QUESTIONNAIRE FOR ENVIRONMENTAL APPRAISAL (FOR ROAD/HIGHWAY PROJECTS)

Similar documents
AD Table 3.--Goodrich Evacuation Systems Installed on Certain Airbus Model Airplanes

A Research, Science and Discovery based Polyurethane Technology company

THE TECHNICAL STANDARDS AND SAFETY ACT 2000, S. O. 2000, c and -

532: 2006 Bicycle tube valves and valve tubing Specification (third revision) 2414: 2005 Cycle and rickshaw pneumatic tyres (fourth revision)

ADDENDUM #1. A. Alternate Bid Item #3A - The procurement and installation of a new 12,000 gallon UL 2085 rated AGT tank for

LIFE INSURANCE CORPORATION OF INDIA

Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS - B311 Sanitary Sewer Connection Repair

GOVERNMENT OF PAKSITAN MINISTRY OF FINANCE, ECONOMIC AFFAIRS, STATISTICS AND REVENUE (REVENUE DIVISION) **** NOTIFICAITON (SALES TAX)

Name and address of DISCOM with Logo. TARIFF NOTIFICATION The 22 rd March, 2018 RETAIL SUPPLY TARIFF EFFECTIVE FROM 1 st APRIL, 2018

EDS REPLY. Point No.2 Past-production details duly authenticated by DMG since Reply

Question Set(2017) Switch Gear & protection(5 th SEm) 9. Explain the construction and operating principle with proper diagram:

APPENDIX I Annual production of selected automobile industry in India (in thousands)

GUIDELINES FOR PREPARATION OF MINE CLOSURE PLAN REG.

REGIONAL DISTRICT OF OKANAGAN-SIMILKAMEEN BYLAW NO , A Bylaw to amend the Electoral Area H Zoning Bylaw No.

Number 10 of 2012 MOTOR VEHICLE (DUTIES AND LICENCES) ACT 2012 ARRANGEMENT OF SECTIONS. 3. Amendment of Part I of Schedule to Act of 1952.

TECHNICAL MANUAL ORGANIZATIONAL, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL WITH REPAIR PARTS AND SPECIAL TOOLS LIST

Summary of the Mineral Block

Ex-Ante Evaluation (for Japanese ODA Loan)

GUWAHATI MUNICIPAL CORPORATION WATER WORKS :: PANBAZAR GUWAHATI

WELCOME. New Septage Waste Haulage Receiving Station Municipal Class Environmental Assessment (Class EA)

MINISTRY OF ENVIRONMENT AND FORESTS NOTIFICATION New Delhi, the 16 th May, Amended by notification S.O.1002(E), dated 4 th May, 2010)

Comparing the Quality of Service of Bus Companies Operating in two Cities in Brazil

For BIS Use Only Doc: CED 50(7436) BUREAU OF INDIAN STANDARDS

APPENDIX I LIST OF WARD-WISE HOUSEHOLD AND POPULATION IN MYSORE CITY CORPORATION, Page 213

Code of Practice for Vessel Bunkering Operations & Transfer of Waste Liquids by Road Tanker within Jersey Harbours

From vegetable gardens and clay pits to highways and urban sprawl: the nature of peri-urban environmental change in Asia Ian Douglas

Number 5 of 2003 MOTOR VEHICLE (DUTIES AND LICENCES) ACT 2003 ARRANGEMENT OF SECTIONS. 4. Amendment of Part I of Schedule to Act of 1952.

Number 24 of 2008 MOTOR VEHICLE (DUTIES AND LICENCES) (NO. 2) ACT 2008 ARRANGEMENT OF SECTIONS. 3. Amendment of Part I of Schedule to Act of 1952.

THE BATTERIES (MANAGEMENT AND HANDLING) RULES, 2001 NOTIFICATION

Tender for procurement of Passive Components of LAN & Wi-Fi and their installation. Corrigenda. Annexure/Clause For Read

TITLE 16. TRANSPORTATION CHAPTER 27. TRAFFIC REGULATIONS AND TRAFFIC CONTROL DEVICES

CENTRAL MARKS DEPARTMENT II (Legal) Our Ref: CMD-II(L)/16:

Number 22 of 2001 MOTOR VEHICLE (DUTIES AND LICENCES) ACT, ARRANGEMENT OF SECTIONS. Section 1. Interpretation.

ORDER OF THE LIEUTENANT GOVERNOR IN COUNCIL

A PROJECT PROFILE ON ROLLING SHUTTERS

Ministry of New and Renewable Energy. Jawaharlal Nehru National Solar Mission (Off-grid and Decentralized Solar Applications)

Response of the Road Haulage Association to Transport for London. New proposals to improve Air Quality.

Hyundai Roadside Support Plan.

1.1 Purpose of This Environmental Impact Report EIR Process Use of This Report Report Organization...

of BIS or used as STANDARD of comments is

Need Assessment Document (NAD) DDUGJY

THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL REFERRED TO ENVIRONMENTAL RESOURCES AND ENERGY, FEBRUARY 6, 2017 AN ACT

Morphological and genetic differentiation of the Black Sea harbour porpoise Phocoena phocoena

TECHNICAL MANUAL OPERATOR'S, ORGANIZATIONAL, DIRECT SUPPORT, and GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

Effective [one year after date of adoption] the provisions of this rule shall apply to:

HVHF / Well completion. Drilling, casing and cementing. Human NA Low/Minor Low/Minor Low/Minor NA. Human NA Low/Minor Low/Minor Low/Minor NA

CASE NOS. 79, 80, 81 & 82 of 2017/363 Date

ARTICLE 4 AS AMENDED

SOLID WASTE MANAGEMENT ORDINANCE FOR THE TOWN OF HUDSON, MAINE

Attachment D Environmental Justice and Outreach

COMMERCIAL SCHEME Approval No

I. Meter Hire/Rental Charges

DRIVEWAY STANDARDS EXHIBIT A. The following definition shall replace the definition of driveway in Section 62:

CONTENTS 1 INTRODUCTION SUMMARY 2-1 TECHNICAL ASPECTS 2-1 ECONOMIC ASPECTS 2-2

City of Pacific Grove

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network:

Executive Summary. Phase 2 Evaluation Report. Introduction

HEAVY-DUTY ENGINE PROGRAM AGRICULTURAL PUMP ENGINE COMPONENT ELECTRIC MOTOR NEW PURCHASE OPTION

FUNDAMENTALS OF POWER DISTRIBUTION SAIEE-1337-V : 2 CPD credits : Category 1

ROAD ACCIDENTS IN INDIA 2016

LAT Activity Code Table

TransLink/MoTI SURREY RAPID TRANSIT ALTERNATIVES ANALYSIS PHASE 2 EVALUATION

Plywood and Oriented Strand Board (OSB) in the Pacific Rim and Europe:

Noise Impact Assessment

TRAVEL DEMAND FORECASTS

ECONOMIC AND FINANCIAL ANALYSIS: PROJECT 1

The Republic of the Union of Myanmar. Ministry of Natural Resources and Environmental Conservation. Union Minister Office

Comhairle Chontae Chill Mhantain Wicklow County Council Fire Service.

CSE CONCLAVE. ENABLING CITY ACTION PLAN FOR CLEAN AIR India Habitat Centre, New Delhi April 19-20,

European Union, Trade in goods with Israel

European Union, Trade in goods with Brazil

Environmental Assessment Derry Road and Argentia Road Intersection

Engineering - Other Projects

European Union, Trade in goods with Belarus

NATO NATO CCMS Pilot Study Meeting Cardiff, UK UK,, May

Project Location. Purpose and Need for Action. File Code: 1950 Date: September 14, Dear Interested Party,

European Union, Trade in goods with Chile

European Union, Trade in goods with Colombia

European Union, Trade in goods with Malaysia

European Union, Trade in goods with New Zealand

European Union, Trade in goods with Kuwait

CONSOLIDATED TO MAY 17, 2017 UP TO AND INCLUDING BY-LAW TOWNSHIP OF WOOLWICH BY-LAW NO. #

Rwanda Biofuels Limited. Powering Rwanda s Development

European Union, Trade in goods with Panama

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation

European Union, Trade in goods with Peru

European Union, Trade in goods with Tunisia

ARTICLE 9 AS AMENDED

Passenger Train Brake Inspection and Safety Rules: Guidelines for British Columbia s Heritage Railways

Finding List by Question by State *

European Union, Trade in goods with Jordan

European Union, Trade in goods with Andean community 4

European Union, Trade in goods with Senegal

THE LF-690 SERIES. Operating and Service Manual. Series includes all variants of LF-690/691 and 692

CHINO DESALTER PHASE 3

MPC-20 Software Configuration Tool Guide

NESCO UTILITY. Januganj, Balasore TARIFF NOTIFICATION The 23 rd March, 2015 RETAIL SUPPLY TARIFF EFFECTIVE FROM 1 st APRIL, 2015

Madhya Pradesh Road Development Corporation: A Case Study of ADB Assistance for Institutional Development in the Transport Sector in India

Ministry of New and Renewable Energy (Jawaharlal Nehru National Solar Mission) Form B for Project Proposals for

Transcription:

QUESTIONNAIRE FOR ENVIRONMENTAL APPRAISAL (FOR ROAD/HIGHWAY PROJECTS) te 1 : te2 : All information given in the form of annexures should be part of this file itself. Annexures as separate files will not be accepted. Please enter x in appropriate box where answer is / I. General Information A. Name of the project 1. Existing project/proposed project/ expansion project/modernization project : 2. If Existing/expansion/ modernization project, whether environmental clearance has been obtained : B. Length (in kilo metres) C. Location Stretch of the Road/Alignment Village Tehsil District State D. Geographical information 1. Latitude From To 2. Longitude From To 3. G.T. Sheet. (Survey of India Map.). 4. Elevation above Mean Sea Level (metres) Road/Highway Projects 1

Min. Max. 5. Total Area proposed for the Project (in ha.) 6. Nature of Terrain 7. Nature of Soil (Clayey, Sandy, silty, loam etc) II. 8. Permeability along the route in various Sections Current land use of the proposed project site Area (in ha.) A. Agricultural 1. Irrigated 2. Unirrigated B. Homestead C. Forest D. tified Industrial Area/Estate E. Grazing F. Fallow G. Mangroves H. Orchards I. Sand dunes J. development zone K. Marshes L. National Park/Sanctuary Road/Highway Projects 2

Total III. Alternate Routes/Alignments considered A. B. C. D. IV. Reason for selecting the proposed Route/Alignment: V. Land use plan A. Does the proposed project conform to the approved land use all along the route/alignment? (To be certified by the concerned Department of State Government). B. If not, clearly indicated, which of the stretches are not as per approved land use. C. Does it conform to the Regional Development Plan? VI. Site Preparation A. Is the proposed route/alignment located in low-lying area? B. Level before filling (above MSL in m) C. Level after filling (above MSL in m) D. Details of fill material required Road/Highway Projects 3

Quantity of Fill Material required (in cu.m) Source E. Gradient details F. Would the above filling result in complete/partial filling of water Bodies? G. Does the site involve stripping? If yes, provide the following details: 1. Size of the area to be stripped. 2. Location 3. Soil type 4. Volume and quantity of earth to be removed 5. Location of dump site 6. Proposal for utilisation of removed topsoil. H. Does it involve cutting? If yes, please furnish the following details: 1. Size of the area to be cut. 2. Depth of cut 3. Location 4. Soil type 5. Volume and quantity of earth and other material to be removed Road/Highway Projects 4

6. Location of dump site. I. Does it involve tunneling?. If yes, please furnish the following details: 1. Lithology 2. Geological structural fraction 3. Diameter (meters.) 4. Length (kilometer.) 5. Location J. Does the site preparation require cutting of trees? If yes, please furnish the following details: 1. How many trees are proposed to be cut? 2. Species of the above trees 3. Are there any protected/endangered species?. If yes, provide details VII. In case the route/alignment falls totally or partially in the CRZ area A. What is the categorization of the area (as per approved CZMP)? CRZ-I C CRZ-II CRZ-III Road/Highway Projects 5

CRZ-IV B. Does the proposed activity qualify under the category of permissible activity? C. If yes, under what provision is it permitted? Sl.. Provision. D. In case the road passes through a flood plain of a river, please furnish: 1. Detailed micro-drainage 2. Flood passages 3. Flood periodicity in the area E. Does the proposed project involve construction on any sandy stretch? If yes, please furnish detail F. Height (above MSL in metres.) G. Does the project involve extraction of sand, leveling or digging of sandy stretches within 500 mts of high tide line? If yes, mention the activity involved and area. Road/Highway Projects 6

1. Stretch 2. Area (sq. metre) H. Does the project involve any dredging? If yes, please provide the following details (capital/maintenance): Extent of dredging, disposal of dredged material etc) I. Is any sand proposed to be removed from sand dunes? J. Does the project involve cutting/destroying of mangroves? If yes, give detail 1. Area 2. Species 3. Existing health VIII. Details of the location: Sea Other Water Bodies River/Creek/Lake,etc (Please specify) Distance of seaward boundary from the edge of the alignment (in m.) Distance of seaward boundary of Road/Highway Projects 7

construction (in m.) IX. Does the proposed project site involve any breeding or nesting ground? If yes, provide the following details A. Name of the aquatic organism B. Type of habitat C. Period of year in which activity takes place D. Independent report of biohabitat study may be furnished. X. Does the project have any adverse effect on biodiversity? If so, details of flora and fauna so affected: XI. Does the project involve any land reclamation? If yes, please provide the following details A. Activity for which land to be reclaimed B. Area of land to be reclaimed (Hectares) XII. Whether there will be any change in the drainage pattern after the proposed activity? If yes, what are the changes? Road/Highway Projects 8

A. What is the maximum extent B. Is any additional area to be flooded XIII. Does the proposed alignment/route involve migratory path of animals? If yes, please provide the following: A. Name of fauna B. Habitat C. Period of the year in which activity take place XIV. Project Details (A summary of project proposal shall be enclosed). A. Length of New alignment proposed (kms) B. Width of the new alignment (metres) C. Length of existing alignment proposed to be Strengthened/widened (kilometers.) D. Width of the existing alignment (metres) E. Width of the existing alignment after widening (metres) F. Total length of the alignment (kilometres) G.. of Bridges Major Minor H. Length of Bridges (metres) I. Width of Bridges (metres) Road/Highway Projects 9

J..of Culverts K. Length of Culverts (metres) L. Number and distance (metres) between underpasses M..of intersections N. Length of Intersection (metres) O.. of Railway crossings P. Length of Railway crossings (metres) Q..of Villages through which Alignment passes through R. Population of the villages Road/Highway Projects 10

XV. Raw material required during construction S. Item Quantity 1 Bluemetal 2 Bricks 3 Sand 4 Cement 5 Bitumen 6 Diesel 7 Others(Please specify) (Tonnes) Mode of Transport Source XVI. Water required during construction: A. Water Requirements (cu.m./day) S. Purpose Average Demand 1 Road making 2 Dust Suppression 3 Drinking 4 Others (Please specify) TOTAL Peak Demand Source Type Treated/ Untreated/Fresh/ Recycled Remarks Road/Highway Projects 11

B. Source of Raw Water Supply (Net) S. Source Cu.m/hr Cu.m./day 1 Sea 2 River 3 Groundwater 4 Rainwater harvesting 5 Municipal water supply 6 Others (Please specify) XVII. Whether there will be any ingress of saline water into ground water due to project? XVIII. Whether any of the following exist within 7 km of the project site. If so, Please indicate aerial distance and the name of the site. S. Item Name Aerial Distance (in km) 1 National Park 2 Marine Park 3 Sanctuary/Tiger Reserve/Elephant Reserve/Turtle westing ground 4 Core Zone of Biosphere Reserve 5 Reserved Forest 6 Wildlife Habitat Road/Highway Projects 12

7 Habitat of endangered/exotic species 8 Coral Reef 9 Mangroves 10 Lakes/Reservoirs/Dams 11 Breeding Site 12 Nesting Site XIX. Ambient Air Quality (for RPM, SPM, SO2, NOX, CO) Procedures adopted should be as per guidelines of CPCB and should cover one full season (Locations should be so selected to represent the varying geographical locations and sensitive receptors) S. Stretch of the road Date, Time & Location Concentration as monitored (in ug/m3) SPM, SO2, NOX, CO Permissible Standard (As per SPCB guidelines Remarks (Name of the instrument and sensitivity) XX. Solid Waste A. Solid Waste generated during Road Construction (Tonnes/Day) 1. Top Soil Road/Highway Projects 13

2. Overburden 3. Others (Please specify) Total B. Possible users of Solid Waste C. Method of disposal of solid waste Method Quantity (TPM) 1. Landfill 2. Others(Please specify) 3. In case of landfill a) Is solid suitable for landfill b) Dimensions c) Life of landfill d) Proposed precautionary and mitigation measures e) Other alternative proposed along with details Road/Highway Projects 14

XXI. ise level (db) S. Stretch of the Road (Locations Should be so selected to represent the varying geographical locations and sensitive receptors) ise before Construction ise after Construction Abatement Measures 1 2 3 XXII. Projected Air Quality (taking into account the traffic projections on (SPM, SO2, NOX, CO in ug/m3) this road). S. Pollutant Before Constructions After Construction 1 SPM 2 SO2 3 NOX 4 CO XXIII. Storage (of inflammable/explosive/hazardous/toxic substances) S. Name Consumption 1 Bitumen 2 Diesel 3 Others (please specify) (in TPD) Maximum Quantity at any point of time (tonnes) Means of transportation Road/Highway Projects 15

XXIV. Occupational Health A. What are the major occupation health and safety hazards anticipated including due to use of explosives, if any? B. What provisions have been made/proposed to be made to conform to health/safety requirements? C. Details of personal protective equipment provided/to be provided to the workers XXV. Green Belt A. Total area of project (in ha.) B. Area already afforested (for existing projects), in ha. C. Area proposed to be afforested (in ha.) D. Width of green belt (minimum, in m.) along the alignment E. Trees planted and proposed 1. Planted 2. Proposed 3. List of species F. Proposal for maintenance of plantation XXVI. Construction Phase A. Estimated duration of construction B. Number of persons to be employed for construction 1. Peak 2. Average s. C. Proposal for employment of local people. Road/Highway Projects 16

D. What provision has been made for the sanitation for the construction workers? E. How the fuel (kerosene/wood, etc) requirement of labour force will be met to avoid cutting of trees from the adjoining areas. F. Measures for Health care with emphasis on protection from endemic diseases. XXVII. Socio-economic profile A. Human Settlement Aerial distance from the periphery of the site Upto 500 m From the Periphery 500 m to 3000 m From the Periphery 3000 m to 7000 m From the periphery Population Of which SC/ST Number of Houses Present Occupational Pattern B. Economic activity S. Population Occupation(Agriculture/Horticu lture/fishing/tourism/transport /construction) Average Income per annum Road/Highway Projects 17

XXVIII. Rehabilitation & Resettlement Plan including vocational training and other avenues of employment S. A. Population to be displaced Name of Village Population Land oustees only Homestead Oustees only Land + Homestead Oustees 1 2 3 B. Rehabilitation Plan for Oustees C. Site where the people are proposed to be resettled D. Compensation package E. Agency/Authority responsible for their resettlement. XXIX. Does it involve displacement of ethnic minority S. If yes, please furnish details Name of the community Number of Males Number of Females Total A. Please specify any special measures for their rehabilitation. Road/Highway Projects 18

XXX. Pollution Control A. Details of Pollution Control Measures/Environmental Safeguards: S.. Existing Proposed to be installed 1. Air 2. Water 3. ise 4. Solid Waste B. Protection of Forest/National Park./Sanctuary/Mangroves 1. Agricultural land 2. Grazing land 3. Top soil 4. Natural resources 5. Sand dunes and mudflats 6. Hill feature 7. Reclaiming borrow areas 8. Low-lying areas 9. Soil and slope stabilization 10. Preventing siltation 11. Archaeological and other Heritage sites XXXI. Expenditure on Environmental Measures: A. Capital cost of the project (as proposed to the funding agency/financial institutions (Rs.Lakhs) Road/Highway Projects 19

B. Cost of environmental protection measures (Rs. Lakhs) S. Recurring Cost per annum Capital Cost 1 Pollution Control 2 Pollution Monitoring 3 Solid Waste Management 4 Green Belt 5 Others (Please Specify) Total XXXII. Public Hearing A. Date of Advertisement B. Newspapers in which the advertisement appeared C. Date of Hearing D. Panel Present E. List of Public present along with addresses and occupation S. Summary/details of public hearing Issues raised Recommendation of panel Response of Project Proponents 1 2 3 4. The data and information given in this Performa are true to the best of my knowledge and belief Date: Place: Signature of the Applicant with full name & address. Given under the seal of organisation on behalf of whom the applicant is signing. Road/Highway Projects 20