Installation, Operation, and Maintenance

Similar documents
Installation and Operation

Replacement of 600-Ampere Bushing and 200-Ampere Bushing-Well Adapters

Installation and Operation

Installation. S&C Omni-Rupter Switches Outdoor Distribution 14.4 kv and 25 kv

S&C Vista Underground Distribution Switchgear

Instructions for Installation and Operation

Instructions for Installation

Instructions for Installation and Operation

Cleaning Flooded Gear

Cleaning Flooded Gear

Installation. Loadbuster The S&C Loadbreak Tool Outdoor Distribution (14.4 kv through 34.5 kv) Table of Contents. Instruction Sheet

Installation and Operation

S&C Source-Transfer Vista Underground Distribution Switchgear

Inspection and Maintenance

S&C Circuit-Switchers Mark VI Installed on S&C Mounting Pedestals 84- through 102-inch Phase Spacing Outdoor Transmission (69 kv through 138 kv)

Installation. S&C Omni-Rupter Switches Outdoor Distribution 14.4 kv and 25 kv

Instructions for Installation

PAD-MOUNTED SWITCHGEAR INSPECTION & MAINTENANCE RECOMMENDATIONS TYPE PSI/II. 15kV 25kV. Qualified Persons

INSTRUCTIONS For Field Assembly, Installation, and Maintenance

INSTRUCTIONS Ç CAUTION. S&C Power Fuses Types SMD-1A, SMD-2B, SMD-2C, and SMD-3. For Field Assembly and Installation NOTE INSTRUCTION SHEET

Installation and Operation

COOPER POWER. SERIES CMU Medium voltage power fuse installation instructions. Fusing Equipment MN132032EN

Installation And Operation

COOPER POWER SERIES. UltraSIL polymer-insulated D-73P disconnect switches installation instructions. Switches MN008004EN

TYPE AST. Grounding Switch. ALL Ratings INSTALLATION & INSTRUCTION MANUAL

GWI Rev. 1 October 2007 Supersedes Rev. 0 Dated February 2004

ibusway for Data Center

TRINETICS CSD SERIES OIL SWITCH INSTALLATION INSTRUCTIONS

Installation. S&C Circuit-Switchers Mark VI 69-kV 51-inch Phase Spacing Single Pedestal Design Outdoor Transmission.

Galaxy Receiving and Unpacking 09/

COOPER POWER SERIES. Screened Separable Connectors MN650023EN. Effective October 2016 Supersedes March 2012 (IS )

COOPER POWER SERIES. Screened Separable Connectors MN650024EN. Effective October 2016 Supersedes March 2012 (IS )

TONS. Before each shift: Before operating: Before initial operation of hoist:

SIEMENS. XJ-L Busway Systems. Storage, Installation and Maintenance Instructions for... Piece No. 32-J Rev 3

COOPER POWER SERIES. K-Limiter back-up current-limiting fuse installation instructions. Fusing Equipment MN132010EN

COOPER POWER SERIES. QD5 Quik-Drive tap-changer reversing neutral stationary contact asssembly kit A26 installation instructions

Installation, Operation and Maintenance Instructions. SLS Series Single Phase Disconnector

Effective March 2015 Supersedes S August 2012

APCO CRF-100A RUBBER FLAPPER SWING CHECK VALVES

COOPER POWER SERIES. 200 A Fused Loadbreak Elbow Connector Replacement Fuse Installation Instructions. Fusing Equipment MN132021EN

Nor East. Instructions. Safety Messages. Inspection. Parts Nor East Controls. Service. Type 05 Air-O-Motor Actuator Used With Globe Valves

Manual No: Revision: B. CCVP Rain Shield. Installation Guide

Nor East. Instructions Safety Messages. Inspection. Parts. DeZURIK Service. Type 05 Pneumatic Actuator Used With Globe Valves

WARNING. Instructions for Combination Bypass Isolation and Transfer Switches Amps I.L A FILE APPLICATION SAFETY PRACTICES

COOPER POWER SERIES. HX-CB loadbreak fuse cutout installation instructions. Fusing Equipment MN132011EN

Installation. S&C Manual PME Pad-Mounted Gear Outdoor Distribution (14.4 kv and 25 kv) Table of Contents

ELB ELB

OPERATOR S AND PARTS MANUAL PALLET FORKS. Part Number: MODEL NUMBER: Rev. 4

Instruction Booklet for the Installation, Operation and Maintenance of Type 5-15 kv VCP-WG Vacuum Circuit Breaker 4000A MiniMod

5/15/27 kv, 25/31.5/50/63 ka Manual Ground & Test Devices Installation, Operations and Maintenance Manual

Effective June 2016 New Issue

Effective November 2016 Supersedes February 2012 (S )

Operation. S&C Vista Underground Distribution Switchgear UnderCover, Vault-Mounted, and Pad-Mounted Styles. Table of Contents

COOPER POWER. SERIES ELF Current-Limiting Dropout Fuse Installation Instructions. Fusing Equipment MN132028EN. Pull ring. Housing

Q20 5th wheel hitch WARNINGS. warning: never exceed your vehicle manufacturer's recommended towing capacity

COOPER POWER SERIES. 600 A 15/25 kv class T-OP II connector assembly installation instructions. Deadbreak Apparatus Connectors MN650048EN

SecoVac * Ground & Test Device

SM-1700 Secondary Shunt Trip Coil Assembly. Powered by Safety

Introduction CAUTION. S&C Power Operated Metal-Enclosed Switchgear Outdoor Distribution (4.16 kv, through 34.5 kv)

GE Industrial Solutions. DEH Installation and Maintenance Manual AKD-20 AR / Entellisys AR Exhaust Plenum System

Installation Instructions For Motor Control Center (MCC) Units

COOPER POWER SERIES. Types D and DV recloser installation instructions. Reclosers MN280030EN

Introduction CAUTION CAUTION. S&C Power Operated Metal-Enclosed Switchgear Indoor and Outdoor Distribution (4.16 through 34.5 kv)

Hydraulic Wheel Dolly

NorthStar. brand. Instruction Manual. SLIM Tach SL Thru-Shaft Diameter. Magnetoresistive Encoder Designed for GE Wind Energy

CANT-Series Cantilever Carts Instruction Manual

INSTALLATION INSTRUCTIONS

COOPER POWER SERIES. Dielectric grease application to recloser cable instructions. Reclosers MN280070EN

Product Specifications for Aluminum Vertical Break Switches

BCFS Belt Driven Centrifugal Filtered Supply Fans

Manual Transfer Switch

MINI-EDGER POLISHER/SCRUBBER

COOPER POWER SERIES. Types 4H single-phase and 6H three-phase vacuum interrupter conversion kits. Reclosers MN280014EN

m WARNING: READ ALL m WARNING: This unit can be dangerous! Careless or m DANGER: Risk of cut. Keep hands and feet away IMPORTANT! Safety Instructions

Operating Instructions and Parts Manual 3-1/2 ton Farm Jack Model FJ-3-1/2A

1000-LB. MOTORCYCLE LIFT TABLE OWNER S MANUAL

Vacuum Circuit Breaker (Vehicle)

READ AND SAVE THESE INSTRUCTIONS. ComfortBreeze UV360-1 SYSTEM 24V Ultra-Violet Air Cleaner. Trion

Before equipment use, please read this operation manual carefully. Serial Number: Date Purchased:

CENTER BREAK GROUP OPERATED AIR BREAK SWITCHES RATED 15.5kV THROUGH 170kV EFFECTIVE DATE: 10/25/16 REV B

Lineman s Hoist. Operating, Maintenance & Parts Manual. Follow all instructions and warnings for LMST680-2

Operating Instructions - Electric Pow'r-Riser Models

PATENT PENDING. Phone: (877) Operation and Service Manual

Lincoln Hoist. Web Hoist Operating Manual. Lincoln Hoist

INSTRUCTIONS FOR THE RELIANCE Fast/Tran TM ARL0909 & ARL0909R

IB PowlVac ITE-HK Remote Racking Device

Hydraulic Wheel Dolly

Engine Crane Owner s Manual

Installation Power Management Unit Battery Cables and Battery Harness

Florham Park, NJ USA Call (ASCO) for sales or service

TIC 300 PRO. Users Manual Mode d emploi Bedienungshandbuch Manual d uso Manual de uso. Non Contact AC Voltage Detector. High Energy Tic Tracer

SB20G. Large Pressurized Abrasive Blaster Assembly & Operating Instructions

Jet Fans. Instruction Manual READ AND SAVE THESE INSTRUCTIONS WARRANTY

Installation Instructions for the Valor Lightbar Low Hook-On Mounting Kit

CAUTION CAUTION indicates a potentially

Distributed by Tri-State Equipment Company Inc. Web: PH: FAX:

Rev. 10/27/2015 CDL-2000, MANUAL

Low Profile Service Jack

COOPER POWER SERIES. 600 A 15, 25, and 35 kv Class Cleer Loadbreak Bushing Insert Installation Instructions. Loadbreak/Deadbreak Connectors MN650016EN

POLISHERS 17 & 20 DUAL SPEED OPERATING & MAINTENANCE

Transcription:

S&C Regulator Bypass Switches Outdoor Distribution (14.4 kv through 25 kv) Type XL (Sequenced) and Type NL (Non-sequenced) Installation, Operation, and Maintenance Table of Contents Section Page Section Page Introduction Qualified Persons.... 2 Read this Instruction Sheet.... 2 Retain this Instruction Sheet.... 2 Proper Application.... 2 Warranty.... 3 Safety Information Understanding Safety-Alert Messages.... 4 Following Safety Instructions... 4 Replacement Instructions and Labels.... 4 Inspection and Handling Inspection.... 5 Handling.... 5 Installation Installing the Regulator Bypass Switch.... 6 Checking Operation... 7 Operation XL Switch Operation....10 NL Switch Operation....11 Maintenance Inspection....14 Visual Inspection....14 Operation Inspection....15 Cleaning....15 Lubrication...15 Replacement....16 Type XL Type NL March 30, 2015 S&C Electric Company 2015, all rights reserved Instruction Sheet 841-500

Introduction Qualified Persons Read this Instruction Sheet Retain this Instruction Sheet Proper Application WARNING The equipment covered by this publication must be installed, operated, and maintained by qualified persons who are knowledgeable in the installation, operation, and maintenance of overhead electric power distribution equipment along with the associated hazards. A qualified person is one who is trained and competent in: The skills and techniques necessary to distinguish exposed live parts from non-live parts of electrical equipment. The skills and techniques necessary to determine the proper approach distances corresponding to the voltages to which the qualified person will be exposed. The proper use of the special precautionary techniques, per sonal protective equipment, insulating and shielding materials, and insulated tools for working on or near exposed energized parts of electrical equipment. These instructions are intended only for such qualified persons. They are not intended to be a substitute for adequate training and experience in safety procedures for this type of equipment. Read this instruction sheet thoroughly and carefully before installing or operating your S&C Type XL or S&C Type NL Regulator Bypass Switch. Familiarize yourself with Safety Information on page 4. The latest version of this publication is available online in PDF format at sandc.com/support/product-literature.asp This instruction sheet is a permanent part of your S&C Type XL or S&C Type NL Regulator Bypass Switch. Designate a location where you can easily retrieve and refer to this publication. Type XL and NL Regulator Bypass Switches are station-class devices used to bypass and isolate voltage regulators for maintenance. They can also be applied to bypass and isolate devices such as current transformers of primary metering equipment. Type NL Regulator Bypass Switches perform the same functions as the Type XL Regulator Bypass Switches, except the sequencing of operations is left to the operator. Type NL Regulator Bypass Switches are used in applications where a 1200-ampere continuous rating is required or where it is desired to bypass the voltage while leaving its shunt winding energized (bypass closed, disconnect open) so that mechanical and electrical testing can be carried out. Refer to the documentation supplied with your voltage regulator or other device before installing your S&C Regulator Bypass Switch. Contact the manufacturer of your voltage regulator or other device if you have any questions concerning the compatibility of your S&C Regulator Bypass Switch with non-s&c-supplied equipment or contact your nearest S&C Sales Office. CAUTION The S&C Type XL and Type NL Regulator Bypass Switches described in this publication must be selected for a specific application that is within the ratings furnished for this equipment. The ratings for each bypass switch are listed on a ratings label found on the base of the bypass switch. Ratings and dimensional drawings for each regulator bypass switch are also in S&C Specification Bulletin 841-31 available on sandc.com. 2 S&C Instruction Sheet 841-500

Introduction Warranty The warranty and/or obligations described in S&C s standard conditions of sale, as set forth in Price Sheet 150, plus any special warranty provisions, as set forth in the applicable product-line specification bulletin, are exclusive. The remedies provided in the former for breach of these warranties shall constitute immediate purchaser s or end user s exclusive remedy and a fulfillment of all seller s liability. In no event shall seller s liability to immediate purchaser or end user exceed the price of the specific product that gives rise to immediate purchaser s or end user s claim. All other warranties, whether express or implied or arising by operation of law, course of dealing, usage of trade, or otherwise, are excluded. The only warranties are those stated in Price Sheet 150, and THERE ARE NO EXPRESS OR IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. ANY EXPRESS WARRANTY OR OTHER OBLIGATION PROVIDED IN PRICE SHEET 150 IS GRANTED ONLY TO THE IMMEDIATE PURCHASER AND END USER, AS DEFINED THEREIN. OTHER THAN AN END USER, NO REMOTE PURCHASER MAY RELY ON ANY AFFIRMATION OF FACT OR PROMISE THAT RELATES TO THE GOODS DESCRIBED HEREIN, ANY DESCRIPTION THAT RELATES TO THE GOODS, OR ANY REMEDIAL PROMISE INCLUDED IN PRICE SHEET 150. S&C Instruction Sheet 841-500 3

Safety Information Understanding Safety-Alert Messages There are several types of safety-alert messages that may appear throughout this instruction sheet as well as on labels and tags attached to the S&C Regulator Bypass Switch. Familiarize yourself with these types of messages and the importance of the various signal words, as explained below. DANGER DANGER identifies the most serious and immediate hazards that will likely result in serious personal injury or death if instructions, including recommended precautions, are not followed. WARNING WARNING identifies hazards or unsafe practices that can result in serious personal injury or death if instructions, including recommended precautions, are not followed. CAUTION CAUTION identifies hazards or unsafe practices that can result in minor personal injury if recommended precautions are not followed. NOTICE NOTICE identifies important procedures or requirements that can result in product or property damage if instructions are not followed. Following Safety Instructions If you do not understand any portion of this instruction sheet and need assistance, contact your nearest S&C Sales Office or S&C Authorized Distributor, or call S&C Headquarters at (773) 338-1000, Monday through Friday between 8:30 AM and 5:00 PM Central Standard Time. (In Canada, call S&C Electric Canada Ltd. at (416) 249-9171, Monday through Friday between 8:00 AM and 5:00 PM Eastern Standard Time.) NOTICE Read this instruction sheet thoroughly and carefully before installing or operat ing your S&C Regulator Bypass Switch. Replacement Instructions and Labels It is important that any missing, damaged, or faded labels on the equipment be replaced immediately. Replacement labels are available by contacting your nearest S&C Sales Office, S&C Authorized Distributor, S&C Headquarters, or S&C Electric Canada Ltd. 4 S&C Instruction Sheet 841-500

Inspection and Handing Inspection Handling Examine the shipment for external evidence of damage as soon after receipt as possible, preferably before removal from the carrier s conveyance. Check the bill of lading to make sure that all shipping skids, crates, and containers listed thereon are present. If there is visible loss and/or damage: 1. Notify the delivering carrier immediately. 2. Ask for a carrier inspection. 3. Note condition of shipment on all copies of the delivery receipt. 4. File a claim with the carrier. If concealed damage is discovered: 1. Notify the delivering carrier within 15 days of receipt of shipment. 2. Ask for a carrier inspection. 3. File a claim with the carrier. Also notify S&C Electric Company in all instances of loss and/or damage. Remove the regulator bypass switch from the shipping carton or crate, taking care not to lift it by the s, live parts, or pull-ring. S&C Instruction Sheet 841-500 5

Installation Installing the Regulator Bypass Switch Before Starting NOTICE This instruction sheet ONLY describes the procedure for installing, operating, and maintaining the S&C Regulator Bypass Switch. Refer to the documentation supplied with your voltage regulator or other device before installing your S&C Regulator Bypass Switch. Step 1 Hoist the regulator bypass switch and bolt it into position on the pole or supporting structure. The bypass switch is designed to be installed in-line with the voltage regulator in the positions shown in Figures 1 and 2, with the pullring at the top. If necessary, shim the base to eliminate any distortion caused by irregularities in the supporting structure. When installing, observe the correct electrical and operational clearance in front of the bypass switch for your application. Step 2 Verify the presence of the contact lubricant applied at the factory to both the jaw and hinge contact surfaces and that this lubricant is still free of contaminants. If necessary, clean the contact surfaces with a nontoxic, nonflammable solvent and apply a fresh coating of lubricant (S&C Part Number 9999-043, Shell Gadus S2 U1000 2 or equivalent). Step 3 Make the electrical connection between the source terminal of the regulator bypass switch and the source side of the voltage regulator and the load terminal of the regulator bypass switch and the load-side of the voltage regulator. See Figures 1 and 2. If you are using aluminum conductors, be sure to wirebrush them and apply a coating of oxidation inhibitor (No- Ox-Id A Special or equivalent) before inserting them into the connectors. Step 4 For Type NL Regulator Bypass Switches: Before placing the Type NL Regulator Bypass Switch into service, open the bypass. The bypass should remain in the open position when the voltage regulator is energized. Remember to return the bypass of the Type NL Regulator Bypass Switch to the open position after performing the Checking Operation procedure detailed in Step 5. Source terminal Bypass Mounting holes Disconnect Load terminal Figure 1. Type XL Regulator Bypass Switch. Source terminal Mounting holes Disconnect Bypass Voltage regulator terminals Pull-ring Voltage regulator terminals Load terminal Figure 2. Type NL Regulator Bypass Switch. 6 S&C Instruction Sheet 841-500

Installation Step 5 Checking Operation Before placing the bypass switch into service, check the interrupter to verify that critical -to-interrupter clearances are as shown in Table 1 on page 8. (a) When the interrupter is in the closed position, the main contacts should be fully closed. On Type NL Switch Blades, the will rest against the stop. See Figure 3a. On Type XL Switch Blades, the stationary contact will protrude approximately ¼ inch from the contacts. See Figure 3b. (b) The interrupter should be centered between the two halves of the interrupter, with equal clearance on either side. See Figure 4a and 4b. (c) Check the gap between the interrupter housing and the shunt contact on the assembly. (See Table 1, Dimension A on page 8.) NOTICE There should be a gap between the interrupter housing and the shunt contact. Without a gap between the shunt contact and the interrupter housing contact in the closed position, it is possible for load current to continuously flow through the interrupter. The interrupter is designed for intermittent duty ONLY. Energizing a switch without proper clearance will overheat the interrupter causing the switch to malfunction. Blade Stop Figure 3a. Type NL Regulator Bypass Switch. Check that each is against the stop. (Type NL Blade shown, Disconnect and Bypass Blades similar.) Stationary contact Blade contacts (d) Check the gap between the -closing lever and the interrupter-closing cam. (See Table 1, Dimension B on page 8.) (e) Open the switch so the shunt contact is engaged with the interrupter housing contact. Check the distance between the opening cam and opening lever. (See Table 1, Dimension C on page 8.) (f) From the closed position, slowly open the interrupter switch until the is just about to separate from the stationary contact. At this point, the shunt contact should touch the interrupter housing contact. See Figures 5a and 5b on page 9. Figure 3b. Type XL Regulator Bypass Switch. Check that the stationary contacts are visible through the contacts. The stationary contact will protrude approximately ¼ inch from the contacts. S&C Instruction Sheet 841-500 7

Installation Figure 4a. Type NL Blade. Check to make sure the interrupter is centered between both sides of the interrupter. Figure 4b. Type XL Blade. Check to make sure the interrupter is centered between both sides of the interrupter. TABLE 1 INTERRUPTER INSPECTIONS C B A Model Voltage, kv Dimension A Dimension B Dimension C Type XL Regulator Bypass Switch Type NL Regulator Bypass Switch 14.4 ⅛-inch 3 16-inch (max.) 3 16-inch (max.) 25 ⅛-inch 3 16-inch (max.) 3 16-inch (max.) 14.4 3 16-inch 3 16-inch (max.) ⅛-inch (max.) 25 3 16-inch 3 16-inch (max.) ⅛-inch (max.) 8 S&C Instruction Sheet 841-500

Installation Stationary contact Shunt contact housing contact Figure 5a. Type NL Bypass Switch. Check that the shunt contact is touching the interrupter housing contact BEFORE the separates from the stationary contact. Stationary contact housing contact Blade Shunt contact Figure 5b. Type XL Bypass Switch. Check that the shunt contact is touching the interrupter housing contact BEFORE the separates from the stationary contact. S&C Instruction Sheet 841-500 9

Operation NOTICE Open and move the voltage regulator tap changers to the neutral position before operating the regulator bypass switch. Operating the regulator bypass switch before opening and moving the tap changers to the neutral position may cause a short circuit in the voltage regulator s series winding. XL Switch Operation Type XL Regulator Bypass Switches provide built-in mechanical interlocking and sequencing. One pull-ring is used to open the switch. During the opening stroke, the bypass closes first, bypassing the regulator without interrupting service to the load. Then the disconnect opens the regulator series winding. Finally, the interrupter opens, interrupting the shunt-winding magnetizing current and isolating the regulator from the line. Figure 6. Use a conventional insulated hookstick fitted with a heavy-duty hook-tool such as the S&C Substation Prong. Before Operating To open and close the bypass switch using the hookstick ring, use a conventional insulated hookstick or S&C Universal Pole and Pole Extension (if required) fitted with a heavy-duty hook-tool such as the S&C Substation Prong or equivalent. Step 6 To Open: Using a vigorous downward force, pull the hookstick ring until the interrupter is in the fully open position, 90 degrees from the closed position. Be prepared to apply additional force when the interrupter engages with the interrupter. Support the interrupter with the hookstick through its full travel. The operation is automatically sequenced as shown in Figure 7 on page 12. To Close: To close the bypass switch and restore the regulator to service, engage the hookstick ring with the substation prong and push the interrupter firmly back into the jaw contact. 10 S&C Instruction Sheet 841-500

Operation NL Switch Operation The Type NL Regulator Bypass Switch is manually sequenced. The center bypass is in the normally open position while the voltage regulator is energized. The voltage regulator is bypassed by operating the bypass, disconnect, and interrupter s in sequential order. See Figure 8 on page 13. Before Operating To open and close the bypass switch hookstick rings, use a conventional insulated hookstick or S&C Universal Pole and Pole Extension (if required) fitted with a heavy-duty hook-tool such as the S&C Substation Prong or equivalent. Step 7 To Open: (a) Engage the hookstick-mounted substation prong with the hookstick ring of the bypass. Using a vigorous upward push, close the bypass into the bypass jaw contacts. This prevents interruption of service to the load. (b) Using a vigorous downward force, pull the hookstick ring on the disconnect until the disconnect is fully-open. This opens the voltage regulator series winding. (c) Using a vigorous downward force, pull the hookstick ring of the interrupter down until the interrupter is fully-open. Be prepared to apply additional force when the interrupter engages the interrupter. Support the interrupter with the hookstick through its full travel. This will interrupt the shunt-winding magnetizing current, isolating the regulator from the line. To Close: (a) Engage the hookstick-mounted substation prong with the hookstick ring on the interrupter. Using a vigorous upward push, close the interrupter into the load-side jaw contact. (b) Engage the hookstick-mounted substation prong with the hookstick ring on the disconnect. Using a vigorous upward push, close the disconnect into the source-side jaw contact. (c) Using a vigorous downward force, pull the hookstick ring on the bypass until the bypass is fullyopen, putting the voltage regulator back into service. For testing purposes, the voltage regulator may be bypassed with its shunt winding energized, by closing the bypass and then opening the disconnect. S&C Instruction Sheet 841-500 11

Operation Switch closed. Voltage regulator is energized. Bypass is open; disconnect and interrupter are closed. Switch in early stage of opening stroke. Bypass has closed, making a direct connection between the source and load. Disconnect and interrupter are still closed. Switch in later stage of opening stroke. Disconnect has opened, but voltage-regulator shunt winding is still energized through the interrupter. Switch fully open. Voltage-regulator magnetizing-current interruption has taken place within the interrupter with no external arc or flame. Voltage regulator is de-energized and bypassed. Figure 7. Sequence of operation of Type XL Regulator Bypass Switches. 12 S&C Instruction Sheet 841-500

Operation Disconnect When the voltage regulator is energized the bypass is open; disconnect and interrupter are closed. Bypass First step to isolate regulator: Bypass is closed. Voltage-regulator series winding is now shunted by bypass. Disconnect and interrupter remain in closed position. Second step to isolate regulator: Disconnect is opened-disconnecting the voltageregulator series winding. Bypass is still closed and voltage-regulator shunt winding remains energized through the interrupter. Third step to isolate regulator: is opened and voltage-regulator magnetizing current is interrupted inside the interrupter, with no external arc or flame. Bypass is still closed; disconnect is still open. Figure 8. Sequence of operation of Type NL Regulator Bypass Switches. S&C Instruction Sheet 841-500 13

Maintenance The S&C Type XL and Type NL Regulator Bypass Switches are designed to be low-maintenance devices. S&C Electric Company recommends inspecting the regulator bypass switch during the voltage regulator s normal maintenance cycle. Frequent operation, humidity, pollution, emergency overloading of the line, and lightning strikes may necessitate more frequent inspection. Tools Required: 6-inch metal scale ⅞-inch hex key (Type XL Replacement) ¾-inch box wrench (Type NL Replacement) Optional: Contact lubricant, Shell Gadus S2 1000U 2 (S&C Part Number 9999-043) Steel wool (0#) or fine sandpaper (100 or 120) Wire brush (terminal pad prep) Inspection S&C recommends performing a basic visual and operational inspection of the switch before cleaning, lubrication, or interrupter replacement. Step 8 Visual Inspection: Start with the bypass switch in the fully closed position. (a) Wildlife or Debris. Check the bypass switch and associated voltage regulator for wildlife nests, tree limbs, or debris that could interfere with the dielectric clearance of the switch. Clear away any debris and clean the switch if necessary. (b) Mounting Structure. Check that the mounting structure has not warped (if wooden), settled, or tilted, and that the structure is in overall good condition. Check any mounting bolts, through-bolts, or lag screws used to secure the bypass switch to the structure to make sure they are secure and in good condition. (c) Condition of Bases, Insulators, and Live Parts. Check the insulators, live parts, and base for signs of tracking, flashover, contamination, arc damage, and soot. Also check that the shunt contact is not touching the interrupter housing contact. See Figure 9. If the interrupter housing has been in contact with the shunt contact while the interrupter has been closed and energized, the interrupter should be replaced. Shunt contact Housing contact ⅛ 3 16 inch clearance between shunt contact and interrupter housing contact Figure 9. Check to make sure the shunt contact is not touching the interrupter housing. Replace the interrupter if the shunt contact is touching the interrupter housing. 14 S&C Instruction Sheet 841-500

Maintenance Operation Inspection: Step 9 DANGER Operational Inspection of the regulator bypass switch should ONLY be performed when the regulator bypass switch is de-energized and grounded at both terminals. Follow all applicable safety procedures. Failure to do so may lead to injury or death. Open and close the bypass switch several times. Check that the operation is smooth through the full travel of the switch s, and that the (s) open to 90 degrees, and seat fully against the closed stop when closed. The shunt contact should make firm contact with the interrupter housing contact when closed. Follow the Checking Operation procedure in Step 5 starting on page 7 for a more detailed operational check. Cleaning NOTICE DO NOT power wash the interrupter. Power washing the interrupter may cause excessive water ingress into the interrupter housing. Step 10 The bypass switch may be power washed using water or a non-abrasive dry cleaning method. DO NOT power wash the interrupter. Direct the spray away from the interrupter concentrating on the (s), contacts, and hinges. Make sure to operate the switch after using a dry cleaning method to thoroughly dislodge any particles of the cleaning medium that may have lodged in the contacts. Re-grease the contacts after power washing. See Step 11 for instructions on greasing the contacts. Lubrication Step 11 The contacts should be prepared with the s in the open position before applying lubricant. See Figure 10. (a) Clean off the old grease with a clean, dry cloth. Remove oxidation by lightly polishing the contacts with steel wool or fine grit sandpaper, and wipe excess grit off with a dry cloth. (b) Apply a light coating of non-sulfur-containing contact lubricant such as Shell Gadus S2 1000U 2 or equivalent. Lubrication points (jaw contacts) Figure 10. Clean off old grease with a clean cloth. Polish the contact if necessary. Apply a light coating of Shell Gadus S2 1000U 2 or equivalent. S&C Instruction Sheet 841-500 15

Maintenance Step 12 Replacement DANGER Isolate the bypass switch at the load and line-side terminals and test for voltage. After the switch has been completely isolated, ground both sides of the switch according to standard utility practice. Failure to do so will result in severe injury or death. Opening lever Tube (a) Open the switch. (b) Remove the existing interrupter. Discard the old hardware. (c) Make sure the interrupter is in the open position by pulling the opening lever away from the tube of the interrupter. See Figure 11. (d) Install the replacement interrupter using the bolts and lockwashers furnished. Type XL s use ¼ 20 ⅞-inch button head screws and lockwashers. Type NL use ½ 13 ⅞-inch hex-head cap screws and lockwashers. (e) While opening, verify that the contact and stationary contact are still engaged when the shunt contact first touches the interrupter housing contact. See Figures 5a and 5b on page 9. (f) Slowly close and open the interrupter several times and verify that the dimensions shown in the Checking Operation section starting on page 7 have been achieved. Figure 11. Pull the opening lever away from the tube of the interrupter to place it in the OPEN position. 16 S&C Instruction Sheet 841-500