THE CARMONY BUILDING ELECTRICAL SYMBOLS AND ABBREVIATIONS NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED ELECTRICAL SYMBOLS AND ABBREVIATIONS

Similar documents
E1.1. Ebert Norman Brady. Architects ELEC. LEGEND & GEN NOTES ST. JOHNS COUNTY BUILDING SERVICES. Simes & Rosch, LLC PROJECT GENERAL NOTES

M-1.0 FILE NAME: CAFE BIZOU CLIENT: CATHERINE MCKENNA PROJECT: PROJECT NO. REV DESCRIPTION DATE PLAN CHECK

Electrical Depth. Page 81

Electrical Existing Conditions and Building Load Summary Report

2018 Consultant s Handbook Division 26 Electrical 2413 Switchboards


Diane Emert Senior Thesis 2005 Broadway Plaza, Rochester, MN. Electrical Appendix

ADDENDUM #2 TO BID # BID NUMBER: ISSUE DATE: Friday, January 18, 2019

KITCHEN HOOD SCHEDULE. Owensboro Senior Living MAKE-UP AIR UNIT SCHEDULE PACKAGED TERMINAL AIR CONDITIONING UNIT SCHEDULE

AREA OF WORK ENERGY

A. This section includes unit capacitors for power factor correction.

A. This section includes enclosed dry type transformers for lighting and power loads, with primaries and secondaries rated 600 volts and less.

LIGHT FIXTURE SCHEDULE TYPE DESCRIPTION LAMPS / MANUFACTURER TOTAL

Customer Requirements Downtown Secondary Network Service

SECTION LOW VOLTAGE DISTRIBUTION EQUIPMENT

Design Build Deliver. Metal Enclosed Switchgear, 5-35kV 1200 A Maximum Loadbreak, 4000 A Maximum Non-Loadbreak

Heat Tracing Sales Mt. Airy, Maryland Controls

Technical catalog February 2017 Low Voltage Switchboards and Panelboards UL/CSA

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/14/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

4.5. Switchboards. Contents Description Instant Service Switchboards Product Selection...

Application guide. Tmax Link OEM UL 891 Switchboard Program

Electrical Depth. Mark W. Miller Sibley memorial Hospital Grand Oaks Washington, DC CURRENT SYSTEM

Bussmann series Quik-Spec Coordination Panelboard

14295 PARK MEADOW DR

30 Years of Innovative Solutions for Construction & Industry

REAR +/- 94' 20' 10' 10'-4" 9'-6" 10'-3" 10' 20' 13'-2" Private Office 25. Private Office 23 Private Office 24 7'-1" Open Space 3 14'-7"

GE Energy. GE Panelboards. The right panelboard for any application. imagination at work

ASCO Low Voltage Automatic Transfer Switch Systems

10 Commercial, Industrial, Agricultural Services

*PLEASE NOTE: ANY FREE SHIPPING OFFERS DO NOT APPLY TO POWER DISTRIBUTION PANELS, TRANSFORMERS, OR SUBSTATIONS*

ASCO SERIES 185 Power Transfer Switches

Michigan State University Construction Standards SECONDARY UNIT SUBSTATIONS PAGE

ProCS and ProC Series Heat Trace Panelboards

SUBSTATION VACUUM CIRCUIT BREAKER (38KV)

SUBSTATION VACUUM CIRCUIT BREAKER (15.5KV)

SUBSTATION VACUUM CIRCUIT BREAKER (25.8 / 27KV)

1100 Wilson Boulevard Approximately 4,000 USF. Restaurant. mondayre.com

A system fault contribution of 750 mva shall be used when determining the required interrupting rating for unit substation equipment.

Cole Service Building Boiler Replacement. Issued for Bidding and Construction August 30, 2012 Project Number G120270CD GENERAL ABBREVIATIONS

Options: PART NUMBER MAIN BREAKER PHASE VOLTAGE

DESIGN GUIDELINES LOW VOLTAGE SWITCHGEAR PAGE 1 of 5

Corrections most seen on plan review October 18, 2017 David Rankin Seattle Department of Construction and Inspections

SERVICE ATTACHMENT ON A BUILDING WITH BUS DUCT SERVICE ENTRANCE AND INDOOR METERING

Outdoor Enclosure Power System ENC X100MP48F20-AC6

Low Voltage Switchgear Type WL Low Voltage Metal-Enclosed Switchgear

Key features. DESIGNS: - Conservator type - Hermetically sealed

SynergEX Panelboards for Hazardous Locations

Installing a Downstream Distribution Panelboard

Panelboards and Lighting Control. Types PRL1a, 2a, 3a, 3E, 4 and Column Modifications. Contents Description

CECO BUILDING SYSTEMS

C1000 Series Automatic Cap Bank

Medium Voltage Metal-Enclosed Switches

Detail Bill of Material Page 1 of 2 Project Name: Arc Eng Exposition Negotiation No: LAEC0706X6K1 General Order

Quick Start Guide TS 910 & TS 920

GENERAL NOTES ELECTRICAL NOTES MATCH LINE SEE SHEET E1.11 KEY PLAN NTS MATCH LINE SEE SHEET E1.12 SPR-2" SPR-2" SPR-2" SPR-2" SPR-2" SPR-2" TYP DH-108

Quik-Spec Coordination Panelboard Specifications

#26115 Mt. Diablo Blvd. and Dewing Ave Mt. Diablo Blvd. Lafayette, CA 94549

Laser Service Factory-assembled Panelboards

RCS1000 Data Sheet. RCS1000 Series Controllable Circuit Breaker Panel

GE 8000-Line Motor Control Centers

Medium Voltage Metal-Enclosed Switches

fastfax Rock Solid TM Load Centers General Information

Electrical Depth. Josh Kreutzberger Lighting/Electrical

CENTERLINE 2500 Low Voltage Motor Control Centers and Switchgear Assemblies

XP Series Pre-Wired Factory Sealed Circuit Breaker Panelboards Explosionproof, Dust-Ignitionproof System

SAVE THESE INSTRUCTIONS

University of California, San Diego Cal (IT) 2 Technical Assignment #2. Brian Smith

UNLV Animal Care Facility. University of Nevada Las Vegas CAM 1513/PC ADDENDUM A August 5, 2016

CONTRACT DOCUMENTS FOR WAYNE STATE UNIVERSITY

Parts Price List - KD Series 2/6/17

Low Voltage Automatic Transfer Switch Systems

American Electric Supply, Inc.

UNIVERSAL PRODUCT RANGE. Performance I Durability I Serviceability

Metal-enclosed medium-voltage power factor correction system

75 KVA Transformer Power Distribution - 480V to 120/208V - Nema 3R V and 8 120V Outlets

ELECTRICIAN S REGULATIONS EXAMINATION 26 June 2010

58 th STREET 87,717 RSF. New Mixed-Use Development NEW CONSTRUCTION POSSESSION Q3 2016

T e c h n i c a l R e p o r t T w o

SIGNAL WORDS QUALIFIED PERSON

T H QL Recommendations based on standard conditions. Installation must conform to all local and national codes.

Modular Metering. Canadian Version

Mobile Power Distribution Center - Input 240D/120V 200A - Output (8) 120v GFCI & (2) 240V Outlets

Quik-Spec Electrical Gear

Motors Automation Energy Transmission & Distribution Coatings EDP11. Enclosed Drive Panel USA EDP11

Introduction. Features. Intelligent Technologies Motor Control Center Structures

Quick Start Guide TS 910

Options. Meter base. Cooling Up fan to 22 kaic rated breakers SERVICE

Pretest Module 24 Three-phase Service Entrance

1.2. Loadcenters and Circuit Breakers. Contents. Overview. Type BR Loadcenters and Circuit Breakers. Product Selection Guide.

WIRING DESIGN & PROTECTION REQUIREMENTS CHECKLIST

University of Houston Master Construction Specifications Insert Project Name

FORM A: ACCESSIBILITY CHECKLIST. Questions. Possible Solutions A. PARKING. Location Name Location Address: (street address) (city) (state) (zip)

Metal-enclosed medium voltage power factor correction system

Technical Report 2. John Conley Lighting + Electrical Option Thesis Advisor Shawn Good Electrical Thesis Advisor Gary Golaszewski

Pioneer 321 MSR. 2/14 Antwerpsesteenweg Gent - Oostakker T +32 (0) F +32 (0)

SECTION MOTOR CONTROL

Service Requirements

Meter Centers & Loadcenters Group Metering

The 2017 Program will be comprised of the following: Long Term Projects $15,295,100 Short Term Projects 18,000,100 TOTAL $33,295,200

Sapling 2-Wire Digital Communication System Line Drawing

Transcription:

LIGHTING ELECTRICAL SYMBOLS AND ABBREVIATIONS ABBREVIATIONS ELECTRICAL GENERAL NOTES EQUIPMENT POWER DEVICES NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED LINE TYPE LEGEND CIRCUITS TELECOMMUNICATION SYSTEM FIRE ALARM SYSTEM E0.1 ELECTRICAL SYMBOLS AND ABBREVIATIONS

LIGHTING POLE BASE RELAY TIME CLOCK E1.0 SITE ELECTRICAL PLAN Scale: 1" = 20'-0" LUCAS DRIVE FIRE / WATER 107 103 108 STAIR #2 PROPOSED BUILDING BREEZEWAY ELECTRICAL 106 MACHINE ROOM 105 9-0" 10 #1 102 107 1 GENERAL N. GREEN STREET ( WIDENING BY OTHERS SHOWN) E1.0 SITE ELECTRICAL PLAN

A A.2 A.6 B C D E F G G.1 G.9 H J K L L. L.9 M 1 1.1 ELECTRICAL 106 1.7 2 FIRE / WATER 107 MACHINE ROOM 105 STAIR #3 103 108 STAIR #2 BREEZEWAY 10 12'-0" #1 102 109 1 3 3.3 E2.1 FIRST FLOOR ELECTRICAL PLAN Scale: 1/8" = 1'-0" BASIS OF DESIGN: GENERAL FIRST FLOOR ELECTRICAL PLAN E2.1

A A.2 A.6 B C D E F G G.1 G.9 H J K L L. L.9 M 1 1.1 209 MENS RESTROOM 207 WOMENS RESTROOM 206 21 1.7 2 JANITOR 208 ELECTRICAL 205 STAIR #3 203 10'-8" DOWN CORRIDOR 210 LOBBY 20 #1 CORRIDOR 213 2 10'-8" DOWN DOWN 3 3.3 211 E2.2 SECOND FLOOR ELECTRICAL PLAN Scale: 1/8" = 1'-0" STAIR #2 202 212 BASIS OF DESIGN: GENERAL RESTROOM LIGHTING CONTROL (RM# 206 & 207) SECOND FLOOR ELECTRICAL PLAN E2.2

1 1.1 1.7 2 3 3.3 A A.2 A.6 B C D E F G G.1 G.9 H J K L L. L.9 M E2.3 ROOF ELECTRICAL PLAN Scale: 1/8" = 1'-0" GENERAL E2.3 ROOF ELECTRICAL PLAN

PANEL DESIGNATION: MDP AMPS: 2500 SERVICE ENTERANCE LABEL: YES PANEL DESIGNATION: HH AMPS: 100 SERVICE ENTERANCE LABEL: NO PANEL LOCATION: ELECTRICAL 106 BUS AMPS: 2500 MOUNTING: SURFACE PANEL LOCATION: ELEC 106 BUS AMPS: 100 MOUNTING: SURFACE VOLTAGE: 80Y/277V, 3 PHASE, WIRE MCB: YES WITH GFI ENCLOSURE TYPE: NEMA-1 VOLTAGE: 80Y/277V, 3 PHASE, WIRE MCB: NO ENCLOSURE TYPE: NEMA-1 FEEDER SIZE: REFER TO ONE LINE POWER RISER MLO: NO FEEDER ENTRANCE:. FEEDER SIZE: REFER TO ONE LINE POWER RISER MLO: 100 FEEDER ENTRANCE:. 1 PANEL HOUSE 12000 12.0 SPACE 2 3 12000 800 3 12.0 3 5 12000 12.0 6 7 SPACE SPACE 8 9 3 10 11 12 13 SPACE SPACE 1 15 3 16 17 18 19 SPACE SPACE 20 21 3 22 23 2 25 SPACE SPACE 26 27 3 28 29 0 31 SPACE SPACE 32 33 3 3 35 6 37 SPACE SPACE 38 39 3 0 1 2 PHASE TOTALS: 12.0 12.0 12.0 TOTAL KVA 372.0 A B C TOTAL AMPS 7.7 Three sections providing at least spaces for 20 total tenant breakers of 00 size 1 WEST STAIRS 600 20 1 5.6 5000 PANEL LH XFMR 2 3 CENTER STAIRS 600 20 1 5.6 3 20 5000 5 EAST STAIRS 600 20 1 5.6 5000 6 7 WATER RISER ROOM 600 20 1 1.5 923 SITE LIGHTING 8 2 20 9 STUMBLE LTG EAST 1ST 2800 20 1 3.7 923 10 11 STUMBLE LTG WEST 1ST 200 20 1 3.8 1386 SITE LIGHTING 12 2 20 13 STUMBLE LTG WEST 1ST 200 20 1 3.8 1386 1 15 EXITS AND WALL PACKS 1000 20 1 3.8 1 20 2800 STUMBLE LTG EAST 2ST 16 17 CORE LIGHTING 190 20 1 2.6 1 20 200 STUMBLE LTG WEST 2ST 18 19 REST ROOMS, ELEC, JAN,ELEV LOBBY 2ND 10 20 1 2.5 1 20 200 STUMBLE LTG WEST 2ST 20 21 20 1 1 20 22 23 20 1 1 20 2 25 20 1 1 20 26 27 20 1 1 20 28 29 20 1 1 20 30 31 20 1 1 20 32 33 20 1 1 20 3 35 20 1 1 20 36 37 20 1 1 20 38 39 20 1 1 20 0 1 20 1 1 20 2 PHASE TOTALS: 13. 13.1 12.0 TOTAL KVA 38.5 A B C TOTAL AMPS 6. MDP PANEL HOUSE PANEL HH PANEL LH PANEL DESIGNATION: LH AMPS: 60 SERVICE ENTERANCE LABEL: NO PANEL DESIGNATION: HOUSE AMPS: 800 SERVICE ENTERANCE LABEL: NO PANEL LOCATION: ELEC 106 MCB or MLO: MCB MOUNTING: SURFACE VOLTAGE: 208Y/120V, 3 PHASE, WIRE FTL: NO ENCLOSURE TYPE: NEMA-1 FEEDER SIZE: REFER TO ONE LINE POWER RISER FEED TOP or BOTTOM: BOTTOM 1 EXHAUST FAN 38 20 1 2.2 1872 SPLIT OUTDOOR 2 1 20 3 LIGHTS 250 20 1 2.1 1872 5 GFI 150 20 1 0.3 10 SPLIT INDOOR 6 1 15 7 WATER HEATER 1500 20 1 1.6 10 8 9 TIME CLOCK 200 20 1 0.2 1 20 10 11 20 1 1 20 12 13 20 1 1 20 1 15 20 1 1 20 16 17 20 1 1 20 18 19 20 1 1 20 20 21 20 1 1 20 22 23 20 1 1 20 2 25 20 1 1 20 26 27 20 1 1 20 28 29 20 1 1 20 30 31 20 1 1 20 32 33 20 1 1 20 3 35 20 1 1 20 36 37 20 1 1 20 38 39 20 1 1 20 0 1 20 1 1 20 2 PHASE TOTALS: 3.8 2.3 0.3 TOTAL KVA 6. A B C TOTAL AMPS 17.8 PANEL LOCATION: ELEC 106 BUS AMPS: 800 MOUNTING: SURFACE VOLTAGE: 80Y/277V, 3 PHASE, WIRE MCB: NO ENCLOSURE TYPE: NEMA-1 FEEDER SIZE: REFER TO ONE LINE POWER RISER MLO: 800 FEEDER ENTRANCE:. 1 22160 62.2 0000 VAV HEAT LOADS 2 3 22160 100 3 62.2 3 200 0000 5 22160 62.2 0000 6 7 ROOFTOP UNIT 39721 61.9 22160 PANEL HH 8 9 39721 175 3 61.9 3 100 22160 10 11 39721 61.9 22160 12 13 3 POLE SPACE 3 POLE SPACE 1 15 3 16 17 18 19 3 POLE SPACE 3 POLE SPACE 20 21 3 22 23 2 25 26 27 28 29 0 31 2 33 35 6 37 8 39 0 1 2 PHASE TOTALS: 12.0 12.0 12.0 TOTAL KVA 372.1 A B C TOTAL AMPS 7.8 PANEL VAV XFMR PANEL DESIGNATION: VAV AMPS: 200 SERVICE ENTERANCE LABEL: NO PANEL LOCATION: ELECTRICAL 106 BUS AMPS: 200 MOUNTING: SURFACE VOLTAGE: 80Y/277V, 3 PHASE, WIRE MCB: NO ENCLOSURE TYPE: NEMA-1 FEEDER SIZE: REFER TO ONE LINE POWER RISER MLO: YES FEEDER ENTRANCE:. 1 SPARE 20 1 1 20 SPARE 2 3 SPARE 20 1 1 20 SPARE 5 SPARE 20 1 1 20 SPARE 6 7 SPARE 20 1 1 20 SPARE 8 9 SPARE 20 1 1 20 SPARE 10 11 SPARE 20 1 1 20 SPARE 12 13 SPARE 20 1 1 20 SPARE 1 15 SPARE 20 1 1 20 SPARE 16 17 SPARE 20 1 1 20 SPARE 18 19 SPARE 20 1 1 20 SPARE 20 21 SPARE 20 1 1 20 SPARE 22 23 SPARE 20 1 1 20 SPARE 2 25 SPARE 20 1 1 20 SPARE 26 27 SPARE 20 1 1 20 SPARE 28 29 SPARE 20 1 1 20 SPARE 30 31 SPARE 20 1 1 20 SPARE 32 33 SPARE 20 1 1 20 SPARE 3 35 SPARE 20 1 1 20 SPARE 36 37 SPARE 20 1 1 20 SPARE 38 39 SPARE 20 1 1 20 SPARE 0 1 20 1 1 20 SPARE 2 PHASE TOTALS: TOTAL KVA A B C TOTAL AMPS ELECTRICAL SCHEDULES AND ONE-LINE RISER DIAGRAM DZ MH DATE: JUNE 3, 27 DRAWN BY. CHECKED BY. E7.0