APPENDIX D- TRAFFIC STUDY

Similar documents
LOTUS RANCH TRAFFIC IMPACT ANALYSIS. LLG Ref Senior Transportation Engineer & Charlene Sadiarin Transportation Engineer II

LOTUS RANCH TRAFFIC IMPACT ANALYSIS. LLG Ref Senior Transportation Engineer & Charlene Sadiarin Transportation Engineer II

TRAFFIC IMPACT ANALYSIS 661 BEAR VALLEY. Escondido, California September 1, LLG Ref

APPENDICES. Appendix R Traffic Impact Analysis (January 2017)

TRAFFIC IMPACT ANALYSIS WESTMINSTER SEMINARY. Escondido, California June 25, LLG Ref Transportation Engineer II

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

APPENDIX J LAKE WOHLFORD DAM REPLACEMENT PROJECT TRAFFIC IMPACT ANALYSIS (DAM REPLACEMENT) Lake Wohlford Dam Replacement Project EIR

MADERAS HOTEL TRANSPORTATION IMPACT ANALYSIS. LLG Ref Transportation Planner III & Jorge Cuyuch Transportation Engineer I

TRAFFIC IMPACT ANALYSIS SAFARI HIGHLANDS RANCH

2.0 Development Driveways. Movin Out June 2017

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Appendix C. Traffic Study

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By:

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

King Soopers #116 Thornton, Colorado

Oakbrook Village Plaza City of Laguna Hills

INDUSTRIAL DEVELOPMENT

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015

The key roadways in the project vicinity are described below. Exhibit displays the existing number of lanes on the study roadways.

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii

APPENDIX B Traffic Analysis

STAFF REPORT # CHANGE OF ZONING

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Alpine Highway to North County Boulevard Connector Study

APPENDIX C-2. Traffic Study Supplemental Analysis Memo

Traffic Impact Statement (TIS)

4.14 TRANSPORTATION AND CIRCULATION

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

APPENDIX H. Transportation Impact Study

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

Task 5.1: Existing Conditions Review and Analysis

Section 5.0 ENVIRONMENTAL ANALYSIS

Traffic Engineering Study

Appendix Q Traffic Study

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Transportation & Traffic Engineering

APPENDIX G Traffic Assessment of EIR Alternatives Traffic Impact Analysis

Appendix G: Transportation/Traffic

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

Traffic Impact Analysis. Yelm East Gateway Planned Action

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For:

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

TRAFFIC PARKING ANALYSIS

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

Proposed Inn at Bellefield Traffic Impact Assessment

5.9 TRANSPORTATION AND TRAFFIC

Clean Harbors Canada, Inc.

Section 5.8 Transportation and Traffic

700 University Avenue Mixed-Use Development. Traffic Impact Analysis

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

Draft Report: West Berkeley Bowl Project

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

1. INTRODUCTION 2. PROJECT DESCRIPTION CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios:

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards

Diablo Vista Pumping Plant Replacement

Traffic Impact Study Speedway Gas Station Redevelopment

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.

TRAFFIC IMPACT ANALYSIS

West Rosslyn Development

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place

TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY Purpose of Report and Study Objectives... 2

Appendix H TRAFFIC IMPACT ANALYSIS

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street

TRAFFIC IMPACT STUDY FOR

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

PUBLIC INFRASTRUCTURE PROJECTS

APPENDIX VMT Evaluation

Perris Apartments Traffic Impact Analysis City of Perris, California

NOB HILL IMPROVEMENTS PROJECT

Access Management Standards

Traffic Impact Analysis Update

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC

LCPS Valley Service Center

April 7, Mr. Blake Shutler Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina

APPENDICES. No Cumulative Impact Project Alternative Traffic Analysis Memorandum (May 2016)

Section 5.0 Traffic Information

TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION FINAL REPORT

Final. Traffic Impact Study For 1200 Ashby Avenue Mixed-Use Development. In City of Berkeley. November 26, TJKM Transportation Consultants

Parks and Transportation System Development Charge Methodology

Traffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For:

Lacey Gateway Residential Phase 1

APPENDIX A LEVEL OF SERVICE CONCEPTS, ANALYSIS METHODOLOGIES,STANDARDS OF SIGNIFICANCE

1650 South Delaware Street

Appendix E TRAFFIC IMPACT ANALYSIS

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Los Angeles Mission College Facilities Master Plan Draft Program Environmental Impact Report 3.13 TRANSPORTATION / TRAFFIC

Environmental Assessment Derry Road and Argentia Road Intersection

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

Transcription:

APPENDIX D- TRAFFIC STUDY

TRANSPORTATION IMPACT ANALYSIS IMPERIAL COUNTY OFFICE OF EDUCATION County of Imperial, California March 06, 2018 LLG Ref. 3-17-2831 Prepared by: Jose R. Nunez Transportation Planner II Under the Supervision of: John Boarman Principal

TABLE OF CONTENTS SECTION PAGE 1.0 Introduction... 1 2.0 Project Description... 2 2.1 Project Location... 2 2.2 Project Description... 2 3.0 Existing Conditions... 6 3.1 Existing Transportation Conditions... 6 3.2 Existing Traffic Volumes... 7 3.3 Imperial Avenue Extension... 7 4.0 Analysis Approach and Methodology... 10 4.1 Intersections... 10 4.2 Street Segments... 10 5.0 Significance Criteria... 11 5.1 City of El Centro Facilities... 11 6.0 Analysis of Existing Conditions... 12 6.1 Peak Hour Intersection Levels of Service... 12 6.2 Daily Street Segment Levels of Service... 12 7.0 Trip Generation/Distribution/Assignment... 14 7.1 Trip Generation... 14 7.2 Trip Distribution... 14 7.3 Trip Assignment... 14 8.0 Cumulative Projects... 18 8.1 Description of Projects... 18 9.0 Analysis of Near-Term Scenarios... 24 9.1 Existing + Project... 24 9.1.1 Intersection Operations... 24 9.1.2 Segment Operations... 24 9.2 Existing + Project + Cumulative Projects... 24 9.2.1 Intersection Operations... 24 9.2.2 Segment Operations... 24 10.0 Project Access... 27 i

11.0 Significance of Impacts and Mitigation Measures... 28 11.1 Significant Impacts Prior to Mitigation... 28 11.2 Mitigation Measures... 28 APPENDIX APPENDICES A. Intersection and Segment Manual Count Sheets B. Intersection Methodology and Analysis Sheets C. City of El Centro Roadway Classification Table ii

LIST OF FIGURES SECTION FIGURE # FOLLOWING PAGE Figure 2 1 Vicinity Map... 3 Figure 2 2 Project Area Map... 4 Figure 2 3 Site Plan... 5 Figure 3 1 Existing Conditions Diagram... 8 Figure 3 2 Existing Traffic Volumes... 9 Figure 7 1 Project Traffic Distribution... 15 Figure 7 2 Project Traffic Volumes... 16 Figure 7 3 Existing + Project + Cumulative Project Traffic Volumes... 17 Figure 8 1 Cumulative Projects Traffic Volumes... 22 Figure 8 2 Existing + Project + Cumulative Projects Traffic Volumes... 23 LIST OF TABLES SECTION TABLE # PAGE Table 3 1 Existing Traffic Volumes... 7 Table 5-1 Significance Criteria... 11 Table 6 1 Existing Intersection Operations... 12 Table 6 2 Existing Street Segment Operations... 13 Table 7 1 Project Trip Generation... 14 Table 9 1 Near-Term Intersection Operations... 25 Table 9 2 Near-Term Street Segment Operations... 26 iii

TRANSPORTATION IMPACT ANALYSIS IMPERIAL COUNTY OFFICE OF EDUCATION Imperial County, California March 06, 2018 1.0 INTRODUCTION Linscott, Law & Greenspan Engineers (LLG) has been retained to assess the potential traffic impacts to the local roadway system due to the annexation of 80 acres of land (APN 054-510-001) for the construction of a 21,685 square-foot administrative annex building for the Imperial County Office of Education. The building would be located on a 6.85-acre parcel along the west side of Sperber Road south of McCabe Road. The following items are included in this transportation analysis: Project Description Existing Conditions Description Analysis Approach and Methodology Significance Criteria Analysis of Existing Conditions Project Traffic Generation/Distribution/Assignment Cumulative Projects Discussion Intersection/Street Segment Capacity Analysis Significance of Impacts and Mitigation Measures 1

2.0 PROJECT DESCRIPTION 2.1 Project Location The proposed building will be located on the west side of Sperber Road and south of McCabe Road. As part of the project, Betty Jo Mc Neece Loop will be extended to the west along the project s frontage. The project proposes two driveways to this new extension. 2.2 Project Description The project involves the annexation of 80 acres of land (APN 054-510-001) for the construction of a 21,685 square-foot administrative annex building for the. The building would be located on a 6.85-acre parcel and the remaining land would continue to be used for agricultural purposes. The new building would accommodate 150 to 200 employees. The is located along the eastside of Sperber Road to the north of existing Betty Jo Mc Neese Loop. Figure 2 1 shows the Project vicinity and Figure 2 2 illustrates, in more detail, the site location. Figure 2 3 shows the Project s Site Plan. 2

S a l t o n S e a City of Calipatria City of Westmorland City of Brawley City of Imperial City of Holtville San Diego City of El Centro Project Site^ City of Calexico M E X I C O [ 0 2.5 5 Miles N:\2219\GIS N:\2831\Figures Date: 4/30/13 12/03/17 Figure 1-1 2-1 Vicinity Map County Imperial of Imperial County Office Detention of Education Facility

Imperial Ave C i t y o f E l C e n t r o Ross Rd McCabe Rd Project Site La Brucherie Rd Clark Rd Dogwood Rd Future Imperial Avenue Extension N:\2219\GIS N:\2831\Figures Date: 4/30/13 12/03/17 [ Figure 1-2 2-2 Project Area Map County Imperial of Imperial CountyOffice Detention of Education Facility

N:\2831\Figures Date: 03/06/18 Figure 2-3 Project Site Plan County of Imperial Office of Education

3.0 EXISTING CONDITIONS Effective evaluation of the traffic impacts associated with the Proposed Project requires an understanding of the existing transportation system within the project area. Figure 3 1 shows an existing conditions diagram, including unsignalized intersections and lane configurations. Figure 3 1 shows an existing conditions diagram, including unsignalized intersections and lane configurations. The study area includes the following three (3) existing intersections and four (4) street segments. Intersections: 1. McCabe Road / La Brucherie Road 2. McCabe Road / Sperber Road 3. McCabe Road / Clark Road Segments: 1. La Brucherie Road: North of McCabe Road; 2. McCabe Road: Between La Brucherie Road and Sperber Road; 3. McCabe Road: East of Clark Road; 4. Clark Road: North of McCabe Road; 3.1 Existing Transportation Conditions The following is a brief description of the streets in the project area. La Brucherie Road is classified as a Major Collector on the County of Imperial Circulation Element. La Brucherie Road is currently constructed as a north-south two-lane undivided roadway providing one lane of travel per direction. No bike lanes or bus stops are provided, and parking is generally prohibited within the project area. The posted speed limit is 55 mph. Sperber Road is an unclassified north-south two-lane undivided roadway within the study area. Sperber Road currently provides access to several County offices and departments. No bike lanes or bus stops are provided, and parking is generally prohibited within the project area. The speed limit is 25 mph. Clark Road is classified as a Minor Arterial on the County of Imperial Circulation Element. Clark Road is currently constructed as a north-south two lane undivided roadway providing one lane of travel per direction. No bike lanes or bus stops are provided, and parking is generally prohibited within the project area. The posted speed limit is 50 mph. McCabe Road is classified as a Minor Collector on the County of Imperial Circulation Element. Currently, McCabe Road is currently constructed as an east-west two lane undivided roadway providing one lane of travel per direction. No bike lanes or bus stops are provided, and parking is generally prohibited within the project area. The posted speed limit is 50 mph. 6

Applestill Road is an unclassified east-west two-lane undivided roadway within the study area. 3.2 Existing Traffic Volumes Table 3 1 is a summary of the most recent available average daily traffic volumes (ADTs) from LLG counts commissioned in November 2017. Manual hand counts at the study area intersections were also conducted in November 2017 when schools were in session. Figure 3 2 shows the Existing Traffic Volumes. Appendix A contains the manual count sheets. TABLE 3 1 EXISTING TRAFFIC VOLUMES Street Segment ADT a Date La Brucherie Road North of McCabe Road 4,620 November, 2017 McCabe Road La Brucherie Road to Sperber Road 5,030 November, 2017 East of Clark Road 5,700 November, 2017 Clark Road McCabe Road to Heber Road 6,180 November, 2017 Footnotes: a. Average Daily Traffic Volume counts conducted in November, 2017 by LLG Engineers. 3.3 Imperial Avenue Extension Imperial Avenue is proposed to be extended southward from I-8 to connect to McCabe Road. Imperial Avenue is a major north-south route through the City of El Centro. Motorists heading to the south and east from Imperial Avenue must enter the I-8 freeway and exit at 4 th Street (SR 86), one mile away. This traffic pattern exacerbates the congested traffic condition that already exists at the 4 th Street (SR 86)/I-8 interchange at times. Motorists heading to the west from Imperial Avenue must enter the I-8 freeway and exit at Forrester Road, three miles away. The Imperial Avenue Extension project provides a variety of transportation benefits. The extension of Imperial Avenue to McCabe Road will reduce congestion on 4 th Street (SR 86), one of the most heavily traveled transportation corridors in the City of EI Centro. This extension will also provide a direct transportation link to new developments occurring in the immediate area. It is proposed to extend Imperial Avenue in four phases. The near-term analysis in this report was completed assuming the project would precede the completion of the Imperial Avenue extension. 7

2U!( 1!( 2!( 3 La Brucherie Rd McCabe Rd McCabe Rd McCabe Rd Sperber Rd Clark Rd Future Imperial Avenue Extension 2U 55 50 2U!( 1 50 2U McCabe Rd Project Site!( 2 2U!( 3 2U Future Betty Jo Mc Neece Betty Jo Mc Neece Loop 55 2U La Brucherie Rd 25 Sperber Rd 2U 50 Applestill Rd 2U Clark Rd 2U D / U XX Turn Lane Configurations Intersection Control 2-Lane Undivided Roadway Divided Daily / Undivided Traffic Volumes Roadway Posted Speed Peak Hour Limit Traffic Volumes 50 N:\2831\Figures Date: 12/03/17 Figure 3-1 Existing Conditions Diagram County of Imperial Office of Education

!( 1!( 2!( 3 58 / 47 149 / 50 154 / 138 33 / 59 112 / 120 220 / 101 326 / 155 238 / 109 34 / 10 102 / 83 132 / 83 32 / 7 96 / 15 2 / 3 McCabe Rd McCabe Rd McCabe Rd 355 / 143 111 / 107 103 / 16 165 / 148 15 / 22 Clark Rd 19 / 18 144 / 101 10 / 11 Sperber Rd 8 / 69 23 / 68 La Brucherie Rd 15 / 21 166 / 53 4 / 4 45 / 14 322 / 72 23 / 27 6,180 Future Imperial Avenue Extension 5,030!( 3!( 2 3 5,700 McCabe Rd Project Site Betty Jo Mc Neece Loop Future Betty Jo Mc Neece Applestill Rd Clark Rd Sperber Rd [ Figure 3-2!( 1 Existing Traffic Volumes La Brucherie Rd 4,620 Study Intersections!# AM / PM Intersection Peak Hour Volumes AM / PM Average Daily Traffic Volumes X,XXX N:\2831\Figures Date: 12/11/17

4.0 ANALYSIS APPROACH AND METHODOLOGY Level of service (LOS) is the term used to denote the different operating conditions which occur on a given roadway segment under various traffic volume loads. It is a qualitative measure used to describe a quantitative analysis taking into account factors such as roadway geometries, signal phasing, speed, travel delay, freedom to maneuver, and safety. Level of service provides an index to the operational qualities of a roadway segment or an intersection. Level of service designations range from A to F, with LOS A representing the best operating conditions and LOS F representing the worst operating conditions. Level of service designation is reported differently for signalized and unsignalized intersections, as well as for roadway segments. 4.1 Intersections Unsignalized intersections were analyzed under AM and PM peak hour conditions. Average vehicle delay and Levels of Service (LOS) was determined based upon the procedures found in Chapter 17 of the 2000 Highway Capacity Manual (HCM), with the assistance of the Synchro (version 7) computer software. Unsignalized intersection calculation worksheets and a more detailed explanation of the methodology are attached in Appendix B. 4.2 Street Segments Street segment analysis is based upon the comparison of daily traffic volumes (ADTs) to the City of El Centro s Roadway Classification, Level of Service, and ADT Table. This table provides segment capacities for different street classifications, based on traffic volumes and roadway characteristics. The City of El Centro s Roadway Classification, Level of Service, and ADT Table is attached in Appendix C. 10

5.0 SIGNIFICANCE CRITERIA 5.1 City of El Centro Facilities The significance criteria summarized in Table 5 1 developed by Linscott, Law and Greenspan, Engineers is based upon the City of El Centro s goal for intersections and roadway segments to operate at LOS C or better. In general, a LOS C or better that degrades to a LOS D or worse is considered a significant direct impact. A cumulative impact can occur if the intersection or segment level of service is already operating below City standards and the project increases the delay by more than 2 seconds or the v/c ratio by more than 0.02. TABLE 5-1 SIGNIFICANCE CRITERIA Existing Existing + Project Existing + Project + Cumulative Projects Impact Type INTERSECTIONS LOS a C or better LOS C or better LOS C or better None LOS C or better LOS D or worse Direct LOS D LOS D and adds 2.0 seconds or more of delay Cumulative LOS D LOS E or F Direct LOS E LOS F Direct LOS F LOS F and delay increases by 10.0 seconds Direct Any LOS Project does not degrade LOS and adds 2.0 to 9.9 seconds of delay Any LOS Project does not degrade LOS and adds < 2.0 seconds of delay SEGMENTS LOS E or worse Any LOS Cumulative None LOS C or better LOS C or better LOS C or better None LOS C or better LOS C or better and v/c > 0.02 LOS D or worse Cumulative LOS C or better LOS D or worse Direct b LOS D LOS D and v/c > 0.02 Cumulative LOS D LOS E or F Direct LOS E LOS F Direct LOS F LOS F and v/c c increases by > 0.09 Direct Any LOS LOS E or worse and v/c 0.02 to 0.09 LOS E or worse Cumulative Any LOS LOS E or worse and v/c < 0.02 Any LOS None Source: Linscott, Law & Greenspan, Engineers Footnotes: a. Level of Service b. Exception: post-project segment operation is LOS D and intersections along segment are LOS D or better results in no significant impact. c. Volume to Capacity Ratio 11

6.0 ANALYSIS OF EXISTING CONDITIONS 6.1 Peak Hour Intersection Levels of Service Table 6 1 summarizes the existing peak hour intersection operations. As shown, all the study area intersections are calculated to currently operate at acceptable service levels of LOS D or better during both the AM and PM peak hours. TABLE 6 1 EXISTING INTERSECTION OPERATIONS Intersection Control Type Peak Hour Delay a Existing LOS b 1. McCabe Road / La Brucherie Road AWSC c AM 25.6 D PM 9.4 A 2. McCabe Road / Sperber Road OWSC d AM 13.9 B PM 11.2 B 3. McCabe Road / Clark Road AWSC AM 19.3 C PM 11.3 B Footnotes: a. Average delay expressed in seconds per vehicle. b. Level of Service. c. AWSC All-Way Stop Controlled intersection. d. OWSC One-Way Stop Controlled intersection. Minor street left turn delay is reported. UNSIGNALIZED DELAY/LOS THRESHOLDS Delay LOS 0.0 10.0 A 10.1 to 15.0 B 15.1 to 25.0 C 25.1 to 35.0 D 35.1 to 50.0 E 50.1 F 6.2 Daily Street Segment Levels of Service Table 6 2 summarizes the existing segment operations along the key study area roadways. As shown, all roadway segments are calculated to currently operate at acceptable LOS C on a daily basis. 12

La Brucherie Road Street Segment TABLE 6 2 EXISTING STREET SEGMENT OPERATIONS Classification Capacity (LOS E) a ADT b LOS c V/C d North of McCabe Road Minor Collector 16,200 4,620 C 0.285 McCabe Road La Brucherie Road to Sperber Road Minor Collector 16,200 5,030 C 0.310 Sperber Road to Clark Road Minor Collector 16,200 5,700 C 0.352 Clark Road North of McCabe Road Minor Arterial 16,200 6,180 C 0.381 Footnotes: a. Capacities based on City of El Centro Roadway Classification Table. b. Average Daily Traffic Volumes. c. Level of Service. d. Volume to Capacity. 13

7.0 TRIP GENERATION/DISTRIBUTION/ASSIGNMENT The ITE Trip Generation Manual (9 th Edition) was used to determine the traffic generated by the Proposed Project. Project trips were calculated based on the office rates utilized on the City of San Diego Association of Governments (SANDAG) trip generation rates guide. It should be noted that for LLG doubled the daily trip rate was doubled based on the project description and details of projected employment and hours of operation. 7.1 Trip Generation Table 7 1 tabulates the total project traffic generation. The total project is calculated to generate approximately 870 ADT with 110 inbound/ 12 outbound trips during the AM peak hour and 23 inbound/ 90 outbound trips during the PM peak hour. Land Use Size TABLE 7 1 PROJECT TRIP GENERATION Daily Trip Ends (ADTs) Rate a Volume AM Peak Hour PM Peak Hour Volume Volume In Out In Out Office of Education 21,685 40 / ksf 870 110 12 23 90 Source: SANDAG Not So Brief Guide of Vehicular Traffic Generation Rates for the San Diego Region, April 2002 Footnotes: a. Rates doubled from 20/ksf to account for hours of operation during a typical workday. 7.2 Trip Distribution The project trip distribution was developed based on the available circulation network and the proximity of residential communities within the study area, where potential employees may reside. Figure 7 1 depicts the trip distribution percentages for the project traffic. 7.3 Trip Assignment The project trips summarized in Table 7 1 were assigned using the trip distribution percentages developed as shown in Figure 7 1. Figure 7 2 illustrates the total project traffic volumes assignment. Figure 7 3 illustrates the existing + project traffic volumes assignment. 14

20% 2% 8%!( 1 La Brucherie Rd McCabe Rd Future Imperial Avenue Extension 30% 65% r e t ite Future Betty Jo Mc Neece!( 2 Sperber Rd 5% Betty Jo Mc Neece Loop 30% Applestill Rd!( 3 Clark Rd 35% 5% Study Intersections XX% Regional Trip Distribution N:\2831\Figures Date: 12/03/17 Figure 7-1 Project Traffic Distribution County of Imperial Office of Education

!( 1!( 2!( 3 9 / 2 1 / 7 3 / 18 0 / 2 La Brucherie Rd 2 / 0 Sperber Rd 8 / 59 4 / 27 33 / 7 McCabe Rd McCabe Rd McCabe Rd 22 / 5 4 / 27 4 / 32 72 / 15 Clark Rd 39 / 8 70 260 180!( 1 260!( 2 570!( 3 305 McCabe Rd Project Site 40 Future Betty Jo Mc Neece Betty Jo Mc Neece Loop 10 Future Imperial Avenue Extension!# Study Intersections AM / PM Intersection Peak Hour Volumes Average Daily X,XXX Traffic Volumes AM / PM La Brucherie Rd Sperber Rd Applestill Rd 40 Clark Rd [ N:\2831\Figures Date: 12/11/17 Figure 7-2 Project Traffic Volumes

!( 1!( 2!( 3 113 / 127 58 / 47 223 / 119 326 / 155 277 / 117 2 / 5 168 / 30 32 / 7 182 / 57 154 / 138 33 / 59 34 / 10 102 / 83 141 / 85 McCabe Rd McCabe Rd McCabe Rd 355 / 143 115 / 134 103 / 16 169 / 180 15 / 22 Clark Rd 19 / 18 144 / 101 10 / 11 Sperber Rd 16 / 128 27 / 95 La Brucherie Rd 15 / 21 166 / 53 6 / 4 45 / 14 344 / 77 23 / 27 6,440 Future Imperial Avenue Extension 5,290!( 3!( 2 6,005 McCabe Rd Project Site Betty Jo Mc Neece Loop Future Betty Jo Mc Neece Applestill Rd Clark Rd Sperber Rd [ Figure 7-3 Existing + Project Traffic Volumes La Brucherie Rd!( 1 4,690 Study Intersections!# AM / PM Intersection Peak Hour Volumes AM / PM Average Daily Traffic Volumes X,XXX N:\2831\Figures Date: 12/11/17

8.0 CUMULATIVE PROJECTS There are other planned projects in the areas in the project vicinity which will add traffic to the roadways surrounding the project site. Based on a review of other potential projects within the area, it was determined that the following future cumulative development projects should be included in the traffic analysis. Detailed below is a brief description of these cumulative projects, which are approved, have applications submitted or are under construction. 8.1 Description of Projects 1. Clark Road Multi-Family Residential Development proposes to develop a maximum of 134 multi-family residential units, 23. The project is generally located at the southeast quadrant of the intersection of Clark Road and Wake Avenue. The total project is calculated to generate approximately 960 ADT with 14 inbound / 56 outbound trips during the AM peak hour and 59 inbound / 31 outbound trips during the PM peak hour. The traffic study for this project is under prepared by LLG (May 2007). 2. Citrus Grove is a proposed project involving the development of 120 residential dwelling units on approximately 50 acres of land. The proposed project is located east of SR-86 and north of McCabe Road. The project is calculated to generate 1,302 ADT with 29 inbound / 69 outbound trips during the AM peak hour and 90 inbound / 47 outbound trips during the PM peak hour. 3. Courtyard Villas proposes to develop 54 single-family residential dwelling units and a park on 21.5 acres. The proposed project is located east of Austin Road and south of Orange Avenue. The project is calculated to generate 590 ADT with 12 inbound / 35 outbound trips during the AM peak hour and 39 inbound / 23 outbound trips during the PM peak hour. 4. Lotus Ranch Mixed Use proposes the annexation of approximately 213 acres of agriculture land in order to accommodate the development of 635 single-family residential lots, five storm water detention basins, and two public parks totaling 11.11 acres. The project site is generally located south of Interstate 8 and bounded by La Brucherie Avenue to the east. The total project is calculated to generate approximately 5,710 ADT with 116 inbound / 344 outbound trips during the AM peak hour and 361 inbound / 213 outbound trips during the PM peak hour. 5. Estrella is a proposed project involving subdivision of existing farmland into single-family units and multi-family attached units with developments of school and park. The project site is bound on the east by Meadow Road between Jasper Road and Central Main Canal. 6. Hampton Inn Hotel consists of a 4-story 93-room hotel. The project is located at 598 Wake Avenue, just northeast of the Dogwood Road/ Wake Avenue intersection in the City of El Centro. The project is calculated to generate approximately 760 ADT with 32 inbound / 20 outbound trips during the AM peak hour and 29 inbound / 26 outbound trips during the PM peak hour. The traffic study for this project was prepared by LLG (January 2008). 7. Heber World Meridian proposes to develop a maximum of 272 single-family residential dwelling units, 99 multi-family residential units, 23,200 square feet of commercial and 3.4 acres of park/open space. The project is located on the east side of Pitzer Road and north of Highway 18

86 (Heber Road), the total project is calculated to generate approximately 6,050 ADT with 133 inbound / 356 outbound trips during the AM peak hour and 366 inbound / 344 outbound trips during the PM peak hour. The traffic study for this project is under completion by LLG (July 2007). 8. Imperial Center is a proposed project consists of a 611,000 square foot retail complex, 110,000 square feet of plaza / auction / exhibit space as well as a 37,000 square foot gas station and convenience store, and a hotel. It is located to the east of SR 111 just north of Heber Road. The proposed project is calculated to generate 26,370 ADT with 433 inbound / 310 outbound trips during the AM peak hour and 1,175 inbound / 1,251 outbound trips during the PM peak hour. The traffic study for this project was prepared by LLG (October 2006). 9. El Centro Town Center Phase II consists of the proposed development of 31.88 acres into 341,516 square feet of General Commercial development. The project site is located between the Central Drain and 3Cruickshank Drive, east of Imperial Avenue and west of North 12th Street (extended). It is calculated that the proposed project will generate a total of 15,088 ADT primary trips, with 677 inbound/733 outbound trips during the PM peak hour. 10. The Imperial Valley Commons project consists of a Conditional Use Permit to allow development of a commercial retail center. The proposed project consists of the development of approximately 700,000 square feet of commercial retail space divided into individual retail stores varying in size from approximately 4,000 square feet to approximately 196,000 square feet. The project is calculated to generate 20,648 ADT with 262 inbound / 168 outbound trips during the AM peak hour and 933 inbound / 1,010 outbound trips during the PM peak hour. The traffic study for this project was prepared by LLG (October 2005). 11. Linda Vista Mixed Use proposes to develop 182 single-family dwelling units along with a 6- acre commercial lot. The project site is currently undeveloped agricultural land. Based on the trip generation calculations, the total project is calculated to generate 7,175 ADT with 109 inbound / 143 outbound trips during the AM peak hour and 349 inbound / 327 outbound trips during the PM peak hour. The traffic study for this project was prepared by LLG (August 2004). 12. Los Lagos Development proposes to develop 1,109 single-family residential dwelling units, 776 multi-family residential dwelling units, 6.3 acres school area, and 24.0 acres of retail/commercial area. The project site is located in Calexico. 13. Las Ventanas Development proposes to develop 879 single-family residential dwelling units, 454 multi-family residential dwelling units, 6.3 acres school area, and 28.6 acres of retail/commercial area. The project site is located in Calexico. 14. Mariposa Meadows / Torrence Residential proposes to develop a maximum of 240 singlefamily residential dwelling units, 1,075 multi-family residential units, and 18.7 acres of park/open space. The project is located east of Mariposa Drive, south of Correll Road, and west of Dogwood Road. Based on the trip generations calculations, the total project is calculated to generate approximately 8,900 ADT with 138 inbound / 551 outbound trips during the AM peak hour and 555 inbound / 292 outbound trips during the PM peak hour. The traffic study for this project was prepared by LLG (May 2007). 19

15. The McCabe Ranch proposes to develop 428 single-family residential dwelling units located south of Interstate 8 and west of Dogwood Road. The project is calculated to generate 3,550 ADT with 76 inbound / 206 outbound trips during the AM peak hour and 243 inbound / 142 outbound trips during the PM peak hour. The traffic study for this project was prepared by LLG (July 2002). 16. Miller Burson proposes to develop 599 single-family residential dwelling units and a park site. The project is located north of Interstate 8, south of Ross Road, and east of Austin Road. The project requires an Annexation and Change of Zone. 17. Mosaic proposes to develop a maximum of 971 single-family residential dwelling units, 320 multi-family residential dwelling units, and 2.7 acres of commercial uses to be constructed in several phases. The proposed project is located south of State Route 86/Heber Road, north of Fawcett Road, both east and west of Dogwood Road in the County of Imperial. Based on the trip generation calculations, the total project is calculated to generate approximately 11,946 ADT with 220 inbound / 661 outbound trips during the AM peak hour and 736 inbound / 441 outbound trips during the PM peak hour. The traffic study for this project was prepared by LLG (April 2007). 18. The Plaza at Imperial is a proposed development of 350,102 square feet of commercial/retail space divided into individual retail stores varying in size. The majority of this development has been built and is occupied by tenants. However, approximately 50,000 square feet of development remains to be developed. The project is located in the southeastern portion of the City of El Centro south of Interstate 8, north of Danenberg Drive, and east of Dogwood Road. The remaining project to be developed is calculated to generate 1,752 ADT with 23 inbound / 14 outbound trips during the AM peak hour and 78 inbound / 85 outbound trips during the PM peak hour. The traffic study for this project was prepared by LLG (June 2006). 19. Rosswood proposes to develop 153 single-family residential dwelling units, a 69,016 square-foot park to be used by the residents of the subdivision and a 92,000 square-foot retention basin. The project is located in the southeast quadrant of Ross Avenue and the Alder Canal, north of Interstate 8, south of Ross Avenue, east of Dogwood Road, and west of SR 111 in the County of Imperial. The project requires an annexation and Change of Zone. The project is calculated to generate 1,540 ADT with 29 inbound / 87 outbound trips during the AM peak hour and 57 inbound / 115 outbound trips during the PM peak hour. The traffic study for this project was prepared by LLG (May 2006). 20. Surya Enterprise proposes to develop a project consisting of a 4-story, 81-room hotel, a 4-story, 60-room hotel, a 4,200 square foot restaurant and a gas station with 16 vehicle-fueling stations and a convenience market. The site is located at 2350 Weakley Street in the City of El Centro. The project is calculated to generate approximately 4,902 ADT with 223 inbound / 201 outbound trips during the AM peak hour and 155 inbound / 143 outbound during the PM peak hour. The traffic study for this project is under prepared by LLG (November 2008). 20

21. Thomas Property proposes a rezoning from Tourist Commercial to General Commercial. The project proposes to develop a maximum of 6.54 acres of neighborhood commercial. The project is generally located at the northeast corner of the intersection of SR-86 and Wake Avenue. The total project is calculated to generate approximately 4,316 net ADT with 103 inbound / 81 outbound net trips during the AM peak hour and 173 inbound / 141 outbound net trips during the PM peak hour. The traffic study for this project is under prepared by LLG (August 2007). 22. Heberwood Estates is a proposed 425-unit residential development. The project is located west of Dogwood Avenue and north of SR 86. Based on the trip generation calculations, maps 1-3 of the proposed project are calculated to generate a total of 3,179 ADT, with 61 inbound and 184 outbound trips during the AM peak hour, and 202 inbound and 118 outbound trips during the PM peak hour. The initial traffic study for this project was prepared by LLG (April 2005). 23. Willowbend is a 38.46-acre project proposing 122 single-family units and a park, north of McCabe Road, east of 8 th Street and west of Highway 86. The trip generation for this project was manually calculated using the ITE Trip Generation Manual (7 th Edition). The project is calculated to generate 1,250 average daily trips with 24 inbound trips and 71 outbound trips during the AM peak hour and 81 inbound and 47 outbound trips during the PM peak hour. 24. 3103 S. 4 th Street is a proposed General Plan Amendment (GPA) from rural residential to general commercial and change of zoning (COZ) from agriculture to neighborhood commercial. The project is located along 4 th Street and south of I-8. Based on the trip generation calculations, the proposed project is calculated to generate a total of 1,660 ADT, with 30 inbound and 20 outbound trips during the AM peak hour, and 42 inbound and 42 outbound trips during the PM peak hour. 25. Stonefield Apartments proposes to develop a 240 multi-family residential dwelling units located east of Dogwood Road, adjacent to the Imperial Valley Mall. The project is calculated to generate 1,580 ADT with 24 inbound / 97 outbound trips during the AM peak hour and 98 inbound / 52 outbound trips during the PM peak hour. Figure 8 1 depicts the total cumulative project traffic volumes in the project area. Figure 8 2 depicts the existing + project + cumulative projects traffic volumes in the area. 21

!( 1!( 2!( 3 15 / 30 22 / 90 21 / 58 29 / 79 16 / 31 3 / 3 La Brucherie Rd 20 / 30 5 / 2 Sperber Rd 46 / 132 28 / 79 59 / 88 14 / 21 McCabe Rd McCabe Rd McCabe Rd 70 / 104 42 / 62 14 / 21 Clark Rd 18 / 53 52 / 94 2,800 Future Imperial Avenue Extension 4,300!( 1 4,000!( 2!( 3 4,000 McCabe Rd Project Site Future Betty Jo Mc Neece Betty Jo Mc Neece Loop!# Study Intersections AM / PM Intersection Peak Hour Volumes Average Daily X,XXX Traffic Volumes AM / PM Future Project Dwy N:\2831\Figures Date: 12/11/17 La Brucherie Rd Sperber Rd Applestill Rd Clark Rd [ Figure 8-1 Cumulative Projects Traffic Volumes

!( 1!( 2!( 3 34 / 10 117 / 113 163 / 175 45 / 14 365 / 135 23 / 27 142 / 206 239 / 150 5 / 8 La Brucherie Rd 15 / 21 186 / 83 11 / 6 Sperber Rd 16 / 128 27 / 95 372 / 287 168 / 30 210 / 136 213 / 226 33 / 59 58 / 47 277 / 117 32 / 7 McCabe Rd McCabe Rd McCabe Rd 425 / 247 129 / 155 103 / 16 211 / 242 29 / 43 7,490 Future Imperial Avenue Extension 10,740 Clark Rd 37 / 71 196 / 195 10 / 11!( 1 9,290!( 2!( 3 10,005 McCabe Rd Project Site Future Betty Jo Mc Neece Betty Jo Mc Neece Loop!# Study Intersections AM / PM Intersection Peak Hour Volumes Average Daily X,XXX Traffic Volumes AM / PM N:\2831\Figures Date: 12/11/17 La Brucherie Rd Sperber Rd Applestill Rd [ Figure 8-2 Existing + Project + Cumulative Projects Traffic Volumes Clark Rd

9.0 ANALYSIS OF NEAR-TERM SCENARIOS 9.1 Existing + Project The following is a discussion of the intersection and street segment operations under the existing + project traffic conditions. 9.1.1 Intersection Operations Table 9 1 shows that all the study area intersections are calculated to operate at acceptable LOS D or better during both the AM and PM peak hours. 9.1.2 Segment Operations Table 9 2 shows that the study area segments are calculated to continue to operate at acceptable LOS C on a daily basis. Based on the City of El Centro s significance criteria, no significant impacts were identified for any study area intersections or segments. 9.2 Existing + Project + Cumulative Projects The following is a discussion of the intersection and street segment operations under the existing + project + cumulative projects traffic conditions. 9.2.1 Intersection Operations Table 9 1 shows that with the addition of cumulative project traffic, all the study area intersections are calculated to operate at acceptable LOS D or better during both the AM and PM peak hours with the following exceptions which are calculated to operate at LOS E during the AM peak hour. La Brucherie Road / McCabe Road McCabe Road / Clark Road Based on the County of Imperial s significance criteria, two significant cumulative intersections impacts were identified. 9.2.2 Segment Operations Table 9 2 shows that with the addition of cumulative project traffic, all study area segments are calculated to continue to operate at acceptable LOS D on a daily basis. 24

TABLE 9 1 NEAR-TERM INTERSECTION OPERATIONS Intersection Control Type Peak Hour Existing Existing + Project Existing + Project + Cumulative Projects Delay a LOS b Delay LOS Δ c Delay LOS Δ d Sig? 1. McCabe Road / La Brucherie Road AWSC e AM 25.6 D 27.2 D 1.6 49.0 F 21.6 Yes PM 9.4 A 9.6 A 0.2 14.2 B 4.6 No 2. McCabe Road / Sperber Road OWSC f AM 13.9 B 18.0 C 4.1 20.8 C 2.8 No PM 11.2 B 13.0 B 1.8 17.9 C 4.9 No 3. McCabe Road / Clark Road AWSC AM 19.3 C 25.0 C 5.7 48.1 E 23.1 Yes PM 11.3 B 12.0 B 0.7 22.6 C 10.6 No Footnotes: a. Average delay expressed in seconds per vehicle. b. Level of Service. c. Δ denotes an increase in delay due to project traffic. d. Δ denotes an increase in delay due to cumulative project traffic. e. AWSC All-Way Stop Controlled intersection. f. OWSC One-Way Stop Controlled intersection. Minor street left turn delay is reported. Shading represents a potential significant impact. SIGNALIZED UNSIGNALIZED DELAY/LOS THRESHOLDS DELAY/LOS THRESHOLDS Delay LOS Delay LOS 0.0 10.0 A 0.0 10.0 A 10.1 to 20.0 B 10.1 to 15.0 B 20.1 to 35.0 C 15.1 to 25.0 C 35.1 to 55.0 D 25.1 to 35.0 D 55.1 to 80.0 E 35.1 to 50.0 E 80.1 F 50.1 F 25

TABLE 9 2 NEAR-TERM STREET SEGMENT OPERATIONS Street Segment Existing Capacity (LOS E) a Existing Existing + Project Existing + Project + Cumulative Projects ADT b V/C c LOS d ADT V/C LOS Δ e ADT V/C LOS Δ f Sig? La Brucherie Road North of McCabe Road 16,200 4,620 0.285 C 4,690 0.290 C 0.005 7,490 0.462 D 0.172 No McCabe Road La Brucherie Road to Sperber Road 16,200 5,030 0.310 C 5,290 0.327 C 0.017 9,290 0.573 D 0.246 No East of Clark Road 16,200 5,700 0.352 C 6,005 0.371 C 0.019 10,005 0.618 D 0.247 No Clark Road North of McCabe Road 16,200 6,180 0.381 C 6,440 0.398 C 0.017 10,740 0.663 D 0.265 No Footnotes: a. Capacities based on City of El Centro Roadway Classification & LOS table (See Appendix C). b. Average Daily Traffic c. Volume to Capacity ratio d. Level of Service e. Δ denotes an increase in delay due to project traffic. f. Δ denotes an increase in delay due to cumulative project traffic. 26

10.0 PROJECT ACCESS Access to the project site will be via two (2) project constructed full-access driveways along the project constructed extension of Betty Jo Mc Neece to the west from Sperber Road. Betty Jo Mc Neece will cul-de-sac just west of the project s frontage and provide no connection to La Brucherie Road to the west. All project traffic will utilize the Sperber Road / Betty Jo Mc Neece intersection to access the project site. The access is expected to operate well. 27

11.0 SIGNIFICANCE OF IMPACTS AND MITIGATION MEASURES Following is a description of the calculated significant impacts based on the established significance criteria along with recommendations for mitigation measures. 11.1 Significant Impacts Prior to Mitigation Based on the City of El Centro significance criteria, two significant cumulative impacts were calculated at the following intersections: INTERSECTIONS: 1. La Brucherie Road / McCabe Road; 2. McCabe Road / Clark Road. 11.2 Mitigation Measures The Imperial Avenue extension project is discussed in Section 3.3 of this transportation study. The transportation study assumed the project would be constructed prior to the roadway extension being completed. The Project is calculated to have a significant cumulative impact at two study intersections. The following summarizes the recommended mitigation measures. 1. La Brucherie Road / McCabe Road Contribute a fair share towards the installation of a traffic signal and dedicated left-turn lanes on all approaches. 2. McCabe Road / Clark Road Contribute a fair share towards the installation of a traffic signal and a dedicated left-turn lane on the westbound approach. End of Report 28