HP 6890Series Gas Chromatograph. Installation Guide. Flame Ionization Detector. Accessories HP G1561A HP G1562A HP G1591A HP G1598A

Similar documents
Installation Guide. Flame Ionization Detector on a 6890 GC. Accessories G1561A, G1562A, G1591A, G1598A

Installation Guide. Nitrogen-Phosphorus Detector on 6890 GC Accessories G1575A, G1576A, G1594A, G1599A

Installation Guide. Purged Packed Inlet, Electronic Pneumatics Control on 6890 GC Accessory G1551A

Installation Guide Thermal Conductivity Detector Accessory 19232E

Installation Guide. Volatiles Interface for 6890 Gas Chromatograph Accessory G2319A

Installation Guide. Flame Ionization Detector on a 6850 GC Accessory G2621

Agilent G1554A On-Column Capillary Inlet with EPC

Installation Guide. Heater Interface Cable for Mass Sensitive Detector Accessory G1590A

Installation Guide. Thermal Conductivity Detector on a 6850 GC Accessory G2623A

Installation Guide. Auxiliary Pressure Control Manifold on 6890 GC Accessory G1570A

Installation Guide NPD/ECD Chemical Filters Accessory 19199N

Nickel Catalyst Tube Accessory 19205A

Installing a Purged Packed (PP) Inlet

Installing a Cool On-Column Inlet

Installing the Flame Ionization Detector EPC Flow Control Manifold

Installing an Auxiliary Pressure Control Module

Nickel Catalyst Tube on a 6820 GC, Accessory G4318A

Installing an Auxiliary Pressure Control Module

Installing a PTV Inlet

Installing a PTV Inlet

Agilent G3969A Transfer Line Interface for an Agilent 7697A HS Accessory

Installing a Purged Packed Inlet

Agilent G3510A/G3511A Multimode Inlet

Installing the CO 2 Cryogenic Oven Cooling Kit

29 Installation Step 1. Unpacking the GC Cable diagrams Step 2. Placing the GC system on the benchtop Step 3. Turning the power on

Valve Box and Valve Accessories G4315A, G4316A, G4317A

Model 4430 Photoionization Detector (PID) Operator s Manual

Agilent 6890 Gas Chromatograph

Agilent 490 Micro GC Internal and External Mount Genie Filter Brackets

Installing the 6850 Direct Valve Column Connector Kit

Agilent G2333B (Single) and G2334B (Dual) Flame Photometric Detectors

Agilent G3348B Flame Photometric Detector

Agilent G2738A Upstream Capillary Interface

Agilent G2647A (Single) and G2648A (Dual) Flame Photometric Detector Update Kits

Installation Guide. Agilent 7683 Automatic Liquid Sampler

Deans Switch Microfluidics

In addition to this instruction sheet, the following are included in this kit (some additional parts are included for future maintenance):

Fiber Optic Illuminator. Model 21AC Model 21DC

NANOpure Infinity UV Module Upgrade

Battery Replacement. Installation Instructions. Summary of Changes. Catalog Number 2711P-RY2032. Original Instructions

INSTALLATION INSTRUCTIONS

Agilent G4367A Auxiliary Electronic Pressure Control (Aux EPC) Module

Agilent 7820A Gas Chromatograph

Manual No: Revision: B. CCVP Rain Shield. Installation Guide

E24-E28 M88 & S38 Mass Air Flow Conversion System Instruction Manual

A g i l e n t A G a s C h r o m a t o g r a p h Service Manual

Model HPX60 Series Automatic Battery Charger User s Manual Rev. 1.0 October 17, 2006

OPERATIONS MANUAL. Mini Centrifuge Model MCF Certified

PET UNIT DOSE TABLE INSTALLATION MANUAL FN: Rev A 1/18

Instruction Manual. Labnet Spectrafuge 16M Microcentrifuge

EVO TM 200 AND EVO TM 400 LCD DISPLAY INSTALLATION GUIDE

System 3 ZB1PS Device Chassis. Operator s Manual

Altivar 61/71 Adjustable Speed Drives Plastic Kits and Power Terminal Kit

Alcatel-Lucent 7310 DC Metro Cell AWS (B4) Kit MC-DBR1, MC-DBR2, MC-DBR3, MC-DBR4, MC-DBR5. Installation Manual

Audi B9 A4 & S4 Carbon Fiber Steering Wheel Trim Installation Instructions

Feeder Circuit Breaker Units Secure Support Pan and Change Door Latch

Model 700 Microarray Oven

Electrometer NiCad Battery Replacement

HP Modular Cooling System 200/100 Options Installation Guide

3 980/980E Ionized Air Gun Instruction Manual

HP BladeSystem c7000 Carrier-Grade Options Installation Guide

FlexChem Model 404 Rotating Oven

ALITA LINEAR AIR PUMP OPERATION & MAINTENANCE MANUAL. AL- Model Number Date Code / Serial Number Date of Purchase

Fast Simulated Distillation Based on Agilent 6890N Gas Chromatograph Application

P. D. Q. Automatic Burnout Furnaces. 115 and 230-volt Models OPERATOR S MANUAL

900 PEAK AMP PORTABLE JUMP STARTER

INSTALLATION INSTRUCTIONS

OMEGA CORDLESS SERIES VACUUM INSTRUCTION MANUAL

USER S GUIDE 2880 SERIES. 3 Safety Instructions. Product View. Assembly 4-5. Operation. Maintenance and Care. Troubleshooting.

Model Combustible Gas Sample Draw Detector Head Operator s Manual

DUSTTRAK AEROSOL MONITOR SOLAR POWER KIT MODEL

Ford 7.3L SuperDuty Cold Air Intake

User s Manual Power Supply. IM E 2nd Edition. Yokogawa Electric Corporation

Model Fixed Rack-Mount Kit

Phase Sequence Tester

Model 8610C Gas Chromatograph. GC Chassis Types ECD PID FID / DELCD FPD. Mounts up to Six Detectors and Five Injectors

ARION: 19 EIA-310E Standard Enclosure

Thermo Scientific. TRACE GC Ultra UFM. Ultra Fast Module Device Instruction Manual. PN , Revision May 2010

Application. Gas Chromatography June 1995

series USER MANUAL

E24/E28 M30 Mass Air Flow Conversion System Instruction Manual Version 2.0

Installation Instructions

Automatic Burnout Furnaces 115 to 230-volt Models OPERATOR S MANUAL

Dispenser Pan Sensors & Containment Sump Sensors

NANOPAC-300 & 500 Power Supply. Instruction manual NANOPAC-300 & NANOPAC-500

Using a New Gas Phase Micro-Fluidic Deans Switch for the 2-D GC Analysis of Trace Methanol in Crude Oil by ASTM Method D7059 Application

3M Ionized Air Gun 980/980E. User s Guide

Dispenser Pan Sensors & Containment Sump Sensors

260 Solvent Vapor Exit Accessory

User s Manual Power Supply. IM E 3rd Edition. Yokogawa Electric Corporation

Pump Sentry. Models 812 PS & 1612 PS INSTALLATION INSTRUCTIONS

SECTION 4 - FUEL SYSTEMS AND CARBURETION

Installation Note. Agilent Technologies E4440A Spectrum Analyzer Option BAB, APC 3.5 Input Connector Retrofit Kit

Section 7 - Troubleshooting Guide

DANI Transformer Oil Gas Analyzer

AEROMOTIVE Part # GM LS1 Fuel Rails INSTALLATION INSTRUCTIONS

HP Adjustable Depth Fixed Rail Kit Installation

PET UNIT DOSE CABINET

INSTALLATION INSTRUCTIONS FOR PCBM-36C CONVERSION KIT From Natural Gas to Propane/LP Gas

Installation Instructions - ECS Tuning Vent Pod Vacuum/Boost Gauge Kit

Transcription:

HP 6890Series Gas Chromatograph Installation Guide Flame Ionization Detector Accessories HP G1561A HP G1562A HP G1591A HP G1598A

DHewlett-Packard Company 19891995 All Rights Reserved. Reproduction, adaptation, or translation without permission is prohibited, except as allowed under the copyright laws. HP part number G1531-90300 Second Edition, Nov 1995 Printed in USA Warranty The information contained in this document is subject to change without notice. Hewlett-Packard makes no warranty of any kind with regard to this material, including, but not limited to, the implied warranties of merchantability and fitness for a particular purpose. Hewlett-Packard shall not be liable for errors contained herein or for incidental or consequential damages in connection with the furnishing, performance, or use of this material. Safety Information The HP 6890 Gas Chromatograph meets the following IEC (International Electrotechnical Commission) classifications: Safety Class 1, Transient Overvoltage Category II, and Pollution Degree 2. This unit has been designed and tested in accordance with recognized safety standards and designed for use indoors. If the instrument is used in a manner not specified by the manufacturer, the protection provided by the instrument may be impaired. Whenever the safety protection of the HP 6890 has been compromised, disconnect the unit from all power sources and secure the unit against unintended operation. Refer servicing to qualified service personnel. Substituting parts or performing any unauthorized modification to the instrument may result in a safety hazard. Disconnect the AC power cord before removing covers. The customer should not attempt to replace the battery or fuses in this instrument. The battery contained in this instrument is recyclable. Safety Symbols Warnings in the manual or on the instrument must be observed during all phases of operation, service, and repair of this instrument. Failure to comply with these precautions violates safety standards of design and the intended use of the instrument. Hewlett-Packard Company assumes no liability for the customer s failure to comply with these requirements. WARNING A warning calls attention to a condition or possible situation that could cause injury to the user. CAUTION A caution calls attention to a condition or possible situation that could damage or destroy the product or the user s work. The following safety instructions should be followed at all times: Hydrogen (H 2 )is flammable and is an explosion hazard when confined in an enclosed space such as the oven. In any application using hydrogen, turn off the supply at its source before working on the instrument. The flame ionization detector (FID), nitrogen-phosphorus detector (NPD), and flame photometric detector (FPD) use hydrogen gas as a fuel. Be sure all hydrogen gas is shut off to the detectors before shutting off the power to the instrument. The oven, inlet, and detector zones may be hot enough to cause burns. Turn off the heated zones and allow time for cooling before working on the instrument. To avoid shock hazard, turn off the power and unplug the instrument before removing the instrument s covers. Wear safety glasses when using compressed gas and when handling glass or fused silica capillary columns. It is good practice to wear safety glasses at all times when working with the instrument. The insulation on the GC is made of refractory ceramic fibers (RCF) and recommend the following safety procedures. Ventilate your work area. Wear long sleeves, gloves, safety glasses, and a disposable dust/mist respirator. Dispose of insulation in a sealed plastic bag. Wash your hands with mild soap and cold water after handling. Little Falls Division Hewlett-Packard Company 2850 Centerville Road Wilmington, DE 19808-1610

Overview This sectionreviews the procedurefor installing a flame ionization detector(fid) on an HP 6890Gas Chromatograph(hereafter referred to as the GC). Before following this procedure,refer to the safety informationon the inside front cover. Parts List EPC U FID assembly: capillary optimized or adaptable U Top insulation U Bottom insulation U Nutwarmer cup and insulation (for adaptablefid only) NonEPC U FID assembly: capillary optimizedor adaptable U Top insulation U Bottom insulation U Makeup gas regulator U 2 machinescrews U Nutwarmer cupand insulation (for adaptablefid only) Tools U Electrostaticprotectionsuchas groundedwrist strap (HP part no. 9300 0969for large wrists or HP part no. 9300 0970for small wrists) U T 20Torx screwdriver U Diagonal cutters U 7/16 in.wrench(nonepc detectorsonly) Steps 1. Preparing the GC 2. Installing the flow manifold 3. Installing the makeupgas regulator(nonepc detectorsonly) 4. Positioningand securingthe detector 5. Connectingthe detector 6. Routing the tubing 7. Installing the nutwarmercup(adaptablefid only) 8. FID chimneyinsert (optional) 9. Restoringthe GC to operatingcondition 10.Calibrating your detector(epc detectoronly) 2

Flame ionization detector Makeup gas regulator (nonepc only) Flow manifold Power switch Printed circuit board 3

Preparing the GC WARNING Hazardousvoltages are presentin the mainframewhen the GC is pluggedin. Avoid a potentially dangerousshockhazard by unpluggingthe power cordbefore removing the side panels. 1. Turn off the GC and unplugthe power cord.allow time for all heated zonesto cooland then turn off supplygases at their sources. From the backof the GC: 2. Unsnapand lift off the pneumaticstop cover. 3. Remove the RFI cover. Remove the screw with a T 20 Torx screwdriver, slide the cover to the left until it disengages from the top rear panel, and remove it. 4. If you are installing a nonepc detector, remove the detector cover plate from the front or back position by loosening the two screws with a T 20 Torx screwdriver and sliding the plate up and off. 5. Loosen the five screwsin the top rear panel with a T 20Torx screwdriver. Grasp the panel at eachend and gently lift it up and then away from the GC. Be carefulnot to disruptthe supplytubing. 4

2 3 4 (nonepc detectors only) 5 Loosen five screws 5

6. Remove the detectorcover. a. Lift the cover as shownand locate the hinge in the right, rear corner. Detector cover Hinge b. Squeeze the clip as shown. c. Pull the clip toward you. d. Pull the pin to the left. e. Slide the detectorcover to the right and lift it off. 6

Caution Board componentscan be damagedby static electricity;use a properly groundedstatic controlwrist strap when removing the electronicscovers. 7. Remove the electronicsside cover. Loosen the two captive screwswith a T 20 Torx screwdriver, slide the cover to the rear, and lift it off. Electronics side cover Captive screws 8. Remove the electronicstop cover. Press the rear locking tab toward the front of the GC while lifting the backof the cover. Slide the cover back,up,and out of the GC. Rear locking tab (underneath cover) Electronics top cover 7

Installing the flow manifold Caution Board componentscan be damagedby static electricity;use a properly groundedstatic controlwrist strap when removing the electronicscovers. 1. From the backof GC, locate the pneumaticscarrier. Pneumatics carrier 2. If you are installing a detectorin the front positionand an inlet is installed in the backposition,unplugthe backinlet ribboncable.unlock the connectorby pushing the tabs away from the center. Connector locations Back detector Front detector Back inlet Front inlet 8

3. Locate the troughsin the flow manifold and the ridges in the pneumaticscarrier. Slide the flow manifold into the carrier, lining up the ridges and troughs. Back detector Front detector Ridges Troughs Flow manifold 9

4. Plug the ribboncable into the front or backconnector(see page 8, step 2.) Make certain the connectoris firmly seated and locked.if the flow manifold is installed and plugged into the correctposition,the ribboncable will retain its fold as shown in the diagram. If you unpluggedan inlet ribboncable in Step 2, replace it. Folded ribbon cable Open connector Locked connector 5. From the front of the GC, securethe flow manifold to the carrier by tightening the captive screwuntil snug using a T 20Torx screwdriver. Front captive screw Back captive screw 10

Installing the makeup gas regulator (nonepc detectors) 1. Install a screwin the front or back positionof the pneumaticscarrier as shown.do not tighten the screw. 2. Install a screwin the makeupgas regulator as shown.do not tighten the screw. Back Front Screw 3. Place the makeupgas regulator in the front or backpositionof the pneumatics carrier. Tighten the screwswith a T 20Torx screwdriver. 11

4. Connectthe tube on the makeupgas regulator to the fitting labeled MU on the flow manifold.tighten the nut fingertight, then use the 7/16 in.wrenchto tighten it 3/4of a turn. Follow the same procedurefor connectingthe air and hydrogen tubing (labeled at the backof the GC) to the flow manifold. Air Makeup gas regulator Hydrogen 5. Locate the RFI cover that you removed in Preparing the GC (p. 4). Remove the rectangularcutout in the front or backdetector position.use diagonal cuttersto cut the metal in the two locations or work the cutoutbackand forth until it breaksfree from the cover. 6. Locate the pneumaticscover that you removed in Preparing the GC (p. 4). Remove the oval labels in the front or backdetectorposition by pushingon the label from underneaththe cover. Cut here Back Back RFI Cover (from back of GC) Front Pneumatics Cover (from back of GC) Front 12

Positioning and securing the detector 1. Remove the roundmetal cutouton the oven top and the squareplasticcutoutin the electronicscarrier in the front or backdetectorposition,if necessary. Cut the metal circle with diagonal cuttersso that the nibs are connectedto the piece removed.cut the plasticin six placeswith diagonal cutters.discardthe cutouts. Back Front 2. Lift out the die cutinsulationplug from the front or backdetectorposition,if necessary. 13

Caution Be carefulto remove only the insulationwithin the scribedcircle. 3. Carefully remove the scribedcircle of insulationfrom the oven top to create an opening into the oven. Method 1: Use an Xactoknife to cut out the insulationusing the scribedcircle as a guide. Method 2: Pierce the insulationwith a screwdriver. Rotate the screwdriveraroundthe circumferenceof the scribedcircle to remove excessinsulation. Clean up any piecesof insulationthat fall inside the oven. 14

4. Place the bottominsulationin the detectorcavity as shown. 5. Place the top insulationin the bottominsulationso that the hole in the insulation lines up with the hole in the oven top.. 6. Place the detectorpallet into the insulatedcavity. Partially tighten the four screws with a T 20Torx screwdriver. Tighten all the screwsto snugness. Captive screws (4) Pallet Top insulation Bottom insulation 15

Connecting the detector Caution Board componentscan be damagedby static electricity;use a properly groundedstatic controlwrist strap when handlingthe FID board. 1. Remove the PC boardfrom its static controlbag and slide into the front or backslot on the main circuitboarduntil it is plugged in. Tighten the screwon the PC board bracket with a T 20Torx screwdriver. Back detector slot Front detector slot Plugs into main board Tighten screw PC board 16

2. Attach the signal cable and ignition wire to the PC board,if not already connected. Ignition cable Signal cable Signal connector PC board Ignition connector 17

3. Connectthe heater/sensorwire to the squareconnectorclosestto the front or back detector. Heater/sensor wire Heater/sensor connector (back position) Heater/sensor connector (front position) 18

Routing the tubing Route the tubing from the flow manifold to the detectoras shown. Front detector tubing Back detector tubing 19

Installing the nutwarmer cup (adaptable FID) 1. Install the insulationin the cupas shown. 2. Take the insulationcupand pushthe wire spring lever at the bottomof the cupto the right to uncoverthe hole. 3. From inside the oven, place the cup over the detectorfitting so that the top of the cuptouchesthe top of the oven. 4. Release the spring.make certain the spring fits in the groove of the detectorfitting. groove 20

FID chimney insert (optional) Purchasea PTFE chimneyinsert (HP part no. 19231 21050)if you are runninghighly corrosiveanalytes.these insertsmay be orderedfrom the HP Analytical Supplies Catalog. Chimney insert 21

Restoring the GC to operating condition 1. Reinstall the electronicsside panel. 2. Reinstall the top rear panel 3. Reinstall the detectorcover. 4. Reinstall the electronicstop cover. 5.Plug in the GC and turn it on. 6. Press [Front Det] or [Back Det]. If the detectorhas been properly installed,you will see the following display: EPC FRONT DET (FID) Temp 24 Off < H2 flow 0.xZ Off Air flow 0.xZ Off Mkup flow 0.xZ Off Flame Off Output 0.0 NonEPC FRONT DET (FID) Temp 24 Off < H2 flow Off Air flow Off Mkup (N2) Off Flame Off Output 0.0 ZAn actual flow value is displayedwhen the gases are off or not connected. This is not an error. After the gases are connectedand the detectoris operational,the actual flow values will be equal to the setpoint values. 22

Calibrating your detector (EPC only) Your detector s flow manifoldcontainsa pressuresensorthat must be zeroed after it is installed on your GC. This calibrationprocedureensures an accuratedetectordisplay. Caution Do not connectthe detectorand makeupgases to your flow manifolduntil you have zeroed your detector s pressuresensor. 1. Plug in your GC and turn it on, if you haven t already doneso. 2. Wait 15 minutes.this allows your GC to reach thermal equilibrium. 3. Zero the detector s pressuresensor: a. Press [Options],scrollto Calibration and press[enter]. b. Scroll to Front detector or Back detector and press[enter]. c. Scroll to Oxidizer zero and press[on]. d. Scroll to H2 zero and press[on]. e. Scroll to Makeup zero and press[on]. 4. Turn off your GC and unplugthe power cord. 5. Plumb the air, hydrogen,and makeupgases to your detector. See the HP 6890Site Preparation and Installation Manual for instructions. 6. Reinstall the RFI cover. 7. Replacethe pneumaticstop cover. 8. Plug in the GC again and turn it on. 23

Printed on recycledpaper. Manual Part No. G1531 90300 This productis recyclable. Hewlett PackardCompany Printed in USA 11/95