Page 1 of 5 DS1 (Residential) Customer Charge Per electric service account $ 11.95 $ 11.95 $ 11.95 Meter Charge Per electric service account $ 5.00 $ 5.00 $ 5.00 Distribution Delivery Charge (per kwh) Summer $ 0.04727 $ 0.04727 $ 0.04727 NonSummer, First 800 kwh $ 0.02770 $ 0.02770 $ 0.02770 NonSummer, Over 800 kwh $ 0.01485 $ 0.01485 $ 0.01485 Uncollectible Recovered in Base Rates (per monthly bill) $ 0.48 $ 0.48 $ 0.48 EDT Cost Recovery ($ per kwh) $ 0.0014246 $ 0.0012182 $ 0.0013667 DS2 (Small General Service) Secondary Meter Voltage (up to and including 600 volts) $ 25.81 $ 25.81 $ 25.81 All other electric service accounts $ 370.00 $ 370.00 $ 370.00 Secondary Meter Voltage (up to and including 600 volts) $ 8.37 $ 8.37 $ 8.37 All other electric service accounts $ 13.22 $ 13.22 $ 13.22 Distribution Delivery Charge (per kwh) Summer $ 0.04041 $ 0.04041 $ 0.04041 Nonsummer, First 2,000 kwh $ 0.02156 $ 0.02156 $ 0.02156 Nonsummer, Over 2,000 kwh $ 0.01107 $ 0.01107 $ 0.01107
Page 2 of 5 DS3 (General Service) Secondary Meter Voltage (up to and including 600 volts) $ 10.52 $ 10.52 $ 10.52 Primary Meter Voltage (above 600 volts up to and including 15 kv) $ 11.55 $ 11.55 $ 11.55 High Voltage Meter Voltage (above 15 kv up to 100 kv) $ 12.07 $ 12.07 $ 12.07 Primary Supply Voltage $ 6.795 $ 6.795 $ 7.884 High Supply Voltage $ 2.159 $ 2.159 $ 2.159 +100 kv Supply Voltage $ 0.388 $ 0.388 $ 0.388 Transformation Charge (per kw) $ 0.590 $ 0.590 $ 0.590 Metering Reassignment Charge $ 88.50 $ $ Rate Limiter (per kwh) $ 0.04346 $ 0.04495 $ 0.05110
Page 3 of 5 DS4 (Large General Service) Secondary Meter Voltage (up to and including 600 volts) $ 18.31 $ 18.31 $ 18.31 Primary Meter Voltage (above 600 volts up to and including 15 kv) $ 19.73 $ 19.73 $ 19.73 High Voltage Meter Voltage (above 15 kv up to 100 kv) $ 20.19 $ 20.19 $ 20.19 Primary Supply Voltage $ 5.491 $ 4.086 $ 7.819 High Supply Voltage $ 1.687 $ 0.678 $ 1.687 +100 kv Supply Voltage $ 0.042 $ 0.079 $ 0.042 Transformation Charge $ 0.590 $ 0.590 $ 0.590 Transformation Charge, RZ II +100kV (Cust. on 12/31/2012 Only) $ 0.150 Metering Reassignment Charge $ 88.50 $ $ Reactive Demand Charge (per kvar) Per kvar $ 0.270 $ 0.270 $ 0.270 Rate Limiter (per kwh) $ 0.04346 $ 0.04495 $ 0.05110 EDT Cost Recovery (per kwh) Primary Supply Voltage $ 0.0012182 $ 0.0012182 $ 0.0012182 High Supply Voltage $ 0.0012182 $ 0.0012182 $ 0.0012182 +100 kv Supply Voltage $ 0.0005810 $ 0.0012182 $ 0.0005864
Page 4 of 5 DS5 (Lighting Service) Fixture Charges for Street and Protective Lighting Service Area Sodium Vapor, 100 Nominal Watts $ 4.35 $ 6.76 $ 6.76 Sodium Vapor, 250 Nominal Watts $ 5.07 $ 7.91 $ 7.91 Sodium Vapor, 400 Nominal Watts $ 5.29 $ 8.44 $ 8.44 Metal Halide, 250 Nominal Watts $ 6.61 $ 10.28 $ 10.28 Metal Halide, 400 Nominal Watts $ 6.03 $ 9.63 $ 9.63 Directional Sodium Vapor, 250 Nominal Watts $ 5.31 $ 8.46 $ 8.46 Sodium Vapor, 400 Nominal Watts $ 5.35 $ 8.62 $ 8.62 Metal Halide, 250 Nominal Watts $ 6.88 $ 10.87 $ 10.87 Metal Halide, 400 Nominal Watts $ 6.11 $ 9.76 $ 9.76 Decorative Sodium Vapor, 100 Nominal Watts $ 7.49 $ 10.41 $ 10.41 Metal Halide, 150 Nominal Watts $ 8.55 $ 13.61 $ 13.61 Other Charges Customer Charge (Customerowned Lighting Fixtures) $ 25.81 $ 25.81 $ 25.81 Meter Charge (Customerowned Lighting Fixtures) $ 8.37 $ 8.37 $ 8.37 Distribution Delivery Charge (per kwh) (All Lighting Fixtures) $0.00000 $0.01571 $0.01571 EDT Cost Recovery (per kwh) (All Lighting Fixtures) $ 0.0014246 $ 0.0012182 $ 0.0013667 Pole Charge NA NA $ 6.94
Page 5 of 5 DS6 (Temp. Sensative DS) Otherrwise eligible for DS3 Secondary Meter Voltage (up to and including 600 volts) $ 10.52 $ 10.52 $ 10.52 Primary Meter Voltage (above 600 volts up to and including 15 kv) $ 11.55 $ 11.55 $ 11.55 High Voltage Meter Voltage (above 15 kv up to 100 kv) $ 12.07 $ 12.07 $ 12.07 Otherwise eligible for DS4 Secondary Meter Voltage (up to and including 600 volts) $ 18.31 $ 18.31 $ 18.31 Primary Meter Voltage (above 600 volts up to and including 15 kv) $ 19.73 $ 19.73 $ 19.73 High Voltage Meter Voltage (above 15 kv up to 100 kv) $ 20.19 $ 20.19 $ 20.19 All Supply Voltages $ 8.641 $ 8.641 $ 8.641 Tier 1 Excess Demand Charge (per kw) $ 13.230 $ 13.230 $ 13.230 Tier 2 Excess Demand Charge (per kw) $ 19.840 $ 19.840 $ 19.840 Transformation Charge (per kw) $ 0.590 $ 0.590 $ 0.590 Metering Reassignment Charge $ 88.50 $ $ Rate Limiter (per kwh) $ $ $