Geda Materials Hoist Operating Instructions

Similar documents
Star Swivel-Arm Hoist Installation and Operating Instructions

Rubbish Chutes Operating & Assembly Instructions

UNDER VEHICLE ACCESS SAFETY

Assembly and Operating Manual

SPECIFICATION FOR. MAINTENANCE OF POWERED LIFTING PLATFORMS (for use by disabled persons)

USER'S MANUAL TRANSPORT PLATFORM / MATERIAL HOIST. HEK GTP Dual T This manual is assigned to: Issue:

USER S MANUAL GTP 1500 TRANSPORT PLATFORM

6.0 Vehicles and machinery

User manual. Alpin Z 300. Vertical platformlift

Element C7.2 Lifting Work Equipment

Element 3: Musculoskeletal Hazards and Risk Control

BROOKS STAIRLIFTS SUPERGLIDE 120

Boom Lift Platform Capacity Reduction Manual. For Set Lighting Technicians and Studio Grips

Name: ACORN Inc. Address: 6450 Kingspointe Parkway, Unit 1, Orlando, Florida, IMPORTANT!

Operators manual Bumpa 8 metre 110v Bumpa 10 metre 110v

Mine Hoist Hazards. The incidents over the past 10 years have been associated with causal factors such as, but not limited to:

Important. Contents. Contact us:

4 B High Do not allow anyone except the signal person in the working area

Operators manual Hoddi 6 metre 110v Bumpa 8 metre 110v Bumpa 10 metre 110v

shortform operating instructions

HIGH SPEED SLIDING GATE OPENER

The Stannah Stairiser SX User Manual

PLATFORM WHEEL WELL ACCESS STAND

LSU University Safety Manual Section IV, Part C Stairs and Ladders. C. Stairs & Ladders

Important. Contents. Contact us:

4400-Lb. Capacity Pallet Jack

Ensure staff are trained in use of equipment

LEARNER GUIDE. Conveyor Belt Tractor CBT. PO Box 2026 Mountain Gate VIC 3156 p: ABN: RTO: 21396

ESSENTIAL SAFETY RESOURCES

Wheel Horse. 44 Snowthrower. for 5xi Lawn and Garden Tractors. Model No & Up. Operator s Manual

ELECTRIC HOIST MODEL NO: CH2500B, CH4000B OPERATION & MAINTENANCE INSTRUCTIONS PART NO: , LS1010

Package Contents Part A (3) I-Beam (1) Base (2) Other parts

29 CFR 1910, Subpart O

Grease Stand MODEL# DF MAINTENANCE AND OPERATION MANUAL. Page 1

- 0 - UT Series Product Manual

Operating Manual. SEH series. Construction Hoist. Manufacturing year:... Serial number:... Manufactured and distributed by:

BY CUSTOM EQUIPMENT LLC OPERATIONS & SAFETY MANUAL PUSH-AROUND AERIAL WORK PLATFORM SUPO-642E REV D HB-P3.6 SERIES I

Powered Industrial Truck Safety Program

John Berends Implements Pty Ltd OPERATOR S MANUAL PARTS LIST

Safe Operating Procedure LADDER - Single

Shown on model Bolts 6 Oil lines 5 Screw 7 Adjusting screw Shown on model 209

7 Hazard assessment 8 Worker participation 9 Hazard elimination and control

hercules Commercial CPL400 CPL600 CPL800 CPL1000 CPL1200 CPL1400 INSTALLATION & OWNER S MANUAL Commercial Vertical Platform Lifts

Page 1 of 6 VAN DAILY VEHICLE PRE CHECKS INFORMATION

SEGMENT SIXTEEN - Other Risks and Hazards

Automotive Lifting Equipment

Thule Glide Instructions

KV4-300 mk2. KV5-200 mk2. KV5-100T mk2. KV3-250 mk2

TELESCOPIC LADDER MODEL NO: TL-2B / TL-3B

MANUAL LIFTER TROLLEY INSTRUCTION MANUAL

ROUGH TERRAIN VEHICLES

Revision Date Reviewed By Authorised By. V3 22/01/2018 D Newton P FitzPatrick. processes Task. Coupling and Uncoupling Coupling.

NXLONG/HD TRAILER. Operating Manual. Trailer. Hilomast LLC 402 Chairman Court Debary FL32713

ENGINEERS RESPONSIBILITY-WINDERS

Technical Publications AWP. Operator's Manual. Fourth Edition, First Printing Part No

NK TRAILER. Operating Manual. Trailer. Hilomast LLC 402 Chairman Court Debary FL 32713

Garaventa Genesis OPAL

OSH5063EP(PRS3607) Workplace and Work Equipment Hazard. Session 10. Lifting Operation

Assembly Instructions

In This Document MODULE DESCRIPTION This module provides information on the safety concerns and

Residential Platform Lifts RPL400 / RPL600 Owner s Manual and Warranty Information

SAFE OPERATING PROCEDURE LADDER - Extension

General Instructions and Inspection Instructions for Crane

Northern Concrete Construction, Inc. Safety Management System. Authority: President

LKS300/LKS450 OPERATOR S MANUAL

Heavy Duty Engine Cranes

X X26 Serial Numbers

TRASH RACK CLEANING MACHINE

INTRODUCTION Please read this manual before you use your jack and ensure you understand its operation and the safety procedures to be observed.

Operator s Manual with Maintenance Information. Second Edition First Printing Part No

Important. Contents. Contact us:

RINK Model 1622 Series number:

Big Bag Unloader. Customer Product manual Part Number Issued 07/17

Event Risk Assessment

22 ELEVATING WORK PLATFORMS

Big Ox Energy - Siouxland LLC. Safety Management System. Authority: President

Instruction Manual For Auto Shift Hydraulic Lift Table

Wallace Tri-Adjustable Gantry Cranes Square Tube Assembly Instructions

Responsible Unit: Facilities Management

HYDRAULIC TROLLEY JACK K Distributed by Kincrome Tools and Equipment:

HERCULES II DC OWNER S MANUAL HERCULES II DC RESIDENTIAL & COMMERCIAL

And the Labour Law for the Private Sector promulgated by And Legislative Decree No.(36) of 2012, particularly Article (166) thereof,

Stairways and Ladders

Health & Safety Policy and Procedures Manual SECTION 22 CRANE SUSPENDED PERSONNEL PLATFORMS

E-Z LIFT 2000 BMC/TMC OPERATORS MANUAL EZ90018-EZ90538 EZ90549-EZ90689

SAFETY GUIDANCE MATERIAL

CHAPTER 22 MOBILE ELEVATING WORK PLATFORMS 22 MOBILE ELEVATING WORK PLATFORMS. Basic Types. Scissor-Type Machines

SECTION 11 POWERED INDUSTRIAL TRUCKS

Wind and Temperature Tip Over Hazard Do not add notice boards or similar

COOKSON OWNER S MANUAL

USER MANUAL AND SPARE PARTS LIST RINK. Model SP950. Serial Number: 1703 English

Lifting device for standard removable versions

OPERATING & INSTRUCTION MANUAL

1 Clearheart Construction Co., Inc. Mobile Crane - Onshore MOBILE CRANES Cranes and derricks

JHT ACN COMPANY INDUCTION JOHN HEGGART TRANSPORT. Ph: Fax: P.O BOX 1271 Warragul Vic

CAUTION -TABLE OF CONTENTS- II. OPERATING INSTRUCTIONS

Section 14 TABLE OF CONTENTS Material Handling, Storage and Disposal. 14.A Material Handling B Material Hoists

Waste & Litter Collection utilizing the Rear Loading Compactor

Portable Ladder Safety

IMPORTANT INSTRUCTIONS FOR OPERATION & MAINTENANCE OF

Transcription:

Geda Materials Hoist Operating Instructions Conveying & Hoisting Solutions Pty Ltd ABN 78 163 105 744 1 Purpose of Equipment Geda Rack & Pinion Hoists are temporarily erected hoist systems that are intended exclusively for transporting goods. Materials Hoists are NOT intended for the carriage of humans or animals. 2 Safety 2.1 Warnings The Hoist is constructed using sate-of-the-art technology and is safe to operate. However, the nature of the operating procedures is such that the Hoist has areas and parts that cannot be protected without impairing the function and operating capability. Therefore good personal safety practice is essential to protect personnel and the Hoist. t h e H o i s t. The Hoist can present dangers if it is used incorrectly by untrained personnel or if it is not used in accordance with regulations. Read and understand these instructions first before setting up or operating this equipment Keep these instructions accessible near the Hoist. Before beginning work, one should become familiar with the working environment. No changes, additions or modifications may be made to the Hoist or associated equipment. Do not modify, remove, bypass or override the safety devices. Have the area around the Hoist barricaded off and post warning notices. Observe National Plant Regulations and Occupational Health and Safety Regulations. In situations that are dangerous or potentially dangerous to the operating personnel or to the hoist, pressing the EMERGENCY-STOP button can stop the Hoist. Fig. 1 EMERGENCY- STOP button 2.2 Certification A Certificate of Competency is required to operate this Hoist. The Operator must be familiar with the Operating Instructions, possess adequate experience and be aware of the dangers involved with the Hoist. 2.3 Log Book A continuous working record (i.e. logbook) of the significant events concerning the safety and operation of the Hoist shall be kept and retained on the Hoist. Refer to AS 2550.7 Section 9.6 for details. 2.4 Incident Notification The employer, as defined by the Regulations referred to below, who has management or control of the workplace must be aware that they may have an obligation to notify WorkCover of any incidents involving this equipment. Refer to the Occupational Health and Safety Act and the Occupational Health & Safety (Incident Notification) Regulation(s) applicable to your State 2.5 Inspections Inspections as detailed in Chapter 6: Maintenance should be performed before Installation or Use of this equipment. Form 0503 Issued 14th May 2013 Page 1 of 6

2.6 Hazard Assessment Please note that this checklist is indicative only. Users must perform their own Risk Assessment subject to the intended siting and use of the equipment. Hazard Risk Control Crushing by the Hoist collapsing, tipping or rolling Moderate Ensure that the load does not protrude from the platform and the Hoist is always observed during operation, or the load may catch leading to the Hoist toppling. Ensure that the Hoist has been assembled on firm level ground only. Check the area under the Hoist has not been cut, bored, eroded or otherwise become unstable. Ensure the securing structure is of adequate strength. Ensure that the Hoist is correctly attached with adequate bracing and fixtures. Regularly check mast bolts, bracing and fixings for soundness. Do not remove bracings or fixings Check the Hoist mast is vertical in both elevations. Do not overload the Hoist, or allow loads to protrude. Crushing or shearing by trapping between the Hoist and fixed structures, or Hoist parts. Falling when unloading a raised platform Striking or crushing by materials falling from the equipment Moderate Moderate Low Do not operate in extreme weather conditions. Barricade a work-space around the base of the Hoist to prevent personnel standing underneath the Hoist Ensure the base area is unobstructed before lowering the Hoist in the final 2m zone. Keep body parts clear of the Hoist and it s components while in motion. Keep fingers and toes clear of the Loading Ramps. Barricade area at height to prevent falls. Ensure Landing gates or barriers remain closed except during loading/unloading. Do not step onto a raised platform. Barricade a work-space around the base of the Hoist to prevent personnel standing underneath the Hoist Do not overload the Hoist. Loose or suspect materials should be adequately secured before hoisting. Do not carry protruding loads. Electrocution Low Operate from a protected supply only. Do not operate in a liquid environment. Explosion Low Do not operate near naked flames. Do not operate in an explosive environment. Cutting, stabbing or puncturing Crushing or entanglement when inspecting or maintaining the Hoist Low Low Ensure mesh on platform and Landing Gates is in good condition. Do not carry protruding loads. Do not place body parts against the Hoist when in operation. Wear close fitting clothing Do not wear jewellery such as chains or rings. 3 Specifications Model 500/300Z 500/300L 500Z/500 Maximum Load Capacity (evenly distributed) 300kg 500kg 500kg Supply Voltage 240v 9.5A 240v 10.5A 415v 11.4A Lifting Speed 13m/min 9m/min 25m/min Maximum Lifting Height 50m 50m 100m Platform size 900mm x 1750mm 1600mm x 1750mm 1600mm x 1750mm Platform Loading Ramp size 600mm x 920mm 600mm x 1770mm 600mm x 1770mm Height to platform when completely lowered 300mm 300mm 300mm Ground Bearing Area 0.25m 2 0.4m 2 0.4m 2 Base Mass 490kg 550kg 520kg Mast Mass 48kg 48kg 48kg Form 0503 Issued 14th May 2013 Page 2 of 6

4 Description 4.1 Outline During operation the Hoist is controlled by means of the mobile Hand Control at the Switchbox on the cable bin. An Overspeed Governor prevents a free-fall from a drive or brake failure. Floor Stops may be fitted to the Hoist to allow stops at a pre-determined point. Pressing the UP button slightly will cause the Hoist to stop automatically at the next Floor Stop fitted. Pressing the UP button completely will cause the Hoist to rise continuously until the button is released or the Working Limit is reached. Landing Gates interlocks and signalling system connected to the Hoist operate on 48vAC and do not require additional insulation (see AS 3000 Wiring Rules) 4.2 General Arrangement 10 11 9 8 7 12 13 6 5 4 3 2 1 dimensions 1.8 x 2.3m Fig. 2: Hoist Components 1 Hoist Base 6 Overspeed Governor 11 Mast Section 2 Cable Drum 7 Motor/Brake 12 Platform 3 Switchbox 8 Cable Guide 13 Loading Ramp 4 Hand Control 9 Landing Stop 5 Trailing Cable 10 Working / Final Limit Form 0503 Issued 14th May 2013 Page 3 of 6

4.3 Controls Fig.3: Operator s Hand Control 1: EMERGENCY STOP 2: not used 3: UP button 4: DOWN button 5: Control Lead 1: Main key switch 2: Green Lamp (Hoist run) 3: Red lamp (Hoist stopped, Interlock open) 4: Cabinet Lock 5: Red Lamp (Hoist stopped. Landing Gate open) 6: Landing Gate Link (48vAC) Fig. 4: Switchbox at the Hoist base. 4.4 Travel Limit Switches Normal operational up travel is limited by a Working-Limit switch activated by a red plate fitted to the mast above the topmost landing point [Fig. 6]. This limit switch will be reached if the UP button is completely pressed, or the UP button is pressed in AUTOMATIC mode while the platform is at the uppermost landing. Pressing the DOWN button in either mode will allow the platform to descend off this limit switch. Down travel is limited by a Working-Limit switch activated by a plate fitted to the mast so the platform stops at ground level. Pressing the UP button in either mode will allow the platform to move off this limit switch. An upper Final-Limit switch is tripped by the red activating plate [Fig. 6] fitted to the mast above the topmost landing point. The Final-Limit switch will only be tripped by failure of the Working-Limit switch. It is not possible for the Operator to move the platform off this limit switch and Conveying and Hoisting Solutions Pty Ltd must be contacted for corrective action. A Proximity switch is also fitted to limit upper travel if the red Limit switch activating plate is removed or tampered with. If the red Limit switch activating plate and Proximity switch are tampered with or removed, the hoist design will ensure the drive sprocket will over-run the mast but the platform will be retained on the mast by all keepers and guides. A lower Final-Limit switch is tripped if the hoist over-runs the lower Working-Limit switch. The Operator cannot move the hoist platform if this switch has been activated and Conveying and Hoisting Solutions Pty Ltd must be contacted for corrective action. Failure, removal or tampering with the Working-Limit and Final-Limit switches in the down direction will result in the drive pinion causing a special section of rack to be torn off, preventing any hoist operation until the Supplier has been contacted for corrective action. Automatic Landing stop may be set by fixing a Landing Stop plate on the mast as shown in Fig. 5 Fig 5: Landing Stop 1,05m Fig. 6: Working / Final-Limit Form 0503 Issued 14th May 2013 Page 4 of 6

5 Operation 5.1 Pre-Operation Read the Warning notices in Chapter 2 and implement a Risk Assessment before starting work Perform maintenance as described in Chapter 6 Do not work beneath; step over or into the Hoist. Always wear personal protective equipment. 5.2 Prohibitions Do not hoist people or animals. Do not exceed the loading specifications stated in Chapter 3 Do not operate with the load on one side of the platform only or a load protruding over platform edges. Do not operate in wind speeds of more the 70km/hr Do not operate if the Hoist or any of it s components are damaged Do not operate if required Maintenance has not been performed. Do not use this Hoist if there is any damage or unusual performance. Isolate the Hoist as described in Chapter 7.1 Emergency Shutdown. Do not operate the Hoist if there is a risk of people being endangered by the load or platform. Do not operate in poor conditions (below 15ºC or above 45ºC, fog, ice, naked flames etc) Do not operate if upper and/or lower Travel Limit switches have not been set. Do not operate if any bracing or fixings have been loosened or removed. 5.3 Beginning of Work Period Start-up Turn the Keyed Isolator Switch [#1 in Fig.4] on the Switchbox to ON Check that the platform is unloaded. Check that personnel and/or animals are not near or on the platform. Check all ramps and covers are closed firmly. Turn the EMERGENCY STOP [#1 in Fig. 3] button clockwise to release. Verify that the green lamp [#2 in Fig. 4] is lit. See Chapter 5.5 if not lit. Press and hold the black UP button [#3 in Fig. 3] to raise the platform 2 metres. Release the button and check the Hoist stops instantly and the platform does not descend under it s own weight. Press and hold the black DOWN button [#4 in Fig. 3] and lower the platform 1 metre. Release the button and check the Hoist stops instantly and the platform does not descend under it s own weight. Lower the platform to the ground and place a suitable load on the platform. Repeat the above lift test Check that the Trailing Cable [#6 in Fig.1] winds and unwinds regularly from its container. 5.4 Loading or Unloading the Platform Refer to Fig. 7 The load platform must always be loaded in such a way that there is free access for loading and unloading. The load must be evenly distributed on the platform. Bulky goods must not protrude laterally over the platform. The load must be positioned securely. Materials that tend to slip, or is higher than the platform or could fall over, must be adequately secured. Consideration should be given to the effects of sudden wind gusts on the security of the load. Fig. 7: Prohibited loading 5.5 Indicator Lamps The green lamp {#2 in Fig. 4] is lit when all Hoist & Landing Gate Interlocks are closed and all Emergency Stop switches have been released. The top red lamp {#3 in Fig. 4] is lit when a Hoist Interlock is open such as a Loading Ramp. The Hoist will not run. Both red lamps [#3 and #5 in Fig. 4] are lit when a Landing Gate is open, the Landing Gate connection to the Hoist is loose, unplugging or removing the Landing Gate link or the Emergency Stop Button [#1 in Fig. 3] has been pressed on the Hand Control. The Hoist will not run. Form 0503 Issued 14th May 2013 Page 5 of 6

5.6 Regular Operation Refer to Fig. 3 and Fig 4 in Chapter 4 1. Turn on the Main Key Switch [#1 in Fig. 4] 2. Turn the EMERGENCY STOP Button [#1 in Fig. 3] clockwise to release. 3. Check the green lamp is lit [#2 in Fig. 4]. Refer to Chapter 5.5 if not lit. 4. Firmly press and hold the UP [#3 in Fig. 3] button to cause the platform to rise. 5. Release the button to stop. 6. Firmly press and hold the DOWN [#4 in Fig. 3] button to cause the platform to lower. 7. Release the button to stop. 8. Up and down motions may be ceased at any time by releasing the motion button or by pressing the EMERGENCY STOP [#1 in Fig. 3] button. 9. Up and down motions will be limited by a Limit Switch see Chapter 4.4 5.7 Floor Stop Operation Refer to Fig. 2, Fig. 3 and Fig. 5 Automatic stop at the next landing is available in the UP mode only. Operation in the DOWN mode will cause the platform to descend from a point to the ground. Automatic stop at the next landing will occur if: A Landing Stop has been fitted to the mast [#10 in Fig.2, Fig. 5] The UP button is pressed slightly Release the button to stop. 6 Operator Maintenance 6.1 Daily Perform an empty test run and check that: Working-Limit switches top and bottom are functioning Loading ramps lock correctly and the Hoist does not function if opened EMERGENCY OFF button is functioning and the Hoist does not move When electrically connected to the Hoist, an open Landing Gate will not allow Hoist operation 6.2 Fortnightly or after Adverse Weather Conditions Brake test. Load the platform with a load equal to the rated capacity and check that the platform does not move downward when the Hoist is not operated. Lubricate the toothed rack and driving pinions with general grease. Check the trailing cable, mains supply and control leads for damage. 7 Shutdown 7.1 Emergency Shutdown Stop operation of the Hoist by either: 1. Releasing the UP or DOWN buttons [see Fig. 3]. 2. Pressing the EMERGENCY-OFF button [#1 in Fig. 3]. 3. Turning off the power supply [#1 in Fig. 4]. Remove the power supply from the Hoist. Erect a sign stating DO NOT USE HOIST UNDER REPAIR and fix to the Hoist. Inform management or management s agent of the situation. 7.2 End of Work Period / End of Hire Shutdown Unload the Hoist and lower the platform to the ground. Turn the keyed Main Isolator to OFF and withdraw the key [#1 in Fig. 4]. Remove the power supply and secure the key in a safe place. Clean any dirt or grease from the Hoist. 8 Installation and Removal Refer to Form 0504 for Installation and Removal Instructions Form 0503 Issued 14th May 2013 Page 6 of 6