing of 0.1 sq.in. ACSR Conductor, 3 wire kms. 4 4 Stay set Installation set 16 Ic. 33 KV line Construction (TTP, 0.1 sq.in. ACSR) 1 11 m long Steel Telescopic pole & Including wire,insulator,hardwear Transportation nos. 2840 2 11 m long Steel Telescopic pole Erection. nos. 2840 3 Stringing of 0.1 sq.in. ACSR Conductor, 3 wire km 142.00 4 Stay set Installation set 1420 5 Installation of Steel Lattice Towers with foundation set 2 Total Base Cost 2BI(a+b+c) IIa. 11 KV line Construction (UG Cable ) 1 11 KV,U/G, Single core, Aluminium,300 sq mm XLPE cable laying (3 Nos) including laying of conduits(3 Nos). km 4 2 Installation of cable straight through Joints including accessories complete. set 4 3 Installation 11 KV outdoor XLPE Cable termination kit with complete accessories. set 8 4 Installation of 10 KV L.A.(3Nos), power fuse.(3nos) including accessories complete set 16 5 Installation of Outdoor Cable Jointing Cabinets including accessories complete. set 4 6 Supply & Installation of Danger Sheets including accessories complete. rkm 4

7 Earthing works including Supply of Earthing Materials requied in U/G Cable terminations, Straight Through Joints, LA etc to complete the specified scope of lot 4 works. 8 Design & Construction of Cable Trench km 4 9 Design & Construction of Cable Joint stations/pits set 8 IIb. 11 KV line Construction (PSC pole, 0.12 Sq inch Covered Conductor) 1 11 m long PSC pole & Including wire,insulator,hardwear Transportation nos. 140 2 11 m long PSC pole Erection. nos. 140 3 0.12 Sq inch Covered Conductor kms. 7 4 Stay set Installation set 70 5 Dismantling of Pole(Works includes dismantling and carry back to office safely ) Set 6 Dismantling of Conductor a (Works includes dismantling and carry back to office safely ) kms. IIc. 11 KV line Construction (PSC pole, ABC cable (3 150 mm2 + 50 mm2 )) 1 11 m long PSC pole & Including wire,insulator,hardwear Transportation nos. 168 2 11 m long PSC pole Erection. nos. 168 3 11 k V ABC cable (3 150 mm 2 + 50 mm 2 ) kms. 7.00 4 Stay set Installation set 56 5 Dismantling of Pole(Works includes dismantling and carry back to office safely ) Set 6 Dismantling of Conductor a (Works includes dismantling and carry back to kms. IId. 11 KV line Construction (PSC pole, 0.1 sq.in. ACSR) 1 11 m long PSC pole& Including wire,insulator,hardwear Transportation nos. 680 2 11 m long PSC pole Erection. nos. 680 3 Stringing of 0.1 sq.in. ACSR Conductor, 3 wire kms. 34 4 Stay set Installation set 340 5 Dismantling of Pole(Works includes dismantling and carry back to office safely ) Set 10 6 Dismantling of Conductor a (Works includes dismantling and carry back to office safely ) kms. 0.50 IIe. 11 KV line Construction (TP pole, 0.1 sq.in. ACSR) 1 11 m long steel tubular pole& Including wire,insulator,hardwear Transportation nos. 2180 2 11 m long steel tubular pole Erection. nos. 2180 3 Stringing of 0.1 sq.in. ACSR Conductor, 3 wire kms. 109 4 Stay set Installation set 1090 5 Dismantling of Pole(Works includes dismanteling and carry back to office safely ) Set 18 6 Dismantling of Conductor a (Works includes dismantling and carry back to office safely ) kms. 0.9 Total Base Cost 2BII (a+b+c+d+e) IIIa. 0.4KV line Construction(COMPOSITE ABC 95MM2,PSC,TP) 1 Stringing of ABC cable including hardware fitting Km 61 IIIb. 0.4KV line Construction (PSC, ABC 70MM2) 1 Stringing of ABC cable including hardware fitting Km 25.00

2 PSC Pole & Including wire,insulator,hardwear Transportation Nos 625 3 PSC Pole Erection Nos 625 4 Stay set installation set 200 5 Dismantling of Pole (Works includes dismantling and carry back to office safely) set 3 6 Dismantling of Conductor a (Works includes dismantling and carry back to office safely) Km 1.5 IIIc. 0.4KV line Construction (TP, ABC 70MM2 ) 1 Stringing of ABC cable including hardware fitting Km 89.00 2 steel tubular Pole & Including wire,insulator,hardwear Transportation Nos 2225 3 steel tubular Pole Erection Nos 2225 4 Stay set installation set 712 5 Dismantling of Pole(Works includes dismantling and carry back to office safely ) set 9 6 Dismantling of Conductor (Works includes dismantling and carry back to office safely ) Km 4.50 Total Base Cost2B III(a+b+c) IVa. 11/0.4KV Transformer Installation (300KVA ) 1 LA errection set 7 2 Transformer errection include Platform, Distribution Panel Board & Cable set 7 3 earthing set installation set 14 4 DO fuse installation set 7 IVb. 11/0.4KV Transformer Installation (200KVA ) 1 LA errection set 22 2 Transformer errection include Plateform, Distribution Panel Board & Cable set 22 3 earthing set installation set 44 4 DO fuse installation set 22 IVc. 11/0.4KV Transformer Installation (100KVA) 1 LA errection set 153 2 Transformer erection include Plateform,Distribution Panel Board & Cable set 153 3 earthing set installation set 306 4 DO fuse installation set 153 5 Dismantling of Transformer a (Works includes dismantling and carry back to office safely ) set 0 Total Base Cost2B IV (a+b+c) Total Base Cost 2B (I+II+III+IV) Total (1B+2B) Column 7 and 8 to be carried forward to Scheddule No. 5. Grand Summary Name of Bidder Signature of Bidder

NEPAL ELECTRICITY AUTHORITY PROJECT MANAGEMENT DIRECTORATE Expansion of Distribution Networks in the Western Region of Nepal ICB-PMD DSAEP 072/73-01, Lot 2: Distribution Network Improvement Section 4-Bidding Forms Schedules of Rates and Prices Schedule No.5 - Grand Summary S. N. Description FC Total Price LC Remarks 1 Plant and Mandatory Spare Parts Supplied from Abroad 2 Plant and Mandatory Spare Parts Supplied from With the Employer's Country 3 Design Services 4 Installation and Other Services Grand Total to be carried forward to Letter of Bid Name of Bidder Signature of Bidder

NEPAL ELECTRICITY AUTHORITY PROJECT MANAGEMENT DIRECTORATE Expansion of Distribution Networks in the Western Region of Nepal ICB-PMD DSAEP 072/73-01, Lot 2: Distribution Network Improvement Section 4-Bidding Forms Schedules of Rates and Prices Schedule No. 6: Recommended Spares parts and Recommended Test Equipment (in line with Technical Specifications) Name of Original Total No. of Sets to be Item No. Name & Description of Parts Part No. Number of Units in each set Manufacturer provided Unit Price Total Price Remarks Name of Bidder: Date: Signature of Bidder: (Printed Name) (Designation) (Common Seal)