HDR Engineering. HART North / South. Tampa Bay Applications Group Meeting May 14, 2009

Similar documents
State Avenue Corridor Bus Rapid Transit (BRT)

Waco Rapid Transit Corridor (RTC) Feasibility Study

TBARTA USF to Wesley Chapel Express Bus Service Operating Plan. Draft 3/25/2014

Draft Results and Open House

Metro Transit Update. Christina Morrison, Senior Planner Metro Transit BRT/Small Starts Project Office. John Dillery, Senior Transit Planner

Arterial Bus Rapid Transit. System Policy Oversight Committee April 7, 2014

West Broadway Reconstruction/LRT Design. March 19, 2015

Snelling Bus Rapid Transit. May 13, 2013 Technical Advisory Committee Meeting #1

MBTA Key Bus Route. Community Meeting Route 1 - Boston

METRO Orange Line BRT American Boulevard Station Options

KEY BUS ROUTE IMPROVEMENT PROJECT ROUTE 23 AGENDA

Draft Results and Recommendations

Swift Green Line April 11, 2019

5. OPPORTUNITIES AND NEXT STEPS

WELCOME. Transit Options Amherst - Buffalo Public Workshops

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development

Troost Corridor Transit Study

ARTERIAL BRT OVERVIEW

Point A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report

What IS BRT, Really? Not BRT and RNY

CTfastrak Expansion. Stakeholder Meeting #4 Manchester Town Hall June 3, 2016

Where will. BRT run? BRT will serve 20 stations along the line, connecting to bus routes and serving major destinations. How often will service run?

Northeast Corridor Alternatives Analysis. Public Involvement Round 2 Input on Alternatives for Further Study

Valley Metro Overview. ITE/IMSA Spring Conference March 6, 2014

I-26 Fixed Guideway Alternatives Analysis

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Public Information Workshop

Public Meeting. June 15, :30 7:30 p.m.

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

More than $9 Million coming to Central Valley for transportation

CEDAR AVENUE TRANSITWAY Implementation Plan Update

City of Pacific Grove

Doran Street and Broadway/Brazil Grade Separation Project

MBTA Key Bus Route Improvement Program. Community Meeting Route 66 Allston/Brighton

Jihong Cao, PE, Parsons Brinckerhoff Arnab Gupta, PE, Parsons Brinckerhoff Jay Yenerich, PE, Valley Metro

Restoration of Historic Streetcar Services in Downtown Los Angeles

Bus Rapid Transit: Basic Design for Non-Transit Planners

TPA Steering Committee for Tri-Rail Extension to Northern Palm Beach County. February 26, 2018

I-405 and SR 522/NE 145th Bus Rapid Transit. Elected Leadership Groups Meeting November 30, 2018

Regional Transit Extension Studies. Hampton Roads Transportation Planning Organization Passenger Rail Task Force Meeting December 17, 2013

FINAL DESIGN TRAFFIC OPERATIONS REPORT

Corridor Management Committee. March 7, 2012

Service Quality: Higher Ridership: Very Affordable: Image:

MBTA Key Bus Route Improvement Program. Community Meeting Route 57 - Boston. January 31, 2011 Boston Arts Academy, 174 Ipswich St.

CITY COUNCIL STUDY SESSION UPDATE ON SMART. January 19, 2017 CITY OF SAN RAFAEL

10/4/2016. October 6, Item #1 CITIZENS PARTICIPATION

Railyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017

I-20 EAST TRANSIT INITIATIVE Tier 1 and Tier 2 Alternatives Screening Report EXECUTIVE SUMMARY

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

A Transit Plan for the Future. Draft Network Plan

BUS RAPID TRAN SIT. Institute of Tra nsporta tion Engineers October 17, 2013

Recommendation for 2017 PSRC Funding Transportation Policy Board - June 8, 2017

2030 Multimodal Transportation Study

Downtown Transit Connector. Making Transit Work for Rhode Island

ANDERSON PROPERTY SITE ANALYSIS

Community Outreach Meetings

Background Information about the Metrobus 29 Lines Study

SamTrans Business Plan Update May 2018

Community Advisory Committee. October 5, 2015

Orange Line Bus Rapid Transit (BRT) Improvements San Fernando Valley Service Council April 3, 2019

Mobility Corridor Updates. Transit & Active Transportation Projects

KANSAS CITY STREETCAR

Van Ness Transit Corridor Improvement Project. Engineering, Maintenance and Safety Committee March 25, 2015

East San Fernando Valley Transit Corridor. TAC Briefing December 4, 2013

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION

Multnomah County Commission December 15, 2016

I-26 Fixed Guideway Alternatives Analysis

Transit on the New NY Bridge

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit

Click to edit Master title style

Development and Overview of the NY 5 Bus Rapid Transit Corridor. New York State MPO Conference June 5, 2009

METRO Light Rail Update

DRAFT Subject to modifications

Metro Green Line to LAX Alternatives Analysis. March 2012

IMPROVEMENT CONCEPTS

Metro Transit Arterial Transitway Corridors Study

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

BUS STOP DESIGN & PLANNING GUIDE

Colorado Association of Ski Towns August 26, 2016

North Shore Alternatives Analysis. May 2012

Update on Bus Stop Enhancements

Restoration of Historic Streetcar Services in Downtown Los Angeles

A Presentation to: Project Advisory Group Meeting #10

East Bay Bus Rapid Transit Project. Downtown Oakland to San Leandro International Blvd to East 14 th St

PASCO COUNTY Transit Infrastructure Design Manual

VAN NESS AVENUE BUS RAPID TRANSIT

Basic Project Information

Madison BRT Transit Corridor Study Proposed BRT Operations Plans

Letter EL652 City of Mercer Island. Page 1. No comments n/a

Kendall Drive Premium Transit PD&E Study

Denver Metro Association of Realtors

Business Advisory Committee. July 7, 2015

Draft Station Plan. Tuesday, November 17th

VIRGINIA RAILWAY EXPRESS MANASSAS PARK STATION PARKING EXPANSION. Site Evaluation & Recommendation. October 18, 2016

Puyallup Station Access Improvements Project

COMMUNITY REPORT FISCAL YEAR We are making progress, are you on board? GOLD COAST TRANSIT DISTRICT

Transcription:

HDR Engineering HART North / South BRT Corridor PD&E Tampa Bay Applications Group Meeting May 14, 2009 1

Agenda Update on Project Development and Environment (PD&E) Study Project Overview System Branding or Identity Preferred Station Concepts and Locations Project Schedule including Upcoming Activities 2

Public Involvement Agency Coordination Meeting November 14, 2008 Public Meeting November 18, 2008 & May 12, 2009 Community Working Group Meetings January 27, 2009 & April 28, 2009 Agency Working Group Meetings January 27, 2009 & April 28, 2009 Traffic Working Group Meetings June 6, 2008 December 15, 2008 March 16, 2009 Small Group Meetings held on request 3

Project Overview BRT service from Marion Transit Center to Future Park & Ride near Hidden River / Telecom Park area of I-75 Limited stops, higher frequency, modern station stops and advanced technology Improve ridership and attract t choice-riders with autocompetitive travel times 4

Project Overview Length: 17.5 miles Stations: 26 each way (Not including Marion Street Transitway, Telecom / Hidden River or Park & Ride) Jurisdictions: 4 FDOT Hillsborough County City of Tampa City of Temple Terrace 5

Project Overview PD&E Study Underway Draft Preliminary Engineering Report (PER) Completed and Submitted for Review Evaluated and Identified Station Locations and Footprints Evaluated and Identified Station Potential Impacts to R/W, Utilities, Access, etc. Evaluated Queue Jump Lanes Estimated Project Costs Available on HART s Website: http://www.gohart.org Obtain Project Approvals Document for Final Design Activities 6

Project Overview Concurrent Traffic Analysis Completed Data Collection Activities Determined Design Traffic for Use in Analysis Developed TSP Operating Parameters Building VISSIM Model Modeling Route for Time Savings / Impacts Determining Hardware / Software Capabilities and Potential Modifications Developing Timing Plans for Intersections 7

Project Overview BRT Service Plan 14 hour service 5:30 am to 7:30 pm - tentatively 10 minute headways peak 15 minute headways non-peak Weekday service Local Service Route 2 30 minute headways Service: 20.5 hrs - 4:30 am to 12:45 am UATC to Park & Ride under consideration 20% (Estimated) Time Savings with TSP and limited stops! 8

Station Prototypes Three Station Prototypes Ridership Amenities Basic Features Benches Shelter w/ lighting Totem w/ Real Time Travel Information Bicycle Racks Trash Receptacles Large Stations News Kiosks Ticket Vending Machines 9

BRT Branding / Identity Stations and Vehicles will be unique to the corridor System will be identified as MetroRapid Fares will be same as existing HART routes 10

BRT Branding / Identity Preliminary Concepts Gillig BRT 40 + Length Interior and Exterior Styling ADA Accessible Low Floor Bicycle Racks Colors (to be determined) 11

BRT Branding / Identity Conceptual Design: Materials, Colors, Graphics to be determined 12

Station Location Alternatives Evaluation Criteria Stop Type (Near or Far Side) Distance to Intersection Right-of-Way Requirements Right-of-Way Costs Property Access Impacts ADA Accessibility Adjacent Property Types Land Use Compatibility Known Historical Site Impacts Potential Contamination 13

Station Location Alternatives Evaluation Matrix 14

Preferred Station Concept Right-of-Way Impacts Access Impacts Environmental Impacts Construction Costs Right-of-Way Costs Bus Bay 15

Preferred Station Concept Prototype A Stations 15 Locations Kennedy Blvd / Pierce St. Twiggs St. Estelle St. Columbus Dr. Lake Ave. Hanna Ave. Mid Block Pedestrian Crossing Sligh Ave. Broad St. Linebaugh Ave. 109 th Ave. 131 st Ave. 15 th St. EB Bus Bay 22 nd St. EB Bus Bay 50 th St. Bus Bays & Sidewalk Improvements 56 th St. Bus Bays & Pedestrian Signal Upgrades 16

Preferred Station Concept Prototype B Stations 5 locations Jackson St. / Pierce St. E21 st Ave / Floribraska Ave. Busch Blvd. Magnolia Dr. Bus Bays Palm Dr. / 42 nd St. Bus Bays & Sidewalk Improvements 17

Preferred Station Concept Prototype C Stations 6 Locations Marion Transit Center MLK Blvd. Hillsborough Ave. Waters Ave. Fowler Ave. / Nebraska Ave. NB Bus Bay & SB Site provided by developer University Area Transit Center 18

Telecom Park Stops will be traditional shelter / bench Directional service Outbound AM Inbound PM 19

Hidden River Corporate Park Park & Ride in Area near I-75 with BRT Station Separately Funded Additional Stops Utilize Existing Bus Bays Will be traditional shelter / bench 20

Opinion of Probable Costs Construction Total Cost Design and Transit Signal Priority (TSP) $ 2,976,500 Station Civil Construction $ 18,304,989 Pedestrian Crosswalks $ 238,500 Construction Subtotal $ 21,519,989 Construction Fully Funded through Right-of-Way Station Right-of-Way Right-of-Way Subtotal Engineering & Design Services PD&E Services Traffic & TSP Analysis Final Design Services (Est.) Construction Engineering & Inspection (Est.) Engineering & Design Services Subtotal $ $ 4,241,500 Hillsborough 4,241,500 County Project Subtotal $ 25,761,489 Transportation Task Force Project Total (TTF Funding) LS $ 671,000 LS $ 624,000 LS $ 2,500,000 LS $ 800,000 $ 4,595,000 $ 30,356,489 Capital Equipment Unit Price Quantity Bus Vehicles (40 ft Gillig) $ 450,000 17 $ 7,650,000 Capital Equipment Total (Federally Funding) $ 7,650,000 21

Next Steps / Schedule PD&E Complete End of June 2009 Design Initiated July 2009 Traffic Analysis Completed October 2009 Begin Operations Mid 2011 22

Questions? 23