SERVICE MANUAL 375 SERIES DIGGER MODELS

Similar documents
Service Manual. Example Part Number. Motor Supplier. Motor Number. Ratio. Bail Boss. Input. Model. Shaft. Cover

Service Manual. Example Part Number. Motor Supplier. Motor Number. Model. Bail Boss. Ratio. Shaft

MODEL 130L PLANETARY GEAR DRIVE WITH INTEGRAL BRAKE SERVICE MANUAL

MODEL 1000 DOUBLE PLANETARY SPINDLE DRIVE SERVICE MANUAL

D50K PLANETARY AUGER DRIVE SERVICE AND REPAIR MANUAL

Torque-Hub Planetary Final Drive S12A1 & 2 Series Service Manual

Gear Products Inc N. 161st E. Ave. Tulsa, OK Phone (918) Fax (918)

PO Box 645, Stockton, Missouri, FAX superiorgearbox.com

Torque-Hub Planetary Final Drive 7000 Series Service Manual with Brakes

Model QED-D, QED-A, QED-L

DIFFERENTIALS & AXLE SHAFTS

w w w. h d o n l i n e s h o p. d e LEFT (SPROCKET) CRANKSHAFT ROLLER BEARING KIT GENERAL INSTALLATION -J02580 REV Kit Contents Kit Number

Installation and Maintenance Instructions JSE MAEAD Extruder Clutch. World Leader in Modular Torque Limiters

DRIVE AXLE Volvo 960 DESCRIPTION & OPERATION AXLE IDENTIFICATION DRIVE AXLES Volvo Differentials & Axle Shafts

3.2 DRIVE TORQUE HUB. Roll, Leak and Brake Testing SECTION 3 - CHASSIS & TURNTABLE. 3-2 JLG Lift


HOLINGER SF GEARBOX MANUAL

DRIVE AXLE - INTEGRAL HOUSING

SINGLE SPEED AUGER DRIVES KOPENN ENGINEERING SERVICE & REPAIR MANUAL PM C

TRENCHERS SERVICE MANUAL

/ Marley Geareducer Model 3600 and 4000 / User Manual C

Installation and Maintenance Instructions JSE1-0128MAEAD Extruder Clutch. World Leader in Modular Torque Limiters

STERNDRIVE UNIT 3 B GEAR HOUSINGS MR/ALPHA ONE/ALPHA ONE SS

DRIVE AXLE Nissan 240SX DESCRIPTION & OPERATION AXLE RATIO & IDENTIFICATION AXLE SHAFT & BEARING R & I DRIVE SHAFT R & I

Model 306B H&J Transfer Case Service Manual

Off-Highway Axle Planetary Wheel Ends

BG8A and BG8B MATERIAL LIST

MANUAL TRANS OVERHAUL - BORG-WARNER - T56 6-SPEED MANUAL TRANSMISSIONS Borg-Warner T56 (MM6) 6-Speed

Installation and Maintenance Instructions JSE2-0241MAEAD Extruder Clutch. World Leader in Modular Torque Limiters

SERVICE MANUAL L130B / L4130 Series Logstacker Drive Axle With Bolt-On Stub End Retainer

Amarillo PUMP DRIVES (250 HP THROUGH 350 HP) INSTRUCTIONS FOR REPAIRING MODELS 250, 300, and 350

Service Manual. #19 Gearmatic Winch

SPARE PARTS BOOK. Industrial Axle SRDP SRDP-30-S Since S/N (7/2005) Book No. 349 (6/2007)


Transmission Overhaul Procedures-Bench Service

Parts List Single Reduction Models, Cast Iron Units

RUFNEK 80 DESIGN SERIES 001 SERVICE MANUAL INTRODUCTION AND THEORY OF OPERATION...2 ASSEMBLY NUMBER EXPLANATION...2 WINCH MODEL CODES...

IN-VEHICLE REPAIR. Differential Bearings. Rear Drive Axle/Differential Ford 7.5-Inch Ring Gear. Special Tool(s)

ASSEMBLY. Transmission Automatic Transmission 5R44E and 5R55E. Special Tool(s)

REMOVAL & INSTALLATION

1999 F-150/250 Workshop Manual

DISASSEMBLY AND ASSEMBLY

Maintenance Instructions

PO Box 645, Stockton, Missouri, FAX superiorgearbox.com W D0446-A 4/1/05 1

INSTRUCTIONS FOR OVERHAUL OF RAMEY RE SERIES WINCH

MODEL HD-P10000 PLANETARY WINCH

70001 and Clutch Rebuild Instructions

SPARE PARTS BOOK. Rear Tandem Axle FRDP-13/16-S. Since No (11/2004) Book No. 292 (5/2009)

Section X STEERING DATA AND SPECIFICATIONS. 21 degrees 45 minutes -f- or 1 degree (inner wheel when outer wheel is 20 degrees)

SISU MP-330 DRIVE GEAR. Maintenance Manual

BRAKE SYSTEM Nissan 240SX DESCRIPTION BRAKE BLEEDING * PLEASE READ FIRST * BLEEDING PROCEDURES ADJUSTMENTS BRAKE PEDAL HEIGHT SPECS TABLE

MAINTENANCE MANUAL DP-265

Fluid-O-Tech ROTOFLOW ROTARY VANE PUMP REBUILD MANUAL

MANUAL TRANSAXLE Return to Main Table of Contents

2012 Expedition, Navigator Workshop Manual

D-15/G-15 Maintenance

20,000 LB INDUSTRIAL WINCH

RAM P/N AH04415R Double Reduction Wheel Drive SERVICE MANUAL

REAR AXLE AND SUSPENSION RA 1

2003 E-Series Workshop Manual

parts list and service manual

IMCO SCX SERIES INFORMATION, OPERATION & MAINTAINANCE

Maintenance Manual MM Transfer Cases. MTC-4208X/XL/XP/XLEV, MTC-4210X/XL/XP/XLEV and MTC-4213X Series Revised 09-16

Swing Drive SMCS ;

REAR DIFFERENTIAL LOCATION INDEX

1984 Dodge W250 PICKUP

Installation Instructions for the Tera low range Dana 20 (LOW20)

Geareducer. Repair Manual. Series 27A Series 27T Series 27.1 RM-27D. Manual A

AMARILLO PUMP DRIVES MODEL 1 OOOA, 1200, 1500, 1800

LIFT TRUCK SERIES: G35S-2 G40S-2 G45S-2 G40SC-2 G45SC-2 G50SC-2. November 15, 2000 CODE 3150 LT3150-L0 SUBJECT: NEW DRIVE AXLE

TROUBLESHOOTING SPECIAL TOOL ASSEMBLY AND ADJUSTMENT

Geareducer model 2700 and 3000

Amerigear SF Spindle

Inspection and Verification, Ranger

Central Hydraulics, Inc. Stocking Distributor for White Hydraulic motors

a. remove counterbalance valves, travel motors and travel drives

TC20 Chain Driven Power Take-Off Overhaul Instructions

PARTS LIST AND SERVICE MANUAL

PROPELLER SHAFT GROUP CONTENTS GENERAL DESCRIPTION PROPELLER SHAFT PROPELLER SHAFT DIAGNOSIS SPECIFICATIONS...

Spicer Drive Axles. Service Manual. AXSM-8810 January G155-T, G175-T, M190-T M210-T, M220-T, M230-T Two Speed Axles

Final drive gear set, recommended sequence for adjusting

SERVICE MANUAL. 915 Series Axle

INSTRUCTION MANUAL AND PARTS LIST FOR SERIES 8L-630J AND 630M WARNING

Maintenance Information

SISU DP-330 DRIVE GEAR. Maintenance Manual

Publication T5-703, Rev. 2 Dated: July 31, 2009 SERVICE MANUAL. T50-P TURBOTWIN Engine Air Starter AN

CS24/25 SERIES CLUTCH SHIFT PTO

15.Main Shaft Assembly

2001 Dodge RAM 3500 PICKUP

BDU-10/21 Hydrostatic Transmissions Service and Repair Manual

M Ring and Pinion Installation

PROPELLER SHAFT & DIFFERENTIAL CARRIER SECTIONPD CONTENTS IDX. PROPELLER SHAFT...3 Preparation...3 C200. REAR FINAL DRIVE...40 Preparation...

SCM SAE. Other advantages: Sunfab s SCM SAE is a range of robust axial piston motors especially suitable for mobile hydraulics.

HGM-E LSHT Wheel Motor Service and Repair Manual

PROPELLER SHAFT & DIFFERENTIAL CARRIER SECTIONPD CONTENTS

OPERATING, SERVICE, AND MAINTENANCE MANUAL

1. General Description

Differential Ring And Pinion

Maintenance Manual MM-0194 Single reduction leading axle carrier for tandem axle series MD61. Revised September 2017

SPARE PARTS BOOK. Front Axle FSDP-09/10-S. Book No. 201 (12/2009)

Transcription:

SERVICE MANUAL 75 SERIES DIGGER MODELS Example Part Number 75 F 0 BP Model Ratio Shaft Bail Boss Motor Supplier Motor Number Back Spin Protection THIS SERVICE MANUAL IS EFFECTIVE: S/N: 00 TO CURRENT DATE: 90 TO CURRENT VERSION:.SMD755F0BP_AB NOTE: Individual customer specifications (spindle mounting, sprocket pilot, brake assembly, etc.) may vary from exploded drawing and standard part numbers shown. If applicable, refer to customer drawing for details.

TORQUE (ft/lb) SPEED (rpm) INSTALLATION INFORMATION The 75 drive head is designed for anchor setting and digger applications. This drive head uses a high efficiency, solenoid actuated,two speed axial piston motor of optimum performance. The drive head includes an energy protection system that truncates pressure spikes and controls gearbox back driving generated from an anchors torsional energy. These drives require a customer supplied mounting apparatus for connection to the customers mechanized equipment. The maximum allowable motor pressure is 5000 psi and the maximum flow is 5 GPM in low speed and 0 GPM in high speed. Refer to chart below for more performance information. The hydraulic motor requires an external 00700 psi charge pressure and will need to be filled with hydraulic oil up to the case drain port. The motor will requires a case drain. For two speed operation the pressure reducing valve will need to be supplied with V. The voltage shifts the motor from 55cc maximum displacement to 50cc minimum displacement. The motor has an internal protection system that increases displacement when 700psi is reached at minimum displacement. The motor will continue to increase its displacement until the pressure drops below 700psi or maximum displacement is reached. The motor is fixed at maximum displacement if an electrical signal is not applied to the pressure reducing valve. Refer to drawing below for motor electrical and hydraulic locations. CASE DRAIN PORT ISO 997 M X PRESSURE REDUCING VALVE CONNECTOR: AMP JUNIOR TIMER POLIG VOLTS: 5V AMPS: 75mA PWM: 00Hz OIL PORT 'A', SAE J5 /", CODE 6 # PRESSURIZE THIS PORT FOR CLOCKWISE ROTATION. NOTES: OIL PORT 'B', SAE J5 /", CODE 6 # PRESSURIZE THIS PORT FOR COUNTERCLOCKWISE ROTATION. EXTERNAL SUPPLY PRESSURE PORT ISO 997 M6X.5. A 00700 PSI CHARGE PRESSURE IS REQUIRED FOR THE HYDRAULIC MOTOR TO SHIFT INTO MIN DISPLACEMENT.. BEFORE OPERATION MOTOR MUST BE FILLED WITH HYDRAULIC OIL TO CASE DRAIN.. CASE DRAIN REQUIRED. ACTIVATE SOLENOID FOR MINIMUM DISPLACEMENT. WHEN MOTOR REACHES 700 PSI AT MINIMUM DISPLACEMENT THE DISPLACEMENT WILL INCREASE AT A CONSTANT 700 PSI UNTIL MAXIMUM DISPLACMENET IS REACHED. TORQUE vs. PRESSURE SPEED vs. FLOW 00,000 0 50,000 00,000 50,000 00,000 TORQUE LOW TORQUE HIGH 9 7 6 5 SPEED LOW SPEED HIGH 50,000 00,000 50,000 0 0 000 000 000 000 5000 PRESSURE (psi) 0 0 50 00 50 00 5 50 FLOW (gpm) Model DH75 service manual, SMD75F0BP Page Eskridge, Inc. Olathe, KS. 97

LUBRICATION & MAINTENANCE GEARBOX OIL REQUIREMENTS Use the chart below to determine an appropriate lubricant viscosity. Use only EP (extreme pressure) or API GL5 designated lubricants. The lubricants pour point needs to be 0F below the minimum ambient temperature. Change the lubricant after the first 50 hours of operation and at 500 hour intervals thereafter. The drive should be partially disassembled to inspect gears and bearings at 000 hour intervals. Recommended ambient and operating temperatures for conventional and synthetic gear lubricants 50 5 0 5 50 75 00 5 50 75 00 5 50 F 0W90 conventional 75W90 conventional 5W0 conventional Min Ambient/operating temp Max Ambient temp Max Operating temp 75W90 synthetic 0W0 synthetic 5 0 5 66 79 9 07 C Note: Ambient temperature is the air temperature measured in the immediate vicinity of the gearbox. A gearbox exposed to the direct rays of the sun or other radiant heat sources will operate at higher temperatures and therefore must be given special consideration. The max operating temp must not be exceeded under any circumstances, regardless of ambient temperature. Operating Position Oil Capacity Oil Level Vertical Shaft (Shaft Down) gal To midway on upper/ primary gear set HYDRAULIC MOTOR OIL REQUIREMENTS The maximum motor service life is obtained by using a fluid that meets or exceeds ISO cleanliness specifications code / (ISO 06). A recommended motor filtration of 0um (absolute) is recommended. Hydraulic main circuit oil temperatures should not exceed 76 F/0 C and drain fluid should not exceed F/00 C. Hydraulic fluid type HLP (DIN 55), automatic transmission fluids type A, or API CD engine oils can be used. When hydraulic system has reached full operating temperature the minimum oil viscosity from the motor drain should be above mm²/s (cst). At motor startup the hydraulic fluid viscosity should not exceed 500 mm²/s (cst). The ideal operating range for the hydraulic fluid viscosity is 5 to 0 mm²/s (cst). Model DH75 service manual, SMD75F0BP Page Eskridge, Inc. Olathe, KS. 97

ESKRIDGE 75 EFFECTIVE FROM: SN 00 07 TO PRESENT GROUP 5 7 9 6 0 5 0 5 7 ITEM A B 5A 5B 5C 5F 5J 5L 6 7A 7B 7C 7F 7G 7H 7J 7L 9A 9B 9C 9F 9H A B C D A G L 6A 6B 6C 6D 0A 0B 5A 5B 5C 5E 5F 5H 5J 0B 0F 5A 5B 5C 5E 5F 5H (7) (7) 50 QTY () () () 6 6 () 70 9 70 5 () PART NUMBER 50000 50000 600096 50000 500006 500500 500500 50000 50000 0000 050 50000 0600 500005 50000 60005 600077 6000 60006 0000 0000 05050 60009 6000 060090 0600500 60005 600079 600050 60007 6000960 60007 0060050 6000 05050 60009 0600750 6000 60005 6000 50000 00060 0050 000 50600 0050 000660 0005 0006 0005 0005 05050 05007 050070 0500570 050000 050590 066050 06600 066090 00000 050050 500007 5000 5000 0000 00077 000779 060050 500000 500500 50050 0000 PARTS LIST BASE SHAFT COVERS COVER COVER INPUT GEAR CARRIER ASSEMBLY CARRIER PLANET GEAR PLANET SHAFT DESCRIPTION SPHERICAL ROLLER BEARING ROLL PIN THRUST WASHER RETAINING RING PLATE 500 SEC CARRIER SUN GEAR CARRIER ASSEMBLY, SECONDARY CARRIER SEC PLANET GEAR SEC PLANET SHAFT SEC. 600/00 TAPERED BEARING CONE TAPERED BEARING CUP ROLL PIN /" X /" WASHER SEC. PLANET 600 000 00 SHIMSECONDARY PLANET RETAINING RING; EXTERNAL; 5006 RETAINING RING SECONDARY CARRIER RETAINER SUN GEAR CARRIER ASSEMBLY CARRIER PRI CLUSTER GEAR LOOSE ROLLER PLANET SHAFT PRI PLANET ROLLER WASHERPRI PLANET ROLL PIN /" X /" SPACER WASHER (00 PRI) RETAINING RING; INTERNAL; 5007 RING GEARS RING GEAR COMPOUND PRI RING SPACER CMPD PRI 600/000 RING GEAR SEC 000 RING GEAR THRUST WASHERS & BEARINGS THRUST WASHER THRUST RACE AS055 THRUST BRG AXK055 SEAL KIT SEAL ORING 9 ORING.5 ID ORING 7 OUTPUT SHAFT BEARINGS BEARING CONE BEARING CUP HARDWARE HEX HEAD CAP SCREW HEX HEAD CAP SCREW (M6XX0) HHCS (MXX55mm C.) SOC HD CAP SCREW SHCS/ X / GR. FLAT HEAD HEX SOCKET CAPSCREW FLAT WASHER /"x.5 O.D; HARDENED FLAT WASHER (5/ SAE) FLAT WASHER (M ZINC) PLUGS & FITTINGS HOLLOW HEX PLUG (05HP) GREASE FITTING MISCELLANEOUS SHIM SPLIT RING 500 LOCKING RING ANTISPIN BACK MANIFOLD SPLIT FLANGE KIT SPLIT FLANGE PLUG RETAINING RING; INTERNAL SEAL CARRIER BAIL ASSY BAIL ASSY (Ø.0" BAIL BOSS) BAIL ASSY (Ø.5" BAIL BOSS) MOTOR 5A 0F (7) 5F 5E 50 5H 5B 5C 5J 6D 5A A 0B A G L A 6B 9A 9F B 7C 6B 5F C 7B 7F 7L 7A 6B 0B B 6C 7G D 7H 6C 7G 6 7J 5F 5L 5F 5A 5C 5B 5A 0A 0B 0B 0A 6A 6B 5H 0B 5E 9C 9H 9B 5C 5J 5B *QUALITY OF SHIMS DEPENDANT UPON DESIRED BEARING PRELOAD X75 ECN: REV: A 09 HWP Eskridge, Inc. Olathe, KS. 97 Model DH75 service manual, SMD75F0BP Page

Unit Disassembly Procedure ) Scribe a diagonal line across the outside of the unit from the bail (7) to the base () before disassembly to aid in the proper positioning of pieces during reassembly. ) Remove magnetic drain plugs (0B) and drain oil from unit. The oil will drain out faster and more completely if warm. ) Remove the fifty hexhead capscrews (5A) and flat washers (). ) Separate bail (7) from gearbox and remove from digger assembly. 5) Install two hexhead capscrews (5A) into cover (B) to retain gearbox assembly together while disassembling motor, Stage I and Stage II assemblies. 6) Remove motor (50) from cover (A) by removing four hexhead fasteners (5C) and flat washers (5J). 7) Remove 0 /0 capscrews (5A) and flat washers (). Remove cover (A), thrust bearings (A, G & L), and input gear (). Inspect oring (6B); discard if damaged or deformed. ) Lift Stage I planetary carrier assembly (9) out of the unit. Remove ring gear spacer (B) and inspect oring (6B); discard if damaged or deformed. 9) Remove Stage II sun gear () from secondary carrier assembly (7). 0) Remove the three / flat head capscrews (5F) securing the carrier retaining plate (7L) to the Stage III sun gear (6). ) Remove Stage II ring gear (C) and Stage II carrier assembly (7). Inspect oring (6B), discard and replace any damaged or deformed orings. ) Remove two hexhead capscrews (5A) from cover (B). Lift cover from gearbox. Inspect oring (6C), discard and replace any damaged or deformed orings. ) Remove Stage III sun gear (6) from Stage III carrier assembly. ) Remove the six / flat head capscrews (5F) securing the carrier retaining plate (5L) from output shaft (). 5) Remove Stage III ring gear (D) and Stage III carrier assembly (5). Inspect oring (6C), discard and replace any damaged or deformed orings. 6) The unit is now separated into subassemblies. The area(s) requiring repair should be identified by thorough inspection of the individual components after they have been cleaned and dried. Stage I Carrier Subassembly 9A (Items 9A, 9B, 9C,,, 9F, & 9H) 9F Disassembly 9C 9H 9B ) Rotate planet gears (9B) to check for abnormal noise or roughness in bearings () or planet shafts (9C). If further inspection or replacement is required, proceed as follows. ) Drive roll pins (9F) completely into the planet shafts (9C). ) Press or drive planet shafts (9C) out of carrier (9A). ) Remove planet gears (9B) and thrust washers ( & ) and bearings () from the carrier (9A). 5) Inspect the planet gear (9B) bearing bore, planet shaft (5C) and rollers (). Check for spalling, bruising or other damage. Replace components as necessary; rollers should be replaced as a set of 56. Replace any parts where abnormal wear is found. 6) Use /6 inch pin punch to remove roll pins (9F) from planet shafts (9C). NOTE: If either the rollers or the planet shafts (pins) are damaged, both components should be replaced. Reassembly ) Rebuild primary planet carrier assembly in reverse order using any needed new parts. ) Install rollers in gear as follows: Model DH75 service manual, SMD75F0BP Page 5 a) Set planet gear (9B) onto table. Install one roller spacer () into planet gear bore and seat on internal retaining ring (9H). b) Center the planet shaft (9C) in the planet gear (9B) bearing bore. c) Begin placing rollers () around the shaft (9C). There should be clearance for the last roller to slide in. Be sure to install rollers in each planet gear. d) Place spacer washer () onto planet rollers. Eskridge, Inc. Olathe, KS. 97

e) Place thrust washer () onto planet gear (9B) remove planet shaft. f) Carefully slide the assembly off the table and rotate 0 degrees placing thrust washer onto table. Repeat steps (af). g) Align the planet gear/bearing assembly inside the carrier and install the planet shaft through the entire assembly. ) Planet shaft (9C) should be installed with the chamfered end of the /6 inch hole towards the outside diameter of the carrier (9A); this will aid in alignment of holes while inserting roll pins (9F). ) Drive roll pin (9F) into the carrier hole and into the planet shaft to retain the parts. Repeat for remaining planet gears Stage II Carrier Subassembly (Items 7A, 7B, 7C,,, 7F, 7G, 7H, 7J & 7L) 7C 7B 7G 7H 7G 7J 7F Disassembly ) Rotate planet gears (7B) to check for abnormal noise or roughness in bearings ( & ). If further inspection or replacement is required, proceed as follows. ) Removing retaining ring (7J), washer (7G) and shims (7H) from planet shaft (7C). ) Press planet shafts (7C) out of carrier (7A). 5F 7A ) Remove planet gears (7B) and washer (7G) from carrier. 5) Inspect the planet gear (7B), bearing cone (), bearing cup () and planet shaft (7C). Check for spalling, bruising or other damage. Replace components as necessary; bearing need to be replaced as a cup and cone set. 6) Replace any parts where abnormal wear is found. 7L Reassembly ) Rebuild Stage II planet carrier assembly in reverse order using any needed new parts. ) Install bearing cones () into planet gear bearing cups (). Place washer (7G) onto interior carrier spot faced surface. ) Place carrier retainer (7L) into carrier (7A). Insert planet gear assembly into carrier (7A). Slide planet shaft (7C) into carrier and align planet pin notch with roll pin in carrier. ) Place shims (7H) and washer (7G) onto planet shaft. Install retaining ring (7J). Rotate plant gears by hand to test bearing preload. Correct bearing preload on the planet gears requires 5075 inlbs rotating torque. If gear doesn t rotate remove a shim and test again until a smooth loaded rotation is developed. Repeat for remaining planet gears. 5F Stage III Carrier Subassembly 5L 5A (Items 5A, 5B, 5C,, 5F,, 5J & 5L) 5F Disassembly ) Rotate planet gears (5B) to check for abnormal noise or roughness in bearings (). If further inspection or replacement is required, proceed as follows. ) Drive roll pins (5F) completely into the planet shafts (5C). ) Press or drive planet shafts (5C) out of carrier (5A). ) Remove planet gears (5B) and spacers () from the carrier (5A). 5) Inspect the planet gear (5B) and planet bearings () for spalling, bruising or other damage. 6) Replace any parts where abnormal wear is found. 7) Use / inch pin punch to remove roll pins (5F) from planet shafts (5C). Reassembly 5C ) Install carrier retainer (5L) into carrier (5A). Place planet spacers () onto planet bearings () and install assembly into carrier (5A). 5J 5B Model DH75 service manual, SMD75F0BP Page 6 Eskridge, Inc. Olathe, KS. 97

) Planet shafts (5C) should be installed with chamfered end of / inch hole toward outside diameter of the carrier (5A). This will aid in alignment of holes while inserting roll pins (5F). ) Drive a roll pin (5F) through the carrier hole and into the planet shaft to retain the parts. Repeat for other planet gears. 5C 5B 5E Base Subassembly (Items,, 6A, 6B, 0A, 0B, 5E, 0B, 5A, 5B, 5C & 5H) Disassembly 5A 0A 0B ) Remove the seal carrier retaining screws (5E) and seal carrier (5H) from unit. Inspect seal (6A) and oring (6B) for signs of wear or damage and replace as necessary. ) Remove the lock ring (5C) using a heel bar or puller; if using a heel bar, be sure not to pry against the cage of the inner output shaft bearing (0A). Remove the split ring segments (5B) and shims (5A). Caution: Since the output shaft is no longer retained, care should be taken to avoid personal injury. Care should also be taken not to damage it when it is pressed through base. ) Base () should be set with output shaft side down, as shown, on a plate or table. Press output shaft through the bottom of base by applying a load to top end (internal end) of shaft until it passes through inner shaft bearing cone (0A). 0B 0A 6A 6B 5H 0B ) A gear puller may be used to remove the outer bearing cone (0A) from the shaft (). If reusing old bearing cone, do not pull on or damage roller cage. 5) Inspect inner and outer bearing cups (0A & 0B). If cups are damaged, drive them out using a brass drift Reassembly ) Place base () (output side up, opposite shown) on the table. ) Apply a layer of lithium or general purpose bearing grease to the roller contact surface of outer bearing cup (0B). ) Press outer bearing cone (0A) (large end down as shown) onto the shaft until it seats against the shoulder. Note: Press bearing cone onto output shaft by pressing on inner race only. DO NOT press on roller cage, as it may damage bearing. ) Place the shaft () with the bearing (A) into the base (). 5) Install oring (6B) onto seal carrier (5H). Lubricate inner lip of shaft seal (6A) and slide seal carrier assembly onto the shaft (). Install seal carrier fasteners (5E) and torque to 0 ftlbs dry and 0 ftlbs lubed. Flip this assembly, resting the base () on the end of the output shaft (). 6) Apply a layer of lithium or general purpose bearing grease to the roller contact surface of the inner cup (0B). Press the inner bearing cone (0A) (large end up as shown) onto the shaft () until it is seated against inner bearing cup (0B). 7) The shaft bearing preload needs to result in a rolling torque between 00 to 00 inlb. Adding shims (5A) will increase the preload on the bearing set. Install the LoadNLock segments (5B) over the shims (5A) and into the groove in the shaft (). When the load and lock assembly is installed properly it will not rotate because it is firmly engaged with the shims. Finally, install the lock ring (5C) over the segments (5B). All subassembly service or repairs should be complete at this time. Continue to Unit Assembly to complete unit buildup. Model DH75 service manual, SMD75F0BP Page 7 Eskridge, Inc. Olathe, KS. 97

Unit Assembly ) When all subassemblies are complete, the unit is ready to be assembled. ) Install the Stage III carrier assembly onto the output shaft; align the splines of the carrier (5A) with the splines of the shaft () and slide the carrier onto the shaft. ) Place removable thread locking compound onto the / flathead capscrews (5F). Install capscrews into carrier retaining plate (5L) and torque to 5ftlbs. ) Install Stage III sun gear (6) into Stage III carrier assembly. 5) Lubricate oring (6C) and install on the pilot of the Stage III ring gear (D). Align gear teeth of ring gear (D) with the gear teeth of the planet gears (5B) and place on base. Align mounting holes of ring gear with holes in base. Using the scribed line made during disassembly for reference. 6) Lubricate oring (6C) and install on the pilot of the cover (B). Install cover onto Stage III ring gear (D) and align mounting holes. 7) Install Stage II carrier assembly onto the Stage III sun gear (6) splines. The carrier retaining plate (7L) holes need to be positioned so that all fasteners can be installed. Place removable thread locking compound onto the / flathead capscrews (5F). Install capscrews into carrier retaining plate (7L) and torque to 5ftlbs. ) Lubricate oring (6B) and install on the pilot of the Stage II ring gear (C). Align gear teeth of ring gear (C) with the gear teeth of the planet gears (7B) and place on cover (B). Align mounting holes of ring gear with holes in base. 9) Install Stage II sun gear () into Stage II carrier assembly (7). 0) Lubricate oring (6B) and install on the pilot of the Stage I ring gear spacer (B) then install spacer. ) Place Stage I carrier assembly (9) onto Stage II sun gear (). ) Compound primary timing instructions: a) The planet gears will now need to be timed. Refer to the diagram. The planet gears each have a timing mark, usually a round punch locate timing marks on planet gear (9B). b) As seen from above, start with the top planet gear and position it s timing mark pointing straight down. Next, rotate the lower left planet gear counterclockwise as indicated in the timing diagram. Then rotate the lower right planet gear clockwise as indicated. c) Set the input gear () and the input thrust race (A) into the center of the primary planet carrier assembly. d) If compound primary ring gear (A) was not removed during disassembly, then skip to step. Otherwise, bolt to the inside of the cover (A) with twelve bolts (). Use a removable thread locking compound on the threads of the bolts. Tighten to 0 ft.lbs. dry or 0 ft.lbs. lubricated. Timing Mark 7 Teeth ) Install thrust washer (G) onto Stage I carrier then install thrust bearing (L) and thrust washer (G). ) Lubricate oring (6B) and install on the pilot of the cover (A). 5) Noting the scribed line made during disassembly, install the cover (A). Install fasteners (5A) into Stage III ring gear and fasteners (5A) into Stage II and Stage I to constrain unit while spin testing. 6) Ensure the unit spins freely by using a splined shaft to drive the input gear (). If unit does not rotate freely for one revolution remove cover and verify Stage I planet gearing is timed correctly. 7) Finish installing 0 /0 hex head capscrews (5A) with flat washers () into the Stage II and Stage I assembly. Torque the capscrews to 0 ftlbs dry, 0 ftlbs lubricated. ) Install motor (50) onto cover (A). Install M fasteners (5C) and washers (5J). Torque fasteners to 0 ftlb dry 60 ftlbs when lubricated. ) Remove temporally fasteners installed in Stage III gear assembly. Place bail (7) onto assembly and aligning holes in bail and cover using scribed line made during disassembly as a reference. Install 50 /0 hex head capscrews (5A) with flat washers (). Torque the capscrews to 0 ftlbs dry, 0 ftlbs lubricated. 9) Fill the unit to the proper level, as specified, with GL5 EP oil. The digger is now ready to use. Model DH75 service manual, SMD75F0BP Page Eskridge, Inc. Olathe, KS. 97