Performance Based Contracting in UK. Paresh Tailor Highways Agency, UK

Similar documents
EBRD Transport & Energy in Serbia

The Highways Agency is working to improve the M3 between junctions 2 to 4a.

SEPULVEDA PASS CORRIDOR

TER WP2 Transport Challenges and Global Crisis. Dr. Klaus Schierhackl, CFO Bad Gastein,

THE UK RAIL MARKET 2015

Ranhill Berhad (RANHILL) - Oil & Gas - Deals and Alliances Profile

Pametno gospodarenje cestovnom infrastrukturom Smart Management of Road Infrastructure Christophe Nicodème, ERF

Presentation to the Portfolio Committee on Transport Gautrain Update. Jack vd Merwe (Pr. Eng) CEO: Gautrain Management Agency 25 August 2009

Kathrine Wilson-Ellis Strategic Safety Team. Phil Proctor Future Technologies

Interim Advice Note 137/10. The use of Stepped Speed Limits at Roadworks. Interim Advice Note 137/10 Stepped Speed Limits

Submission to the Transport and Public Works Committee s inquiry into the operations of toll roads in Queensland

USDOT CMAQ Program. Southeast Diesel Collaborative Annual Conference September, 2017

REGIONAL MEETING ON SUSTAINABLE ENERGY

Reducing CO 2 emissions from vehicles by encouraging lower carbon car choices and fuel efficient driving techniques (eco-driving)

Modernising the Great Western railway

Providing Safety. Convenience. Mobility.

SMART MOTORWAYS. April 2016

Illinois Renewable Energy Portfolio Net Metering Grid Interconnection Requirements Financing Options

Mobility on Demand, Mobility as a Service the new transport paradigm. Richard Harris, Xerox

Madhya Pradesh Road Development Corporation: A Case Study of ADB Assistance for Institutional Development in the Transport Sector in India

A successful PFI & PPP Model of Smart Street Light Implementation

NATIONAL WORKSHOP FOR PROMOTION OF LOW SULPHUR FUELS IN BOTSWANA, MARCH 2016.

Evonik Corporate Venturing. Dr. Jürgen Finke Ecosummit 2012, Neuss November 14, 2012

Independent supplier and installer of electric vehicle charging solutions.

Post Opening Project Evaluation. M6 Toll

Innovation in Transport. Mike Waters

Road Tolls and Road Pricing Innovative Methods to Charge for the Use of Road Systems

Hinkley Point C our approach to Health and Safety Iain Graham Head of Health & Safety

3 dimensions of fuel pricing Political steps and principles of setting effective fuel pricing mechanisms

Copyright 2016 by Innoviz All rights reserved. Innoviz

irap Innovation Workshop 2016 Maximising Travel on 3-Star or Better Roads

Procurement notes for councils (Scotland)

siemens.co.uk/traffic Driving tomorrow s cities Transport and mobility solutions

The German Tolling Prospects

16th World Road Meeting 4.1 PPP for Urban Road Network 11:00~13:00, May 26, 2010

The London Low Emission Zone. Nick Fairholme Head of the LEZ Transport for London

KCB GROUP PLC INVESTOR PRESENTATION. Q FINANCIAL RESULTS

ARC TAQC. June 12, 2014

Renewable Energy System Tariffs and Pricing

NATIONAL REPORT: SPAIN. At 31/12/2015

PROMOTING POSITIVE ENVIRONMENTAL BEHAVIOUR CHANGE AT CROSSRAIL THE GREEN LINE RECOGNITION SCHEME. Cathy Myatt, Lorna Mellings & Kenny Hills

Christos Koulouris CEO, Invision Consulting S.A.

CANADA LINE a Canadian P3 Success Story

MONTHLY PERFORMANCE DASHBOARD

Central London Congestion Charging Scheme. 17 March 2005 Impacts - 9 th Annual Conference. Michele Dix Director Congestion Charging Division

GUIDE FOR VAN DRIVERS

INVESTING IN GLOBAL GROWTH OPPORTUNITIES AND CHALLENGES FOR UK SUPPLY BASE.

CMAA P3 Conference September 27, Kathleen Sanchez, LA Metro Mike Schneider, HDR/InfraConsult

Newcastle/Gateshead Low Emission Zone Feasibility Study

Submission to Greater Cambridge City Deal

Institutional Presentation

Congestion tax in Stockholm - Effects and Lessons learned

Strategies for expanding shared use of ultra low emission vehicles in GB. Chas Ball, Chief Executive, Carplus e-bridge Conference Berlin

Institutional Presentation

The Gambia National Forum on

TEMPLATE OF THE NATIONAL REPORT

Zero Emission Bus Deployment Best Practices and Lessons Learned from Around the World

APP/P1.2/SCH. Scheme Overview Summary Proof of Evidence Peter Adams

Glendale Water & Power Smart Grid Project

The Health Benefits of Public Transport. Vince Hills Business Development Officer - Nexus

MICHELIN A better way forward

Broward County Intermodal Center And People Mover. AASHTO Value Engineering Conference Presentation. September 1, 2009 San Diego, CA

IMPROVING CITIES THROUGH PUBLIC-PRIVATE PARTNERSHIPS. Toronto Forum For Global Cities December 2008

PT Bank Bukopin Tbk - Strategy, SWOT and Corporate Finance Report

Success Story Scaling Up Energy Efficiency An Indian Experience

Enderby Park & Ride, Leicester

Dallas Integrated Corridor Management System Lessons Learned. June 2, 2014

Realigning the Pacific Humanitarian Team Approach. Pacific Humanitarian Partnership Meeting Thursday 20 October 2016

Positive Train Control (PTC)

Phone: Website: CAPABILITY STATEMENT. Energy Efficiency & Sustainability Engineers

The potential for insurance markets to reduce road trauma. Samantha Cockfield, Manager Road Safety

A Joint initiative by ProRail and Network Rail for ETCS Level 3 Hybrid Demonstration

London s residential EV Charging Future

BIMB Holdings Berhad - Strategy, SWOT and Corporate Finance Report

4-6 October 2016 The NEC, Birmingham, UK. cleanenergylive.co.uk

Head of Division for Road Traffic Technology; Road Infrastructure Safety; Routine Road Maintenance Management

Converting BRT to LRT in the Nation s Capital Ottawa, Canada. John Manconi City of Ottawa Ottawa, Canada

HELICOPTER OPERATIONS WITHIN THE LONDON HEATHROW AND LONDON CITY CONTROL ZONES

THE UK RAIL REPORT 2018

MONTHLY PERFORMANCE DASHBOARD

Best Practices in Intercity Rail An Infrastructure Manager s Perspective. Nigel Ash Managing Director, Network Rail Consulting TRB January 2014

Automotive Sector. Foreign Direct Investment Department Italian Trade Agency Rome. London 20th September 2016

How will high speed rail transform the sheffield city region

THE PARTNERSHIP OF RAIL & COAL MOVING AHEAD 2014 RMCMI ANNUAL MEETING SEPTEMBER 19, 2014

Draft Results and Recommendations

Sustainable transport better infrastructure - The Danish Government s vision for green infrastructure

Draft Results and Open House

Site Stakeholder Group

Low Cost Affordable Trams

Stronger road safety. in South Australia. Presented by Tamra Fedojuk Senior Statistician Road Safety Policy

ECONOMIC AND FINANCIAL ANALYSIS: PROJECT 1

Symposium on Mileage-Based User Fees. International Applications Germany

P.O BOX 429, NUKU ALOFA, Tel: (676) Fax: (676)

Congestion Charging in London

Click to edit Master title style

Rapid Transit Implementation Working Group #4 February 9, 2017

BACS APPROVED BUREAU SCHEME SUPPORT GUIDELINES

Overview. A fact sheet from Feb 2015

Public sector finances, UK: August 2018

Statistical tables S 0. Money and banking. Capital market. National financial account. Public finance

Transcription:

Performance Based Contracting in UK Paresh Tailor Highways Agency, UK

DBFO History Early PFI projects Queen Elizabeth II bridge, Second Severn, Birmingham North Relief Road DBFO part of the Government s Public Private Partnership (PPP) Initiative where the private sector take over traditionally public sector roles to give better value for money. DBFO concept published in green paper Paying for Better Motorways 1993.

Objectives to ensure that the project road is designed, maintained and operated safely to transfer the appropriate level of risk to the public sector to promote innovation (technical / financial) to foster the development of a private sector road-operating industry in the UK to minimise financial contributions from the public sector

DBFO Projects Awarded Tranche 1 & 1a Works Payment Contract Cost Mechanism Award A69 Newcastle to Carlisle $18.8m Shadow tolls Jan 1996 A1(M) Alconbury to Peterborough $256m Shadow tolls Feb 1996 A417/A419 Swindon to Gloucester $98m Shadow tolls Feb 1996 M1-A1 Motorway Link, Leeds $428m Shadow tolls Mar 1996 A50/A564 Stoke to Derby Link $41.2m Shadow tolls May 1996 A30/A35 Exeter to Bere Regis $151.4m Shadow tolls July 1996 M40 junctions 1-15 $74.2m Shadow tolls Oct 1996 A168/A19 Dishforth to Tyne Tunnel $58.8m Shadow tolls Oct 1996

Roads Programme Total Number of Schemes (incl. completed schemes) 113 Comprised of: Motorway Widenings 31 Trunk Road Widenings 28 Junction Improvements 22 Bypasses 32 Schemes Completed 47 Total value of schemes remaining $24bn

DBFO Projects Awarded Tranche 2 Works Payment Contract Cost Mechanism Award A13 Thames Gateway, London $292m Lane Apr 2000 (Transferred to TfL in July 2000) availability A1 Darrington to Dishforth $490m Congestion Feb 2003 A249 Stockbury to Sheerness $200m Congestion Feb 2004

M40 A30 A50 M6 Toll NTCC A249 A1DtoD NRTS M25 M1/A1 A19 A69 A1M A417/419 4 3.5 3 2.5 2 1.5 1 0.5 0 1996 Highways Agency PFI Portfolio Contract 01 03 04 05 06 08 Scheme Cumulative Capital value Billions

Typical DBFO Structure Secretary of State Highways Agency Department's Agent (FM / PFC) Department s Representative (Highways Agency) DBFO Agreement (inc. Direct Agreement) Funders (Stakeholders) (Bank Loans) (Bond Finance) DBFO Company Finance Company Construction Contracts O & M Contract Contractor Operation and Maintenance Design Contract Designer Design sub-consultants Total No. of contracts: 150+

Core Service Delivery Requirements DBFO companies must comply to: Provide a safe highway reducing casualty and maintaining safe & serviceable network Minimise disruption (reliability) minimise delays from incidents and maintenance Keep travellers informed keeping technology working

Key Benefits of DBFO Contracts Fostering development of a private sector road operating industry Better outturn cost certainty More reliable and accurate expenditure forecasts Transfer of appropriate levels of risk to private sector Improved partnerships between public and private sectors Provide scope for innovation in all areas including finance Overall, provides better value for money

DBFO has delivered.. Public sector Private sector Customer Value for money Security, revenue stream Safer, more reliable service

NEXT DBFO PROJECT M25 London Orbital New-build cost: $3 $4bn O/A cost (incl. O&M): $10bn

Performance Criteria Areas Lane Availability Route Performance Condition Criteria Safety Performance Proactive Management

Where next with performance based contracting Recently developed a Toolkit for Performance Measurement for all contracts in response to the Highways Agency s key organisational drivers and commissioning objectives Continued performance improvement Long-term relationship with Suppliers Benchmarking Performance Identification of Best Practice Learning Lessons

Toolkit for Performance Measurement Product Service Right First Time Cost Time Safety Client Perf Team Culture

Performance measured Radar diagrams can be used to present all Areas of Measure scores for a given measurement period. Areas of poor and excellent service can readily be identified. 8.0 7.0 6.0 5.0 4.0 3.0 2.0 1.0 0.0 Communicatio n Product 0 506 Q2 0 506 Q3 0 405 Q4 0 506 Q1 0 506 Q4 0 607 Q1 0 607 Q2 8.0 7.0 6.0 5.0 4.0 3.0 2.0 1.0 0.0 Responsive ness Service 0506Q2 0506Q3 0405Q4 0506Q1 0506Q4 0607Q1 0607Q2 Product 8.0 Health & Safety Safety 8.0 Teamwork Right First Time 7.0 7.0 6.0 6.0 5.0 5.0 4.0 4.0 Safety Service 3.0 2.0 1.0 0.0 0405Q4 0506Q1 0 506 Q2 0 506 Q3 0 506 Q4 0 607 Q1 0 607 Q2 3.0 2.0 1.0 0.0 0405Q4 0506Q1 0506Q2 0506Q3 0506Q4 0607Q1 0607Q2 8.0 Risk Mmt Safety Time 8.0 ECC Use Right Cost First Time 7.0 7.0 6.0 6.0 5.0 5.0 4.0 4.0 3.0 3.0 2.0 2.0 Cost Time 1.0 0.0 0 405 Q4 0 506 Q1 0 506 Q2 0 506 Q3 0 506 Q4 0 607 Q1 0 607 Q2 1.0 0.0 0405Q4 0506Q1 0506Q2 0506Q3 0506Q4 0607Q1 0607Q2 Right First Time Line graphs or histograms can be used to identify trends in performance for Area of Measure or Performance Indicator level.

Thank You