330,000 SF High School Schedule: 25 Months PLUMBING ESTIMATED QUANTITY SURVEY Item Code Description Qnty Unit Material $ Labor MH Lab. Rate Labor $ 00001.00 General Conditions : 00001-00001.01 General Conditions - Consumables 28,712 Hrs 57,424-40 2.00 57,424 2.00 - - 00001.02 General Conditions - Craft Trailer 16 Mo 2,400-40 150.00 2,400 150.00 - - 00001.03 General Conditions - Foreman 16 Mo - 2,752 40 110,080 - - 6,880.00 110,080-172.00-00001.04 General Conditions - Office Trailer 16 Mo 4,000-40 250.00 4,000 250.00 - - 00001.05 General Conditions - Project Closeout 1 LS 5,000-40 5,000.00 5,000 5,000.00 - - 00001.06 General Conditions - Project Meetings 16 Mo 800 160 40 6,400 - - 450.00 7,200 50.00 10.00-00001.07 General Conditions - Project Schedule 16 Mo 8,000 64 40 2,560 - - 660.00 10,560 500.00 4.00-00001.08 General Conditions - Project Submittals 1 LS 2,500-40 2,500.00 2,500 2,500.00 - - 00001.09 General Conditions - Punch Lists 120 Hrs 1,200 240 40 9,600 - - 90.00 10,800 10.00 2.00-00001.10 General Conditions - Storage Trailer 16 Mo 2,000-40 125.00 2,000 125.00 - - 00001.11 General Conditions - Supervision 16 Mo - 2,752 40 110,080 - - 6,880.00 110,080-172.00-00001.12 General Conditions - Temporary Electric 32 Mo 4,000-40 125.00 4,000 125.00 - - 00001.13 General Conditions - Temporary Heat 32 Mo 1,600-40 50.00 1,600 50.00 - - 00001.14 General Conditions - Temporary Toilets 32 Mo 4,800-40 150.00 4,800 150.00 - - 00001.15 General Conditions - Temporary Water 32 Mo 2,400-40 75.00 2,400 75.00 - - 00001.16 General Conditions - Truck and Tools 32 Mo 10,400-40 325.00 10,400 325.00 - - 00001.17 General Conditions - Weekly Cleanup 70 Wks 7,000 560 40 22,400 - - 420.00 29,400 100.00 8.00-00002.00 BURIED SANITARY PIPING: 00002 00002.01 Excavate/Backfill/Compaction 3,650 CY 54,750 475 50 23,725-14,454 25.46 92,929 15.00 0.13 3.96 00002.02 2" CISP - 45 Ell 5 EA 40 2 50 113 - - 30.50 153 8.00 0.45-00002.03 2" CISP - 45 Wye 2 EA 30 1 50 60 - - 44.90 90 14.90 0.60-00002.04 2" CISP - 90 Ell 2 EA 16 1 50 45 - - 30.65 61 8.15 0.45-00002.05 2" CISP Hub and Spigot 95 LF 596 9 50 428 - - 10.77 1,023 6.27 0.09-00002.06 2" Floor C-Out 1 EA 29 0 50 19 - - 47.50 48 28.50 0.38-00002.07 3" CISP - 45 Ell 55 EA 550 33 50 1,650 - - 40.00 2,200 10.00 0.60-00002.08 3" CISP - 45 Wye 14 EA 365 13 50 630 - - 71.10 995 26.10 0.90-00002.09 3" CISP - 90 Ell 24 EA 300 14 50 720 - - 42.50 1,020 12.50 0.60-00002.10 3" CISP Grade Clean-Out 3 EA 450 6 50 300-15 255.00 765 150.00 2.00 5.00 00002.11 3" CISP Hub and Spigot 855 LF 5,942 90 50 4,489 - - 12.20 10,431 6.95 0.11-00002.12 3" CISP x 2" Reducer 2 EA 16 1 50 28 - - 22.14 44 8.14 0.28-00002.13 3" Floor C-Out 7 EA 293 3 50 158 - - 64.30 450 41.80 0.45-00002.14 4" CISP - 45 Ell 77 EA 1,078 64 50 3,196 - - 55.50 4,274 14.00 0.83-00002.15 4" CISP - 45 Wye 97 EA 5,083 110 50 5,481 - - 108.90 10,563 52.40 1.13-00002.16 4" CISP - 90 Ell 23 EA 506 19 50 955 - - 63.50 1,461 22.00 0.83-00002.17 4" CISP Clean-Out Tee 15 EA 786 17 50 848 - - 108.90 1,634 52.40 1.13-00002.18 4" CISP Double - 45 Wye 4 EA 197 6 50 286 - - 120.70 483 49.20 1.43-00002.19 4" CISP Grade Clean-Out 3 EA 525 7 50 338-23 295.00 885 175.00 2.25 7.50 00002.20 4" CISP Hub and Spigot 2,665 LF 24,118 373 50 18,655 - - 16.05 42,773 9.05 0.14-00002.21 4" CISP Riser Piping 240 LF 2,266 46 50 2,280-276 20.09 4,822 9.44 0.19 1.15 00002.22 4" CISP Wall Clean-Out 15 EA 855 9 50 450 - - 87.00 1,305 57.00 0.60-00002.23 4" CISP x 3" Reducer 8 EA 170 2 50 120 - - 36.20 290 21.20 0.30-00002.24 4" Connect to Existing 5 EA 250 40 50 2,000-125 475.00 2,375 50.00 8.00 25.00 00002.25 4" Floor C-Out 22 EA 1,195 12 50 583 - - 80.80 1,778 54.30 0.53-00002.26 6" Floor Sleeves/Seals 15 EA 375 5 50 225-150 50.00 750 25.00 0.30 10.00 00002.27 6" Foundation Sleeves/Seals 5 EA 250 2 50 113-75 87.50 438 50.00 0.45 15.00 15053.00 SCIENCE ATORY ROUGH-IN: 15053 15053.01 1" Copper Hangers 450 EA 3,848 203 50 10,125 - - 31.05 13,973 8.55 0.45-15053.02 1" Copper Insulation 3,955 LF - - 50-19,775-5.00 19,775 15053.03 1" Copper Water Piping 3,595 LF 12,403 216 50 10,785 - - 6.45 23,188 3.45 0.06-15053.04 1" Copper Water S.O. Valve 42 EA 355 19 50 945 - - 30.95 1,300 8.45 0.45-15053.05 1" Copper Water Union 42 EA 512 16 50 819 - - 31.70 1,331 12.20 0.39-15053.06 1" x 1/2" Copper Water Reducer 266 EA 689 93 50 4,655 - - 20.09 5,344 2.59 0.35-15053.07 1/2" Copper 90 Ell 266 EA 133 53 50 2,660 - - 10.50 2,793 0.50 0.20-15053.08 1/2" Copper Hangers 165 EA 1,196 74 50 3,713 - - 29.75 4,909 7.25 0.45-15053.09 1/2" Copper Insulation 2,620 LF - - 50-9,039-3.45 9,039 15053.10 1/2" Copper Water Piping 2,380 LF 3,808 119 50 5,950 - - 4.10 9,758 1.60 0.05 -
15053.11 1/2" Supply Stops/Valve 266 EA 1,596 72 50 3,591 - - 19.50 5,187 6.00 0.27-15053.12 2" Acid Waste Hangers 238 EA 2,083 107 50 5,355 - - 31.25 7,438 8.75 0.45-15053.13 2" Horizontal Waste Insulation 2,390 LF - - 50-17,280-7.23 17,280 15053.14 2" PP Acid Waste 45 Ell 126 EA 2,041 76 50 3,780 - - 46.20 5,821 16.20 0.60-15053.15 2" PP Acid Waste 90 Ell 266 EA 4,203 160 50 7,980 - - 45.80 12,183 15.80 0.60-15053.16 2" PP Acid Waste Pipe 3,445 LF 20,842 310 50 15,503 - - 10.55 36,345 6.05 0.09-15053.17 2" PP Acid Waste Tee 112 EA 2,184 94 50 4,704 - - 61.50 6,888 19.50 0.84-15053.18 3" Acid Waste Hangers 202 EA 2,576 107 50 5,353 - - 39.25 7,929 12.75 0.53-15053.19 3" Horizontal Waste Insulation 1,775 LF - - 50-14,200-8.00 14,200 15053.20 3" PP Acid Waste 45 Ell 56 EA 1,618 38 50 1,904 - - 62.90 3,522 28.90 0.68-15053.21 3" PP Acid Waste 45 Wye 140 EA 5,824 133 50 6,650 - - 89.10 12,474 41.60 0.95-15053.22 3" PP Acid Waste End-of-Line Cleanout 14 EA 265 17 50 826 - - 77.90 1,091 18.90 1.18-15053.23 3" PP Acid Waste F Drain 14 EA 2,450 18 50 875 - - 237.50 3,325 175.00 1.25-15053.24 3" PP Acid Waste P Trap 14 EA 907 13 50 658 - - 111.80 1,565 64.80 0.94-15053.25 3" PP Acid Waste Pipe 1,835 LF 19,910 165 50 8,258 - - 15.35 28,167 10.85 0.09-15053.26 3" x 2" PP Acid Waste Reducer 126 EA 1,575 78 50 3,906 - - 43.50 5,481 12.50 0.62-15053.27 Acid Waste Dilution Tank with Limestone 124 EA 35,340 186 50 9,300 - - 360.00 44,640 285.00 1.50-15053.28 Emergency Eye Wash Station 14 EA 8,050 84 50 4,200-280 895.00 12,530 575.00 6.00 20.00 15053.29 Pipe Identification 610 EA 1,525 153 50 7,625 - - 15.00 9,150 2.50 0.25-15053.30 Students - Science Lavatory Final Connection 110 EA 2,750 165 50 8,250 - - 100.00 11,000 25.00 1.50-15053.31 Teachers - Science Lavatory Final Connection 14 EA 350 21 50 1,050 - - 100.00 1,400 25.00 1.50-15053.32 Test Acid Waste Piping 12,380 LF 248 49 50 2,450 - - 0.22 2,698 0.02 0.004-15053.33 Valve Indentification 322 EA 483 81 50 4,025 - - 14.00 4,508 1.50 0.25-15040.00 PLUMBING FIXTURES: 15040 50 15040.01 2" Watts 909 RPZ Backflow preventer 1 EA 615 3 50 160 - - 775.00 775 615.00 3.20-15040.02 4" Water Meter (Install Only) 1 EA 15 6 50 300 - - 315.00 315 15.00 6.00-15040.03 4" Watts 909 RPZ Backflow Preventer 1 EA 2,430 9 50 450 - - 2,880.00 2,880 2,430.00 9.00-15040.04 Dishwasher Drain Kit 5 EA 100 5 50 250 - - 69.90 350 19.90 1.00-15040.05 Drinking Fountain - Single 32 EA 26,272 120 50 6,000-160 1,013.50 32,432 821.00 3.75 5.00 15040.06 Elevator Sump Pump Zoeller #53 1/3 HP 2 EA 450 3 50 150-20 310.00 620 225.00 1.50 10.00 15040.07 Floor Drain - Custodian Closet 10 EA 1,350 23 50 1,125 - - 247.50 2,475 135.00 2.25-15040.08 Food Service Precast Grease Interceptor 1500 gal 1 EA 6,200 24 50 1,200-400 7,800.00 7,800 6,200.00 24.00 400.00 15040.09 Freeze Proof Wall Hydrant 8 EA 1,400 8 50 400-40 230.00 1,840 175.00 1.00 5.00 15040.10 Laboratory Precast Grease Interceptor 1000 gal 1 EA 4,850 21 50 1,050-350 6,250.00 6,250 4,850.00 21.00 350.00 15040.11 Laundry Sink and Stand 5 EA 1,710 14 50 688 - - 479.50 2,398 342.00 2.75-15040.12 Lavatories 64 EA 34,112 173 50 8,640 - - 668.00 42,752 533.00 2.70-15040.13 Lavatories (ADA) 51 EA 18,564 138 50 6,885 - - 499.00 25,449 364.00 2.70-15040.14 Lavatory Supports 115 EA 8,970 81 50 4,025 - - 113.00 12,995 78.00 0.70-15040.15 Leanord 1N, 356 GPM Mixing Valve 1 EA 275 2 50 100 - - 375.00 375 275.00 2.00-15040.16 Lochinvar 200 Gallon Vertical Tank 1 EA 2,500 4 50 200-45 2,745.00 2,745 2,500.00 4.00 45.00 15040.17 Lochinvar EWN 250 PM, 250,000 BTU H.W. Heater 1 EA 9,850 8 50 400-95 10,345.00 10,345 9,850.00 8.00 95.00 15040.18 Medical Double Sinks 2 EA 676 5 50 225 - - 450.50 901 338.00 2.25-15040.19 Medical Single Sinks 7 EA 1,589 14 50 700 - - 327.00 2,289 227.00 2.00-15040.20 Terrazzo Mop Sink - Custodian Closet 10 EA 5,320 27 50 1,325 - - 664.50 6,645 532.00 2.65-15040.21 Shock Absorber - Zurn Model C 20 EA 900 4 50 210 - - 55.50 1,110 45.00 0.21-15040.22 Shower Faucet & Head Assembly 22 EA 4,950 44 50 2,200 - - 325.00 7,150 225.00 2.00-15040.23 Shower Receptor/Base 14 EA 2,730 17 50 840 - - 255.00 3,570 195.00 1.20-15040.24 SS Double Kitchen Sink 34 EA 9,146 84 50 4,216 - - 393.00 13,362 269.00 2.48-15040.25 SS Single Kitchen Sink 32 EA 7,264 72 50 3,600 - - 339.50 10,864 227.00 2.25-15040.26 SS Triple "Concession" Sink 1 EA 2,100 8 50 400 - - 2,500.00 2,500 2,100.00 8.00-15040.27 Trap Primer 18 EA 1,044 9 50 450 - - 83.00 1,494 58.00 0.50-15040.28 Urinal Supports 60 EA 4,680 42 50 2,100 - - 113.00 6,780 78.00 0.70-15040.29 Urinals 60 EA 43,500 231 50 11,550 - - 917.50 55,050 725.00 3.85-15040.30 Washing Machine Box Kit 5 EA 155 3 50 168-25 69.50 348 31.00 0.67 5.00 15040.31 Water Closet (ADA) 54 EA 15,606 170 50 8,505 - - 446.50 24,111 289.00 3.15-15040.32 Water Closets 128 EA 27,264 269 50 13,440 - - 318.00 40,704 213.00 2.10-15041.00 FOOD SERVICE ROUGH-IN: 15041 50 15041.01 1" Copper hangers 28 EA 239 13 50 630 - - 31.05 869 8.55 0.45-15041.02 1" Copper Piping Assembly 155 LF 524 34 50 1,705 - - 14.38 2,229 3.38 0.22-15041.03 1/2" - 1" Water Piping Insulation 320 LF - - 50-1,600-5.00 1,600 15041.04 1/2" Copper Hangers 12 EA 91 5 50 240 - - 27.55 331 7.55 0.40-15041.05 1/2" Copper Piping Assembly 135 LF 178 26 50 1,283 - - 10.82 1,461 1.32 0.19-15041.06 2" Sanitary Vent Assembly 150 LF 264 8 50 390 - - 4.36 654 1.76 0.05-15041.07 4" Sanitary Waste Assembly 175 LF 805 11 50 560 - - 7.80 1,365 4.60 0.06-15041.08 Indirect Waste Rough-In 16 EA 557 42 50 2,080 - - 164.80 2,637 34.80 2.60 -
15041.09 Rough-In @ 3 - Compartment Sink 2 EA 378 6 50 300 - - 339.00 678 189.00 3.00-15041.10 Rough-In @ Convection Steamer 1 EA 93 2 50 100 - - 192.90 193 92.90 2.00-15041.11 Rough-In @ Floor Trough 1 EA 75 2 50 75 - - 150.00 150 75.00 1.50-15041.12 Rough-In @ Ice Machine 1 EA 93 2 50 100 - - 192.90 193 92.90 2.00-15041.13 Rough-In @ Tilting Skillet 1 EA 93 2 50 100 - - 192.90 193 92.90 2.00-15041.14 Rough-In @ Washdown Station 2 EA 378 6 50 300 - - 339.00 678 189.00 3.00-15041.15 Rough-In @ Worktable with Sink 2 EA 378 6 50 300 - - 339.00 678 189.00 3.00-15041.16 Test Rough-In Piping 615 LF 12 18 50 923 - - 1.52 935 0.02 0.03-15042.00 FIXTURE ROUGH-IN DW: 15042 15042.01 1-1/2" Copper 45 Ell 48 EA 341 20 50 1,008 - - 28.10 1,349 7.10 0.42-15042.02 1-1/2" Copper 90 Ell 120 EA 794 50 50 2,520 - - 27.62 3,314 6.62 0.42-15042.03 1-1/2" Copper Ball Valve 62 EA 1,358 42 50 2,108 - - 55.90 3,466 21.90 0.68-15042.04 1-1/2" Copper OS - Hanger 550 EA 4,560 248 50 12,375 - - 30.79 16,935 8.29 0.45-15042.05 1-1/2" Copper Piping - Vertical 215 LF 922 34 50 1,720 - - 12.29 2,642 4.29 0.16-15042.06 1-1/2" Copper Reducer 120 EA 475 40 50 1,980 - - 20.46 2,455 3.96 0.33-15042.07 1-1/2" Copper Tee 218 EA 3,205 111 50 5,559 - - 40.20 8,764 14.70 0.51-15042.08 1-1/2" Copper Union 62 EA 569 19 50 930 - - 24.17 1,499 9.17 0.30-15042.09 1-1/2" Copper Piping - Horizontal 2,135 LF 9,245 171 50 8,540 - - 8.33 17,785 4.33 0.08-15042.10 1" Copper 45 Ell 106 EA 313 32 50 1,590 - - 17.95 1,903 2.95 0.30-15042.11 1" Copper 90 Ell 282 EA 759 85 50 4,230 - - 17.69 4,989 2.69 0.30-15042.12 1" Copper Ball Valve 280 EA 2,722 126 50 6,300 - - 32.22 9,022 9.72 0.45-15042.13 1" Copper OS - Hanger 605 EA 5,173 272 50 13,613 - - 31.05 18,785 8.55 0.45-15042.14 1" Copper Piping - Horizontal 920 LF 1,619 55 50 2,760 - - 4.76 4,379 1.76 0.06-15042.15 1" Copper Piping - Vertical 3,010 LF 5,298 241 50 12,040 - - 5.76 17,338 1.76 0.08-15042.16 1" Copper Reducer 206 EA 534 35 50 1,751 - - 11.09 2,285 2.59 0.17-15042.17 1" Copper Tee 210 EA 1,334 74 50 3,675 - - 23.85 5,009 6.35 0.35-15042.18 1" Copper Union 280 EA 3,416 90 50 4,480 - - 28.20 7,896 12.20 0.32-15042.19 1/2" Copper 45 Ell 110 EA 55 22 50 1,100 - - 10.50 1,155 0.50 0.20-15042.20 1/2" Copper 90 Ell 439 EA 220 88 50 4,390 - - 10.50 4,610 0.50 0.20-15042.21 1/2" Copper Ball Valve 162 EA 684 49 50 2,430 - - 19.22 3,114 4.22 0.30-15042.22 1/2" Copper OS - Hanger 420 EA 3,045 189 50 9,450 - - 29.75 12,495 7.25 0.45-15042.23 1/2" Copper Piping - Horizontal 610 LF 976 31 50 1,525 - - 4.10 2,501 1.60 0.05-15042.24 1/2" Copper Piping - Vertical 4,270 LF 6,832 299 50 14,945 - - 5.10 21,777 1.60 0.07-15042.25 1/2" Copper Tee 110 EA 73 23 50 1,155 - - 11.16 1,228 0.66 0.21-15042.26 1/2" Copper Union 162 EA 740 31 50 1,539 - - 14.07 2,279 4.57 0.19-15042.27 2-1/2" Balancing Valve 8 EA 2,792 14 50 700 - - 436.50 3,492 349.00 1.75-15042.28 2-1/2" Ball Valve 8 EA 1,240 8 50 400 - - 205.00 1,640 155.00 1.00-15042.29 2-1/2" Copper Tee 12 EA 576 10 50 510 - - 90.50 1,086 48.00 0.85-15042.30 2-1/2" Distribution System 4,195 LF 38,049 378 50 18,878 - - 13.57 56,926 9.07 0.09-15042.31 2-1/2" Hanger 535 EA 5,537 284 50 14,178 - - 36.85 19,715 10.35 0.53-15042.32 2-1/2" Riser Piping 240 LF 809 65 50 3,240 - - 16.87 4,049 3.37 0.27-15042.33 2-1-2" Copper 90 Ell 42 EA 1,037 31 50 1,533 - - 61.20 2,570 24.70 0.73-15042.34 2" Copper 45 Ell 62 EA 725 42 50 2,108 - - 45.70 2,833 11.70 0.68-15042.35 2" Copper 90 Ell 158 EA 1,880 107 50 5,372 - - 45.90 7,252 11.90 0.68-15042.36 2" Copper Ball Valve 120 EA 3,312 108 50 5,400 - - 72.60 8,712 27.60 0.90-15042.37 2" Copper OS - Hanger 665 EA 8,512 359 50 17,955 - - 39.80 26,467 12.80 0.54-15042.38 2" Copper Piping - Horizontal 915 LF 7,274 71 50 3,569 - - 11.85 10,843 7.95 0.08-15042.39 2" Copper Piping - Vertical 305 LF 2,425 37 50 1,830 - - 13.95 4,255 7.95 0.12-15042.40 2" Copper Reducer 142 EA 1,018 72 50 3,621 - - 32.67 4,639 7.17 0.51-15042.41 2" Copper Tee 122 EA 2,867 95 50 4,758 - - 62.50 7,625 23.50 0.78-15042.42 2" Copper Union 120 EA 4,920 92 50 4,620 - - 79.50 9,540 41.00 0.77-15042.43 2" Distribution System to Fixtures 6,075 LF 48,296 425 50 21,263 - - 11.45 69,559 7.95 0.07-15042.44 2" FxF DI 90 Ell 1 EA 100 2 50 75 - - 175.00 175 100.00 1.50-15042.45 2" x 6" Sleeves/Seal 132 EA 9,900 132 50 6,600 - - 125.00 16,500 75.00 1.00-15042.46 3/4" Copper 45 Ell 60 EA 108 17 50 840 - - 15.80 948 1.80 0.28-15042.47 3/4" Copper 90 Ell 100 EA 95 28 50 1,400 - - 14.95 1,495 0.95 0.28-15042.48 3/4" Copper Ball Valve 55 EA 365 25 50 1,238 - - 29.13 1,602 6.63 0.45-15042.49 3/4" Copper OS - Hanger 610 EA 4,423 275 50 13,725 - - 29.75 18,148 7.25 0.45-15042.50 3/4" Copper Piping - Horizontal 3,050 LF 7,747 153 50 7,625 - - 5.04 15,372 2.54 0.05-15042.51 3/4" Copper Piping - Vertical 915 LF 2,324 64 50 3,203 - - 6.04 5,527 2.54 0.07-15042.52 3/4" Copper Reducer 112 EA 197 26 50 1,288 - - 13.26 1,485 1.76 0.23-15042.53 3/4" Copper Tee 110 EA 229 35 50 1,760 - - 18.08 1,989 2.08 0.32-15042.54 3/4" Copper Union 55 EA 355 18 50 880 - - 22.45 1,235 6.45 0.32-15042.55 4" Hangers 90 EA 1,688 59 50 2,925 - - 51.25 4,613 18.75 0.65-15042.56 4" DIP Buried FxPE 20 LF 440 7 50 350-19 40.45 809 22.00 0.35 0.95
15042.57 4" Distribution System to Boilers 800 LF 12,000 256 50 12,800-600 31.75 25,400 15.00 0.32 0.75 15042.58 4" Flanged CI Gate S.O. Valve 1 EA 475 2 50 113 - - 587.50 588 475.00 2.25-15042.59 4" Flanged CI Strainer 1 EA 262 2 50 98 - - 359.50 360 262.00 1.95-15042.60 4" Floor/Wall Sleeves 32 EA 2,400 32 50 1,600-160 130.00 4,160 75.00 1.00 5.00 15042.61 4" FxF DI 90 Ell 1 EA 310 3 50 155 - - 465.00 465 310.00 3.10-15042.62 4" FxF DI Tee 1 EA 435 5 50 233 - - 667.50 668 435.00 4.65-15042.63 4" FxFx 2" DI Red 90 Ell 1 EA 300 3 50 150 - - 450.00 450 300.00 3.00-15042.64 4" FxFx 2" DI Red Tee 1 EA 360 4 50 205 - - 565.00 565 360.00 4.10-15042.65 8 GPM Recirculation Pump 2 EA 1,390 8 50 400-30 910.00 1,820 695.00 4.00 15.00 15042.66 Circuit Setter Valve 3/4" 2 EA 72 1 50 39 - - 55.50 111 36.00 0.39-15042.67 Insulate DW 110 Deg Piping 4,615 LF - - 50-27,690-6.00 27,690 15042.68 Insulate DW Piping 24,855 LF - - 50-149,130-6.00 149,130 15042.69 Pipe Identification 3,400 EA 8,500 850 50 42,500 - - 15.00 51,000 2.50 0.25-15042.70 Pressure Guages @ BFP 3 EA 330 2 50 113 - - 147.50 443 110.00 0.75-15042.71 Pressure Guages @ Water Heaters 21 EA 2,310 16 50 788 - - 147.50 3,098 110.00 0.75-15042.72 Rough-In BFP - Service Entry 2 LS 600 28 50 1,400 - - 1,000.00 2,000 300.00 14.00-15042.73 Rough-In Gas Water Heater Package 1 LS 450 16 50 800 - - 1,250.00 1,250 450.00 16.00-15042.74 Rough-In Secondary Hot Water Heaters 6 LS 1,950 48 50 2,400 - - 725.00 4,350 325.00 8.00-15042.75 Rough-In Water Usage Monitor 1 LS 210 5 50 250 - - 460.00 460 210.00 5.00-15042.76 Test DW 110 Deg Piping 4,615 LF 92 92 50 4,615 - - 1.02 4,707 0.02 0.02-15042.77 Test DW Piping 17,980 LF 360 360 50 17,980 - - 1.02 18,340 0.02 0.02-15042.78 Thermometer @ Water Heaters 14 EA 1,540 11 50 525 - - 147.50 2,065 110.00 0.75-15042.79 Valve Indentification 700 EA 1,050 175 50 8,750 - - 14.00 9,800 1.50 0.25-15043.00 FIXTURE ROUGH-IN SWV: 15043 15043.01 2-1/2" CISP - 45 Ell 11 EA 58 7 50 336 - - 35.75 393 5.25 0.61-15043.02 2-1/2" CISP - 45 Wye 40 EA 360 30 50 1,500 - - 46.50 1,860 9.00 0.75-15043.03 2-1/2" CISP - 90 Ell 20 EA 140 10 50 520 - - 33.00 660 7.00 0.52-15043.04 2-1/2" CISP - Hanger 185 EA 2,220 113 50 5,643 - - 42.50 7,863 12.00 0.61-15043.05 2-1/2" CISP - Horizontal No-Hub 400 LF 3,060 84 50 4,200 - - 18.15 7,260 7.65 0.21-15043.06 2-1/2" CISP - Reducer 35 EA 173 7 50 368 - - 15.45 541 4.95 0.21-15043.07 2-1/2" CISP - Tee 21 EA 189 15 50 735 - - 44.00 924 9.00 0.70-15043.08 2-1/2" CISP - Vertical No-Hub 810 LF 6,197 186 50 9,315 - - 19.15 15,512 7.65 0.23-15043.09 2" CISP - 45 Ell 18 EA 102 7 50 342 - - 24.64 444 5.64 0.38-15043.10 2" CISP - 45 Wye 8 EA 66 5 50 232 - - 37.25 298 8.25 0.58-15043.11 2" CISP - 90 Ell 120 EA 800 46 50 2,280 - - 25.67 3,080 6.67 0.38-15043.12 2" CISP - Hanger 200 EA 1,850 120 50 6,000 - - 39.25 7,850 9.25 0.60-15043.13 2" CISP - Horizontal No-Hub 1,220 LF 10,126 354 50 17,690 - - 22.80 27,816 8.30 0.29-15043.14 2" CISP - Tee 62 EA 558 36 50 1,798 - - 38.00 2,356 9.00 0.58-15043.15 2" CISP - Vertical No-Hub 4,575 LF 37,973 1,464 50 73,200 - - 24.30 111,173 8.30 0.32-15043.16 3" CISP - 45 Ell 20 EA 141 11 50 540 - - 34.07 681 7.07 0.54-15043.17 3" CISP - 45 Wye 452 EA 5,017 357 50 17,854 - - 50.60 22,871 11.10 0.79-15043.18 3" CISP - 90 Ell 118 EA 950 64 50 3,186 - - 35.05 4,136 8.05 0.54-15043.19 3" CISP - End-of-Line C-Out 61 EA 2,550 27 50 1,373 - - 64.30 3,922 41.80 0.45-15043.20 3" CISP - Floor C-Out 6 EA 870 8 50 375 - - 207.50 1,245 145.00 1.25-15043.21 3" CISP - Hanger 461 EA 5,509 281 50 14,061 - - 42.45 19,569 11.95 0.61-15043.22 3" CISP - Horizontal No-Hub 2,440 LF 21,838 586 50 29,280 - - 20.95 51,118 8.95 0.24-15043.23 3" CISP - Reducer 60 EA 361 13 50 660 - - 17.02 1,021 6.02 0.22-15043.24 3" CISP - Tee 165 EA 6,963 129 50 6,435 - - 81.20 13,398 42.20 0.78-15043.25 3" CISP - Vertical No-Hub 1,220 LF 10,919 317 50 15,860 - - 21.95 26,779 8.95 0.26-15043.26 4" CISP - 45 Ell 255 EA 2,208 194 50 9,690 - - 46.66 11,898 8.66 0.76-15043.27 4" CISP - 45 Wye 402 EA 7,156 422 50 21,105 - - 70.30 28,261 17.80 1.05-15043.28 4" CISP - 90 Ell 60 EA 702 46 50 2,280 - - 49.70 2,982 11.70 0.76-15043.29 4" CISP - Floor C-Out 9 EA 1,665 12 50 608 - - 252.50 2,273 185.00 1.35-15043.30 4" CISP - Hanger 875 EA 16,625 595 50 29,750 - - 53.00 46,375 19.00 0.68-15043.31 4" CISP - Horizontal No-Hub 2,440 LF 25,474 683 50 34,160 - - 24.44 59,634 10.44 0.28-15043.32 4" CISP - Reducer 171 EA 1,447 39 50 1,967 - - 19.96 3,413 8.46 0.23-15043.33 4" CISP - Tee 110 EA 6,017 129 50 6,435 - - 113.20 12,452 54.70 1.17-15043.34 4" CISP - Vertical No-Hub 2,440 LF 25,474 683 50 34,160 - - 24.44 59,634 10.44 0.28-15043.35 Insulation @ SWV Piping 7,150 LF - - 50-53,625-7.50 53,625 15043.36 Pipe Identification 2,075 EA 5,188 519 50 25,938 - - 15.00 31,125 2.50 0.25-15043.37 Rough-In @ Sump Pump 2 EA 150 6 50 319 - - 234.50 469 75.00 3.19-15043.38 Test SWV Piping 16,210 LF 324 324 50 16,210 - - 1.02 16,534 0.02 0.02-15045.00 STORM WATER AND ROOF DRAINAGE: 15045 15045.01 STORM WATER AND ROOF DRAINAGE SYSTEM 1 LS 19,500 410 50 20,500 15,500 3,500 59,000.00 59,000 19,500.00 410.00 3,500.00 15016.00 BOILER - NATURAL GAS: 15016
15016.01 1-1/4" Drip Leg Assembly 3 EA 75 3 50 143 - - 72.50 218 25.00 0.95-15016.02 1-1/4" Hook-Up to Equipment 3 EA 162 8 50 390 - - 184.00 552 54.00 2.60-15016.03 1-1/4" Shut-Off Valve 3 EA 61 2 50 98 - - 52.80 158 20.30 0.65-15016.04 2" 150# MI Threaded 90 Ell 11 EA 188 7 50 347 - - 48.60 535 17.10 0.63-15016.05 2" 150# MI threaded Reducer 3 EA 51 2 50 81 - - 44.00 132 17.00 0.54-15016.06 2" 150# MI Threaded Tee 3 EA 67 2 50 119 - - 61.70 185 22.20 0.79-15016.07 2" 150# MI Threaded Union 2 EA 38 2 50 75 - - 56.70 113 19.20 0.75-15016.08 2" 150# Shut Valve 1 EA 35 1 50 40 - - 75.25 75 35.25 0.80-15016.09 2" Clevis Hanger 98 EA 907 44 50 2,205 - - 31.75 3,112 9.25 0.45-15016.10 2" Floor Supports 4 EA 220 4 50 200-20 110.00 440 55.00 1.00 5.00 15016.11 2" Schedule 40 BSP 830 LF 4,225 174 50 8,715 - - 15.59 12,940 5.09 0.21-15016.12 2" Steel x PE Transition PC 1 EA 110 2 50 75-25 210.00 210 110.00 1.50 25.00 15016.13 2" Wall Brackets 3 EA 225 3 50 150-15 130.00 390 75.00 1.00 5.00 15016.14 3" Wall/Floor Sleeve/Seal 6 EA 210 6 50 300 - - 85.00 510 35.00 1.00-15016.15 Buried Gas Piping 2" 20 LF 80 4 50 180 - - 13.00 260 4.00 0.18-15016.16 Gas Meter (Set) Assembly 1 EA 210 2 50 100 - - 310.00 310 210.00 2.00-15016.17 Install Gas Meter (Furnished) 1 EA 10 2 50 88-5 102.50 103 10.00 1.75 5.00 15016.18 Paint Gas Piping 830 LF 208 25 50 1,245 - - 1.75 1,453 0.25 0.03-15016.19 Pipe Identification 46 EA 115 12 50 575 - - 15.00 690 2.50 0.25-15016.20 Test Gas Piping 850 LF 17 17 50 850 - - 1.02 867 0.02 0.02-15016.21 Valve Indentification 4 EA 6 1 50 50 - - 14.00 56 1.50 0.25-15016.22 Material Taxes (Excluded - Add $46,600.00 if required) 1 LS - - 50 - - 45,000.00 - - 15016.23 Overhead and Profit 1 LS 285,000-50 285,000.00 285,000 285,000.00 - - 15016.24 Subcontractor Mark-up 1 LS 22,000-50 22,000.00 22,000 22,000.00 - - 15100.00 1,342,666 28,712 48 1,370,329 307,839 20,907 3,041,740 Average 15100.01 Material $ Labor MH Lab. Rate Labor $ contractor Equip. $ TOTAL MAT. Unit $