COMPONENTS ILLUSTRATION

Similar documents
CYLINDER HEAD GASKET (2AZ-FE)

CAMSHAFT (LH BANK) (2GR FE) ENGINE MECHANICAL 1424N 01 REPLACEMENT

25. REMOVE OIL PIPE NO.1 (a) Remove the 2 oil pipe unions, and oil pipe No.1. (b) Remove the oil control valve filter LH and gaskets.

11. REMOVE OIL PAN SUB ASSY NO.2 (a) Remove the 18 bolts and 2 nuts.

REPLACEMENT HINT: 11. REMOVE V RIBBED BELT TENSIONER ASSY (a) Remove the 5 bolts and V ribbed belt tensioner.

REMOVAL 7. DISCONNECT ACCELERATOR CABLE FROM THROTTLE BODY. 8. DISCONNECT HOSES (a) Remove the 2 bolts from the air intake chamber assembly.

1ZZ-FE ENGINE MECHANICAL ENGINE UNIT DISASSEMBLY. If you paid for the content in this manual you were screwed!

OVERHAUL 1. REMOVE OIL FILLER CAP SUB ASSY. 2. REMOVE CYLINDER HEAD COVER SUB ASSY (a) Remove the 10 bolts, 2 nuts, cylinder head cover and gasket.

26/01/2017 3GR-FSE ENGINE MECHANICAL: ENGINE UNIT: DISASSEMBLY; 2006 MY GS300 [01/ ]

REPLACEMENT. 1. REMOVE CYLINDER HEAD COVER NO.2 (a) Remove the 4 nuts and cylinder head cover No. 2.

OVERHAUL 1. REMOVE OIL FILLER CAP SUB ASSY. 2. REMOVE OIL FILLER CAP GASKET (a) Using a screwdriver, remove the gasket from the oil filter cap.

OVERHAUL. 1. REMOVE W/HEAD TAPER SCREW PLUG NO.2 (a) Using a socket hexagon wench 10, remove the taper screw plug and gasket.

CYLINDER HEAD ASSY (1MZ FE)

VALVE CLEARANCE (1NZ-FXE)

6/6/2018 2ZR-FXE Engine Mechanical: Camshaft: Removal 2012 Toyota Prius V MotoLogic

13. INSTALL NO. 2 CHAIN VIBRATION DAMPER 14. INSTALL TIMING CHAIN COVER OIL SEAL

INSTALLATION EM 21. Inward. Sensor. Plate Washer. 10 mm Hexagon Wrench SST. Fulcrum Length SST TIMING BELT ENGINE MECHANICAL 2002 AVALON (RM872U)

Technical Service BULLETIN

OVERHAUL 1. REMOVE CYLINDER BLOCK WATER DRAIN COCK SUB ASSY

1GR-FE ENGINE MECHANICAL: TIMING CHAIN: INSTALLATION (2007 4Runner) Model Year: 2007 Model: 4Runner Doc ID: RM WS002X

2005 Toyota Truck RAV4 2WD L4 2.4L (2AZ FE)

OVERHAUL. 1. REMOVE OIL FILLER CAP SUB ASSY (a) Remove the oil filler cap from the cylinder head cover.

REMOVAL. 5. REMOVE OIL DIPSTICK GUIDE (a) Remove the bolt, dipstick guide and engine wire bracket. (b) Remove the O ring from the dipstick guide.

TIMING CHAIN COMPONENTS

Timing Belt: Service and Repair. Toyota Truck Sienna LE V6-3.0L (1MZ-FE) 2002

Page 1 of 25. Service and Repair REMOVAL SIZED FOR PRINT. Related Components

REPLACEMENT. 12. REMOVE ENGINE MOVING CONTROL ROD (a) Remove the 5 bolts, the engine moving control rod and the engine mounting stay.

V160 MANUAL TRANSMISSION MT2 1

REMOVAL 1. DRAIN ENGINE COOLANT 2. REMOVE THROTTLE BODY COVER 3. DISCONNECT TIMING BELT FROM CAMSHAFT TIM- ING PULLEYS (See page EM 14)

TIMING BELT (1MZ FE Jan., 2003)

2001 ACCORD - Timing Belt and Balancer Belt Installation

EG 18 ENGINE MECHANICAL TIMING BELT EG5EK 01 COMPONENTS FOR REMOVAL AND INSTALLATION

2/17/2017 Timing Belt Service and Repair, Removal and Replacement

Technical Service BULLETIN

2AZ-FE Engine Oil Consumption Repair Procedure

12. REMOVE ENGINE MOVING CONTROL ROD (a) Remove the 4 bolts, the engine moving control rod and the bracket.

EG-34 ENGINE MECHANICAL TIMING BELT COMPONENTS FOR REMOVAL AND INSTALLATION

Service and Repair. a. Remove the 2 nuts and 2 upper radiator support. b. Lift out the radiator and cooling fan assembly.

REMOVAL. 16. LOOSEN CRANKSHAFT PULLEY BOLT Using SST, loosen the pulley bolt. SST ( ), EM 20 SST TIMING BELT

CYLINDER HEAD COMPONENTS FOR REMOVAL AND INSTALLATION

2000 Toyota Truck Tundra. Timing Belt: Service and Repair

2004 Toyota CAMRY. Submodel: Engine Type: L4 Liters: 2.4 Fuel Delivery: FI Fuel: GAS

INSTALLATION. Check that the idler pulley moves smoothly.

2003 Toyota Truck Highlander 2WD V6-3.0L (1MZ-FE) Copyright 2013, ALLDATA Page 1

8/14/2016 8:12 PM. Bolt: Part No for Type B

INSPECTION. (b) Using a wire brush, remove all the carbon from the combustion NOTICE:

OVERHAUL. 1. REMOVE VALVE LIFTER HINT: Arrange the valve lifter in the correct order.

2004 Lexus LS430. Submodel: Engine Type: V8 Liters: 4.3 Fuel Delivery: FI Fuel: GAS

EM 38 2TR-FE ENGINE MECHANICAL CAMSHAFT REMOVAL

Technical Service BULLETIN

REPLACEMENT 1. REMOVE FRONT WHEEL

INSTALLATION EM 8 1NZ-FE ENGINE MECHANICAL DRIVE BELT INCORRECT CORRECT. Generator Vehicle Front A077960E03. Adjusting Bar. Bolt A. Bolt B.

20.Cylinder Block. Cylinder Block A: REMOVAL ME(H4DOTC)-63 ST CRANKSHAFT STOPPER

Toyota Camry CE Sedan L4-2.2L DOHC (5S-FE) MFI Timing Belt: Service and Repair

10. SEPARATE COMPRESSOR (a) Remove the nut, 3 bolts compressor stay and compressor. HINT: Hang up the hoses instead of detaching.

ENGINE ASSEMBLY. COMPONENTS (Part 1)

tr.html

2004 Toyota Truck Tundra 4WD V8 4.7L (2UZ FE)

75 5 ENGINE HOOD/DOOR

INSTALLATION. NOTICE: Do not scratch the angle sensor of the timing pulley.

DESCRIPTION. Exhaust Heat Recirculation System Circuit

OVERHAUL NOTICE: 7. REMOVE BRAKE MASTER CYLINDER (a) Disconnect the 5 connectors from brake master cylinder.

Rear Door: Service and Repair REAR DOOR

INSTALLATION. 6. SET NO.1 CYLINDER TO TDC/COMPRESSION (a) Temporarily install the crankshaft pulley bolt to the crankshaft.

OVERHAUL. 1. REMOVE FRONT DOOR LOWER FRAME BRACKET GARNISH LH (a) Using a screwdriver, remove the lower frame bracket garnish.

TIMING BELT COMPONENTS

6. Cylinder Block SERVICE PROCEDURE A: REMOVAL 1. RELATED PARTS

). 1. REMOVE FR WIPER ARM RH

OIL AND FILTER INSPECTION

IGNITION SYSTEM ON-VEHICLE INSPECTION NOTICE:

TECHNICAL INSTRUCTIONS FOR SAFETY RECALL ALE VALVE SPRING AND LASH ADJUSTER REPLACEMENT GS 350: IS 350:

TOYOTA COROLLA LOWERING SPRINGS Preparation

2.2L 4-CYL - VIN [S]

7. CYLINDER HEAD/VALVES

WARNING: ALWAYS relieve fuel pressure before disconnecting any fuel related component. DO NOT allow fuel to contact engine or electrical components.

Timing Belt: Service and Repair

Timing Belt: Service and Repair Timing Belt Replace. Timing Belt Removal

2003 Nissan-Datsun Truck Frontier 4WD V6-3.3L (VG33E)

MECHANICAL(H4DOTC DIESEL) > Cylinder Block INSTALLATION 1. After setting the cylinder block to ST, install the crankshaft bearing.

ON VEHICLE INSPECTION NOTICE:

SHOCK ABSORBER ASSY FRONT LH

3/13/ :32 AM. NOTICE: Do not disconnect the hose.

TIMING BELT (5S FE) COMPONENTS

(a) Remove the rear floor service hole cover. (b) Disconnect the fuel pump connector.

2AZ-FE Engine Oil Consumption

CO/HC INSPECTION HINT:

REMOVE FRONT WHEEL RH

COMPONENTS ILLUSTRATION

EM-81 EM0Z7-01 DISASSEMBLY

2AZ-FE Engine Oil Consumption

Technical Service BULLETIN

REMOVAL. 1. REMOVE ENGINE UNDER COVER 2. DRAIN ENGINE COOLANT 3. REMOVE RADIATOR ASSEMBLY (See page CO 1 5) 4. REMOVE DRIVE BELT (See page 1) CH

ENGINE OVERHAUL <2.4L ENGINE>

Drive/Propeller Shaft: Service and Repair

ENGINE TUNE-UP INSPECTION OF ENGINE COOLANT INSPECTION OF ENGINE OIL INSPECTION OF BATTERY. INSPECTION OF AIR FILTER (Paper Filter Type)

Oil Pan Seal Cutter Oil Filter Wrench Transmission & Transfer Bearing Replacer. ( ) Replacer Pipe

5. Cylinder Block. 2-3b [W5A1] SERVICE PROCEDURE A: REMOVAL 1. RELATED PARTS


VALVE CLEARANCE (3ZZ FE/4ZZ FE)

PROPELLER SHAFT PR 1

Transcription:

COMPONENTS ILLUSTRATION ILLUSTRATION

REMOVAL 1. REMOVE CAMSHAFT HOUSING SUB-ASSEMBLY (a) Remove the camshaft housing sub-assembly. 2. REMOVE NO. 1 EXHAUST MANIFOLD HEAT INSULATOR 3. REMOVE MANIFOLD STAY 4. REMOVE EXHAUST MANIFOLD 5. REMOVE NO. 1 VALVE ROCKER ARM SUB-ASSEMBLY 6. REMOVE VALVE LASH ADJUSTER ASSEMBLY 7. REMOVE VALVE STEM CAP 8. REMOVE CYLINDER HEAD SUB-ASSEMBLY (a) Using a 10 mm bi-hexagon wrench, uniformly loosen and remove the 10 cylinder head bolts and 10 plate washers in several steps in the sequence shown in the illustration. Be careful not to drop washers into the cylinder head. Head warpage or cracking could result from removing the bolts in the wrong order. (b) Using a screwdriver with its tip wrapped with tape, pry between the cylinder head and cylinder block, and remove the cylinder head. Be careful not to damage the contact surfaces of the cylinder head and cylinder block. 9. REMOVE CYLINDER HEAD GASKET (a) Remove the cylinder head gasket.

INSTALLATION 1. INSPECT NO. 1 VALVE ROCKER ARM SUB-ASSEMBLY 2. INSPECT VALVE LASH ADJUSTER ASSEMBLY 3. INSPECT CYLINDER HEAD SET BOLT 4. INSPECT CYLINDER HEAD 5. INSTALL CYLINDER HEAD GASKET (a) Apply seal packing (Diameter 4.0 mm (0.157 in.)) to the cylinder block as shown in the illustration. *1 Cylinder Block Seal packing: Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent Remove any oil from the cylinder block. (b) Place a new cylinder head gasket on the cylinder block with the Lot No. stamp facing upward.

*a Lot No. Install the cylinder head gasket within 3 minutes after applying seal packing. (c) Apply seal packing (Diameter 4.0 mm (0.157 in.)) to the new cylinder head gasket as shown in the illustration. *1 Cylinder Head Gasket Seal packing: Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

Remove any oil from the cylinder head gasket and cylinder head. Install the cylinder head gasket within 3 minutes and tighten the bolts within 15 minutes of applying seal packing. (d) After tightening the cylinder head bolts, wipe off the seal packing material seeped out from the contact surfaces between the cylinder head and cylinder block. *a Before wiping off: *b After wiping off: 6. INSTALL CYLINDER HEAD SUB-ASSEMBLY HINT: The cylinder head bolts are tightened in 3 progressive steps. (a) Place the cylinder head on the cylinder block. Make sure that no oil is on the mounting surface of the cylinder head. Place the cylinder head on the cylinder block gently in order not to damage the gasket with the bottom part of the head. (b) Install the plate washers to the cylinder head bolts. (c) Apply a light coat of engine oil to the threads and under the heads of the cylinder head bolts. (d) Step 1: (1) Using a 10 mm bi-hexagon wrench, install and uniformly tighten the 10 cylinder head bolts in several steps, in the sequence shown in the illustration. Torque: 49 N m (500 kgf cm, 36ft lbf) Do not drop the plate washers into the cylinder head.

(e) Step 2: *a Paint Mark (1) Mark each cylinder head bolt head with paint as shown in the illustration. (2) Tighten the cylinder head bolts 90 in the sequence shown in step 1. (f) Step 3: (1) Tighten the cylinder head bolts another 45 in the sequence shown in step 1. (g) Check that the paint mark is now at a 135 angle to the front. 7. INSTALL VALVE STEM CAP 8. INSTALL VALVE LASH ADJUSTER ASSEMBLY 9. INSTALL NO. 1 VALVE ROCKER ARM SUB-ASSEMBLY 10. INSTALL EXHAUST MANIFOLD 11. INSTALL MANIFOLD STAY 12. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR 13. INSTALL CAMSHAFT HOUSING SUB-ASSEMBLY (a) Install the camshaft housing sub-assembly.