UNIVERSITI TEKNIKAL MALAYSIA MELAKA FACULTY OF ELECTRICAL ENGINEERING FINAL YEAR PROJECT REPORT COST MONITORING DIGITAL POWER METER PREPARED BY:

Similar documents
BORANG PENGESAHAN STATUS TESIS

SMART SUN TRACKING WITH AUTOMATED CLEANING SYSTEM FOR PV MODULES AMIRAH AFIQAH BINTI AHMED

DEVELOPMENT HYDROGEN GAS GENERATOR FOR DUAL FUEL ENGINE USING YULL BROWN METHOD AHMAD ZAKI BIN ZAIMANI UNIVERSITI MALAYSIA PAHANG

UNIVERSITI MALAYSIA PAHANG BORANG PENGESAHAN STATUS TESIS

DEVELOPMENT OF MICROHYDRO GENERATOR SYSTEM AHMAD ZUBAIDI BIN ABDUL MD RANI UNIVERSITI MALAYSIA PAHANG

COMPARISON OF AUTOMATIC AND CVT TRANSMISSION FOR A CAR UNDER 1 LITER ENGINE

UNIVERSITI MALAYSIA PAHANG BORANG PENGESAHAN STATUS TESIS

ENERGY BALANCE STUDY FOR 4 STROKE GASOLINE ENGINE ANALYSES ABDULLAH SHARIFFUDIN MOHAMAD BACHELOR OF MECHANICAL ENGINEERING UNIVERSITI MALAYSIA PAHANG

DESIGN, DETAIL ANALYSIS AND PERFORMANCE TESTING OF UAV PROPULSION SYSTEM CHE MUHAMMAD RIDHWAN BIN CHE HASHIM

UNIVERSITI MALAYSIA PAHANG BORANG PENGESAHAN STATUS TESIS

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

BORANG PENGESAHAN STATUS TESIS

ARC FLASH ANALYSIS STUDY IN INDUSTRY HARNA A/P ELAVARASU

THE DEVELOPMENT OF ADAPTIVE LIGHTING SYSTEM FOR MOTORCYCLES ASYRAF BIN AMIR

WIRELESS SOLAR CHARGER SITI NOR AZURA BINTI RAHMAN

SPRAY SIMULATION OF HYDROGEN FUEL FOR SPARK IGNITION ENGINE USING COMPUTATIONAL FLUID DYNAMIC (CFD)

AUTOMATED GUIDED VEHICLE USING LINE FOLLOWING DETECTION MOHD KHAIRULZAMAN BIN A RAHMAN

CONTINUOUS BATTERY MONITORING (CBM) SYSTEM FOR EARLY BATTERY FAILURE DETECTION YUSOF BIN YUNUS

AN AUTONOMOUS VEHICLE USING WALL FOLLOWING DETECTION MOHD AFFI BIN MOHD ALI

ADJUSTABLE POWER MONITORING SYSTEM (APMS) FOR DAILY USAGE MOHAMMAD ZULKHAIRI BIN BADRULHISHAM

INTELLIGENT SAFETY HELMET FOR MOTORCYCLIST FAEZAH BINTI HASHIM

SHOPPING CART ANTI-THEFT SECURITY SYSTEM NAZRIN BIN OTHMAN

SMART METER-TNB DUAL TARIFF FOR DOMESTIC APPLICATION NASYRAH BT ABDUL RAHIM

DESIGN AND SIMULATION AUTOMOBILE ACTIVE SUSPENSION SYSTEM MOHD ASQALANI BIN NAHARUDIN UNIVERSITI MALAYSIA PAHANG

CONTROL OF A REAL INVERTED PENDULUM SYSTEMS USING STATEFEEDBACK CONTROLLER MUHD SAFWAN BIN ABDUL SATAR UNIVERSITI TEKNIKAL MALAYSIA MELAKA

TRAFFIC LIGHT LED FAULT MONITORING AND DETECTION SYSTEM FAIZATUL HANIM BINTI RAHMAT

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

This item is protected by original copyright

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

OPTIMAL ANTI LOCK BRAKING SYSTEM WITH REGENERATIVE BRAKING IN HYBRID ELECTRIC VEHICLE DANA DEHGHANI UNIVERSITI TEKNOLOGI MALAYSIA

UNIVERSITI TEKNIKAL MALAYSIA MELAKA (UTeM) FACULTY OF ELECTRICAL ENGINEERING (FKE) FINAL YEAR PROJECT II (FYP II) BEKU 4973

MICRO WIND POWER GENERATOR NORAISAH BINTI ABU

UNIVERSITI TEKNIKAL MALAYSIA MELAKA PIEZOELECTRIC ENERGY HARVESTING FLOOR MAT

CONTROL OF INVERTED PENDULUM-CART SYSTEM BASED ON FUZZY LOGIC APPROACH HASRULNIZAM BIN HASHIM

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

PI CONTROLLER FOR BATTERY CHARGER SYSTEM MOHD AZHAR BIN AZMI

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

THE STUDY ON THE IMPACT OF CONSTANT POWER LOAD TO A DIRECT CURRENT POWER SYSTEM DRIVEN BY PHOTOVOLTAIC, WIND - THYRISTOR RECTIFIER AND LINEAR SOURCES

YASIR AMZAD ALI BIN MOHD YASEEN

DEVELOPMENT OF SOLAR DIGITAL THERMOMETER MOHD ALIAS SANI BIN YAACOB. Bachelor Degree of Electrical Engineering (Power System)

THE DESIGN OF A TORQUE FEEDBACK CONTROLLER USING PID CONTROLLER FOR AN UPPER LIMB ROBOTIC ARM KARTIKESU A/L VIJAYAN

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

DESIGN AND ANALYSIS OF THE SOLAR CAR BODY YUSRI BIN YUSOF. Report submitted in partial fulfillment of the requirements

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

DEVELOPMENT OF SOLAR FLUORESCENT LAMP MOHD HAFIZUDDIN BIN ABDUL RAZAK

ELECTRIC CAR VOLTAGE MONITORING SYSTEM NAJMI AZFAR BIN MOHD ROSLI

APPLICATION OF DEMAND SIDE MANAGEMENT STRATEGIES TO REDUCE ENERGY CONSUMPTION IN UNIVERSITY BUILDINGS NAJAATUL FARIHAH BINTI HAMIDI

CURRENT CARRYING CAPABILTY OF POLYESTER CARBON COATED FOR ELECTRICAL CONDUCTOR MOHD HAIDIR BIN MANAF UNIVERSITI TEKNOLOGI MALAYSIA

THERMOELECTRIC POWERED HIGH TEMPERATURE USING BOOST CONVERTER MUHAMAD KAMAL HAFIZ BIN MOHD ANUAR UNIVERSITI TEKNIKAL MALAYSIA MELAKA

OPTIMAL LOCATION OF FACTS FOR ATC ENHANCEMENT BY USING SENSITIVITY ANALYSIS RAIMON OMAR AL SHAIKH SALEM

CASE STUDY: UNDERSTANDING TIlE PRINCIPLE AND MECHANISM OF ALTERNATOR MOTOR

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

POWER FACTOR CORRECTION FOR VARIOUS TYPE OF MAGNETIC FLUX BALLAST FLOURESCENT LAMP MOHD ALL FADZIL BIN NASIR

MODELING OF ELECTRIC DOUBLE LAYER CAPACITOR FATHIN ASILA BINTI MOHD PABLI UNIVERSITI TEKNOLOGI MALAYSIA

GLYCERINE PITCH FROM GLYCERINE CONCENTRATION PROCESS AS ALTERNATIVE FUEL FOR BOILER OPERATIONS KIRUBAHARAN A/L MERAPAN

THE ANALYSIS OF THE FORCES THAT ACT ON THE MOTORCYCLE BRAKE PEDAL DURING EMERGENCY BRAKE

FABRICATION OF A PROTOTYPE LOW POWER MOTOR FOR INDOOR VENTILATION SIMON THEOPHYLUS YUSUF

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

OPTIMAL LOCATION OF THYRISTOR CONTROLLED SERIES COMPENSATOR USING SENSITIVITY APPROACH NEW HUANG CHIN UNIVERSITI TEKNOLOGI MALAYSIA

ROBUST ELECTRONIC BRAKE FORCE DISTRIBUTION IN HYBRID ELECTRIC VEHICLES YEOH WEI CHERNG UNIVERSITI TEKNOLOGI MALAYSIA

NEURAL NETWORK CONTROLLER FOR DC MOTOR USING MATLAB APPLICATION NORAZLINA BINTI AB. RAHMAN

DESIGN AND DEVELOPMENT OF AN AUTOMOTIVE SEAT FOR SAFETY

FINITE ELEMENT (FE) MODEL OF BRAKE INSULATOR IN REDUCING BRAKE SQUEAL NOISE FOR MOTORCYCLES MUNDHER FADHIL ABDULRIDHA UNIVERSITI TEKNOLOGI MALAYSIA

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

DEVELOPMENT OF COMPRESSED AIR POWERED ENGINE SYSTEM BASED ON SUBARU EA71 MODEL CHEN RUI

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

ZULHILMI AFIQ BIN ZULKIFLE

COMPUTATIONAL ANALYSIS OF TWO DIMENSIONAL FLOWS ON A CONVERTIBLE CAR ROOF ABDULLAH B. MUHAMAD NAWI

ANALYSIS OF OVERCURRENT PROTECTION RELAY SETTINGS OF A COMMERCIAL BUILDING NURUL SYAQIRAH BINTI MOHD SUFI UNIVERSITI MALAYSIA PAHANG

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

DEVELOPMENT OF ELECTRICAL DISCHARGE MACHINING POWER GENERATOR MUHD ABU BAKAR BIN MUHD RADZI

DESIGN AND FABRICATION OF POLYVINYL CHLORIDE TIE-ROD CYLINDER FOR LOW PRESSURE WATER HYDRAULIC SYSTEM

TECHNOLOGY AND INNOVATION MANAGEMENT AWARENESS AND PRACTISE A CASE STUDY IN BRITISH AMERICAN TOBACCO GSD (KL) SDN BHD

OPTIMIZATION ON FUEL GAS OPERATION FOR COMBINED CYCLE POWER PLANT MOHD IZAMUDDIN BIN MAHMUD

MODELLING OF THROUGH-THE-ROAD HYBRID ELECTRIC VEHICLE OKE PAUL OMEIZA

A FREQUENCY CONTROLLER USING FUZZY IN ISOLATED MICROGRID SYSTEM

STUDIES AND DESIGN OF SUSPENSION SYSTEM FOR A FORMULA SAE RACING CAR AIZAT FUAD BIN AHMAD SHATAR UNIVERSITI TEKNIKAL MALAYSIA MELAKA

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

STAND-ALONE PHOTOVOLTAIC (PV) SYSTEM DESIGN GHAFAR BIN JENAL

BATTERY LEVEL MONITORING SYSTEM AIESYAH BINTI GHAZALI

FINITE ELEMENT ANALYSIS OF AUTOMOTIVE INTAKE MANIFOLD USING CAE SOFTWARE MUHAMMAD HAIKAL BIN HARON

GEAR RATIO INVESTIGATION OF AUTOMOTIVE MANUAL TRANSMISSION MUHAMAD AMIR SHAH ARIF HARUN. A thesis submitted in partial fulfillment of the

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

COMPUTER METHODS IN ELECTRICAL POWER DISTRIBUTION FOR PETRONAS GAS INDUSTRIAL PLANT NORAHIDA IBRAHIM

DESIGN AND DEVELOPMENT A SMALL STIRLING ENGINE NURUL HUDA BINTI BASO

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

DISC BRAKE SQUEAL GENERATION DURING DRY AND WET CONDITIONS MUNEER NAJI WAHEED UNIVERSITI TEKNOLOGI MALAYSIA

International Journal of Advance Engineering and Research Development

SAIDATINA AISHAH BINTI MOHD SHAH B

RAYMOND JOSEPH. Faculty of Mechanical Engineering Universiti Malaysia Pahang.- PERPUSTAKAAN UNIVE1STI MALAYSIA PAHANG No. Paroehan No.

COMPARISON OF STANDARD EXHAUST AND RACING EXHAUST ON MACHINE PERFORMANCE

DEVELOPMENT OF AUTO RE-CLOSER EARTH LEAKAGE CIRCUIT BREAKER (AR-ELCB) AHMAD KHAIRUL AZWAN BIN JANTAN ANUA JAH

CONVERSION OF GLYCEROL TO METHANOL OVER COPPER AND NICKEL SUPPORTED ON HZSM-5 ZEOLITE BY HYDROTHERMAL PROCESS NURUL SYUHADA BT SPALIE

NUMERICAL ANALYSIS OF ELASTOHYDRODYNAMIC LUBRICATION WITH BIO-BASED FLUIDS DEDI ROSA PUTRA CUPU UNIVERSITI TEKNOLOGI MALAYSIA

International Journal Of Core Engineering & Management Volume-4, Issue-10, January-2018, ISSN No:

DESIGN AND FABRICATION OF ENGINE MOUNTING FOR UTeM FORMULA SYLE RACE CAR MOHD SABIRIN BIN RAHMAT UNIVERSITI TEKNIKAL MALAYSIA MELAKA

DESIGN OF A MICROCONTROLLER-BASED PASSIVE STANDBY UNINTERRUPTIBLE POWER SUPPLY (UPS) NIK MOHAMAD ANIS BIN NIK HARON

BRAKE CONTROL SYSTEM FOR MOTORIST VEHICLE MUHAMAD NOR BIN ARIF

Transcription:

i UNIVERSITI TEKNIKAL MALAYSIA MELAKA FACULTY OF ELECTRICAL ENGINEERING FINAL YEAR PROJECT REPORT COST MONITORING DIGITAL POWER METER PREPARED BY: LOO SEONG ENG B020810001 BACHELOR DEGREE IN ELECTRONIC ENGINEERING (WIRELESS TELECOMMUNICATION) WITH HONOUR

ii UNIVERSTI TEKNIKAL MALAYSIA MELAKA FAKULTI KEJURUTERAAN ELEKTRONIK DAN KEJURUTERAAN KOMPUTER BORANG PENGESAHAN STATUS LAPORAN PROJEK SARJANA MUDA II Tajuk Projek : COST MONITORING DIGITAL POWER METER Sesi Pengajian : 2 0 1 1 Saya Loo Seong Eng mengaku membenarkan Laporan Projek Sarjana Muda ini disimpan di Perpustakaan dengan syarat-syarat kegunaan seperti berikut: 1. Laporan adalah hakmilik Universiti Teknikal Malaysia Melaka. 2. Perpustakaan dibenarkan membuat salinan untuk tujuan pengajian sahaja. 3. Perpustakaan dibenarkan membuat salinan laporan ini sebagai bahan pertukaran antara institusi pengajian tinggi. 4. Sila tandakan ( ) : SULIT* *(Mengandungi maklumat yang berdarjah keselamatan atau kepentingan Malaysia seperti yang termaktub di dalam AKTA RAHSIA RASMI 1972) TERHAD** **(Mengandungi maklumat terhad yang telah ditentukan oleh organisasi/badan di mana penyelidikan dijalankan) TIDAK TERHAD Disahkan oleh: (TANDATANGAN PENULIS) (COP DAN TANDATANGAN PENYELIA) Tarikh: 03.05.2011 Tarikh: 03.05.2011 Tarikh:.. Tarikh:..

iv I hereby declare that I have read this report and in my opinion this report is Sufficient in terms of the scope and quality for the award of Bachelor of Electronic Engineering (Computer Engineering) With Honours. Signature :... Supervisor s Name : Engr. Zulkifli Shariff Date : 03.05.2011

iii I declare that this report entitle Cost Monitoring Digital Power Meter is the result of my own research except as cited in the references. The report has not been accepted for any degree and is not concurrently submitted in candidature of any other degree. Signature : Name : Loo Seong Eng Date : 03.05.2011

v ACKNOWLEDGEMENT Thanks to God that is always blessing to me, finally the Final Year Project (FYP) report is completed. In order to complete this report, I was in contact with many people. They have contributed towards my understanding and thought. First and foremost, I would like to express my sincere appreciation to both of my supervisor s that are Engr. Zulkifli Shariff and Engr. Ranjit Singh Sarban Singh who is really kind, patience and continuously guided me by share her time and knowledge during my study. I am also very thankful to Ms. Siti Aisyah bte Anas for helping and guiding me a lot on the PIC coding in order to complete my coding for the project. Other than that, I am also wish to express my deepest thanks to PM. Tan Kim See for spending his times to give explanation and discuss about electronic system in for my energy meter chip. His knowledge was helping me a lot in completing my research. My special thanks to all my friends for the collaboration in helping me to complete my site work. Last but not least, million thanks to my beloved parents and my siblings who support and encouraging me all the time. Thanks a lot to them.

vi ABSTRACT Projek ini dinamakan COST MONITORING DIGITAL MULTIMETER. Robot ini merupakan satu PROTOTAIP yang dapat diaplikasikan dalam sektor industri untuk meengira jumlah kuasa electric dan mengira kos berdasarkan jumlah kuasa elektrik yang teleh digunakan. Projek ini telah dibahagi kepada 3 bahagian iaitu input, peripheral interface dan output. Litar kawalan masukkan kami menggunakan suis tekan sebagai Reset. Litar keluaran kami merupakan LCD yang akan memaparkan nilai kuasa elektrik dan kos. Manakala litar kiraan utama kami ialah PIC16f877A. Kelebihan menggunakan PIC16F877A ini adalah kerana ia mempunyai I/O PORT yang banyak berbanding dengan lain. Selain itu PIC16F877A juga mempunyai kawalan pada pwm, jadi ia sesuai diggunakan dalam projek kami kerana litar kami memerlukan ROM yang tinggi untuk menyimpan data.

vii ABTRACT This project is called COST MONITORING DIGITAL MULTIMETER. This project is a prototype which can implemented in industrial that can help to calculate total electric power and calculate the cost based on the consumption. This project categorized into 3 parts, which are input, peripheral interface and output. The input section of our project use s push button as Reset button, while the output of our project is LCD that can be seen the total power consumption and the cost base on the power consumption value. The main controller circuit we use as controller is PIC 16F877A. The advantages of this controller is, its have many I/O PORT than others. Moreover, this controller is suitable because it have more ROM to saving the data.

viii TABLE OF CONTENT CHAPTER TITLE PAGE TITLE DECLARATION ACKNOWLEDGEMENT ABSTRACT TABLE OF CONTENTS LIST OF FIGURES LIST OF APPENDICES i ii v vi viii xi xiii CHAPTER TITLE PAGE 1 INTRODUCTION 1 1.1 Introduction 1-5 1.2 Background of problems 5 1.3 Objectives 6 1.4 Scope 6-7 1.4.1 Flow of the System 7-8 1.5 Importance of Study 8-9

ix CHAPTER TITLE PAGE 2 LITERATURE REVIEW 10 2.1 Related system 10-12 3 METHODOLOGY 13 3.1 Methodology for the system 13-14 3.2 Simplification of circuit 15-16 3.3 Component 17-18 3.3.1 Passive Electronic Component 19-20 3.3.2 Active Electronic Component 21-23 4 EXPLANATION FULL SYSTEM OF THE METER 24 4.1 Explanation for the system 24 4.1.1 Power supply 25-27 4.1.2 Voltage sensing 27-29 4.1.3 Current sensing 30-31 4.2 Explanation the full system for all block 32-35 4.3 Explanation for the calculating system 35-37 5 SOFTWARE PROJECT 38 5.1 Introduction for Coding Project Software 38 5.2 Instruction to CCS Compiler 39 5.2.1 Choosing the PIC type 39 5.2.2 Bits Setting 40

x CHAPTER TITLE PAGE 5.2.3 Generating Coding by Using EDITOR 40 5.2.4 Generating C file to HEX file 41 5.3 Instruction for using CCS Compiler 42 5.3.1 WINPIC800 42 5.3.2 Setting of WINPIC800 43 5.3.3 Choosing Program / Coding to BOOTLOADER 43 5.3.4 Burn Coding to PIC 44 5.4 Project Coding 45 6 RESULT AND DISCUSSION 46 6.1 Result 46-47 6.2 Discussion 47-48 7 CONCLUSION 49 8 FUTURE / UPGRADE PLAN 50 8.1 Suggestion 50 REFERENCES 51-53

xi FIGURE PAGE Figure 1: electric usage in industry. 2 Figure 2: electric consumption by industry. 2 Figure 3: electric usage in home housing. 3 Figure 4: electrical energy consumption is proportional towards 4 the usage of electrical devices. Figure 5: System Flow 7 Figure 6: flow chart diagram 15 Figure 7: block diagram flow of the system 16 Figure 8: Capacitor 19 Figure 9: Resistor 19 Figure 10: Inductor 20 Figure 11: Small inductance inductor 20 Figure 12: PIC 16 F 877A (DIP IC) 21 Figure 13: Thermistor 21 Figure 14: Voltage Regulator IC 21 Figure 15: Light Emitting Diode 22 Figure 16: Triode Vacuum Tubes (valves) 22 Figure 17: Bridge Rectifier 23 Figure 18: Diode 23 Figure 19: Transistor 23 Figure 20: block diagram flow of the meter system 24 Figure 21: Pulsating DC 25 Figure 22: Filter to smooth the pulsating waveform to DC ripple waveform 25 Figure 23: Voltage Regulator 26 Figure 24: Step down 240VAC voltage as a voltage signal 27 Figure 25: Equation for transformer 28

xii FIGURE PAGE Figure 26: Ohm s Law in finding the voltage value 29 Figure 27: Ohm s Law for current (I) value 30 Figure 28: Current sensing circuit 30 Figure 29: the binary to decibel number 35 Figure 30: grouping for the 7 segment display. 36 Figure 31: meanings for the grouping of the 7 segment 36 Figure 32: calculation for total power value 36 Figure 33: flow of the cost calculation 37 Figure 38 : CCS Compiler 38 Figure 39: Choosing the model of the PIC 39 Figure 40 : Windows of Bits Setting 40 Figure 41 : Generating Coding in CCS Compiler 40 Figure 42: Generating the HEX. File coding 41 Figure 43: WINPIC800 Software 42 Figure 44: WINPIC800 Setting Software 43 Figure 45: Choosing BOOTLOADER file 43 Figure 46: Finished burning coding to PIC by WINPIC800 44 Figure 47: Draft of the system 46 Figure 48: Completed Meter System 47

xiii LAMPIRAN MUKA SURAT LAMPIRAN A : PIC DATA SHEET 54 LAMPIRAN B : PIN DIAGRAM 55 LAMPIRAN C : DEVICE OVERVIEW 56 LAMPIRAN D : PIC16F877A BLOCK DIAGRAM 57 LAMPIRAN E : PIC16F877A PINOUT DESCRIPTION 58-61 LAMPIRAN F : INSTRUCTION SET SUMMARY 62-63 LAMPIRAN G : INSTRUCTION DESCRIPTION 64-68

CHAPTER 1 INTRODUCTION 1.1 Introduction Malaysia is toward to a develop country and the utility is becoming very high burden for the public especially to pay the rate of electricity bills. With this, we open this opportunity to develop a new product which can calculate and presented the cost of power electric usage through a display device which is inexpensive, small size and clarity to the users. Elements of electronics hardware, digital system, programming and digital display are applied and combined into our products to make them more easy to use. Industries mostly will spend 24 hours [1] [2] [4] [5] for electricity and home housing mostly will spend an average of 18 hours a day in electricity usage. [2] [3] [4] [6] [7] [8] Payment of electricity bills usually dependents on the usage of the electricity. The more users utilize the electricity, the higher the more the user have to pay for their utility. To create awareness, users need to have a system where it can monitor the usage of the electricity. Based on this idea, Cost Monitoring Digital Power Meter device will be designed and developed. This device will measure the usage of electric power and calculate the cost of the electricity used daily for instances in houses or factories. This system will indirectly help the users to monitor the usage in electricity which will help them to control and overcome any wastage. The main purpose of the product is to overcome the electricity wastage by giving awareness for the users by monitoring and keep track on their daily power usage. Power Consumption Meter is an automatic system to calculate the cost base on electric power unit that is used by electricity users. 1

Figure 1: electric usage in industry. Figure 2: electric consumption by industry. From the figure 2 the largest users of electricity in the industrial sector were basic non-ferrous metal products that is 17.9PetaJoule. For agriculture, agricultural services and hunting is 5.0PetaJoukle, log saw milling and timber dressing was 4.4PetaJoule, and paper and paper products were 7.0PetaJoule. Wholesale and retail trade were the largest commercial users, which is 7.6PetaJoule, accommodation, 2

cafes and restaurants is 3.6PetaJoule and finance, insurance, property and business services is the less, it was 3.5PetaJoule. [5] *peta=10^15 Figure 3: electric usage in home housing. Figure 3 is a graph that is showing about the electric power consumption of a home housing in US, the graph show the electric consumption time is about 16hours and it starting increased from time 4am then it is slightly decreased from 4am till 6am, then it is increased highly from 6am when people is rushing for school and work, but it dropped about 1hour after that. Then the consumption starting increased again on 8am till it reaches the maximum because of daily activities then it is slightly decreased till rest time that is 9pm. [7] This system will indirectly help the users to monitor the usage in electricity which will help them to control and overcome any wastage. Therefore the purpose of this project is to overcome the electricity wastage by giving awareness for the electricity users by monitoring and keep track on their daily power usage. With this system, it can help industries and home housing save a lot of money for paying the electric bills by monitoring and planning their daily spend for the electric power usage. Because of the unstable economic flowed many of individual, private and also government needs this technologies in term of reducing their bill payment. As we know the electrical energy consumption is proportional towards the usage of electrical devices. The higher the usage of electrical devices, the higher the electrical power used which will lead to higher bill costing. Users do not realize that if they did not switch off the electrical devices, this will lead to the increment of the 3

electrical billing cost. Hence a bill monitoring electric power meter is developed to monitor the usage and spending of electricity. [9] [10] Figure 4: electrical energy consumption is proportional towards the usage of electrical devices. The concepts of this system is each time the electricity users is using the electricity, the LCD display will show the cost, and digital counter will show the unit of power that have been used by the user. All information and notification will be shown on the LCD displays. By using this product, users are able to manage their electricity consumption in daily used. Customer can compare the original meter reading from supplier with our product to ensure either the usage is synchronized. The monitoring power meter are able provide information about power flow and demand and help identify the total of the cost. Effective monitoring programs are important for power reliability assurance for both utilities and customers. While power quality problems can and do occur on utility power systems, many surveys have shown that most customer power quality problems originate within the customer facility. With this in mind, it is clear that monitoring is essential for both power suppliers and users to ensure optimal power system performance and effective energy management. Cost Monitoring Digital Power Meter can provide information about power flow and demand and help identify the cause of power system disturbances. It can even help identify problem conditions on a power system before they cause interruptions or disturbances. Effective monitoring programs are 4

important for power reliability assurance for both utilities and customers. While power quality problems can and do occur on utility power systems, many surveys have shown that most customer power quality problems originate within the customer facility. With this in mind, it is clear that monitoring is essential for both power suppliers and users to ensure optimal power system performance and effective energy management. Metro Power Enterprise offers product to help users monitor and manage power system. These solutions provide powerful access and analytical capabilities along with event notification, with a high degree of flexibility. 1.2 Background of problems As we know, the electrical energy comsumption is proportional towards the usage of electrical devices. The higher the usage of electrical devices, the higher the electrical power used which will lead to higher bill costing. Users do not realise that if they did not switch off the electrical devices, this will lead to the increament of the electrical billing cost. Hence, Cost Monitoring Digital Power Meter is developed to monitor the usage and spending of electricity. This system will indirectly help the users to monitor the usage in electricity which will help them to control and overcome any wastage. Therefore the purpose of this project is to overcome the electricity wastage by giving awareness for the electricity users by monitoring and keep track on their daily power usage. With this system, it can help industries and home housing save a lot of money for paying the electric bills by monitoring and planning their daily spend for the electric power usage. Because of the unstable economic flowed many of individual, private and also government needs this technologies in term of reducing their bill payment. 5

1.3 Objectives The objectives of this project are: 1. To study on the users comment on increase of electricity billing cost. 2. To design a system that will monitor the usage of electrical energy being used by users. 3. To design a system that calculates the payment for the electrical energy being used by users. 4. Electric users can plan out on their daily power usage by monitoring the cost that is show by the device. 1.4 Scope Firstly, the electric power from Tenaga Nasional Berhad (TNB) will be sent to electrical power meter located at the user s house or factories. The input power that is sending by Tenaga Nasional Berhad (TNB) will connected through the meter then electric power will be converting to digital waveform to peak the clock of the counter, and then the counter will show the units of the power that is used by the user through the LCD display. The digital data that is from step up counter will be transferred to the PIC16F877 microcontroller [11] [12]. The digital data that was transferred to PIC16F877 microcontroller will be analyzed and the cost will be calculated based on the program which was integrated in the PIC16F877, The cost of the units based on the electric power will be shown in LCD [13] [14]. This can be seen in Figure 5. 6

Figure 5: System Flow 1.4.1 Flow of the System PIC16F877 is one of the most commonly used microcontrollers especially in automotive, industrial, appliances and consumer applications. In this section, properties of PIC16F877 microcontroller, CCS compiler, ICD-S, the reference book Embedded C programming and the microchip PIC will be used for software implementations [15]. Following are the reasons why microcontrollers are incorporated in project systems: a. Cost: Microcontrollers with the supplementary circuit components are much cheaper than a computer with an analog and digital I/O b. Size and Weight: Microcontrollers are compact and light compared to computers c. Simple applications: If the application requires very few number of I/O and the code is relatively small, which do not require extended 7

amount of memory and a simple LCD display is sufficient as a user interface, a microcontroller would be suitable for this application. d. Reliability: Since the architecture is much simpler than a computer it is less likely to fail. e. Speed: All the components on the microcontroller are located on a single piece of silicon. Hence, the applications will run much faster than it does on a computer. 1. The functionality of the components such as digital counter, 240volts AC power step down transformer, I/O Ports will be explained in detail as they will being used for this project, the fundamental concepts would be better understood and, the reader can flashback to this section to view the schematics and the specifications. 2. This project is base on cost monitoring for electric power usage, so the digital counter will be implemented to sense the electric power unit as an input signal for the PIC controller [16]. Therefore, the calculation programming system application will be using. LCD screen will be implemented as the output of the mechanism. In this project, C language will be used in the PIC16F877 which will do the calculating process. 1.5 Importance of Study Base on survey and study on the electrical power consumption by the user s to get the idea of designing a system which is user friendly and efficient to observe the usage and spending electrical energy. Metro Power Enterprise has wide knowledge and experiences in research and development of power solution applications. Almost all of our current staffs have a research background and are actively doing research in the power technical areas, power application market and its trends and users needs. We will continue to conduct R&D to ensure that our products are competitive on the market, will not obsolete quickly, and we are able to produce innovative products that support the current market needs and trends. The Cost Monitoring Digital Power Meter is important to develop system due to the market needs. Research on the condition to be convenient up the Cost 8

Monitoring Digital Power Meter user, the circuit will be integrated in PIC, and impact of the actions are continuously conducted to create the best products which can be used to help the user by let them plan how to use the electric power, thus creating satisfied while using it. This satisfactions will increase the amount of time that the user will use the products, thereby increasing the effectiveness of the program thus help us quickly gain market share. This project is important to giving awareness for electric utility users. This system can be applied on housing and industries where it is used as power meter and cost calculation. Due to this, electric power is not widely utilizes, and thus user have to pay very expensive price. If this project proves that the meter are showing same value as the appearance meter nowadays, then there will be investors to invest on this system because it have market. This will reduce the cost of paying for wasted electric energy. Hence, there will be wise applications of this system in future. 9

CHAPTER 2 LITERATURE REVIEW This chapter describes the system design and methodology of the study. The study is done by reviewing each part of the process. Each part required the design of the idea and related system for the Cost Monitoring Digital Power Meter system. The methods are also discussed through this chapter. 2.1 Related system Chun-Lien Sua, and Jen-Ho Teng (2007); They stated that deregulation of electric power industry has motivated electricity customers to pay more attention in evaluating both the direct cost of electric service and the monetary value of reliable electric service. This movement has been recognized by the utilities and the valuebased aspects are introduced into the planning and design of power systems to consider the outage costs [17]. With this electric consumer will pay more attention to prevent the waste of electric energy power, with this a lot of electric energy will not be wasted. Single Phase Low Voltage PLC Energy Meter operation data and PC management function of energy data. The power line carrier wave technology is applied for the communication between the data concentrator and each data collector and data remote transmitter terminals for realizing the dual-direction data transmission. Meanwhile the data interchange between the data concentrator and main station PC is processed through public network or other ways. The management of energy data gathering, price/payment calculation, power line loss calculation and report creation have been entirely automat zed and computerized. The master 10

computer is installed in the power authorities, and it communicates with the meterreading concentrator through the public line. The meter-reading software is installed in the master computer, and it is a consummate power consumption management system integrating the functions of meter file management, meter data collection, meter data management and meter abnormality analysis. The software is developed by DELPHI7. The ACCESS97 database is the existing database at the software launch. The system user can upgrade the database to ACCESS2000 or higher edition [18]. This system is a system that is used to calculating the cost of based on the usage and the timing for serving internet. The total cost of serving internet will be shown on the LCD screen based on the calculation and the speed data that have been transfer. Phason electronic control system The PLC case study is an overview of the features of Phason.s PLC-1 and PLC-2 Programmable Lighting Controls. The case study briefly explains the features and electrical ratings of the controls and then shows an example of how to create a lighting program [19]. This is a system from Phason Company (a smart electric lighting device manufacturer) that have design a system by using PLC to control and manage the usage of lighting to prevent energy waste by using PLC as switching to control (ON / OFF) of the switch by detecting whether the place have people or not, based on the system it will show the and calculate the electric consuming value in the LCD screen. Shun-Yu Chan, Jen-Hao Teng, Chia-Yen Chen, David Chang (2010) This peoples tries to use USB and personal digital assistant to develop a novel power quality (PQ) monitoring platform and then integrates GPRS technique into the proposed PQ platform to realize a wide-area PQ monitoring and report-back system. The works of this paper can be divided into three parts. First, a small-scale PQ monitoring platform with appropriately designed I/O interfaces and peripherals is designed and implemented. Next, a GPRS module which can be integrated into the designed PQ monitoring platform is developed. Finally, a web server with welldesigned database and web human machine interfaces used to record abnormal PQ data and display PQ data are designed [20]. This system is a system that can calculate the total number of data and the accuracy of the GPS system based on the power transfer and received of the PQ digital data value that have flowing of the GPS 11