Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan: R.K.Puram New Delhi

Similar documents
Power evacuation system for RAPP Generating Units No. 5,6 (2x220 MW) and 7,8 (2x700 MW).

Evacuation system from Chamera III HEP (231 MW).

Minutes of the 19 th meeting of the Standing committee on transmission system of Northern Region held at Amritsar on 01/10/05.

3mO :th c:tll '{ Government of India. Ministry of Power. Northern Regional Power Committee

Thereafter, the agenda items were taken up.

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

1. Confirmation of the minutes of 19th meeting of the Standing Committee on Transmission system Planning held on at Amritsar, Punjab.

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level)

Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region

Government of India Central Electricity Authority SP&PA Division R.K. Puram, New Delhi

Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region

Annex_Tumkur In-principle(Phase-I) 1)Minutes of the meeting held on )In-principle Approval_Tumkur Phase-I

Agenda Note for 29 th meeting of the Standing Committee on Power System Planning of Northern Region

Report. the feasibility of

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: )

No.1/9/06-SP&PA/ Dated: As per List enclosed-

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: )

List of Addresses. 1. Sh. V.Ramakrishna Member(Power system),cea, Sewa Bhawan, R.K. Puram, New Delhi 66

SAUDAMINI, Plot No.2, Sector-29, Gurgaon, Haryana Powergrid Corporation of India Ltd., SAUDAMINI, Plot No.2, Sector-29, Gurgaon

-As per List enclosed- 27 th meeting of the Standing Committee on Power System Planning of

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority

8.Director(Operation) Delhi Transco Ltd. Shakti Sadan,Kotla Marg, New Delhi (Fax )

Minutes of the 4 th Meeting of Standing Committee on Power System Planning of North Eastern Region held on 13 th Dec., 2014

Petition No. 1051, 1054 & 1055 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order :

वव षय: उतर क त क वव द त पण र ल य जन पर सथ य सवमवत क 40 व ब ठक क क यरव त

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Standing Committee on Power System Planning in Northern Region

MD, PTCUL welcomed the participants and expressed his happiness for the opportunity of holding the meeting of the Standing Committee in Uttrakhand.

Agenda of 11 th System Studies Meeting in NER

FAX : Member Secretary Southern Regional Power Committee 29, Race Course Cross Road Bangalore FAX :

RFP Corrigendum No. 01

R.S.USHA CHIEF ENGINEER/ PLANNING & RC. Encl: Report and detailed estimate. To The Chief Engineer/D/Madurai Region

Determination of Average Pooled Purchase Cost for FY

No. 1/9/SP&PA-2013 / Dated:

Implementation of the recommendations of the Fifth Punjab Pay Commission T.A./ D.A.

Agenda Note for Standing Committee Meeting of Power System Planning in ER

MINUTES OF THE 47 th SLCF MEETING HELD ON

Evacuation of Wind Power in Kadapa, Anantapur and Kurnool districts of Andhra Pradesh. Revised Administrative Approval - Accorded

Minutes of meeting held on at SLDC, Conference Hall at 03.00PM to discuss about High Voltage problems existing in the Grid.

HVDC Systems in India

HARYANA POWER GENERATION CORPORATION LIMITED Regd. Office C-7, Urja Bhawan, Sector-6, Panchkula Corporate Identity Number: U45207HR1997SGC033517

S.No. Proposed Transmission System for Power Evacuation Scheme of Solar Power Projects in Rajasthan

Bihar: Transmission System Study for 13 th Plan

:Tamil Nadu Generation and Distribution Corporation Limited: Delegation of powers of sanction to officers (TNEB Volume-II) - revised Communicated Reg

Indian Power System Framework

Distribution List Chief Engineer (SP & PA) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi FAX :

Minutes of the 32 nd meeting of the Empowered Committee on Transmission held on January 17, 2014 at CEA, New Delhi

JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE

Minutes of the 37 th Meeting of Standing Committee on Power System Planning in Western Region held on at Mumbai

Minutes of 6 th Joint Co-ordination Meeting of IPPs granted LTA in ER held on at CC, POWERGRID

UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow. Public Notice

1. Operational Feedback on Transmission Constraint: January 2015 & October Description of the. Antecedent constraints Conditions

List of the participants is enclosed at Annexure I.

Solar Energy Corporation of India New Delhi-17

Transmission Line Survey

GOVERNMENT OF INDIA MINISTRY OF HEAVY INDUSTRIES AND PUBLIC ENTERPRISES DEPARTMENT OF HEAVY INDUSTRY

Meeting with Commissioner, Kendriya Vidyalaya Sangathan (KVS) New Delhi 11 April 2016

North Eastern Regional Power Committee

Sewa Bhawan, R. K. Puram, New Delhi As per List Enclosed-

Case Nos. 12 & 48 of 2009

No. 15/3/2018-Trans-Pt(1) Government of India Ministry of Power Shram Shakti Bhawan, Rafi Marg, New Delhi **** OFFICE MEMORANDUM

BPCL,Bottling Plant, Solapur, Pune, Bhitoni, Verna, Jalgoan, Nagpur, Indore

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: )

EDS REPLY. Point No.2 Past-production details duly authenticated by DMG since Reply

Before the. Case No. 106 of 2009

Guidelines for Solar Grid Power Projects

11Rij ~ / Government of India ~ ~ / Ministry of Power L ~ ~ ~1~<t>XUI / Central Electricity Authority ~~:~

Information regarding charging of New Transmission Element in North Eastern Region under perview of NERLDC

Agenda for 23 rd Meeting of WR Constituents regarding Connectivity & Long-Term Access applications in Western Region

Disclosure to Promote the Right To Information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

No. NRPC/OPR/107/01/2016/ Dated: फ स द श /FAX MESSAGE

EEL303: Power Engineering - 1 Introductory Lecture

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

I. Operational Feedback from NLDC:

POWER SYSTEM OPERATION CORPORATION LIMITED NATIONAL LOAD DESPATCH CENTRE B-9, QUTUB INSTITUTIONAL AREA NEW DELHI

2. Chairman & Managing Director MPPTCL, Block No. 3 Shakti Bhawan, Rampur, Jabalpur

6th Annual Conference on

Annexure. Technical Details Package 1

OVERHAULING JOBS (STG)

DAKSHIN HARYANA BIJLI VITRAN NIGAM

PDF processed with CutePDF evaluation edition

Need Assessment Document (NAD) DDUGJY

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R K Puram, New Delhi

Case No. 109 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd.

POWER DEVELOPMENT DEPARTMENT OF JAMMU AND KASHMIR JANIPUR, JAMMU TEL: FAX: PUBLIC NOTICE

received 1. Shyang (3 MW)- Completed 2. Tangling (5 MW)- Completed 3. Shaung (interim) (3 MW)--completed 4 Brua (Interim) (9 MW) - Completed

Shortage

प वर स स टम ऑपर शन क प र शन स समट ड (भ रत रक र क उद यम)

Shortage

भ त क Government of India ववद य त म त र लय Ministry of Power उत त क ष त र य ववद य त वमवत Northern Regional Power Committee. -sd-

Shortage

CONFERENCE ON TRANSMISSION & DISTRIBUTON MR N C VENUGOPAL TRANSMISSION SECTOR GROWTH & CHALLENGES. DATE 2 ND NOVEMBER 2012

Battery Operated Vehicles - Method of Measuring the Range

Shortage

Transcription:

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan: R.K.Puram New Delhi-110066 No.1/9/2004/-SP&PA/ 2004 Sh. S.K. Agarwal, Chief Engg. (Plg.), Haryana Vidyut Prasaran Nigam Ltd., Shakti Bhawan, Sector-6, Panchkula-134109, Haryana, (Fax No.0172-2565746) Executive Director U.P. Power Corporation Ltd., Shakti Bhawan Extn. (3 rd Floor) 14, Ashok Marg, Lucknow-226001 (Fax. No.0522-2280178) Shri Y K Raizada, CE (PP&M.), Rajasthan Rajya Vidyut Prasaran Nigam Ltd Vidyut Bhawan,Jyoti Nagar,Janpath, JAIPUR, (Fax No.0141-2740794) Shri A S Chugh, Chief Engineer(Transmission system) Bhakra Beas Management Board (Power Wing) Admn. Block, SLDC Complex, Ind. Area, Phase 1 Chandigarh-160002 (Fax No.0172-2654590) Shri R.N. Nayak, Executive Director (Engg.) POWERGRID Corpn. of India Ltd, Plot No.-2, Sector- 29, Gurgoan- 1122001.(Fax No95-124-2571802) Shri S Sen, executive Director NTPC, Corporate Centre, Engineering Office Complex Plot No.A-8 4, Sector 24, Post Box No.13, NOIDA(UP) 110 016.(Fax No.95120-2536181) Dated 22 th April Shri G.S. Chawla Chief Engineer (Plg.) Punjab State Electricity Board, Mall Road, Patiala,-147001, Punjab. (Fax No.0175-2215897) Shri J.N.Sachdeva, The Superintending Engineer, Electricity Operation Circle U.T. Chandigarh, (Fax.No.0172-2775733, 2742733) Shri P K Tripathy Manageing Director(Power) J&K state Power Devlopment Corporation Ashok Nagar, satwari, Jammu (Fax No.0191-2435403) S C Chattopadhyay, Chief Engineer(Plg.), TRANSCO, DELHI, Shakti Deep Building, Anarkai Market, DDA Complex, Jhandewalan Extension, New Delhi- 110055. (Fax No.23552070) Shri S N Kapur Chief Engineer(SP), H.P.State electricity Board, Vidyut Bhawan, Shimla-171004. (Fax No.01772-258984) Shri B K Mishra, Member Secy., Northern Regional Electricity Board, 18-A, Shaheed Jit Singh Sansanwal Marg, Katwaria Sarai, New Delhi-110016 (Fax No.2868528) Sh.N.S. M. RAO, GM (Transmission), Nuclear Power Corporation Of India Ltd. 11-N-28, Vikram Sarabhai Bhawan Anushakti Nagar, Mumbi- 400094, (Fax No. 022-25563350) Shri Raj Kumar, GM(DEM), NHPC, NHPC office complex Sector-33, Faridabad-121003 ( Fax No.-95-129-5256571, 2279137)

CENTRAL ELECTRICITY AUTHORITY SYSTEM PLANING AND PROJECT APRAISAL DIVISION F. No.1/9/03-SP&PA/ Dated: 13/05/04 -As per List enclosed- - Subject: Minutes of 16 th Standing Committee meeting on Power System Planning in Northern Region Regarding Corrigendum Sir, With reference to the communication received from POWERGRID and subsequent fax massage dated 28/04/04 and 30/4 04 from NPCIL and NHPC respectively regarding some omission/ amendment required in the minutes of the 16 th Standing Committee sent vide this office letter of even no. dt. 15.04.04, the corrigendum/addendum as enclosed, may be incorporated in the MoM of the 16 th meeting of the standing committee. Encl. As above (S. K. Thakral) Director (SP&PA)

Annexure Corrigendum to the minutes of the 16 th Standing Committee Meeting (1) Under Item no. 1 Evacuation system from Chamera III HEP, in the transmission system finalized for Chamera III and Kutehar, it was decided to establish the pooling point at the location close to the alignment of Chamera- Jullundhar and Parbati-Amritsar lines. Accordingly, the transmission system for Chamera-III and Kutehar would be: Transmission system associated with Chamera III Generation of Chamera III power at 220 kv level Creation of 400/220 kv pooling point at the location close to the alignment of Chamera-Jullundhar and Parbati-Amritsar lines. In the Chamera-III time frame, this would be only 220kV switching station which would be upgraded to 400kV in future. Chamera III Pooling station 220 kv D/C line with 2x0.5 conductor Additional 1 no. 220 kv bay at Chamera III for 220 kv S/C line from Kutehar Pooling station Jullandher 400 kv D/C line(operated at 220 kv ) POWERGRID to locate and purchase requisite land for Pooling station corresponding to requirement of 400 kv S/S Transmission system from Kutehar Kutehar Pooling station 220 kv D/C with 2x0.5 conductor Kutehar Chamera III 220 kv D/C with 2x0.5 conductor bunched into S/C Additional 2 nos. 220 kv bays at Kutehar for 220 kv lines from upstream projects LILO of Parbati Amritsar 400 kv D/C line at Pooling station 400 kv operation of Pooling station Jullundhar D/C line (2) Under Item 2 Power Evacuation system associated with Parbati-II (800 MW) and Koldam HEP (4x200MW), the decision regarding capacity of 400kV S/S at Ludhiana was taken in the 15 th meeting of Standing Committee as 2x315 MVA instead of 3x315 MVA. Accordingly, the bullet point under the heading System under Northern Region Strengthening Scheme may be corrected to read as 400kV S/S at Ludhiana with 2x315 MVA ICT and the first line of the subsequent para be corrected to read as The above system was finalized in the 14 th and 15 th meeting of the Standing Committee considering.

(3) The suggestion of DGM, POWERGRID for change of conductor was in respect of Parbati pooling point Amritsar 400kV D/C line and not in respect of Koldam-Ludhiana line. He had suggested to change the conductor of Parbati pooling point Amritsar 400kV D/C line from AAAC to ACSR MOOSE and the same was agreed. The Koldam Ludhiana 400kV D/C line remains with Triple ACSR conductor. Accordingly, the last para under Item 2 Power Evacuation system associated with Parbati-II (800 MW) and Koldam HEP (4x200MW), reading DGM, POWERGRID stated that their study conductor as envisaged earlier. may be deleted and the following may be added under Item 3 Evacuation system from Parbati III HEP (520 MW): DGM, POWERGRID stated that their study indicates that Parbati pooling point Amritsar line might not required to be constructed with AAAC conductor as ACSR MOOSE twin conductor would be adequate and it would incur saving in the cost of transmission line. The same was agreed. (4) Under Item 3 Evacuation system from Parbati III HEP (520 MW), in the finalized system for Parbati-III, LILO of one circuit of Parbati-II Koldam/Nalagarh line at Parbati-III has been inadvertently missed out. The same needs to be included in the list. Accordingly, the last para under this item would read as: After deliberation, Chief Engineer (SP&PA) stated that following system were recommended with Parabti III HEP:- (i) (ii) (iii) (iv) (v) Stepping up the generation of Parbati III at 400 kv LILO of one circuit of Parbati-II Koldam/Nalagarh line at Parbati-III Creation of 400kV pooling point at Parbati (Panarsa) LILO of both line from Parbati to Koldam at Parabti Pooling point(panarsa) Parbati Pooling point - Amritsar 400 kv D/C line with twin ACSR MOOSE conductor The members of the Standing Committee agreed the above proposal. (5) While discussion the Evacuation system from Koteshwar HEP, it was decided to take-up the establishment of 400 kv Rookree S/S along with associated work expeditiously as a separate strengthening scheme. Accordingly, under Item 5 Power evacuation system from Koteshwar HEP, the following may be appended: It was also decided to take-up the establishment of 400 kv Rookree S/S along with associated work expeditiously as a system strengthening scheme. Accordingly, POWERGRID would formulate a separate scheme for the works at Sl. Nos. (iii), (iv), and (vi) and taken-up this on priority.

(6) Under Item no. 10 Evacuation system from Uri II HEP (240 MW), the additional space at Uri II was to be checked for 400kV line bay and not 220kV line bay as inadvertently recorded in the minutes. Accordingly, the last line of first para under this item may be modified to read as: at Uri II and if available one additional S/C line at 400 kv would be taken from Uri I to Wagoora. (7) CE (ED-TAPS), NPCIL vide his letter of even no. Dated 28/4/04 have requested for following addendum in the item no. - 3 of (8) Under Item 3 of additional agenda Transmission system from RAPP para 1 may be modified as under: Director (SP&PA) stated that the evacuation system from RAPP unit 5,6,7 & 8 was agreed in the 14 th Standing Committee Meeting of the NR, wherein a portion of the RRVPN system i.e. Kota Kankroli 400kV 2xS/C was to be utilized for evacuation of power from RAPP stage 5,6,7&8. RRVPN had intimated POWERGRID their inability to construct the Kota Kankroli lines as well as Kankroli Bhinmal line matching with the RAPP timeframe. The proposal for power evacuation system finalised during the 14 th Standing Committee Meeting has already been put up by POWERGRID to CCEA for approval. In view of this the proposal for RAPP was reviewed and following was suggested. The concluding para may also be modified as under: Concluding the discussion CE (SP&PA) stated that following system was recommended with RAPP C&D. With RAPP unit 5&6 (i) RAPP Kankroli 400kV D/C (ii) RAPP Kota 400kV S/C (iii) Creation of 2x315 MVA and 3x315 MVA S/S at Kota and Kankroli respectively. Supplementary regional scheme to match RAPP 5&6 time frame: (i) Kota Merta 400 kv D/C line (ii) Kankroli Jodhpur 400kV S/C line With RAPP unit 7&8 (i) RAPP Jaipur 400kV D/C line of which one circuit to be LILOed at Kota (ii) RAPP Nagda (WR) 400 kv D/C (NR:WR::50:50) RRVPNL would construct a 220 kv line to interlink with 400 kv S/S at Kota and Kankroli of POWERGRID with their 220 S/S at Kota and Kankroli respectively. The Members of the Committee agreed with the proposal.