Timber Tiger Aircraft, Inc. (303) Garfield Street Brighton, Colorado 80602

Similar documents
T-51 Mustang - 3/4 Scale Kit

Saberwing Aircraft Kit

MD RA Minister's Delegates - Recreational Aviation Représentants du Ministre - Aviation de loisir

MD - RA. Minister s Delegates - Recreational Aviation Représentants du Ministre - Aviation de Loisir Service d Inspection

Mooney Mite M-18X Plans and Drawings Index Arranged by Group Miscellaneous Group

MOONEY MITE AIRCRAFT DRAWINGS NASM Archives Accession No HOW TO ORDER COPIES OF DRAWINGS

Midget Mustang March 2016

Introduction. Fuselage/Cockpit


The tie to tube front windshield was rounded to avoid a distorted by this point.

Dassault Aviation FALCON 7 X. for Jet CAT P160. Assembly Manual. AVIATION Design

TORNADO II, S, & SS FUSELAGE TRACKING

12/03 EXPLODED VIEW 1) L angles on first rear rib: moved from inboard to outboard side of rib (12/03)

Section 1.4 FINAL INSPECTION

Center of Gravity Location and Longitudinal Stability and Control for Glasair II-S TD Aircraft

Table of Contents. Tail Wheel Assembly Installation.. page 01. Stabilizer Installation.. page 02. Fin Installation.. page 03


Seabee Annual Inspection Procedures

AEROPRO Checklist B Service/Maintenance

LAA TYPE ACCEPTANCE DATA SHEET TADS 064 STEEN SKYBOLT

A Simplified Index of Mooney M-18 Drawings at the NASM

Reduced minimum cockpit load by fitting removable trim ballast in front of the pedal assembly: see Section 7.13

LANCAIR LEGACY PRE-TEST FLIGHT INSPECTION (8-04)

CIRRUS AIRPLANE MAINTENANCE MANUAL

RECREATIONAL AIRCRAFT CONDITION REPORT ALL AIRCRAFT

Bonanza Tuned Exhaust System Pre-Production Agreement

AERONCA CHAMPION CITABRIA

PIPER CUB J3-65 N68952 PRE-FLIGHT CHECKLIST

F3D-30 ARF ASSEMBLY MANUAL

Expenses Report for S

Unscheduled Maintenance Checks

PIPER AIRCRAFT CORPORATION LOCK HAVEN, PENNA

Begun 09 September 2008 Airworthy 04 December 2009

LAA TYPE ACCEPTANCE DATA SHEET TADS 193 RANS S4 AND RANS S5 (B WING AND C WING)

PITTS 12 R/C SPORT-SCALE AIRCRAFT ASSEMBLY AND INSTRUCTION MANUAL. Copyright Century UK Limited 2012

Chapter 3: Aircraft Construction

SK-50 ARF ASSEMBLY MANUAL

Airworthiness Directive Schedule

MOONEY MITE AIRCRAFT DRAWINGS NASM Archives Accession No HOW TO ORDER COPIES OF DRAWINGS

Instruction Manual book

Aircraft Maintenance Prof. A.K Ghosh Prof. Vipul Mathur Department of Aerospace Engineering Indian Institute of Technology, Kanpur

SD3-60 AIRCRAFT MAINTENANCE MANUAL. This chapter includes information on dimensions, areas, zoning, etc. and is presented as follows:

Turbinator-2 Build Manual

Here is the gap seal I used for the flaps, genuine hardware store quality. Note cross sectional shape visible on the right end.

Assembly and Operating Manual. SPECIFICATION Length inch (640mm) Wing Span inch (705mm) Flying Weight oz (330g)

Tamiya s Fairey Swordfish

Instruction Manual book

FUN-50 ARF ASSEMBLY MANUAL

Weight & Balance. Let s Wait & Balance. Chapter Sixteen. Page P1. Excessive Weight and Structural Damage. Center of Gravity

40 EP Gee Bee Y Scale ARF V2 Instruction Manual Specs:

SpaceWalker... Revolution Sportster

PIPER CUB J3-65 N68952 PRE-FLIGHT CHECKLIST COCKPIT

TYPE CERTIFICATE DATA SHEET NO. A8SO

C-131 SAMARITAN CONSTRUCTION. A military transport based on the classic civilian twin-engine Convair CV-240 BY ANDY ANDERSON PHOTOS BY ANDY ANDERSON

ASSEMBLY MANUAL. Graphics and specifications may change without notice.

SU-31 PROFILE ELECTRIC ARF ASSEMBLY MANUAL

Monocoupe 90 AF BY LESLIE M. ADAMS

RECOMMENDED MOTOR AND BATTERY SET UP

51in Aerobatic Series Sukhoi SU-26M Almost-Ready-to-Fly. Instruction Manual. Specifications

Assembly and Operating Manual

Assembly and Operating Manual

The Flamingo. Produced by the Metal Aircraft Corporation. Cincinnati, Ohio. Lunken Airfield. by Peter Bruemmer

Assembly and operating instructions. Assembly and Operating Manual

LAA TYPE ACCEPTANCE DATA SHEET VANS RV6 AND RV6A

TEMPORARY REVISION NUMBER

PFA TYPE ACCEPTANCE DATA SHEET TADS 047 PIETENPOL AIRCAMPER. Issue 2 clarification of requirement for transport fittings in Section 11 dated

N398CM. RC-3 Serial Number 387 Zero Timed Restoration Details

Bob's Card Models and [Resources]

MS:176 ASSEMBLY MANUAL. Graphics and specifications may change without notice.

Instruction Manual book

Assembly and operating instructions. Assembly and Operating Manual

MAJOR PORTION RULE ASSESSMENT FOR AUF AEROPLANES NOT LISTED IN OFFICIALLY APPROVED KIT LISTINGS

48in Sbach-342. Instruction Manual. Specifications

RECOMMENDED MOTOR AND BATTERY SET UP

CAP 232 ASSEMBLY MANUAL

Instruction Manual. Wingspan : 2270mm (89.37 inches) : 1870mm (73.62 inches) : 7400gr gr. : 4 channel - 6 standard servo.

Design Considerations: Windscreen Placement and Cockpit Cut-Out Configuration

2001 PRICE LIST. Photo Credit: Bill Fedorko, Custom Planes magazine - January Kemp St. Merritt Island, FL USA

EXTRA 330LX. Specifications: Code: SEA274. Graphics and specifications may change without notice. ASSEMBLY MANUAL

Instruction Manual book

SIZE.120 OR 30CC SCALE 1:5 ARF

Accident Prevention Program

Instruction Manual book

PIPER AIRCRAFT CORPORATION

Retro. An artist rendering inspired this great 40-size sport model BY BOB NOLL AND KEN MARONI 16 MODEL AVIATION

(Glider) ASSEMBLY MANUAL

SD3-60 STRUCTURAL REPAIR MANUAL

Build Manual. Vector & Xtra Slick

ALMOST READY TO FLY. Wing Span in cm. 2

LAA TYPE ACCEPTANCE DATA SHEET TADS 304 JODEL 1050-M1. Issue 1 Initial issue dated

LE copy TO. auvj. tfie I:: Ad. for Aeronaulics Washington,D.c. Washington September, 1927 AIRCRAFT CIRCULARS

ALMOST READY TO FLY. Wing Span in cm. 2

VENTRIX. Dear Customer, Thank you for purchase our Ventrix Sport jet product

29% KATANA ARF ASSEMBLY MANUAL

LAA TYPE ACCEPTANCE DATA SHEET TADS 385 BRISTELL NG5 SPEED WING

LAA TYPE ACCEPTANCE DATA SHEET TADS 303 VANS RV-8. Issue 8 Additional service bulletins added, as follows SB , SB

Instruction Manual book

RECOMMENDED MOTOR AND BATTERY SET UP

LAA TYPE ACCEPTANCE DATA SHEET TADS 317 AEROPRAKT A22 FOXBAT AND A22-L FOXBAT

ASSEMBLY MANUAL. Kit features. MS:76

Transcription:

1 Timber Tiger Aircraft, Inc. (303) 725-5439 www.timbertigeraircraft.com 14471 Garfield Street Brighton, Colorado 80602 Light-Sport Trainer Pricing and Payment Plans through 12/31/18 Please read this packet thoroughly before ordering your kit. The prices in this packet are good until 12/31/18. What is included in the Fuselage and Landing Gear Kit: All steel parts and weldments completed and painted: Bulkhead #2, Bulkhead #3 lower, engine mount pads, landing gears, tail wheel, wing stub drag tubes, etc. Pre-formed bulkheads CNC cut and pre-formed fuselage skins, seats, headrest, longerons, baggage compartments, instrument panel blanks (contact us to have instrument holes cut in place), etc. Wheels and brake system (less tires and tubes), tailwheel Landing gear springs Raw materials as required Relevant hardware Construction drawings as required

2 Builder s manual Misc. odds and ends to get a fuselage up on its landing gear Contact us for fuselage jig kits or quick-build fuselages. What is included in the Flying Surface and Finishing Kit Wing spars Pre-welded compression struts Welded flying wire bracketry and lugs Welded aileron hinges and bracketry Pre-formed aileron spar and tunnels CNC cut honeycomb aluminum wing ribs Pre-formed wing tip bows and stabilizer curvature Pre-welded stabilizer hinges and sockets Pre-formed stabilizer ribs Stabilizer spars pre-bent and ends crushed Windshield kit (specify military or civilian style) Seat belts Fuel tank pre-built Fuel system components Control sticks and rudder pedals Cockpit upholstery: seats and combings. Specify color; red, black, distressed dark brown. Raw materials as required Relevant hardware Construction drawings as required Builder s manual Slated to be available as options from Timber Tiger Aircraft, Inc. in the near future: Engine mount: D-Motor LF-39

3 Engine mount: Rotax 912 Tuned exhaust: D-Motor LF-39 Tuned exhaust: Rotax 912 Cowling and all fairings, either fiberglass or aluminum Not included in the kit, but must be purchased direct from the supplier or aftermarket (we will recommend suppliers in the builder s manual): Brace wires Engine Propeller Instruments Covering and paint Electrical wiring Tires Tire tubes Planned future options: Extended fuel tanks Mockup cockpit kit Fairing buck kits Roll over bar for Bulkhead #2 Landing gear foot pads for easy fuel filler access

4 Builders outside the U.S. should contact us prior to placing a deposit. All prices are in U.S. dollars. Item Price Notes: Check to order ST-L Fuselage and Landing Gear Kit $20,000 See payment schedule on next page. ST-L Flying Surface and Finishing Kit $12,890 See payment schedule on next page. Combined price if above two kits are ordered together $31,890 See payment schedule on next page. Fuselage jig kit $500 Fast build fuselage option $3000 Engine mount, specify D-Motor LF-39 or Rotax 912 $1,000 Availability will be determined sometime Engine cowling, fiberglass (contact for aluminum) Not yet known Availability will be determined sometime Wing and stabilizer fairings, fiberglass (contact for aluminum) Not yet known Availability will be determined sometime Landing gear fairings, uppers and lowers, fiberglass (contact for aluminum) Not yet known Availability will be determined sometime Crating charges if required $400 Shipping costs See notes at right. Please call for shipping costs. Local pickup, if desired, is 20 minutes north of Denver, Colorado, and approximately one hour and 45 minutes south of Cheyenne, Wyoming.

5 Basic kit payment schedule: For Fuselage and Landing Gear Kit (total $20,000): 1,500 to reserve place in line (fully refundable until the production of specified serial number kit begins) Additional 12,000 to start kit production (non refundable) Remaining 6,500 prior to shipping kit (non refundable, required in full before kit is shipped) OR: full payment of 20,000. For Flying Surface and Finishing Kit (total $12,890): 1,500 to reserve place in line (fully refundable until the production of specified serial number kit begins) 6,500 to start kit production (non refundable) Remaining 4,890 prior to shipping kit (non refundable, required in full before kit is shipped) OR: full payment of 12,890. If Fuselage and Landing Gear Kit are ordered WITH the Flying Surface and Finishing Kit (total $31,890 a savings of $1000): 1,500 to reserve place in line (fully refundable until the production of specified serial number kit begins) Additional 20,000 to start kit production (non refundable) Remaining 10,390 prior to shipping kit (non refundable, required in full before kit is shipped) OR: full payment of 31,790. NOTE: the $1,000 savings can ONLY be applied if it is requested prior to starting production of the kit. No exceptions. Shipping costs due just prior to crating/shipping. Price varies by shipping address. Contact for more information. Please note: kits can be expedited. Please contact via phone or e-mail for more information.

6 Pricing on the ST-L is based on labor and materials costs. To keep costs down, some parts are not supplied with the basic kit, providing the builder the option to build them from scratch from the provided blueprints to save money. Some parts must be purchased direct from the manufacturers, in order for us to avoid unnecessary markups on price. These two lists are on the next page. Kit prices are locked in when the deposit is received on or before the date at the top of this page, as long as the kit is paid for in full within six months of the project s start date. The first deposit is designed to reserve a serial number and a spot in the waiting list. It is fully refundable upon return of the supplied serial number certificate. Included with the serial number certificate will be a disclaimer form that must be signed and returned before we can start construction of your kit components. Payments made after the first deposit are non-refundable, since the production of the kit components will have already been started. See the payment plan on page 5. Lead times are kept as short as possible, currently about 6 months from the start of the kit. This wait time is subject to change. It is our hope to move projects quickly and get builders into the air. If a customer delays their kit payments once production has begun, current updated pricing will be applied to the remaining payments. This method will help us avoid delays, which slow production for other customers. Kits will require some technical and fabrication skills on the part of the builder, but our manual is as helpful as we could make it. Even first-time builders shouldn t have too much difficulty building the kit. If you are confused about something in the manual, please don t hesitate to call or e- mail us! E-mails are responded to quickly. The answers to your questions will be added to future versions of the manuals if we feel they will help other builders. Please review the FAQs page on our website for more information regarding the ST-L kit.

7 To pay, checks can be sent to the address at the top of this form. If you plan to pay via credit card, please call in advance, as additional charges may apply. Only the first deposit of $1500 on the basic kit is required when mailing this form. The kit price, however, may be paid in full if you wish to expedite your kit. Customer name Mailing address Shipping address (if different) Best phone number E-Mail address Disclaimer: It is the sole responsibility of all builders to understand the homebuilt airplane laws and regulations within their respective countries. This aircraft was not designed for aggressive maneuvers and will not be tested in aerobatic conditions. Timber Tiger Aircraft, Inc. ONLY condones Normal Category flight, as defined by F.A.R. 23.3(a). Per F.A.R. 91.3, it is the sole responsibility of the pilot/operator of the airplane to ensure the airplane is safe to fly before each and every flight and to fly the airplane in a manner that ensures safety. The undersigned understands that this order form is for a pre-release purchase of an airplane design that has not yet flown. Kits are expected to start shipping sometime around the summer of 2019. A full legal disclaimer will be supplied with deposit/serial number certificates. This legal disclaimer must be signed and returned before kit production can begin. By signing here, you agree that you have read and fully understand and agree with all of the terms and information included within this packet. Name, date, and signature: Amount enclosed: