Installation Manual v1.1: ATS Twin CP3 Kit GM LB7 Duramax. Please read all instructions before installing the ATS Twin CP3 Kit

Similar documents
Installation Manual v1.4: ATS Twin CP3 Kit 2001 GM LB7 Duramax. Please read all instructions before installing the ATS Twin CP3 Kit

Installation Manual v1.2: LLY / LBZ/LMM Twin CP3 Kit GM Duramax. Please read all instructions before installation.

Installation Manual v2.2: Twin CP3 Fuel Injection Kit Dodge 5.9L

Installation Manual v1.0: Twin CP3 Fuel Injection Kit Dodge 6.7L

Installation Manual v1.0: Twin CP3 Fuel Injection Kit Dodge 5.9L

Installation Manual v1.0: Force Cool Kit Dodge with NV4500/NV4500HD/NV5600 Manual Transmissions. Please read all instructions before installation.

Figure 1 - Kit Contents

Installation Manual v1.0: : Pulse Flow Exhaust Manifolds 2006 LBZ Duramax 6.6L EGR Equipped Vehicles

Installation Manual v1.0: 10-Digit P/N: Aurora 3000 Turbo System L Powerstroke Ford

Installation Manual v1.3: 2-Piece Exhaust Manifold Dodge 5.9L. Please read all instructions before installation.

Installation Manual v1.1: Piece Pulse Flow Exhaust Manifold, Stock Replacement L Cummins

Installation Manual v1.1: The ATS Arc-flow Intake Manifold Dodge-Cummins 5.9. Please read all instructions before installation.

05/03/ INST. Ford 6.0L Aurora Turbo Installation v Ford 6.0L Powerstroke

Installation Manual v1.0: P/N 202-A Aurora 3000/5000 Compound Turbo Kit Dodge Cummins 5.9

Installation Manual v1.2: Ford Sub Zero Intercooler L Ford Trucks. Please read all instructions before installation.

Installation Manual v1.0: Code Blocker Electronics Kit GM LBZ Duramax. Please read all instructions before installation.

Installation Manual v1.0: MST Turbo Kit ( ) 5.9L Dodge. Please read all instructions before installation.

Installation Manual v1.0: Aurora Plus Turbo Kit ( ) 5.9L Dodge. Please read all instructions before installation.

2/10/ INST

BD Venom Dual Fuel F O R D 6. 7 L P O W E R S T R O K E Installation Instructions

BD Venom Dual Fuel F O R D 6. 7 L P O W E R S T R O K E Installation Instructions

2/10/ INST

All cores due 30 days after invoice date - no credit after 60 days.

Phone Fax

Installation Manual v1.0: The Torque Pro Propane Injection System GM. Please read all instructions before installation.

Cut zip ties and remove 2 plastic wiring harness brackets.

Installation Manual v1.0: Dodge 68RFE Automatic Transmission. Please read all instructions before the installation of the ATS Co-Pilot

Cut zip ties and remove 2 plastic wiring harness brackets.

2017+ L5P Duramax 3 ½ Down Pipe & EGR Fix Kit

12/05/2012 Lockup Co-Pilot Instructions INST. Installation Manual v1.6: Dodge 68RFE Automatic Transmission

Installation Manual v1.0: RPM Governor Spring Installation Dodge. Please read all instructions before installation.

Included parts: 1 - New Bosch CP3 Pump 1 - HSM Pulley 1 - Serpentine Belt 1 - Pump Brackets/Hardware

05-08 GT. Hellion Power Systems Mustang Kit Instructions

DURAMAX LML EGR DELETE

2006-UP GM ALLISON 6 SPEED LCT-1000/2000/2400 CO-PILOT Parts list

Included parts: 1 - New Bosch CP3 Pump 1 - HSM Pulley 1 - Serpentine Belt 1 - Pump Bracket/ Hardware STEP 1

GM ALLISON 5 SPEED LCT-1000/2000/2400 CO-PILOT PARTS LIST

All cores due 30 days after invoice date - no credit after 60 days.

Shotgun Single Barrel HPFP install guide

STEP 1 Disconnect the negative terminal from both batteries.

Single Barrel Shotgun HPFP Install Guide

Duramax LMM EGR Delete With Intake Tube

Includes: 1. Silicone Hose 2. EGR Block Off Plates 1. Exhaust Block Off Plate 2. Hose Clamps 1. Spacer/Washer 8. Bolts 2. Nuts

advanced FLOW engineering Instruction Manual P/N:

4 December 2017 PN# , , Dodge 6.7L Rumble B SXE (I-00400) 1. BD Rumble B SXE. D o d g e 6. 7 L H P C R Installation Instructions

DODGE CUMMINS DUAL PUMP & DELUXE DUAL PUMP KIT

Scion FR-S ZN6. GTX2867R Gen2 (Internal Wastegate) Installation Instructions GPP P/N #

* PLEASE READ INSTRUCTIONS PRIOR TO INSTALLATION *

Models Affected: Visions with Propane Engines CORRECTIVE ACTION ---- PROCEDURE

BD TrackMaster S D o d g e H P C R Installation Instructions

Included: 2. Intake Block Off Plates 1. Exhaust Block Off Plate 1. Coolant Hose - Reroutes the EGR Cooler Coolant 12. Pieces of mounting hardware -

Ford 6.0L. Part #: Part #: BD GASKET PART# will be needed for this installation.

DURAMAX LMM EGR DELETE

Air Commander

L DURAMAX LBZ EGR DELETE GDP TUNING

91/2 Bulb End Fuel. Low Pressure. Fitting. Low Pressure 12Molded Hose. High Pressure 11Feed Line. Injection Line

Instant Chat off the main page of Or simply call our tech team at

2006 Honda Civic SI Supercharger Kit Installation Instruction Kit #

Disconnect the APP sensor harness connector. See Fig. 4. Remove the accelerator pedal mounting nuts. Remove the APP assembly.

Installation Instructions for: TOYOTA 4.5L SUPERCHARGER SYSTEM

LML 3 Y-Bridge Kit or High Flow Intake Bundle Package

Dodge 24v ISB

18SP680Rev3 EPA04 MBE 4000 Car Hauler Low Pressure Fuel Lines

Instant Chat off the main page of Or simply call our tech team at

INSTALLATION INSTRUCTIONS AIR/OIL SEPARATOR KIT

Kit Part Number:

CAUTIONS AND WARNINGS

Procharger Stage II Intercooled Supercharger System (11-14 GT)

DURAMAX LBZ EGR DELETE

2010+ Victory Cross Country / Cross Roads Installation Guide Nov 2014

BEFORE BEGINNING INSTALLATION

Brute Force Intake System. Installation Instructions for: Part Number Toyota 4Runner 3.4L V Toyota Tacoma 3.

Ford 6.0L Regulated Return Kit

Complete Holley Mid-Mount Accessory Drive Kit

BMW S1000RR Z-Fi QS / Z-Fi TC Installation Instructions P/N S541S, S541R, T541S, T541R

Always wear safety glasses when working on your vehicle.

advanced FLOW engineering Instruction Manual P/N: Make: RAM Model: Diesel Trucks Year: Engine: L6-6.7L (td)

INSTALLATION INSTRUCTIONS AOS-R (Air Oil Separator-Return) Turbo Subaru and STi Document# Support:

Dodge 5.9L Cummins 24v ISBe

10-rib belt system upgrade Installation Manual

PARTS LIST. Alternator Bracket A Main Alternator Bracket 1-P763-A... Idler Pulley. Pulleys. 5/16 x 7/8 SHCS (P/S Option)

Front Drive System - Big Block Chevy Installation Instructions Big Block Chevy with AC & with PS

BLACKBIRD INSTALLATION SUPPLEMENT

BD 6.7L Super B Special Turbo Kit For L Dodge -- I n s t a l l a t i o n I n s t r u c t i o n s -- PN#

INSTALLATION INSTRUCTIONS AOS-R (Air Oil Separator-Return) Turbo Subaru and STi Document# Support:

FUEL RAILS/PLUMBING - SIDE FEED INJECTORS. Application: US Spec STI-04/06, ROW 06. APS High Output Fuel System APSSTI-FRP/01 Installation Guide

Installation Manual for Dodge 24V Cummins Version 3.1. Please read all instructions before the installation of the ATS Co-Pilot

INSTALLATION INSTRUCTIONS COOLANT TANK KIT

INSTALLATION INSTRUCTIONS FUEL RAIL

Air Commander Part No , with air Part No , without air

Weistec M113K Supercharger System Installation Guide

BD 6.7L Super B Special Turbo Kit For L Dodge -- I n s t a l l a t i o n I n s t r u c t i o n s -- PN#

Ducati Monster Ducati Monster 796 (Euro Spec Only) Z-Fi QS Installation Instructions P/N S192S, S192R

3 October 2016 PN# V Dodge Twin Turbo Kit (I-00274) ½ D o d g e 2 4 v I S B

FREE $15 Gift Card for every $100 spent on Ship To Home orders. Find Out How

07-11 GM 4WD 1500 P/U 1 1/4 Body Lift

2016 Camaro Header Installation

IE Audi 3.0T Crank Pulley Upgrade Install Guide IEBAVJ3

PowerMax Diesel Upgrade For Cummins Engines

Cummins 6.7L High Flow Intake Plenum Cover PLEASE READ ALL INSTRUCTIONS BEFORE INSTALLATION

Transcription:

Installation Manual v1.1: ATS Twin CP3 Kit 2002-2004 GM LB7 Duramax Please read all instructions before installing the ATS Twin CP3 Kit This kit is not emissions legal in California. Kit is legal only on race vehicles that will not be used on public highways. Note: DO NOT remove any high pressure fittings from the pump. Doing so can result in damage to the internal components. Thank you for purchasing the ATS Twin CP3 Kit. The picture below shows all the components included in the kit. Two rail fittings (8a. and 8b.) are shown in the picture. The 2001-2002 LB7 fuel rail requires fitting 8a. and the 20032004 LB7 fuel rail requires fitting 8b. Please check before beginning the installation to make sure all components are in the supplied LB7 Twin CP3 kit. Two ½ barbed to JIC-6 fittings (#14 in Figure 1) are provided in the kit for installation variations. The backside large idler pulley is not pictured. Figure 1: LB7 Twin CP3 Kit IMPORTANT: Check to make sure the ATS Twin CP3 kit is complete. 1

Installation 1. Disconnect the negative (-) terminals from both batteries. 2. Remove the serpentine belt by releasing the tensioner. 3. Remove the idler pulley shown in figure 2. Note: the engine shown is not a 2002-2004 model, but the idler pulley locations are accurate. Alternator Bracket New Location Idler Pulley Figure 2: Relocate Idler Pulley 4. Reinstall the idler pulley in the new location shown in figure 2. Figure 3: Idler Pulley Installed in New Location 5. Install the new CP3 pump to the mount using (3) 8mm x 1.25 x 50mm socket cap bolts, (3) flat washers and (3) flange nuts. 2

Figure 4: Pump Mounted On Bracket 6. Install the new CP3 pump mount onto engine using (2) 10mm x 1.5 x 65mm hex bolts and (1) 10mm x 1.5 x 80mm hex bolt. 7. Install ATS CP3 pulley and nut. Torque pulley nut to 52 ft-lbs. Figure 5: Pulley Mounted on Pump 3

8. Without disconnecting the AC lines, remove the AC compressor to gain access to the fuel rail. Lift the AC compressor up and back out of the way. The rubber AC lines will bend and provide enough flexibility to gain access to the fuel rail. Using a T50 Torx, remove the fuel rail plug located on the driver s side near the front of the engine. Note: on 2001-2002 models, there is a second plug located behind the threaded plug in the fuel rail that must be removed with a magnet. Remove Fuel Rail Plug(s) Figure 6: Rail Plug Location and Rail Plugs 9. Install the appropriate supplied fuel rail fitting into the fuel rail. 2001-2002 2003-2004.5 Figure 7: Fuel Rail Fittings The next section explains how to share the supply line between the two injector pumps. The kit comes with enough supplies for two fuel supply options. The first option requires accessing the factory CP3, located in the 4

valley of the engine, to change the supply fitting on the pump and install a new 6 supply line. A trained technician can complete the 6 supply line installation in two hours. Supplies are included in the kit that will reduce the supply line installation to 20 minutes. To complete the 20-minute installation, remove the fuel line shown in Figure 9. Use the two barbed fittings, 6 Tee and ½ fuel line to provide a connection for the second fuel pump supply. Skip steps 10 through 16. To New Pump 20-Minute Supply Line Installation Figure 8: 20-Minute Fuel Supply Connection 10. Remove the ½ fuel line attached to fuel filter housing outlet. Figure 9: Factory Fuel Supply Line 11. Drain engine coolant. 5

12. Remove the thermostat housing. Figure 10: Thermostat Housing 13. Disconnect factory fuel supply line from CP3 Pump. Remove attaching bolts and completely remove fuel supply line assembly from engine. REMOVE Figure 11: Factory Supply Line Assembly 14. Remove the factory supply fitting from the factory CP3 pump. 6

Factory Supply Fitting Figure 12: Factory Supply Fitting Location 15. Install the 6 supply fitting and seal (#9 and 10 in Figure 1) into the factory CP3 pump. Install Supply Fitting Figure 13: Supply Fitting for Factory Pump 7

16. Route supplied ½ fuel hose from fuel filter housing to the supplied -6 tee using the provided ½ barbed to 6 fitting provided in the kit (#14 in Figure 1). Attach hose to fuel filter with existing fuel line clamp. -6 Tee ½ Push-Lok to 6 Fitting Figure 14: Supply Line and -6 Tee 17. Remove fuel return banjo bolt from the top of the pressure relief valve (Figure 15) and install the return combination JIC 6 banjo bolt with the new seal provided in the kit (#11 and #12 in Figure 1). Install New Return Fitting Figure 15: Return Fitting Location 8

18. Install the return, high pressure and supply fuel lines. Install the return line, 25 overall length with two 90 fittings, from the combo banjo bolt to the return on the new pump. Route the short supply line, 8 overall length with two straight fittings, from the 6 Tee to the factory pump supply fitting. Install the 24 supply line with one straight and one 45 fitting from the 6 Tee to the supply fitting on the new pump. Route the high-pressure line from the pump to the new fitting in the rail. High Pressure Fitting -6 Tee Pressure Regulator Supply Fittings Return Fitting Figure 16: Fuel Line Routing If the 20-minute supply line install method was used, then connect the 45 degree fitting of the supply line to the 6 Tee as shown in Figure 8 and connect the end with the straight fitting to the pump. The picture above shows the full 2-hour supply line installation with steel braided lines supplying both pumps. 9

Unplug the fuel pressure regulator connector on the factory CP3 pump. Plug the factory harness connector into female end of supplied electrical harness. Next plug male harness into 1st CP3 pump. Plug remaining male harness into 2nd CP3 pump. Mount electronics box using supplied Velcro. Connect the red wire with ring connector to the positive (+) terminal on the battery. Connect the black wire with ring connector to the negative (-) terminal on the battery. Connect to Factory CP3 Connect to New CP3 Connect to Factory Harness Figure 16: Control Box Location 19. If previously removed, install the thermostat housing and refill cooling system. 20. Remove alternator bracket bolt shown in figure 18 and install the 10mm x 1.5 x 80mm button head bolt (#19 in Figure 1) into alternator bracket. Do not over tighten. New Bolt Installed Figure 17: Alternator Bolt Installation 10

21. Install the serpentine belt provided in the kit as shown below. Idler Pulley Relocated in Step 4 Figure 19: Serpentine Belt Routing 22. Double-check the tightness of all fittings and bolts. 23. Reconnect the negative (-) battery cables. 24. Turn on ignition. With ignition on and the engine off, check for any fuel leaks. 25. Start the engine. Verify that no fuel leaks are present and that the serpentine belt is tracking straight. 26. After approximately 100 miles the belt may stretch and cause the tensioner to chatter. When the belt stretches, install the larger idler pulley with washers provided in the kit in place of the factory idler that was relocated in step 4. Use the two washers to ensure proper spacing and belt alignment. 11

Have Any Questions? Thank you for purchasing the ATS Twin CP3 Kit. Please call or check our website at http://www.atsdiesel.com for technical support and other performance products such as the Five Star torque converter, ATS Co- Pilot, ATS High Performance Transmission along with our full line of power enhancers that include Tuning, Aurora Turbochargers, Fuel Injectors, Water Injection, Propane Injection, and more. Please call or e-mail our Technical Service Department, 8:00am to 5:30pm Mountain Standard Time, Monday through Friday. Contact Information Toll Free: 800-949-6002 Local: 303-431-7973 Fax: 303-431-0135 Website: www.atsdiesel.com Email: info@atsdiesel.com We strive to make our instructions as clear and complete as possible. To achieve this, our instructions are under constant construction. We encourage you to visit our Technical Support Website (http://www.atsdiesel.com/atswebsite/technical.asp) to check for the most up-to-date manuals and diagrams as well as other information. If you have any suggestions as to how we can improve this installation manual, let us know at mailto:suggestions@atsdiesel.com. 12

Bill of Materials 1. Steel Braided Second Pump Supply Line 701-023-4248 2. Steel Braided First Pump Supply Line 701-024-4248 3. Steel Braided Second Pump Return Line 701-025-4248 4. High Pressure Steel Line 701-011-4248 5. 12 of ½ Rubber Fuel Line (Blue or Black) 821FR-8 6. Twin CP3 Injector Pump 701-030-4248 (1) Injector Pump 97720662 (2) 12mm to JIC-6 7400-6-12 7. ATS Injector Pump Pulley 701-014-4248 8. Fuel Rail High Pressure Fitting (a) 03-04 LB7 701-005-1000 (b) 01-02 LB7 701-005-4248 9. Obsolete with revision v1.2 10. 12mm to JIC-6 Fitting 7400-6-12 11. 16mm Banjo to JIC-6 Combination Fitting 701-006-1000 12. 16mm Banjo Seal 97250485 13. ATS Pulley Nut 701-017-1000 14. (2) ½ Barbed to JIC-6 Female Fittings 701-004-1000 15. JIC-6 Male Tee 6JTX 16. ATS GM Twin CP3 Pump Bracket 701-013-4248 17. ATS Twin CP3 Electronics 701-019-4248 18. Serpentine Belt 701-033-4248 19. ATS Alternator Button Head Screw 701-021-4248 13

20. Hardware Kit: 701-001-4248 (2) M10X1.5X65 Hex Screw (1) M10X1.5X80 Hex Screw (3) M10 Flat Washers (3) M8X1.25X50 Socket Cap Screw (3) M8 Flat Washers (3) M8X1.25 Flange Nuts Not Pictured: 21. Large Backside Idler Pulley with two washers 3C3Z-8678-BB 22. Instruction Folder (1) Purple ATS Folder (1) Instruction Manual (2) ATS Stickers 14