Part 6 Floating Structures

Similar documents
Load cells for a Portable Structure

The impact of the 18 th Edition (BS 7671:2018) Sections 722, 753 and [new] 730

GLADSTONE MARINA. SCHEDULE OF RATES & CHARGES EFFECTIVE FROM 1 July 2018

STANDARD DUTY DOCKS HEAVY DUTY DOCKS SUPER DUTY DOCKS

Infrastructure & Power. FP M c Cann. Tel: +44(0) Fax: +44(0)

Top Marine is the leading marina developer in Estonia

A PLAN TO INTERGRATE AND CONNECT RECREATIONAL BOATING WITH THE BATEMANS BAY BUSINESS PRECINCT (Proposal for Floating Pontoons in the CBD)

No. of Single leaf Sector Gates 2 Clear span of opening 7.0m Cylinder rebate size. Sill level inner gate Gate crest level - inner.

specialized in modular PONTOON solutions for various purposes and applications

STANDARDS PRESENTATION Attachment No. 1 TO Page 1 of 6 CALIFORNIA OCCUPATIONAL SAFETY AND HEALTH STANDARDS BOARD

The Right Angle of the Latch to the Snare. Adjusting the Latch relative to the Snare

Trelleborg en g INeereD SYSTeMS Marine Fenders

CHAPTER 10 FLOATING WHARVES

DESIGN AND CONSTRUCTION OF A TIDAL TO ELECTRICAL ENERGY CONVERTER (WITH MATLAB SIMULINK)

Uncontrolled copy not subject to amendment. Airframes. Revision 1.00

Pneumatic and Rolling Fenders. Pneumatic Hydropneumatic Wheel Fenders Roller Fenders Cushion Rollers

MOORAGE BOAT LAUNCHE P N D ENGINEERS, INC.

PRODUCT APPLICATION NOTE

Index. Floating Comfort and Safety Page 4 5. Floating Breakwaters Page 6 7. Floating Pontoons Page 8 9. Special Applications Page 10 11

MULTI-PURPOSE FLOATING PLATFORMS

MOTORS, VOLTAGE, EFFICIENCY AND WIRING. A Deeper Understanding

THE DESIGN OF ANCHOR ELEVATION PLATFORMS FOR CUTTER SUCTION DREDGE D ARTAGNAN

733:1983 Specification for Wrought aluminium and aluminium alloy Bars, rods and sections (for general engineering purposes) (third revision)

oelzow & Company, Inc.

GatesFacts Technical Information Library Gates Compass Power Transmission CD-ROM version 1.2 The Gates Rubber Company Denver, Colorado USA

CPCS renewal test factsheet

The Right Angle of the Latch to the Snare. Adjusting the Latch relative to the Snare

Rolling Fenders & Safety Products Product Brochure

On_Disc. 2 o/c1 BS 7671 applies to a lift installations b highway equipment c equipment on board ships d electrical equipment of machines.

APPENDIX D. D.1 Macalloy Bars. Approximate safe working loads (kn) Appendix D - Proprietary Components (1/9) Stainless steel architectural ties

REDUNDANT PROPULSION SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 2

2018 LOUISIANA TRANSPORTATION CONFERENCE. Mohsen Shahawy, PHD, PE

United Stales COMDPTPUB P Coast Guard NVIC Mar 191

REDUNDANT PROPULSION SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 2

Riverhawk Company 215 Clinton Road New Hartford NY (315) Free-Flex Flexural Pivot Engineering Data

Floatation Systems. Pipeline Hose Polyethylene. Rotational. Pontoon. Viscount Rotational Mouldings. Collar Slurry

Battery Technology for Data Centers and Network Rooms: Site Planning

Fully Automatic Bilge Pump INSTRUCTION MANUAL

TetraSpar. Industrialized Floating Foundation

Case Study of Bridge Load Rating in KY using BrR. C.Y. Yong, P.E., S.E., ENV-SP

WORKERS COMPENSATION (OCCUPATIONAL HEALTH AND SAFETY) AMENDMENT ACT, 1998

Section 03 Marine and Mooring Equipment - Sales Item

23083 Hwy. 190E P.O. Box 898 Robert, LA USA Phone: (985) Expanded Description of Rope/Riser Crawler

EN 131 A GUIDE TO UK LADDER STANDARDS. PART 1. Terms, Types & Functional sizes. PART 2. Testing. PART 3. Marking & User Instructions

MODULAR BARGE SYSTEM

Multideck 50-V2 Features and Applications

PVP Field Calibration and Accuracy of Torque Wrenches. Proceedings of ASME PVP ASME Pressure Vessel and Piping Conference PVP2011-

Asia Pacific Research Initiative for Sustainable Energy Systems 2011 (APRISES11)

A QRP Paddle for the Hendricks PFR-3 Transceiver by Richard Meiss, WB9LPU

Probability based Load Rating

SLIDING DOORS STRONG

LEAD SCREWS 101 A BASIC GUIDE TO IMPLEMENTING A LEAD SCREW ASSEMBLY FOR ANY DESIGN

PRECISION BELLOWS COUPLINGS

SECURITY PRODUCTS GENERAL PRODUCT OVERVIEW. Security Products

Multideck 60-V2. Contents

Differential Friction and Primary NCAP ABSTRACT

2ND EXAM OF MAIN MACHINERY AND AUXILIARY MARINE SYSTEMS

radial GATES Waterman Industries of Egypt

SUMMARY OF THE IMPACT ASSESSMENT

Reliability-Based Bridge Load Posting

OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE. Level 3 assessment Marine Motorman Higher Grade

Series 54 and S54 Resilient Couplings

Installation Instructions Pro Bandit Shifter Fits: GM Powerglide Automatic Transmissions

Impact of Heavy Loads on State and Parish Bridges. Aziz Saber, Ph.D., P.E. Program Chair Civil Engineering Louisiana Tech University

CPCS renewal test factsheet

casualty information Dear Captain General Requirements Encl.: 7 pages

Technical Lecture CRET Series 100 Design Stefan Lips

DANGEROUS GOODS PANEL (DGP) WORKING GROUP MEETING (DGP-WG/17)

MIE243 Computer Aided Design I Design Example 1. Problem Your goal is to design a commercial clothes dryer.

For Sale Bella 572C

The FRACOF Composite Slab Test

Generator Termination Bus-bar Arrangement - Design requirements: Utility Perspective

HOW & WHY YOU MIGHT SINK AND DIE!

STANDARD FOR ROLLING SHEET DOORS

IEC60309 PLUGS AND SOCKETS

This technical bulletin aims to supplement the information relating to holes in the web of James Jones I- Joists given in the Technical Manual.

Rules of Actuator and Guide Alignment in Linear Motion Systems

Grupo Lindley. Harbour Equipment. Grupo Lindley. Floating Equipment for Marinas & Harbours 4. Accessories for Marinas 6. Boatyard Equipment 8

SYDNEY TRAMWAY MUSEUM TROLLEY WIRE INSPECTION PROCEDURE

Multideck 80-V2 Features and Applications

Network Safeworking Rules and Procedures

Specifications for Surface Earthmoving Equipment Surface Mobile Equipment Major Hazard Standard

CONSULTING Engineering Calculation Sheet. Reference Sheets - Pile Cap Capacity (Generic) Tables XX

Isolators. F D = C Ẋ α. The concepts of isolation system can be best understood by presenting damper design first, followed by the isolation systems.

Fuel Quality Directive

Universidad Nacional Experimental Marítima del Caribe Vicerrectorado Académico Coordinación de Idiomas English VI. Maritime Engineering

The Importance of Shaft Alignment

ELGC-BS-KF. Spindle axis. Instructions Operating c [ ]

ReadyMoor Series II. ReadyMoor Series II Quick Release Hooks and Capstans. Efficient cost effective mooring solutions off the shelf. Ready to go.

AN INTEGRATED MODULAR TEST RIG FOR LANDING GEAR FATIGUE AND STRENGTH TESTING

Installation Manual. Talon Series. Portable Vehicle Scale by Fairbanks Scales, Inc. All rights reserved.

CPCS renewal test factsheet

decklash lashing system for deck cargo

Expansion & contraction

Helicopter Ditching Occupant Survivability - NPA (Notice of Proposed Amendment)

Everett E Henderson Jr R.G. LeTourneau Scorpion Drilling Rig

South Cambridgeshire District Council

Emergency Towing Booklet (ETB) According to SOLAS II-1, Reg. 3-4 and MSC.1/Circ. 1255

Contents 1 General on Ship Design 2 Selection of Main Dimensions and Calculation of Basic Ship Design Values

Reference Number PDS 18 - (RIC Standard: EP SP)

Transcription:

Part 6 Floating Structures Brief update on the work to date Gareth Evans PhD. BSc C.Eng FICE FIStructE MBCS An explanation on the stability requirements for pontoons Andrew Johnston B.Eng. (hons) C.Eng MRINA A presentation on Marina pontoons John Berry B.Eng. C.Eng. MICE 1

Update on Part 6 The work has involved a considerable amount of research in order to bring this part of the code up to date. The initial draft is approximately 50% complete The current projection is to have the work completed by the end of 2017 2

Fatigue issues on pontoon connections FEM modelling using elasto-plastic analysis Requires more detail in the standard Requires better detailing Use replaceable components Use energy absorption systems 3

Designing for movement Shock absorption units (replaceable) Clearances due to rotation Replaceable wearing components 4

Design of pontoons stability 5

Basic ship stability Metacentric height (GM) is a measure of initial stability. The greater the metacentric height, the greater is the restoring leaver, and hence stability. 6

Righting lever (GZ) curves 7

Effect of free surfaces 8

Applying heeling moments 9

Notes: The six-column grid IMO criteria for ships: Area under the curve up to 30 o should not be less than 0.55 metre-radians Area under the curve up to 40 o (or angle of downflooding) should not be less than 0.09 metre-radians. The area between 30 o 40 o should not be less than 0,03 metre-radians. The righting lever GZ should not be less than 0.20m at an angle of 30 o or greater. Maximum righting arm should occur at an angle of heel preferable exceeding 30 o, but not less than 25 o. 10

Practical implications Criteria based on large angles of heel may not be appropriate 11

Practical implications 12

Design risk assessment: A statement on the intended use. The environmental design criteria used, including return periods and limiting environmental conditions. The design loads including any load restrictions and how these are controlled. Limiting responses to loads such as minimum freeboard, maximum walkway gradients, and evacuation criteria. Cyclic loading and natural frequency; fatigue of critical elements. Suitable stability criteria including the effects of moorings or adjacent pontoons. 13

Practical implications 14

Design risk assessment Accidental damage criteria (flooding, collision loads, mooring line failure). Inspection and maintenance cycle requirements including the stability case for delivery and maintenance. Environmental impact and pollution containment measures (sewage and fuels). Requirements for lifesaving appliances and navigation aids. Any ballasting requirements. 15

Marina Pontoons Typical marina style pontoons consist of a deck, most probably a timber system on a steel galvanised frame which is supported on a system of floats. The floats may either be a poly block encased in concrete, a set of plastic boxes or perhaps a poly block with a simple GRP covering. The essence of stability is the Metacentric height which needs to be positive to be stable. The nearer to 0 the more tender and more ie easily capsizeable the unit. BS6349 pt 6 did give some guidance on allowable limits, Table 9 Dealing with Pontoons the range given is 1.0m to 15m. At +15m the unit being very stable 16 February 2017 16

Stability Analysis of the Metacentric height can be simply ascertained in considering pontoons as opposed to vessels as the waterplane area will remain relatively constant over the heel range that can be expected in service. The procedure as set out in the existing code will be included in the proposed new version. In looking at heel and stability the YHA guide specifies a minimum reserve freeboard to the floats of 50mm. This is another area where the new code will seek to provide guidance, however! As an anecdotal point in relation to a set of pontoons used for a well known on water boat show, the pontoon providers were asked about the design live loads and what would happen if this were exceeded. The answer was the people will start to get wet feet as the pontoons are loaded to a point where the buoyancy of the floats are exceeded at which point people will tend to back away and the pontoon deck will return to its normal freeboard In that case the footprint of the pontoon walkways and fingers provided an overall stable platform and with sealed floatation units the loads are spread along the walkways and if some floats are effectively sunk they haven't lost their inherent buoyancy. What this does highlight is the need to adequately design and specify the connections between the individual pontoons 17

Connections Connections for Pontoons used in the Marina type environment Pontoons used in the Marina environment often rely on the interconnection between units to provide the stability, utilising the buoyancy of the adjacent floats on either fingers or walkways. Typical Marina Pontoon Units This requires the designers to assess the forces that will be transmitted across the joints and the type of joint for the location and exposure. The joints are under constant stress due to the motion of the units flexing. Often the stability of an single run of walkway pontoons is very tender the MGyy often very small. The effects of either concrete floats or plastic can also have significant effects on the stability of the unit. However stability is not usually an issue once connected to a system of units.. 18

Connections 19

Connections Consideration of the various types of joint are used, for example:- 1. flexible rubber jointed units 20

Connections 2. Fixed hinged connection 21

Connections 3. Steel box connection option 22

Connections 3. Concrete Pontoons The detailing of the connections to this sort of unit needs careful consideration in the way the loads from the connection elements is transposed into the concrete itself such that fatigue cycles on the concrete cannot lead to failure of the concrete surrounding the reinforcing elements 23

Guides Mooring of pontoon units Typical piled installation Various types of mooring details are available to the designer from:- 1. Piles 2. Anchor and Chain 3. Elastomeric types 4.Wall guides For types 1 and 4 the motion of the units needs to be considered. If too much heel occurs or the heave / roll response is to great then the pontoon pile guide can put considerable loads on the pile or guide and could cause the system to bind or be damaged. 24

Guides Elastomeric types can be useful in some locations but consideration of water depth / tidal range needs very careful attention to ensure the angles of moorings always stay reasonably the same and that the tension variation is within the capacity of the system. 25

Pontoon Loadings & Stability The principal factor in safe operation for all concepts on floating structures is stability, ie the ability to withstand overturning forces or moments and return to a normal attitude after removal of the unbalancing loads Also in respect to loading it is considered reasonable on pontoons with service ducts to look at the applied load over the central section not necessarily the full pontoon width. A comparison of loads noted from various well respected publications already in existence is shown below:- 26

Loadings 27

Loadings considered for inclusion in new Code Item Flotation Stability Un Restricted Access 5 kn/m2 2.5 kn/m2 Restricted Access 2 kn/m2 1.5kn/m2 Marina s: Secondary walkways 1.5 kn/m2 1.5 kn/m2 Fingers 1kn/m2 1kn/m2 For flotation apply over deck plan and for stability over the parts of the deck giving worst load distribution ie ½ width for heeling, but not under gangways for structural analysis 28