Whale s Tooth Parking Lot, Railyard & Island Sand New Bedford

Similar documents
North Terminal New Bedford. Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment

Parcels M and M-1 (7 & 8) South Boston. Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment

SPECIAL LEGISLATIVE COMMISSION TO STUDY POTENTIAL ECONOMIC OPPORTUNITIES IN THE DEVELOPMENT OF PORT FACILITIES IN THE STATE OF RHODE ISLAND

Appendix G Aquilla Lake Pool Rise Recreational Resources

Quonset Business Park

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY

Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment

Virginia Offshore Wind Port Readiness Study

Midtown Corridor Alternatives Analysis Capital Cost Estimation Methodology and Assumptions

Department of Planning and Land Services Development Engineering GATES PERMITTING, DESIGN & INSPECTION GUIDE

827 Sans Souci Parkway Wilkes-Barre, Pennsylvania 18706

Table C-1. POLB Middle Harbor Redevelopment Construction/Demolition Activities and Noise Data

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

MULTI-PURPOSE FLOATING PLATFORMS

PPA s Port Infrastructure Development Plans Seminars on Improving Transport Maritime Safety and Development of Port Infrastructure

Ara Tūhono Pūhoi to Wellsford Road of National Significance: Pūhoi to Warkworth Section

CT Consultants, Inc.

COST ESTIMATES: Curb-Running

Mountainland Association of Governments SPRINGVILLE-SPANISH FORK AREA TRANSPORTATION STUDY APRIL 2012

Middle Harbor Project: Draft EIS/EIR LA Chamber of Commerce June 26, 2008, APM Maersk HQ Pier 400

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

STATE OF NEW HAMPSHIRE Inter-Department Communication

Port Everglades Master Plan Update 2006 Tenant Workshop. August 24, 2007

44

2701 INTERTECH DRIVE, YOUNGSTOWN, MAHONING COUNTY, INDUSTRIAL PROPERTY FOR SALE 143,789 SF on ACRES $4,300,000

EXCEPTION TO STANDARDS REPORT

Log Barging Proposal. to to get export log trucks off Tahunanui Drive & Rocks Roads

Valve and Piping Replacements Various Facilities Deer Island Treatment Plant

Bid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D November 21, 2013

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES

Franklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14

Truck Traffic Impact Analysis

Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology

CHAPMANVILLE, WEST VIRGINIA

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING

THE PORT OF LOS ANGELES OCCUPIES 4,300 ACRES OF LAND ALONG 43 MILES OF WATERFRONT. THE PORT OF LOS ANGELES IS THE LARGEST PORT IN THE

NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 5/03/2013

VIRGINIA RAILWAY EXPRESS MANASSAS PARK STATION PARKING EXPANSION. Site Evaluation & Recommendation. October 18, 2016

Transportation Highway Engineering Conference February 24, 2015

10/18/2010. Lampson Transi-Lift Mobile Crane: Concept, Design, and Use. Bruce A. Stemp Lampson International. John Walewski Texas A & M University

LETTER THE BARNHART S KEY TO FIT ANY LOCK PAGE 3. A Mountain Top Experience Page 2. Barnhart s Modular Lift Tower In The Motor City Page 2

Chapter 8.0 PROPOSED CAPITAL IMPROVEMENT PROGRAM

THE PORT OF VIRGINIA

SITE PLANS ASSISTED LIVING REDEVELOPMENT

Downtown Lee s Summit Parking Study

MUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1

No Thoroughfare. Gated Private Road Ahead

H&W LOGISTICS BASE Technical Specifications

PROPOSED AMENDMENTS TO RESIDENTIAL PARKING STANDARDS

Harlem Avenue between 63 rd and 65 th

UNLOCKING SMARTER ROUTES FOR HEAVY CARGO MAMMOET TERMINAL CRANE (MTC 15)

Benalec Secures DOE Approval for All 3 Phases of its Tanjung Piai Project

Rosedale Sanitary Sewer Feasibility Review Report

IH 35 FEASIBILITY STUDY

Capital Improvement Plan Review

Appendix I Draft Transmission Towers and Lines Relocation Options at the Port of Long Beach

Investment Opportunities at POIC Lahad Datu

Cybermarine Offshore Technologies LLC

Durham-Orange County Corridor Alternatives Analysis JULY Prepared by: U R S Team

Box 4 Book 1. Photographs (Lakefront - Toledo) Number Date Description

Proposed Dounreay - Mybster 275 kv / 132 kv

ANDERSON PROPERTY SITE ANALYSIS

An innovative solution for water and sewer installation AXIS. Guided Boring System

Converting BRT to LRT in the Nation s Capital Ottawa, Canada. John Manconi City of Ottawa Ottawa, Canada

Commercial Electric Policy

HYDROLOGIC/HYDRAULIC ANALYSIS REPORT FOR THE TROLLEY BROOK CULVERT ASHLAND, MA

New Jersey Turnpike Authority Interchange 6 to 9 Widening Program

Terminal Alternatives

California s Emission Reduction Plan for Ports and International Goods Movement

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

FOR SALE OR LEASE EBERHARDT & BARRY INC.

Steese Rd - Curb & Sidewalk Improvement

Port Everglades Master Plan Update Phase II Workshop The Board of County Commissioners of Broward County

Appendix G Traffic and Parking Report

Railyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY

ABB Group August 27, 2010 Slide 1

COMPANY PROFILE 2018 MARINE, GENERAL & PRECISION ENGINEERS NEW

Portland Area Mainline Needs Assessment DRAFT. Alternative 4 Public Transportation: New or Improved Interstate Bus Service

Waste and Recycling Disposal Service Requirements for New Residential Developments

RECOMMENDATION APPROVED; RESOLUTION NO (PERMIT 930) ADOPTED BY THE BOARD OF HARBOR COMMISSIONERS. August 17, 2017

The Grid Link Project. Summary of the Report for the Independent Expert Panel

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

Custom Side of Pole Mount

PARKING MANAGEMENT PLAN PROPOSED MIXED-USE DEVELOPMENT AT URL STAMFORD Parcel 38 Greyrock Place and Tresser Boulevard Stamford, CT April 2, 2014

Wentzville Parkway South Phase 2 & 2A

Link LRT: Maintenance Bases, Vehicles and Operations for ST2 Expansion

Station Evaluation. Durham-Orange Light Rail Transit Project Spring 2012

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

MO 370 Interchange Ramp at Salt River Road - Phase 1

4 COSTS AND OPERATIONS

STREET IMPROVEMENTS PROPOSAL BID ITEMS

APPROVED AROUND THE WORLD BENTEC RIGS

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension

CECO BUILDING SYSTEMS

LEGAL DESCRIPTION REZONE PARCEL

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

CORPUS CHRISTI BAY - AN UPDATE ON THE SOUTH TEXAS PORT CITY'S CRUDE OIL EXPORT INFRASTRUCTURE

2017 Industrial Rail and Transportation Study. Becker, Minnesota

Transcription:

Whale s Tooth Parking Lot, Railyard & Island Sand New Bedford Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment 152

Whale s Tooth Parking Lot, Railyard & Island Sand Existing Site Information Item Existing Conditions at Site Ownership Acreage Nautical Distance to Leading Edge of Offshore Wind Areas Public: City of New Bedford, Harbor Development Commission 32 acres (13 ha) 35 nmi (65 km) Quayside Length 250 ft (76.2 m) Berth Depth Channel Controlling Depth Load Bearing Capacity On-Site Power Infrastructure and Buildings Key Environmental Information Overhead Restrictions 24 ft (7.3m) MLLW 26.5 ft (8 m) MLLW <2,500 psf (12.2 t/m 2 ) paved upland areas <1,500 psf (<7.32 t/m 2 ) quayside None None Railyard has an environmental cap. Subsurface excavation requires Soil Management Plan. Route 6 Swing Bridge: no vertical restriction when open; 95 ft (29 m) H 153 Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment

Whale s Tooth Parking Lot, Railyard & Island Sand New Bedford Whale s Tooth, Railyard, Island Sand: This site has been identified as a potential future railroad station associated with the proposed South Coast Rail project, which is being considered by the Commonwealth of Massachusetts to develop commuter rail service between Boston and the South Coast of Massachusetts. If these properties are used for an expanded rail operation as planned, they will not be available to support offshore wind activities. If there is room to accommodate offshore wind activities at this site, it is thought that it would function best as a transfer and storage site for small components and as an adjunct quayside (through Island Sand) for the neighboring manufacturing sites in the Port of New Bedford. Innovation-based Solutions: Use of inter-site transport systems such as a SPMTs and barge system to move components around to other sites that are better suited for actual manufacturing; and Conduct small-footprint manufacturing and conduct storage at the site. Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment 154

155 Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment

Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment 156

157 Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment

Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment 158

159 Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment

Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment 160

Whale s Tooth Parking Lot, Railyard & Island Sand Reuse Card Reuse Case Statistics Summary Table: Whale s Tooth & New Bedford Railyard, New Bedford Reuse Case Acreage Used for this Reuse Case Pre-production Storage Area Post-production Laydown Area # Buildings (see Notes for details) Ground Bearing Strength Quay Length Berth Depth at Quayside Notes: acres hectares acres hectares acres hectares psf t/m 2 feet meters feet meters Secondary Steel: 22.0 8.9 4.5 1.8 9.8 4.0 1 3,000 15 250 76.2 25.0 7.6 Bldg. 1: Fabrication / Manufacturing (600' x 200' / 183m x 61m). Storage Yard: 22.0 8.9 -- -- 18.9 7.6 1 3,000 15 250 76.2 25.0 7.6 Bldg. 1: Small Storage Building (150' x 80' / 46m x 24m). *Quayside improvements required and included in reuse scenario unless noted in site card table. **Storage Yard Case: Most of useable area is open storage. 161 Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment

Whale s Tooth Parking Lot, Railyard & Island Sand Cost Summary Scenario Name Item Redevelopment Classification Reuse Costs Individual Costs Total Costs Reuse Case 1A Secondary Steel Low $7,244,000 $3,509,000 $10,753,000 Reuse Case 2A Storage Medium $7,473,000 $2,345,000 $9,819,000 Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment 162

Whale s Tooth / New Bedford Railyard Redevelopment Cost Details Redevelopment Classification Item Unit Cost Units Quantity Amount Low Medium Level and Regrade $2 SQFT 410,000 $820,000 Subtotal $6,037,000 Add 1' DGA $38 TN 22,778 $866,000 20% $1,207,000 Place 1' DGA $8 CYD 15,185 $121,000 Total $7,244,000 Install Signaling and traffic controls $100,000 LS 1 $100,000 Travel lane design to accomodate RR crossing $20,000 LS 1 $20,000 Travel lane: install heavy duty paving (600' x 50') $8 SQFT 30,000 $240,000 Install ramp to accomodate grade change (225' x 50') $8 SQFT 11250 $90,000 Part time travel lane, heavy duty paving (60,000) $8 SQFT 60000 $480,000 Move, reinforce utilities $50,000 LS 1 $50,000 Level and Regrade, south area $2 SQFT 250,000 $500,000 Install heavy duty paving $8 SQFT 250,000 $2,000,000 Repair quayside/bulkhead 250' x 60' $3,000 LF 250 $750,000 Level and Regrade $2 SQFT 410,000 $820,000 Subtotal $6,228,000 Add 2' DGA $38 TN 45,556 $1,731,000 20% $1,246,000 Place 2' DGA $8 CYD 30,370 $243,000 Total $7,473,000 Install Signaling and traffic controls $100,000 LS 1 $100,000 Travel lane design to accomodate RR crossing $20,000 LS 1 $20,000 Travel lane: install heavy duty paving (600' x 50') $8 SQFT 30,000 $240,000 Install ramp to accomodate grade change (225' x 50') $8 SQFT 11,250 $90,000 Part time travel lane, heavy duty paving (60,000 SQFT) $8 SQFT 60,000 $480,000 Move, reinforce utilities $50,000 LS 1 $50,000 Level and Regrade, south area $2 SQFT 250,000 $500,000 Add 2' DGA $38 TN 27,778 $1,056,000 Place 2' DGA $8 CYD 18,519 $148,000 Repair quayside/bulkhead (250' x 60') $3,000 LS 250 $750,000 Whale s Tooth / New Bedford Railyard Reuse Cost Details Redevelopment Classification Item Unit Cost Units Quantity Amount Secondary Steel Fabrication Building 600 x 200 $16 SQFT 120,000 $1,944,000 Subtotal $2,924,000 Appurtenances, Doors, Electrical etc. $200,000 per unit 1 $200,000 20% $585,000 Install crane pad (60' x 60') $780,000 per unit 1 $780,000 Total $3,509,000 Storage Storage Building (150' x 80') $16 SQFT 12,000 $194,000 Subtotal $1,954,000 Appurtenances, Doors, Electrical etc. $200,000 per unit 1 $200,000 20% $391,000 Install 2 crane pads (60' x 60') $780,000 per unit 2 $1,560,000 Total $2,345,000 Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment 370

Whale s Tooth / New Bedford Railyard Total Cost Details Scenario Name Sce Item Redevelopment Classification Redevelopment Costs Reuse Costs Total Costs Reuse Case 1A Secondary Steel Low $7,244,000 $3,509,000 $10,753,000 Reuse Case 2A Storage Medium $7,473,000 $2,345,000 $9,819,000 Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment 371