Page 1 of KA

Similar documents
s Contact the Area Construction Engineer at for RAP sample location. Page 2 of 10

59-2 KA Page 1 of 16

BARTON COUNTY GENERAL HIGHWAY MAP PREPARED BY THE KANSAS NE 120 RD NE 100 RD NE 80 RD NE 70 RD NE 50 RD NE 60 RD T18S T19S. County Ellsworth County

KDOT PROJECT # 106 KA

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2007

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET NUMBER

2 Min. Min. Edge of. Edgeline See Note 3 PLAN VIEW. See Note 3. This distance may vary

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

Maine Turnpike Authority

Lee County DOT Traffic Section Design Standard for Sign Installation

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

SN01 STANDARD NOTES CITY OF SAMMAMISH 2018 FLASHING YELLOW ARROW SIGNALS PROJECT NO. DATE BY APPR REVISION COSA0023 KING COUNTY WASHINGTON

SN01 STANDARD NOTES CITY OF SAMMAMISH 2018 INTERSECTION IMPROVEMENTS PROJECT NO. DATE BY APPR REVISION COSA0023 KING COUNTY WASHINGTON

CLAY COUNTY MISSOURI HIGHWAYS AND TRANSPORTATION COMMISSION PLANS FOR PROPOSED STATE HIGHWAY NOT TO SCALE LENGTH OF PROJECT

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

Exhibit H: Typical Traffic Control Plans. North Metro Natural Gas Pipeline Project Routing Study

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING

Section 6H.01 Typical Applications

Maine Turnpike Authority

Work Zone Safety & New Interstate Resurfacing Provision

SCDOT TRAFFIC SIGNAL SPECIAL PROVISIONS TRAFFIC CONTROL FOR TRAFFIC SIGNAL PROJECTS MAINTENANCE OF TRAFFIC

TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM

Temporary Traffic Control Plans

STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS

1400 MISCELLANEOUS Traffic Engineering Manual

Work Zone Safety Best Practices Traffic Engineering & Safety Conference October 18, Dean Mentjes Federal Highway Administration

South Carolina. It s serious. Deadly serious.

TRAFFIC CONTROL PLAN ONE-LANE TWO-WAY TRAFFIC CONTROL TCP(1-2)-12 ONE LANE TWO-WAY CONTROL WITH YIELD SIGNS ONE LANE TWO-WAY CONTROL WITH FLAGGERS

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS

SECTIO N 610 PAVEMENT SMO O THNESS

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

TRAFFIC CONTROL PLAN FOR SURVEYING OPERATIONS END ROAD WORK END ROAD WORK * ** END ROAD WORK END ROAD WORK. TCP (S-1a) TCP (S-1b)

PN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:

Federal Project No.: OC-095-1(348)

Maine Turnpike Authority

PERFORMANCE ACTIVITY 603 SIGNS

CITY OF BURLINGTON SHARON AVENUE SANITARY SEWER IMPROVEMENTS - PHASE 1 - REBID CITY OFFICIALS. STEVE SEXTON Mayor JAMES STAVIG.

Session 123 Rumble Stripes: Opportunity to Improve Safety and Retroreflectivity

TTI TRAFFIC SAFETY CONFERENCE. John A. Barton, P.E.

800 Access Control, R/W Use Permits and Drive Design

Alberta Transportation Rumble Strips - C-TEP Lunch and Learn

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY

VDOT 2008 Road and Bridge Standards Section Transition Curves

REVIEW OF SIGNIFICANT CHANGES IN THE 2011 VIRGINIA WORK AREA PROTECTION MANUAL. VDOT Traffic Engineering Division Oc7, 2011 Presentation

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS

Plan Check Policies and Guidelines

Plan Check Policies and Guidelines

Louisiana s s Work Zone Task Force Work Zone Improvements

DELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT

LaDOTD s s New Traffic Control Details

REVIEW OF THE DRAFT 2011 VA WORK AREA PROTECTION MANUAL. December 14, 2010 David Rush VDOT WZS Program Manager

MoDOT 2016 UNIT BID PRICES Northwest District

STREET IMPROVEMENTS PROPOSAL BID ITEMS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/27/06 PAGE : 1 TABULATION OF BIDS

Work Zone Safety. Mike Marr Industrial Safety Consultant Ohio Bureau of Workers Compensation Division of Safety & Hygiene

Night Work Specification

REVISION VIRGINIA WORK AREA PROTECTION MANUAL. Effective April 1, 2015 for State Forces & Effective starting on the July 2015 Advertisement

Control of Pavement Smoothness in Kansas

Safety Assessment. Intersection of Route 29 (Seminole Trail) and Ashwood Blvd (Route 1670). Albemarle County

TRANSPORTATION RESEARCH BOARD. TRB Straight to Recording for All. Rumble Strips/Stripes: Practices and Challenges

Effectiveness of Median Cable Barriers and Rumble Strips

Table Standardized Naming Convention for ERD Files

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

SECTION 12 - CONSTRUCTION AREA TRAFFIC CONTROL TABLE OF CONTENTS

BID SUMMARY SHEET PUBLIC BID NO TRAFFIC WARNING/STREET SIGNS AND SUPPLIES BIDS RECEIVED: MARCH 29, 2016

BID SUMMARY SHEET CONTRACT NO

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (IRI ACCEPTANCE CRITERIA)

CATEGORY 500 PAVING SECTION 535 PAVEMENT SURFACE PROFILE

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA)

Federal Project No.: HSIP-5A27(567)

Created by: St. Louis County

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 961 PORTABLE TRAFFIC SIGNALS OCTOBER 17, 2008

ESTIMATE PREPARATION ASSISTANCE

2003 EDITION. Illinois Supplement to the National Manual on Uniform Traffic Control Devices. Division of Highways

I.D.O.T. Update Version -

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM

Federal Project No.: STP-5A27(380), STP-5A27(381)

DESIGNATED CONSTRUCTION ZONE SPEED FINES DOUBLE. Manitoba Infrastructure and Transportation. Infrastructure and Transportation. Traffic Engineering

Ingham County Request for Proposals Okemos Road and Sandhill Road Widening, Packet #15-15

DRIVEWAY GUIDE. Transportation, Engineering and Development (T.E.D.) Business Group

2013 Changes to the 2011 MMUTCD, Part 6 September 2013

GARDEN STATE. 1 Active Work Zone When Flashing 36x36 W Advisory Speed 10 18x18 W Advisory Speed 15 18x18 W

DIVISION V SURFACINGS AND PAVEMENTS

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

Anticipated Changes Based on 2009 Federal MUTCD

Work Zone Worker Protection

La Paz County Public Works Standards Volume I

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

Work Zone Safety. Guidelines for Temporary Traffic Control

Macomb County Department of Roads Bid Comparison

2011 LOCAL STREET IMPROVEMENTS

POLICY FOR THE ESTABLISHMENT AND POSTING OF SPEED LIMITS ON COUNTY AND TOWNSHIP HIGHWAYS WITHIN MCHENRY COUNTY, ILLINOIS

High Tension Cable Barrier

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

DOCUMENTATION WORKBOOK FY 2017

PARAPETS / RAILS / MEDIANS / SIDEWALKS TABLE OF CONTENTS CHAPTER 25

STANDARD DRAWING INDEX

Transcription:

Page 1 of 10

5 Contact the Area Engineer at 620-384-7821 for RAP sample location. Page 2 of 10

SS-1HP or approved alternate shall be used for Tack. Page 3 of 10

Ú City limit or Urban boundary No Centerline rumble strips Centerline rumble strips City connecting link or Urbanized (Unincorporated city) TYPICAL CITY CONNECTING LINK OR URBANIZED AREA Centerline rumble strips ì Major HighwayÜ ì Major HighwayÜ Ú Minor Highway or County Road Ú City limit or Urban boundary GENERAL NOTES Construction of centerline rumble strips in asphalt pavement is paid under the bid item "Rumble Strips (Milled) (Centerline)". All work and materials required to construct the strips in accordance to these details and Special Provisions are included in this item. See typical sections for other surfacing details. Do not construct rumble strip on bridges or concrete bridge approaches. No variation in spacing between depressions will be permitted. Either rumble strip shape is acceptable with no mixing of shapes on a project unless approved by the engineer. For Shoulder Rumble Strip details see Standard drawing RD707. ì Major HighwayÜ ì Major HighwayÜ TYPICAL RURAL INTERSECTION WITH BYPASS LANES No Centerline rumble strips Centerline rumble strips ì Major HighwayÜ ì Major HighwayÜ TYPICAL RURAL INTERSECTION WITH LEFT TURN LANES Centerline rumble strips Page 4 of 10 KDOT Graphics Certified Ú Minor Highway or County Road Centerline rumble strips No Centerline rumble strips Centerline rumble strips 1 OF 2 2 1 1-15-10 Revised notes S.W.K. J.O.B. 1 9-24-09 Rem ì rumble strips thru sdrd. S.W.K. J.O.B. NO. DATE REVISIONS BY APP'D RD706 KANSAS DEPARTMENT OF TRANSPORTATION MILLED RUMBLE STRIPS FHWA APPROVAL 5-26-1 1 (CENTERLINE) DESIGNED DETAILED QUANTITIES DESIGN CK. DETAIL CK. QUAN.CK. KDOT Graphics Certified 07-09-2015 APP'D. James O. Brewer TRACED Bowser TRACE CK. King

Page 5 of 10 KDOT Graphics Certified ShoulderÜ ì ProjectÜ TYPICAL MINOR SIDEROAD OR ENTRANCE Centerline Rumble Strips Edge of travel wayü Traffic ÙCenterline Rumble Strips of Undivided Highway Traffic Edge of travel wayû TYPICAL INSTALLATION 12" 7" 5" PLAN DETAILS OF DEPRESSION 12" 7" 5" 2 1 1-15-10 Revised notes S.W.K. J.O.B. 1 9-24-09 Rem ì rumble strips thru sdrd. S.W.K. J.O.B. NO. RD706 DATE REVISIONS BY APP'D KANSAS DEPARTMENT OF TRANSPORTATION MILLED RUMBLE STRIPS FHWA APPROVAL 5-26-1 1 (CENTERLINE) DESIGNED DETAILED QUANTITIES DESIGN CK. DETAIL CK. QUAN.CK. APP'D. James O. Brewer TRACED Bowser TRACE CK. King KDOT Graphics Certified 07-09-2015 12" ELEVATION B A A B B A A PLAN B DETAILS OF DEPRESSION (Alternate Shape) "to " depth 12" 12" SECTION B-B (ALT. SHAPE) 2 OF 2 "to " depth "to " depth 12"Radius 12"Radius "to " depth SECTION A-A (Typical for both shapes) ÚTop of pavement ÚTop of pavement SECTION B-B 7" ALT. RUMBLE STRIP SHAPE End of Rad. Úì Sideroad or Paved Entrance End of Rad.

3 300 300 6" SOLID WHITE EDGELINE 4" SOLID YELLOW LINE 6" DOTTED WHITE EXTENSION LINE 6" SOLID WHITE EDGELINE D/4 6" BROKEN WHITE LANE LINE 6" WHITE LANE DROP LINE NOTE: DOTTED EXTENSION LINE TAPER LENGTH POSTED SPEED * 12 FOR POSTED SPEEDS ABOVE 40 MPH W 4-2 D TYPICAL MARKING FOR AUXILIARY PASSING LANE 6" BROKEN WHITE LANE LINE 4" SOLID YELLOW LINE SHOULDER LINE 4 2 2 TYPICAL SPACING FOR DOTTED EXTENSION LINES, UNLESS OTHERWISE NOTED ON PLANS. 9 3 3 SHOULDER LINE 6" BROKEN WHITE LANE LINE 4" BROKEN YELLOW LINE TWO-WAY LEFT TURN DETAIL FOR FIVE LANE ROADWAY TYPICAL SPACING FOR LANE DROP. UNLESS OTHERWISE NOTED ON PLANS. 8 24 4" SOLID YELLOW LINE SHOULDER LINE 32 TYPICAL SPACING FOR BROKEN LINES UNLESS OTHERWISE NOTED ON PLANS SHOULDER LINE 4" BROKEN YELLOW LINE TWO-WAY LEFT TURN DETAIL FOR THREE LANE ROADWAY 4" 4" 16 SPACING (FT) 10 X SPEED (MPH) TWO-WAY LEFT TURN ARROW SPACING DETAIL 4" TYPICAL SPACING FOR NO PASSING LINES UNLESS OTHERWISE NOTED ON PLANS NOTE: IF ARROWS ARE USED SPACE THE ARROWS AS SHOWN IN THE SPACING DETAIL. Page 6 of 10 Pg 1 of 2 5/25/12 Added Dotted Extension and Lane Drop Lines B.A.H. B.D.G. 2 9/20/05 Removed Aux. Passing Lane Dotted Ext. Line J.F.F. B.D.G. 1 7/26/05 New FHWA Approval Date J.F.F. B.D.G. NO. DATE REVISIONS BY APP D KANSAS DEPARTMENT OF TRANSPORTATION TYPICAL PAVEMENT MARKING DETAILS FOR UNDIVIDED ROADWAYS TE308 FHWA APPROVAL 5/25/2012 APP D Brian D. Gower DESIGNED J.F.F. DETAILED J.F.F. QUANTITIES TRACED DESIGN CK. B.D.G. DETAIL CK. B.D.G. QUAN. CK. TRACE CK.

3 NOTE: ALL PAVEMENT MARKINGS SHALL BE BROKEN AT CROSS ROADS. FOR HIGHWAY JUNCTIONS THE NO PASSING ZONE WILL EXTEND 1000 FROM INTERSECTION. 4" BROKEN YELLOW LINE 6" SOLID WHITE LANE LINE 4" SOLID YELLOW LINE 6" WHITE EDGE LINE 6" WHITE EDGE LINE 500 500 6" WHITE EDGE LINE 6" SOLID WHITE LANE LINE 4" SOLID YELLOW LINE 4" BROKEN YELLOW LINE 6" WHITE EDGE LINE TYPICAL ROAD JUNCTION MARKINGS WITH BYPASS LANES 6" BROKEN WHITE LANE LINE SHOULDER LINE 4" SOLID YELLOW DOUBLE LINE SHOULDER LINE 6" BROKEN WHITE LANE LINE TYPICAL MARKINGS FOR FOUR LANE ROADWAY W14-3 4" BROKEN YELLOW LINE 4" SOLID YELLOW NO PASSING LINE SHOULDER LINE TYPICAL TWO LANE MARKINGS NOTE: LONGITUDINAL PAVEMENT MARKING LINES SHALL BE OFFSET A MINIMUM OF 2" FROM LONGITUDINAL PAVEMENT JOINTS. Pg 2 of 2 NOTE: ON NON I, US, AND K ROUTES, 4" EDGE LINES MAY BE INSTALLED. 6" EDGE LINES ARE NOT REQUIRED ON NON I, US, AND K ROUTES. Page 7 of 10 5/25/12 Added Dotted Extension and Lane Drop Lines B.A.H. B.D.G. 2 9/20/05 Removed Aux. Passing Lane Dotted Ext. Line J.F.F. B.D.G. 1 7/26/05 New FHWA Approval Date J.F.F. B.D.G. NO. DATE REVISIONS BY APP D KANSAS DEPARTMENT OF TRANSPORTATION TYPICAL PAVEMENT MARKING DETAILS FOR UNDIVIDED ROADWAYS TE308 FHWA APPROVAL 5/25/2012 APP D Brian D. Gower DESIGNED J.F.F. DETAILED J.F.F. QUANTITIES TRACED DESIGN CK. B.D.G. DETAIL CK. B.D.G. QUAN. CK. TRACE CK.

Page 8 of 10

Page 9 of 10

SUMMARY OF TRAFFIC CONTROL DEVICES (FOR INFORMATION ONLY) All traffic control devices shall be placed in accordance with the applicable KDOT Traffic Control Standards. The contractor shall provide all signs and other traffic control devices for proper traffic control of all construction activities. Quantities listed are estimates only. Contractor operations may require additional signs and traffic control devices, this will be subsidiary to the bid item traffic control. SIGN NO. R2-1 4 R4-1 2 WORK ZONE SIGNS * SIZE SQ. FT. 0-9.25 9.26-16.25 16.26 & OVER W3-4 2 W3-5 2 W8-11 W14-3 2 W20-1 2 W20-4 2 W20-5 W20-7 4 W21-5 W8-15 2 W8-15P 2 G20-4 KG20-2 4 KM4-20 2 KG20-5 2 KI-104a KI-105a LIGHTED DEVICES * WORK ZONE WARNING LIGHT (TYPE A LOW INTENSITY) WORK ZONE WARNING LIGHT (RED TYPE B HIGH INTENSITY) ARROW DISPLAY PORTABLE CHANGEABLE MESSAGE SIGN BARRICADES * CHANNELIZING DEVICES * TYPE III (4 TO ) PEDESTRIAN FIXED PORTABLE PEDESTRIAN SUMMARY OF TRAFFIC CONTROL DEVICES () 160 WORK ZONE SIGN (SPECIAL) SIGN NO. 16.25 SQ. FT. & LESS 16.26 SQ. FT. & OVER RECAPITULATION OF QUANTITIES ITEM QUANTITY UNIT WORK ZONE SIGNS (0 TO 9.25 SQ. FT.) WORK ZONE SIGNS (9.26 TO 16.25 SQ. FT.) WORK ZONE SIGNS (16.26 SQ. FT. & OVER) WORK ZONE BARRICADES (TYPE 3 4 TO ) WORK ZONE BARRICADES (PEDESTRIAN) CHANNELIZER (FIXED) CHANNELIZER (PORTABLE) CHANNELIZER (PEDESTRIAN) WORK ZONE WARNING LIGHT (TYPE A LOW INTENSITY) WORK ZONE WARNING LIGHT (RED TYPE B HIGH INTENSITY) ARROW DISPLAY PORTABLE CHANGEABLE MESSAGE SIGN PAVEMENT MARKING (TEMPORARY) 4" SOLID (TYPE I) STA./LINE 4" SOLID (TYPE II) STA./LINE 4" BROKEN (8')(TYPE I) STA./LINE 4" BROKEN (8')(TYPE II) STA./LINE 4" BROKEN (3')(TYPE I) 932.7 STA./LINE 4" BROKEN (3')(TYPE II) STA./LINE 4" DOTTED EXTENSION (TYPE I) STA./LINE 4" DOTTED EXTENSION (TYPE II) STA./LINE SOLID (LINE MASKING TAPE) STA./LINE BROKEN (LINE MASKING TAPE) STA./LINE SYMBOL (TYPE I) SYMBOL (TYPE II) FLEXIBLE RAISED PAVEMENT MARKERS (4" BROKEN (8 )) STA./LINE FLEXIBLE RAISED PAVEMENT MARKERS (4" BROKEN (3 )) STA./LINE PAVEMENT MARKING REMOVAL LIN. FT. CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY) LIN. FT. CONCRETE SAFETY BARRIER (TYPE F3) (TEMP.-INSTALL ONLY) LIN. FT. CONCRETE SAFETY BARRIER (TYPE F3) (TEMP.-RELOCATE) LIN. FT. INERTIAL BARRIER SYSTEM REPLACEMENT MODULES (IBS) WORK ZONE SIGN (SPECIAL) (16.25 SQ. FT. & LESS) WORK ZONE SIGN (SPECIAL) (16.26 SQ. FT. & OVER) RIGID RAISED PAVEMENT MARKER (TYPE I) RIGID RAISED PAVEMENT MARKER (TYPE II) TRAFFIC SIGNAL INSTALLATION (TEMPORARY) LUMP SUM TRAFFIC CONTROL (INITIAL SET UP) LUMP SUM TRAFFIC CONTROL LUMPSUM LUMP SUM FLAGGER (SET PRICE) 1 HOUR NOTES: 3 2 1 11/10/16 Removed Replacement Modules Summary Table, Added JGB (IBS) to Replacement Modules description NO. DATE REVISIONS BY APP D KANSAS DEPARTMENT OF TRANSPORTATION TRAFFIC CONTROL SUMMARY OF DEVICES RECAPITULATION OF QUANTITIES TE795 FHWA APPROVAL 06/01/15 APP D Kristina Erickson DESIGNED B.A.H. DETAILED R.W.B. QUANTITIES TRACED DESIGN CK. DETAIL CK. QUAN. CK. TRACE CK. Page 10 of 10 FINNEY Co. Proj. No. Title: