HANDLING OF ASSEMBLY... 1 RRH END OF ASSEMBLY... 1 BASE STATION END OF ASSEMBLY... 7 POWER CODING REVISION HISTORY... 11

Similar documents
8400 Series Fiber Distribution System

Fiber Connector Shelf (CCS)

MICROGUARD 500 EXTENSION REEL TRAINING MANUAL. Greer Company. Greer Company Crane Systems 1 OF18

Fiber Optic, Breakout cable, tight buffered, 900 microns

Application Specification Circular Plastic Connector (CPC) Series 45 System 05 AUG 14 Rev D

SYSTIMAX GS3 and 1100GS6 Evolve Modular Panel Instructions

IS94012-ENG - AFN February Revision 6 - Supersedes edition of 28 January and / or. 3 x Stress control mastic, type MFC (Hi-K)

! DANGER Lb. Winch Mounting Instructions. Tools required: Before You Start. Assembly Instructions. General Information. Manual No.

SYSTIMAX 360 FTP Evolve Panel Instructions

EasyStart Installation Instructions for Dometic Family RV A/Cs

Opticom Rack Mount Fiber Enclosures

Zeon Control Pack Relocation Kit 78 Cable Length

Installation Instructions Table of Contents

CABLE GRIPS Strain-Relief Grips Pulling Grips Support Grips

Replacing the Gear Drive Motor Assembly and GFCI Module for Operation with the Chain Drive Motor Assembly

(31 ) ZEON CONTROL PACK RELOCATION KIT

SloanLED THINLED. Constant Current. Installation Guide

Installation Instructions: HYPERION R-Lite SYSTEM

Sentinel Field Satellite Controller Metal Pedestal, Plastic Pedestal and Wall Mount Models Installation Instructions

Fiber Optic Above-Ground) Cross-Connect Enclosure (ACE) Model ACE-200DS Installation Guide)

Panduit PreConfigured ZDF48-RA Industrial Distribution Frame (IDF) Installation Instructions

Assembly Instruction EL OCHITO WHITE CONTACTS 1000BASE-T/10GBASE-T TYPE I: PIN /SKT CABLE: S/FTP

Installing Ignition Coil relay

PART No: PRODUCT: BRAKE CONTROLER HARNESS MAKE & MODEL: FORD RANGER - MAZDA BT-50 INSTALLATION INSTRUCTIONS

Cabling and cable harnesses. General

Desktop 5.5 Z Axis Retrofit

TIP SHEET. Installation Tips for your RS OL-MDB-CH6 (1) (for Jeep vehicles) T1227 v1.0 3/19/14

Double Hanger Only. Sheave Diameter " 3" Double Hanger Only

POWER. Lengths (ft) Nominal Overall Diameter. Part Number. Gauge /strands

ELECTRICAL - Non Insulated Terminals

Installation Instruction Heatshrink Termination For 3 Core Polymeric Cables 7.2kV to 36kV

Mechanical Hoists. Catalog 1100 July Hoists - Mechanical Phone: Web: hubbellpowersystems.

SNR-FOSC-D-T. Installation Manual SNR-FOSC-D-T. Dome Heat Shrinkable Seal Fiber Optic Splice Closure (FOSC)

Installation Instructions: ACCENT SYSTEM

INSTALLATION INSTRUCTIONS

ANZI Transfer Switch and Generator Wiring Installation Addendum

Wiring the 2015 FRC Control System

3M Cold Shrink QT-III Silicone Rubber Three-Core Termination Kits

Fiber optic splice closure

RS4-7/PS4-7 + (2) + SPDT T3015, T3053

MR Gradient Cable Field Termination Training

SLIMFLEX LED Tape Lighting

(31 ) ZEON CONTROL PACK RELOCATION KIT

Panduit PreConfigured Industrial Distribution Frame (IDF) Installation Instructions Part Numbers ZDF and ZDF

Wiring the FRC Control System

2000 lb WINCH. Instruction and Operation Manual

FIXTURE INSTALLATION GUIDE Model T21T (Low Voltage Pendant Set 120V)

Installation Instructions (Translation) Marking. Description. Danger, warning and note symbols. Technical data. ANTARES ExtSet.

Sentinel Field Satellite Controller

INSTALL INSTRUCTIONS DC C-EV. Installation Instructions: DC C-EV.

FTTH simplex indoor cables with semi-tight tube

INSTALLATION INSTRUCTIONS WHITE / SINGLE COLOR 24V LED TAPE

-1- White Tape. Figure 1

INSTALLATION and MAINTENANCE INSTRUCTIONS SHO SERIES ELECTRIC CABLE REELS

Units with pedestal and busbars on the short side (+H360, flat mounting)

Automatic Roof Hatch Opener

Assembly Instruction. EL OCHITO BLUE CONTACTS SuperSpeed USB TYPE I: PIN /SKT CABLE:

GENUINE PARTS INSTALLATION INSTRUCTIONS

w w w. h d o n l i n e s h o p. d e HEATED HAND GRIP KITS GENERAL REMOVAL -J02983 REV Kit Number Models Kit numbers Service Parts

RS OL-MDB-GM1 (GM1) (3) T3125

E E VDC COOLEDGE TILE INTERIOR INSTALLATION INSTRUCTIONS. Caution: Observe precautions for handling electrostatic sensitive devices.

Horizontal Fiber Optic Splice Closure (FOSC) Installation Manual

Installation Tips for your Crimestopper/ProStart Remote Start system (add-on for GM vehicles) v1.02 updated 1/16/2013

5. Extruder Assembly

Prusa i3 Printer Assembly Guide

channel damage the internal components and the weight may break the internal wiring or flexible strip.

VITALink Taped Splice Pigtail Crimp

HDD Insert Series. Application Specification Apr 30 th, 2017 Rev. A. Table of contents

Product Manual MNX10015 / REV B MODEL SB142, SB242. Dual Output Series Switch Boxes

Installation Instructions: ACCENT HIGH OUTPUT SYSTEM

Spring Cable Reels EXEL

3M Cold Shrink QT-II Silicone Rubber Indoor Termination Kits

FORM: C 01/06

3M Cold Shrink Silicone Rubber Skirted Termination Kit QT-III 7672-S-8-TOW/WOT (RW)

Installation Tips for your RS-1 + Honda-SL3 (1.b) Remote starter Honda: ( FIT), ( Pilot), ( Ridgeline) Acura: ( MDX)

AUXILIARY BATTERY BOX INSTALLATION INSTRUCTIONS

GMT Fuse Panel Installation Guide

varioflex 19 network & server cabinets, 600, 800 mm width - 600, 800, 1000 mm depth

Mitsubishi Turbine: Hybrid XT Control Sensor Retrofit

HD Insert Series. Application Specification Apr 30 th, 2017 Rev. A. Table of contents

ADVANCED MODEL ROCKET

FOSC-400A4 INSTALLATION INSTRUCTION

PEDCAP-R-2, R-3 & R-4S/4L-INT

Installation Tips for your Add-on Remote Start (for GM vehicles with INTSL Install 2) v3.2 Updated 11/12/2012

EXTENSIVELY READ THE MANUALS AND HAVE SOME TRAINING. THIS TYPE OF CONNECTION IS NOT EVEN LISTED IN THE TM

Power Connection Kit Installation Instructions. Terminator ZP-M for use with TEK and HTEK series constant watt heating cables

Table of Contents WARN INDUSTRIES PAGE A1

FIXTURE INSTALLATION GUIDE Model T21T (Low Voltage Pendant Set 120V)

Section 5: Parts Replacement

FIXTURE INSTALLATION GUIDE Model T21T (Low Voltage Pendant Set 120V)

RS4/RS7 + + SPDT T0776,T0731

Installation Tips for RS4/RS7 + EVO-ALL (NIS 3.b)

Installation Tips Crimestopper/ProStart Remote Start system + PLJX + DLRM + SPDT (for GM vehicles) T0760 v1.1 updated 2/5/14

INSTALLATION INSTRUCTIONS

EMK-XP ElectroMelt Power Connection and End Seal Kit Installation Instructions

SUBSIDIARY OF DOUGLAS DYNAMICS, L.L.C.

B3 Bypass Step by Step Installation Guide

FIXTURE INSTALLATION GUIDE Model T21T (Low Voltage Pendant Set 120V)

RFS HYBRIFLEX. Click or scan to learn more about RFS HYBRIFLEX

Job Sheet 6 Installing the Combiner Box

Transcription:

INSTALLATION MANUAL HUBER+SUHNER AG Fiber Optics DOC-0000807936 Rev A February 07, 2018 Page 1 of 11 Table of contents HANDLING OF ASSEMBLY... 1 RRH END OF ASSEMBLY... 1 BASE STATION END OF ASSEMBLY... 7 POWER CODING... 10 REVISION HISTORY... 11 HANDLING OF ASSEMBLY To avoid any damage due to improper installation, please keep in mind below points: AVOID any additional stress on connector head by twisting or bending when routing or locating it AVOID installation path around any sharp objects AVOID uncontrolled knocking of connector head on any hard object AVOID any contact of connector head with any additional substance such as glue/oil/fat etc. unless prior authorization is given by HUBER+SUHNER AG RRH END OF ASSEMBLY Step 1 Use a smartphone to scan the QR code which is attached on the side of the reel. If you have internet access you can reach the installation instructions.

Page 2 of 11 Step 2 Remove the mounting bracket which is attached to the spool. Secure the mounting bracket with hose clamps (when fitting to a pole/mast) or screws (when fitting to a wall). Step 3 Mount the cable spool onto suitable de-reeling equipment. Start unwinding from the side where the MLUP connector head is located. Do not pull on the side where is blunt cut. Make sure, that the spool can rotate freely when unspooling. Remove the protection bubble foil only right before attaching the MLUP connector head to the mounting bracket.

Page 3 of 11 Step 4 Use a rope to pull up the cable system. Check the maximum pulling force (at 50 C ambient temperature during 1 hour) on the label attached to the hoisting grip. Do not apply higher force! The maximum pulling force equates to the weight of 100m cable. Cabling systems longer than 100m may not be lifted more than 100m vertical except a second hoisting grip is used. Contact HUBER+SUHNER for further installation instructions. Note: 950N / 95kg is only an example and depends on the hybrid cable used Lead the rope along the left side of the MLUP connector head down onto the cable hoist and secure. Fix the rope with 2 tapes to the lower and upper end of the connector head. Do not remove the air bubble bag which protects the connector head while lifting the cabling system. Pull the cabling system up the mast. Make sure that the MLUP connector head does not hit against any constructions and does not get bent over edges.

Page 4 of 11 Step 5 Remove the MLUP head fixation (tape) from the rope and the air bubble bag from the MLUP connector head. Hook MLUP head into the mounting bracket. Do not remove the rope from the hoisting grip before all cable clamps are mounted. Step 6 Secure the MLUP connector head at the mounting bracket by tightening the two M6 screws on the bottom left and top right corner. Tight the M6 screws with a torque of 2 Nm. Be careful not to damage the housing by tightening the screws too tightly.

Page 5 of 11 Step 7 Fix the cable to the mast using suitable clamps. H+S offers cable clamps for different profiles. Recommended spacing between the clamps is 1m. Clamps should be applied to hybrid cable starting from a point 0.5m to 1.0m below the cable entry proceeding down to the bottom of the mast. The cable has to be fixed straight and in line (maximum 5 ) with the MLUP enclosure between the cable entry and the 1 st cable clamp. The maximum bending radius of the cable is 8x cable diameter. After all cable clamps are attached, remove the rope. Do not remove the rope before all cable clamps are mounted. Step 8 The MLUP enclosure has an integral earth point suitable for M8 lug for grounding. Connect the earth point to an earth bar with a grounding assembly with minimum 16mm 2 / 6AWG cross section. Consider the correct order: first the grounding wire lug, secondly the washer, thirdly the spring washer. Tighten the M8 earth screw with a torque of 5 Nm. Be careful not to damage the enclosure by tightening the M8 earth screw too tightly. H+S offers different grounding assemblies: Item no. 85086667: 0.5m, black, 16mm 2, 2x M8 lug Item no. 85083781: 0.5m, yellow/green, 16mm 2, 2x M8 lug Item no. 85086668: 0.5m, black, 25mm 2, 2x M8 lug Item no. 85083792: 0.5m, yellow/green, 25mm 2, 2x M8 lug All our accessories are also mentioned in the H+S online catalogue.

Page 6 of 11 Step 9 The power jumpers are terminated with a rugged circular plastic plug connector and are blunt cut on the RRH side. Step 10 All connectors (power) are protected with water proof (IP67) protection caps. Therefore the MLUP can be installed and left at the mast for later installation of jumpers. Do remove the cap only at the moment when the plug connector is mated. Step 11 Connect power jumper on left side of connector head. Remove cap: Twist the coupling ring of the plug connector to remove protecting cap as shown. Mating: Push plug connector slightly into flange connector, rotate to find keying position, twist coupling ring of the plug connector as shown until you hear a click sound. Un-mating: Twist coupling ring as shown to unmate the plug connector.

Page 7 of 11 Step 12 If required, a protective cover can be easily fitted over MLUP connector head and can be secured with two screws. Attach the safety cord to the bracket and the protective cover. Protection cover for MLUP: Stainless steel, dimensions (L H W) 365 200 90 mm Item no. 85032157 Step 13 Ensure smooth routing of all cables from connector head to RRH equipment using suitable cable clamps not cable ties. H+S offers cable clamps for different profiles. BASE STATION END OF ASSEMBLY Step 1 Unwinding the whole assembly from the reel and lay the cable to the end equipment. Step 2 Remove end-cap from the cable system and strip cable jacket off the right position.

Page 8 of 11 Step 3 Remove cable jacket carefully. Step 4 Unwrap copper tape from cable using gloves due to potential sharp edges up to the strip-back point. Step 5 Make sure not to leave any sharp edges where the copper foil goes under the jacket: carefully remove excess foil with pin-nosed pliers and then cover it with tape. Step 6 Measure (twice) the required DC tail length and cut them. Step 7 Route DC cable element to their respective termination points and connect. Route earth wire to earth bonding point and connect.

Page 9 of 11 Step 8 If earthing is required outside cabinet/cabin use universal grounding kit and follow separate instructions. NOTE: the grounding cable can also come in black.

Page 10 of 11 POWER CODING RRH end BTS end RRH conductor color code conductor color code 1 Option 1 Option 2 (USA) Option 3 (USA) Option 1 Option 2 (USA) Brown Black Black 1-White 1-Black Blue Grey White 2-White 2-White Brown Black Black 3-White 3-Red 2 Blue Grey White 4-White 4-Green Brown Black Black 5-White 5-Orange 3 Blue Grey White 6-White 6-Blue Brown Black Black 7-White 7-White/Black 4 Blue Grey White 8-White 8-Red/Black Brown Black Black 9-White 9-Green/Black 5 Blue Grey White 10-White 10-Orange/Black Brown Black Black 11-White 11-Blue/Black 6 Blue Grey White 12-White 12-Black/White

Page 11 of 11 REVISION HISTORY Revision Description of detailed changes Manager/Engineer Applicable date Rev. A First Version René Müller 2018-02-07