Amendment Is the power section the only source of power at 300V on the vehicle, and hence will be responsible for regulating this voltage?

Similar documents
Focus Areas Power and Energy Operational Environments

Li-ion Battery System

HONOLULU AUTHORITY FOR RAPID TRANSPORTATION CITY AND COUNTY OF HONOLULU ADDENDUM NO. 1 TO THE REQUEST FOR INFORMATION FOR THE

Clarifications Note 2 ITB GP

REQUEST FOR INFORMATION (RFI) ONR RFI Announcement N RFI-0013 Torpedo Advanced Propulsion System (TAPS)

Effect of Hybridization on the Performance of Fuel Cell Energy/Power Systems (FCEPS) for Unmanned Aerial Vehicle (UAV)

Central Florida Regional Transportation Authority d.b.a.

Design Development and Testing of the Ground Renewable Expeditionary ENergy System

Electric Drive Approach to Mobile Power Platforms

Real-Time Power Quality Study For Sustainable Energy Systems. PI: Dr. U. Meyer-Baese, Co-PIs: Helen LI, Simon Foo, Anke Meyer-Baese, Juan Ordonez

E2S2 Regenerative Solar Power Solutions for Extended Mission Endurance

ANNEX 3. RESOLUTION MEPC.278(70) (Adopted on 28 October 2016)

RESOLUTION MEPC.278(70) (Adopted on 28 October 2016) AMENDMENTS TO THE ANNEX OF THE PROTOCOL OF 1997 TO AMEND THE INTERNATIONAL CONVENTION FOR THE

The Highly Innovative Battery Market Rolls Out Novel Solutions that are Customisable and Reliable

ST. VINCENT AND THE GRENADINES

Compact Energy Storage Module. Modular Systems, EPDS. Product overview

Table of Contents. 1 Introduction. 2 Power System Requirements. Preface... xi

Electric Vehicle Supply Equipment Basics Review

Amendment of UN ECE R100 regarding in-use requirements for vehicles of category L Status:

IMO fuel oil consumption data collection system

Technical Support for Electric Vehicle Charging Requirements in the Building Code that are in effect January 1, 2018

A Cultural Shift in Fuel Sources for Man Portable Power

Turbo-charging Your Forklift Fleet: The Power of Industrial Lithium Forklift Batteries

Applications, opportunities and challenges for SOFC Brent Ness Director, Growth Office

Top Loader Electrification Proposal for POLA Operations

ANNUAL REPORT ON EXPORTS AND IMPORTS OF CONVENTIONAL ARMS, IN ACCORDANCE WITH ARTICLE 13(3) OF THE ARMS TRADE TREATY. Col. (Rtd.) Saa Anthony Sinah

Accelerated Testing of Advanced Battery Technologies in PHEV Applications

The First Annual Municipal Electric Champion Awards

Solar Power Adapters and Deployable and Renewable Alternative Energy Module

sun systemizer High-performance battery storage for a safe power supply

AEG Belgium customer day Telecom products & systems

DEPARTMENT OF THE NAVY NAVAL ORDNANCE SAFETY AND SECURITY ACTIVITY FARRAGUT HALL 3817 STRAUSS AVENUE, SUITE 108 INDIAN HEAD, MD

Technical Support for Electric Vehicle Charging Requirements in the Building Code that are in effect January 1, 2018

Southern California Public Power Authority (SCPPA) Request for Information (RFI) Battery Energy Storage System (BESS)

Amendment SN-0007 Hybrid Energy Storage Module (HESM) Date (18 Dec 2012)

WIRELESS CHARGING FOR THE OFF ROAD INDUSTRY

Technical Challenges for Vehicle 14V/28V Lithium Ion Battery Replacement

DEPARTMENT OF THE NAVY NAVAL ORDNANCE SAFETY AND SECURITY ACTIVITY FARRAGUT HALL 3817 STRAUSS AVENUE, SUITE 108 INDIAN HEAD, MD

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

Overview of the Grid-Saver Fast Energy Storage System

AFG Project Update Spring 2006 Semester 02/15/2006

TECHNICAL ISSUES IN DEVELOPMENT OF A VARIABLE HYBRIDITY FUELCELL LOCOMOTIVE

OICA Draft Proposal for the ELSA Meeting July in Bonn

U.S. Army s Ground Vehicle Programs & Goals

ZOE Battery Durability, Field Experience and Future Vision

Innovation for Transportation Systems

ARAI Date of hosting on website: 27 th October 2015 Last date for comments: 27 th November 2015

Lithium-Ion Battery for Audi A6 PHEV. Steve Lehnert, AUDI AG

New energy for the future

BYD Battery Energy Storage Solution. BYD Design Center

Use of Aqueous Double Layer Ultracapacitor using Hybrid CDI-ED Technology for the use in Hybrid Battery Systems

Consortium de recherche et d innovation en transport urbain au Canada (CRITUC)

POLLUTION PREVENTION AND RESPONSE. Application of more than one engine operational profile ("multi-map") under the NOx Technical Code 2008

Zero Emission Bus pilot program CALACT

Sonnenschein Lithium HC (High Current)

SUBMISSION SUBMISSION ON THE. Energy Innovation (Electric Vehicles and Other Matters) Amendment Bill

The Commonwealth of Massachusetts

New propulsion systems for non-road applications and the impact on combustion engine operation

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

THE ARMS TRADE TREATY PROVISIONAL TEMPLATE

CHAPTER 7 ELECTRIC VEHICLE CHARGING FACILITIES

This document describes the commissioning checklist procedures for the Capstone MicroTurbine systems.

Using Inverter Input Modes for Smart Grid Management

AMENDMENT NUMBER 1 (October 17, 2017) DEADLINE FOR RECEIPT OF PROPOSALS IS AS FOLLOWS: Submittal Due Date & Time: Tuesday, October 24, 2017 at 2:00 PM

Store Energy, Green Future

ANNEX B TERMS OF REFERENCE FOR THE DESIGN OF A LOW VOLTAGE POWER NETWORK FOR IMS STATIONS IN WARRAMUNGA, AUSTRALIA

Technology. For road and track by TOYOTA Motorsport GmbH (TMG)

TECHNICAL WHITE PAPER

DANGEROUS GOODS PANEL (DGP) MEETING OF THE WORKING GROUP OF THE WHOLE

2010 Selection Guide

Li-Ion Charge Balancing and Cell Voltage Monitoring for Performance and Safety

Medium Rate Hybrid Pouch Cell

Solar Inverter 3kW-8kW Inverter (off-grid)

Energy Storage Commonality Military vs. Commercial Trucks

Battery Evaluation for Plug-In Hybrid Electric Vehicles

FURTHER TECHNICAL AND OPERATIONAL MEASURES FOR ENHANCING THE ENERGY EFFICIENCY OF INTERNATIONAL SHIPPING

ELECTRICAL POWER, DIRECT CURRENT, SPACE VEHICLE DESIGN REQUIREMENTS

Amendment of UN ECE R100 regarding in-use requirements for vehicles of category L Status: RESS-9-6 Rev.02

AVL SERIES BATTERY BENCHMARKING. Getting from low level parameter to target orientation

CITY OF TACOMA ENVIRONMENTAL SERVICES DEPARTMENT

Ampd Silo. Energy Storage System. Maintenance-free Li-ion energy storage for mission critical backup. Power to Empower

XLM 62V Energy Storage Module

Man-Portable Tactical Power Report on Efforts

Three phase Solar Pump

Microgrids Outback Power Technologies

Central Florida Regional Transportation Authority d.b.a.

With respect to the fact that wattage losses of the synchronous motor winding, not considering the iron losses, are in accordance with the relation

Reducing Warfighter Load by Increasing Energy Density

ANNEX 30 RESOLUTION MEPC.240(65) Adopted on 17 May 2013

PSIM Tutorial. How to Use Lithium-Ion Battery Model

Hydro-Piezoelectricity: A Renewable Energy Source For Autonomous Underwater Vehicles

Segway Robotic Mobility Platform (RMP) Specifications

USMC Battery Efforts Justin Govar Joint Service Power Expo VERSION 1 / August 11, 2015

ADDENDUM NO. ONE (1) ACQUIRE SNOW REMOVAL EQUIPMENT NORFOLK INTERNATIONAL AIRPORT, VIRGINIA. May 18, 2016

Description Sets the priority for the AC source (AC1 or AC2) for qualification and transfer.

How will India scale its Electric Vehicles Is 2030 deadline feasible? Ashok Jhunjhunwala, IIT Madras,

2011 Advanced Energy Conference -Buffalo, NY

Design and Analysis of Hybrid Renewable Microgrid Systems for United Nations WFP Humanitarian Locations in Developing Countries

Contents. Formula Student UK Appendix FSUK-C-2

New Flyer of America Inc. The State of Charging Standards and Deployment. David Warren Director of Sustainable Transportation

Transcription:

Solicitation Number: Large Displacement Unmanned Underwater Vehicle Innovative Naval Prototype (LDUUV INP) Energy Section Technology Date: (4 AUG 2011) The purpose of is to respond to questions submitted prior to 26 AUG 2011. Questions received after that date and before the deadline for submissions of questions will be addressed in a subsequent amendment. The following questions have been received pertaining to BAA 11-028. BAA 11-028 is hereby amended as follows: 1. Question: Is the power section the only source of power at 300V on the vehicle, and hence will be responsible for regulating this voltage? 2. Question: Refer to Tables 2 and 4 of ONR BAA 11-028 for information pertaining to the power section. Will there be any back EMF to the power section electronics from the propulsion system during vehicle shut down? 3. Question: The question of back EMF is beyond the scope of ONR BAA 11-028. Figure 1 - The figure shows 18"x18" access ports. Note 4 states ports may be anywhere and that the ones shown in the figure are examples. Please confirm that proposers have full control of number and size of access ports required to support the energy system requirements. Yes, proposers have control of the number and size of access ports. Please refer to the information contained in Figure 1 and the notes associated with Figure 1of ONRBAA 11-028.

4. Question: Figure 2 - The mission profile has a period of time when the power profile goes to zero. Does this mean there is no load required of the power system? Can the power system continue to generate power for recharging batteries and/or maintaining energy system temperature during this time? 5. Question: Correct, no load is required from the power system. The power system CAN NOT continue to generate power during this time. Table 2- Please clarify the start/stop Cycle metric definition. Does a start/stop cycle mean before and after a mission? 6. Question: The start/stop cycle definition is contained in Table 2 of ONR BAA 11-028. Table 2 - What is definition of hibernation? Is it the period of time at which there is no power draw on the system during the mission? 7. Question: The definition of hibernation is a period of time at which there is no power draw on the system during the mission. Table 2 - Under Safety Considerations, it states to see Section 6.2 page 12. What is on page 12 that is relevant to Safety? 8. Question: Please see Amendment 2, enclosure 1 to ONRBAA 11-028. The relevant information is contained on page 9. Table 3 - Is the on-board 8 kw battery that is external to the energy section rechargeable? If yes, can it be recharged from the energy system during the mission? If so, what is the peak and sustained charge power capability of the battery?

The question of whether the 8kW batter is rechargeable is beyond the scope of ONR BAA 11-028. 9. Question: What is the minimum voltage of the battery? What is the maximum voltage? 10. Question: Maximum/minimum battery voltage is contained in Tables 2 and 4 of ONRBAA 11-028. Is the 8kW Battery used for any other power requirements in the system? 11. Question: Other power requirements for the 8kW battery are beyond the scope of ONRBAA 11-028. Is there a power conditioning unit (i.e. DC/DC converter) for the battery buss? Is the battery connected through a charger and battery management controller? Is there a specific communication protocol with such a controller? 12. Question: The question of a power conditioning unit is beyond the scope of ONR BAA 11-028. Do proposers have to tie into the conduit runs that are integrated into the corners of the hull section for interfacing electrically with other sections of the UUV? 13. Question: The conduits are for adjoining sections to pass cables; the energy section cabling interface documentation (ICD) to adjoining sections will be provided to the performers continuing on to the Phase I option of the effort. What is the minimum transition time for transitioning power from low power (0-575 watts) to 12,100 watts? Is this time typical for all power transitions, up and down?

14. Question: The minimum transitioning time is contained in Figures 2 and 3 and Appendix A of ONRBAA 11-028. Do we need to include filtering of seawater in our system or is this seawater filtered in another section? 15. Question: Any required seawater filtering must be provided for by each proposal. Is there a lower voltage bus (e.g. 12 VDC or 24 VDC) available on the vehicle? In other words, is there a step down power conversion from the 300 VDC in another section of the UUV that could be accessed for power at that voltage? 16. Question: There is no lower voltage bus available to the energy section. Does the energy section need to be sealed off from the other sections? If so, will the adjacent sections be pressurize by the ocean water so that the pressure differential across the seal would be minimal? 17. Question: The question of the pressurization of other sections is beyond the scope of ONRBAA 11-028. In section 6.2 under the Objective sub-section it states "Conduct subscale (at least 5 kw peak power) component and/or full-scale critical component and integration testing.". Can the proposed fuel cell stack provide 5 kw peak power for Phase I Base or does it need to be fullscale (12 kw peak power)? The question of peak power during the Phase I Base period is answered by the information contained in Section 6.2, Phase I Base Objectives.

18. Question: What is the vehicle velocity profile associated with the mission profile? Specifically, what are the vehicle velocities at 575 watts and 12,100 watts? 19. Question: ONR will not be providing a velocity profile since it is beyond the scope of the BAA. What is the chemistry of the 8 kw battery (e.g. Li-ion)? 20. Question: ONR will not be providing the 8kW battery chemistry since it is beyond the scope of the BAA. The phase-i Threshold specific-energy seems to be 817 kwh/3540 kg or 230.8 Wh/kg; while the Objective specific-energy is 1800 kwh/3540 kg or 508.5 Wh/kg. Please confirm if these values can be just for the test cells or must include the outer casing and terminals, as well. 21. Question: Per Section 6, paragraph 1, page 2, and Table 1 of (specifically note 2), the Threshold and Objective specific energy values are at the complete energy system level. Per the BAA the Cost Proposal Spreadsheet needs to be completed by: Phase I Base (by Government Fiscal Year), Phase I Option (by Government Fiscal Year). In addition to the above, does the Cost Proposal Spreadsheet need to be completed by Task/Subtasks by government fiscal year? If budgets are required by Task is it by Major Tasks only or all Tasks and Subtasks by Government Fiscal Year? In completing the required Cost Proposal Spreadsheet, offerors are to follow the instructions embedded within the required spreadsheet. As shown in the spreadsheet costs are to be proposed based on calendar year. Options are to be priced separately. There is no requirement to provide costs by tasks/subtasks.

22. Question: When can the 8kw battery be used? Can it be used prior to the start of the mission? Can the 8kW battery power be used during the 143W for first 0.5hr at the start of the Threshold profile? Can it be used during the 2700 watt mission period? Per Table 4, page 7: 8 kwh for 1 hour available for energy section start-up. Max Power is 8KW. Energy Section may request power from battery through the control interface 23. Question: Are we responsible for providing ports to flood all channels of the power section or will the adjacent sections also be flooded? The condition of adjacent sections of the UUV is beyond the scope of this BAA.