BASIC TROUBLESHOOTING START / STOP PUSHBUTTONS, PILOT LIGHTS, RELAYS, TIMER LIMIT SWITCHES, FLOW SWITCHES, THERMAL SWITCHES, AND OVERLOAD RELAYS.

Similar documents
An unwritten rule says that when a. Cures for a sick spot welding machine. Figure 1. To test the secondary of the welding machine,

PROCESS ELECTRONICS CORPORATION

PROCESS ELECTRONICS CORPORATION

Automatic taper of charge rate for superior battery life through good equalization of cells and low water use rate.

(For serial numbers before w/ analog control)

ENERGY SMART TROUBLESHOOTING

Cutler-Hammer. Instructions for Installation, Operation, and Maintenance of the AMPGARD Reduced Voltage Soft Starter

SERVICE MANUAL (INTERNATIONAL)

Yaskawa Electric America Unit Troubleshooting Manual Section One: Introduction & Checks Without Power GPD 506/P5 and GPD 515/G5 (0.

SALDET SALES & SERVICE, INC. CLINTON TOWNSHIP, MICHIGAN

331-SV. User Manual THREE PHASE DUPLEX LIFT STATION CONTROL PANEL WITH STATIONVIEW CONTROLLER. Ashland, OH

TS-E TURBO STEAM ELECTRIC COUNTERTOP CONVECTION STEAMER PARTS AND SERVICE MANUAL

Maintenance Manual 13 AMPERE POWER SUPPLY 19A704647P1-P3. Mobile Communications LBI-31801C

This chapter contains information on DC Generation, External Power, and Electrical Load Distribution.

Model 930 Power Control System Instruction Manual

Electric Motor Controls BOMA Pre-Quiz

Electrical Motor Controls Chapter 4 (Fourth Edition) Chapter 2 (Fifth Edition)

CHARGING SYSTEM 7.7 GENERAL TROUBLESHOOTING. Alternator. Voltage Regulator. Battery. Wiring. Voltage Regulator Inspection HOME

ELECTRICAL. Contents - Wiring Diagrams

B-03 ELECTRICIAN TRAINING SKILL DEVELOPMENT GUIDE

THE ALT AL ERNA RN T A OR

Temperature Controllers

Temperature Controllers

INDEX Section Page Number Remarks

MINE CHARGER INSTALLATION AND OPERATION MANUAL MODEL NUMBERS: MSP MSQ MSR MSS

Thyristor Power Controllers for Resistive and Inductive loads (Product Code 21.3)

STARTING SYSTEM TEST STARTING SYSTEM

SERVICE MANUAL (DOMESTIC)

MaxPak Plus Analog DC V S Drive

Illustrated Parts List for GPU-400

3.0 CHARACTERISTICS E Type CO-4 Step-Time Overcurrent Relay

SX-16 Nightsun Searchlight Safety and Service Bulletin # SL

WARRANTY WILL BE VOID If These Steps are Not Performed Before Installing The Control STEPS TO PERFORM BEFORE CONTROL INSTALLATION

MODEL ELC-12/40-CVM-D BATTERY CHARGER

ST Charger. Industrial Battery Charger

ECET 211 Electric Machines & Controls Lecture 6 Contactors and Motor Starters. Lecture 6 Contactors and Motor Starters

SDC,Inc. SCR-Regenerative Ac Drive

Application Engineering

AFM500X Automatic Flashing Module

APPENDIX B SPECIFICATION FOR GENERATOR OVERHAUL EMD MODEL AR10 D18... B-1

OnCommand Troubleshooting Guide Hayward Industries

LED Downlight Ceiling Fixtures

DCT SERIES CASE SIZE 3A FILTERED BATTERY CHARGER 12V/200A 24V/ A 48V/100A 120V/50A 240V/25A OPERATION & MAINTENANCE GUIDE

ABB ! CAUTION. Type KRV Directional Overcurrent Relay E 1.0 APPLICATION 2.0 CONSTRUCTION AND OPERATION. Instruction Leaflet

24-00 ELECTRICAL POWER

SERVICE MANUAL IMPINGER COUNTERTOP OVEN MODEL 1300 SERIES

The Z Series. SCR Power controllers for resistance heating applications. Zero-Fired SCR Power Controllers AMPS VAC

Electricity Course. Part B Course Outline

RoadRelay 4. Installation Guide

2. AC SERVICE AND MOTOR REQUIRED 1. ENCLOSURE REQUIRED

0500 Low Voltage on the Battery or Dead Cell in the Battery

2.0 CONSTRUCTION AND OPERATION 3.0 CHARACTERISTICS K. CO (HI-LO) Overcurrent Relay

AIR CLEANERS Model MC 3000 OWNER S MANUAL CAUTION Read complete instructions before operating. Please file for future reference.

OPERATIONS AND APPLICATIONS MANUAL MODEL NUMBER PM6. 6 KV DC HIGH POTENTIAL TESTER WITH MEGOHMMETER Version 2.0

1/4HP - 7.5HP 120/240/277 VOLTS 50/60HZ

TRIPLETT. Model 310 Type C Type 9. Test Equipment Depot Washington Street, Melrose, MA TestEquipmentDepot.

Installation and Construction Notes for EVSE4

R820 REV2 SERIES SCR POWER CONTROLS NOVEMBER 2017

2008 Toyota RAV ELECTRICAL Charging (2AZ-FE) - RAV4

XENON POWER SUPPLY for 10 kw Britelight Lamphead

VoltPro VP4 Automatic Voltage Regulator

Tri-Spark Ignition System Installation Triple Cylinder TRI-0001

ARC 1850 LIST OF FIGURES

ALTERNATOR PRECAUTIONS. Some precautions should be taken when working on this, or any other, AC charging system.

Series 20 Installation Instructions

UBC Technical Guidelines Section Edition Commissioning of Electrical Systems Page 1 of 5

WAKEFIELD THERMAL SOLUTIONS ASSEMBLY PROCEDURE FOR PRECISION COMPRESSION MOUNTING CLAMP SYSTEMS

A3Z OPERATING MANUAL

L. Photo. Figure 2: Types CA-16 Relay (rear view) Photo. Figure 1: Types CA-16 Relay (front view)

ASSEMBLING A PX-5650 PX-5RD REAR HOUSING ASSEMBLY WITHOUT STATOR

2015 EDITION SUBMERSIBLE MOTORS AIM MANUAL. APPLICATION INSTALLATION MAINTENANCE 60 Hz, Single-Phase and Three-Phase Motors. franklinwater.

Film-Tech. The information contained in this Adobe Acrobat pdf file is provided at your own risk and good judgment.

Troubleshooting Bosch Proportional Valves

INSTALLATION, OPERATION & MAINTENANCE SERIES ABC11B-120-XX BATTERY CHARGERS

Ensuring the Safety Of Medical Electronics

CONTROL FEATURES AVAILABLE OPTIONS

Film-Tech. The information contained in this Adobe Acrobat pdf file is provided at your own risk and good judgment.

Reproduction. Not for ADVANCE PRODUCT SERVICE INFORMATION INFORMATION BULLETIN NO: 36 DATE: 11/27/02 SUBJECT: POWERLINK SYSTEM

Troubleshooting Flowcharts

Chapter 8. Understanding the rules detailed in the National Electrical Code is critical to the proper installation of motor control circuits.

Pressure Makeup Jockey Pump Controller

DC Variable Speed Drive Panel

A6Z OPERATING MANUAL

A2P Single Phase Automatic Industrial Battery Charger

ETP-5E & ETP-10E ECO-TECH PLUS ELECTRIC CONVECTION STEAMER PARTS AND SERVICE MANUAL

SDM72 Start on Demand Modules

Design Standard. Purpose: Design Standard:

Control. Part B, Section 2. This section covers the following unit configurations. 3400V 3500V. Voltage 4. Pump Piston (E, F, G)

Kinetics Industries Inc. 140 Stokes Ave. Trenton, NJ Fax

C.E. Niehoff & Co. C653/C653A and C625 Alternators Troubleshooting Guide NOTICE. Hazard Definitions. Battery Charge Volt and Amp Values

Electrical Systems. Introduction

Phase 1 Workshop Home Study Guide

Motor Drives Training System (Stand-Alone, 120 V Version) (8036-C0)

Installation and Maintenance Instructions. World Leader in Modular Torque Limiters. PTM-4 Load Monitor

System 350 P352AB Electronic Pressure Control Series

High Speed Fuses. Section Contents Page

SERVICE MANUAL (INTERNATIONAL)

SECTION DC POWER SUPPLY/BATTERY CHARGER

User s Manual. ACH550-CC/CD Packaged Drive with Classic Bypass Supplement for ACH550-UH HVAC User s Manual

Application Engineering

Transcription:

BASIC TROUBLESHOOTING FOUR BASIC BUILDING BLOCKS OF A PLATING RECTIFIER: 1. ELECTRICAL CONTROLS 2. AC POWER CIRCUITS 3. DC POWER CIRCUITS 4. ELECTRONIC CONTROL 1. ELECTRICAL CONTROLS START / STOP PUSHBUTTONS, PILOT LIGHTS, RELAYS, TIMER LIMIT SWITCHES, FLOW SWITCHES, THERMAL SWITCHES, AND OVERLOAD RELAYS. TYPICALLY WIRED ON 120 V.A.C.; CHECK WITH VOLTMETER. 2. AC POWER CIRCUITS INPUT LINE (TONG TEST) FOR BALANCE CHECK SINGLE PHASING OR LOSS OF FUSE SCR S LOCATED IN THE PRIMARY VARIABLE AUTO-TRANSFORMERS TAP SWITCHES POWER TRANSFORMER 3. DC POWER CIRCUITS SILICON DIODES / FUSES; SHORTED OR OPEN SECONDARY SCR S / FUSES BALANCED / SHARING LOAD CHECK OUTPUT WAVEFORM / RIPPLE 4. ELECTRONICS MEASURE SIGNAL OR CONTROL VOLTAGES SCR GATE DRIVE VOLTAGE & CURRENT REGULATOR BASIC TROUBLESHOOTING WHEN TROUBLESHOOTING A PLATING PROBLEM, YOU MUST FIRST DETERMINE IF, IN FACT, THE RECTIFIER IS AT FAULT. QUITE OFTEN THE PLATING BATH S CHEMICALS, BUS, RACKING, ETC., ARE AT FAULT.

EXAMPLE: A COMMON PLATING PROBLEM IS LOW DC AMPERAGE DRAW. IF THE RECTIFIER CAN DELIVER RATED NAMEPLATE DC VOLTAGE, THE PROBLEM MOST LIKELY IS EXTERNAL OF THE RECTIFIER. EXAMPLE: INTERMITTENT PLATING DEFECTS. RECTIFIERS, AS A RULE, ARE EITHER GOOD OR BAD. VERY SELDOM WILL THEY OPERATE INTERMITTENTLY. GENERAL RULE OF THUMB: LOW DC CURRENT DRAW; FAULT IS EXTERNAL OF RECTIFIER LOW DC VOLTAGE OUTPUT; FAULT IS IN THE RECTIFIER PLATING DEFECTS: COULD BE EITHER THE RECTIFIER OR THE BATH, OR A COMBINATION OF BOTH. ONCE THE PROBLEM HAS BEEN DETERMINED TO BE IN THE RECTIFIER, YOU MUST ISOLATE THE PROBLEM INTO ONE OF THE FOUR BASIC BLOCKS. IT IS POSSIBLE THAT YOU MAY HAVE FAULTS IN MORE THAN ONE BLOCK AT THE SAME TIME. KEEP AN OPEN MIND WHEN TROUBLESHOOTING RECTIFIERS. BASIC TEST EQUIPMENT NEEDED: 1. FLASHLIGHT CONTINUITY TESTER 2. AC CLAMP ON AMP METER 3. DIGITAL VOLT METER 4. SOLENOID WIGGINS TESTER 5. 0 SCOPE MAJORITY OF TROUBLESHOOTING SHOULD BE DONE LIVE, UNDER A LOAD OF APPROXIMATELY 25% TO 50%. TROUBLESHOOTING HINTS: 1. NEVER USE AN OHM METER TO TEST FUSES. USE A CONTINUITY FLASHLIGHT WHEN DEAD, OR SOLENOID VOLT TESTER WHEN LIVE. 2. IF DIODES ARE ALREADY IN THE RECTIFIER, TEST WITH AN AC AMP PROBE UNDER LOAD. (DON T DISCONNECT AND TEST WITH AN OHM METER).

3. TEST SCR S WITH A CONTINUITY FLASHLIGHT TESTER. (THIS IS A GOOD FIELD TEST, BUT NOT ALWAYS CONCLUSIVE). 4. ONCE RECTIFIER REPAIRS HAVE BEEN COMPLETED, ALWAYS AC CLAMP TEST (UNDER LOAD) THE AC LINES, SCR S OR TAP SWITCHES AND DIODES. THEY SHOULD BE BALANCED AND EQUAL. 5. ONCE THE RECTIFIER IS BACK IN OPERATION, MONITOR IT FOR A FEW HOURS; WATCH FOR EXCESSIVE HEAT, AC BALANCE AND OUTPUT RIPPLE. PREVENTATIVE MAINTENANCE: 1. GENERAL OPERATIONAL CHECK EVERY 30 DAYS. 2. BLOW OUT RECTIFIER WITH COMPRESSED AIR EVERY 6 MONTHS. 3. LUBRICATE CONTACTORS, RELAYS, CONTROL POTS, SWITCHES, ETC., WITH L.P.S. EVERY 12 MONTHS 4. CLAMP TEST (UNDER LOAD) THE AC LINES, DIODES, SCR S OR TAP SWITCHES EVERY 12 MONTHS 5. CHECK OUTPUT METER ACCURACY EVERY 12 MONTHS 6. WATER COOLED RECTIFIERS SHOULD BE ETCH-CLEANED EVERY 24 MONTHS. THIS INCLUDES THE INDIRECT COOLING STYLE RECTIFIERS. BASIC REPAIRS: CAREFULLY MARK ALL CONNECTIONS TO THE DEFECTIVE DEVICE BEFORE REMOVAL. SCR S & DIODES: SCR S ARE TYPICALLY FOUND IN MODULAR, STUD MOUNT AND FLAT PACK CONFIGURATIONS, WHILE DIODES ARE USUALLY THE STUD MOUNT OR FLAT PACK STYLE. THE REPLACEMENT PROCEDURES FOR STUD MOUNT AND FLAT PACK SCR S AND DIODES ARE VIRTUALLY IDENTICAL; WITH THE DIFFERENCE BEING THAT SCR S WILL HAVE TWO ADDITIONAL SMALL LEADS TO BE ATTACHED. TO REPLACE A MODULAR SCR, PERFORM THE FOLLOWING STEPS: 1. NOTE WHERE THE GATE AND INPUT / OUTPUT LEADS ARE ATTACHED. 2. MARK THE LEADS AND REMOVE THE SCR. 3. CLEAN THE BUS BAR SURFACE AND THE NEW SCR SURFACE.

4. APPLY HEAT SINK COMPOUND SPARINGLY TO BOTH SURFACES. 5. FASTEN THE NEW SCR TO THE BUS BAR. 6. REATTACH THE LEADS. REPLACEMENT IS NOW COMPLETE. STUD MOUNT SCR S AND DIODES: STUD MOUNT DEVICES CAN BE MOUNTED ON EITHER AIR OR WATER COOLED HEAT SINKS AND ARE TYPICALLY FOUND WITH ½ OR ¾ DIAMETER STUDS. REPLACEMENT OF STUD MOUNT DEVICES IS THE SAME FOR BOTH AIR AND WATER COOLED SYSTEMS, FOLLOWING THE STEPS BELOW: 1. MARK AND REMOVE THE TWO SIGNAL LEADS FROM THE TERMINAL BLOCKS (SCR). ONE OF THESE IS THE GATE LEAD AND THE OTHER IS THE CATHODE SIGNAL LEAD. 2. REMOVE THE LARGE BRAIDED CABLE. 3. REMOVE THE NUT AND WASHERS AND REMOVE THE DEVICE FROM THE HEAT SINK. 4. CLEAN THE BUS BAR AND THE NEW SCR SURFACES. 5. SPREAD A SMALL AMOUNT OF THERMAL COMPOUND ON THE NEW SCR, TAKING CARE NOT TO GET ANY COMPOUND ON THE SCR THREADS. 6. INSERT THE STUD IN THE HEAT SINK, REASSEMBLE THE FLAT WASHER, THE STAR WASHER AND THEN TIGHTEN THE RETAINING NUT. 7. ATTACH ALL LEADS TO THE PROPER LOCATIONS, BEING SURE THAT ALL CONNECTIONS ARE TIGHT. FLAT PACK SCR S AND DIODES: SOMETIMES REFERRED TO AS HOCKEY PUCKS, THESE ARE USED IN HIGHER POWER RECTIFIERS. THEY RANGE FROM 2 THROUGH 4 IN DIAMETER. AS WITH STUD MOUNT DEVICES, THE ONLY DIFFERENCE BETWEEN A FLAT PACK SCR AND DIODE IS THE PRESENCE OF GATE AND CATHODE LEADS ON THE DEVICE. A FLAT PACK DEVICE IS SECURED BETWEEN TWO CURRENT-CARRYING BUS BARS BY A CLAMPING MECHANISM. SOME CLAMPS HAVE INDICATORS BUILT IN, WHILE OTHERS DO NOT. WHEN REPLACING A DEVICE SECURED WITH A GAUGED CLAMP, NOTE THE READING BEFORE REMOVING THE DEVICE. THE OTHER TYPE OF CLAMPS USED ARE EITHER 5,000 OR 10,000 POUND CLAMPS. THESE SYSTEMS CONSIST OF A PAIR OF CLAMPING BARS, CONNECTED BY TWO STUDS, BETWEEN WHICH IS SANDWICHED THE BUS BARS, A BELVILLE WASHER

SYSTEM, AND THE SEMICONDUCTOR DEVICE. REPLACEMENT OF SCR S OR DIODES UTILIZING THESE TYPES OF CLAMPS REQUIRES THE USE OF MEASURING DEVICES. THE FOLLOWING STEPS SHOULD BE TAKEN TO REPLACE A FLAT PACK SCR OR DIODE. 1. NOTE THE CLAMPING ARRANGEMENT BEING USED. IF A GAUGE IS PRESENT ON THE CLAMP, RECORD THE INDICATION. MARK AND REMOVE THE GATE AND CATHODE LEADS IF REPLACING AN SCR. 2. UNIFORMLY AND SLOWLY LOOSEN THE NUTS ON THE CLAMP STUDS. REMOVE THE BELVILLE WASHER ASSEMBLY AND THE DEVICE. NOTE THAT THE BELVILLE WASHER IS MADE UP OF FOUR PARTS; A CENTERING SECTION, A FLAT WASHER, AND TWO CONCAVE WASHERS. 3. CLEAN THE SURFACES OF BOTH BUS BARS AND THE NEW SCR OR DIODE. CLEAN BOTH CLAMPING BARS AND CHECK THAT THE INSULATED SURFACES OF THE CLAMP HAVE NOT BEEN DAMAGED. 4. APPLY HEAT SINK COMPOUND SPARINGLY TO BOTH SURFACES OF THE DEVICE AND THE BUS BARS. 5. PLACE THE NEW FLAT PACK IN THE CLAMPING MECHANISM, ENSURING THAT THE DEVICE IS ORIENTED PROPERLY. CHECK THE OTHER DEVICES TO VERIFY THIS. THERE ARE TYPICALLY ROLL PINS IN THE BUS BARS THAT ALIGN DEPRESSIONS IN THE DEVICE. MAKE SURE THE ROLL PINS DO NOT DAMAGE THE FLAT PACK SURFACES. 6. FINGER TIGHTEN THE CLAMP NUTS, ENSURING ALL PARTS ARE SITUATED PROPERLY, AND THEN TIGHTEN THE NUTS WITH A WRENCH ONE-QUARTER ADDITIONAL TURN. CHECK THAT APPROXIMATELY THE SAME NUMBER OF THREADS ARE VISIBLE BEYOND THE NUTS ON EACH STUD. 7. USING A DEPTH GAUGE, MEASURE THROUGH THE CENTER OF THE HOLE IN THE BUS BAR AND BELVILLE WASHER SYSTEM. NOTE THIS READING. 8. TIGHTEN EACH NUT ONE-HALF TURN AND THEN RECHECK WITH THE DEPTH GAUGE. CONTINUE THIS TIGHTENING PROCEDURE UNTIL THE DIFFERENCE FROM THE ORIGINAL READING IS 0.048 +/- 0.004 FOR A 10,000 POUND CLAMP, AND 0.026 +/- 0.002 FOR A 5,000 POUND CLAMP. 9. REATTACH THE GATE AND CATHODE SCR LEADS.