Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Similar documents
Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Annex_Tumkur In-principle(Phase-I) 1)Minutes of the meeting held on )In-principle Approval_Tumkur Phase-I

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan: R.K.Puram New Delhi

FAX : Member Secretary Southern Regional Power Committee 29, Race Course Cross Road Bangalore FAX :

Minutes of the 19 th meeting of the Standing committee on transmission system of Northern Region held at Amritsar on 01/10/05.

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R K Puram, New Delhi

HVDC Systems in India

(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level)

4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority

Report. the feasibility of

Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region

Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Distribution List Chief Engineer (SP & PA) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi FAX :

Thereafter, the agenda items were taken up.

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1

1. Confirmation of the minutes of 19th meeting of the Standing Committee on Transmission system Planning held on at Amritsar, Punjab.

य प र षण ल ख REGIONAL TRANSMISSION ACCOUNT. April 2018

1. CONFIRMATION OF THE MINUTES OF THE 14 th PROTECTION SUB- COMMITTEE MEETING HELD ON 21 st March Grid Disturbances in the Southern Region

MINUTES OF THE 1 st MEETING OF THE PROTECTION SUB-COMMITTEE HELD ON 25 th JULY 2006.

Agenda of 11 th System Studies Meeting in NER

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

R.S.USHA CHIEF ENGINEER/ PLANNING & RC. Encl: Report and detailed estimate. To The Chief Engineer/D/Madurai Region

Guidelines for Solar Grid Power Projects

Agenda Note for Long Term Open Access Applications of New Generation in Southern Region

Evacuation of Wind Power in Kadapa, Anantapur and Kurnool districts of Andhra Pradesh. Revised Administrative Approval - Accorded

SYSTEM OCCURRENCE: Various system occurrences during the period were analysed. Details are as under:

SOUTHERN REGIONAL POWER COMMITTEE BANGALORE

Central Electricity Authority ftf~o "5TUTTID m~';jt ~ct l:f~en';f '5f<qTlf-I I -..:;.. "" Power System Planning & Appraisal Division=II

Power evacuation system for RAPP Generating Units No. 5,6 (2x220 MW) and 7,8 (2x700 MW).

The Electric Power System

PRAGATI ENGINEERING COLLEGE

An Overview to HVDC links in India

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

:Tamil Nadu Generation and Distribution Corporation Limited: Delegation of powers of sanction to officers (TNEB Volume-II) - revised Communicated Reg

Wheeling charges, Banking charges & Cross Subsidy Surcharge for Solar Power Generators

MINUTES OF THE 47 th SLCF MEETING HELD ON

CONFERENCE ON TRANSMISSION & DISTRIBUTON MR N C VENUGOPAL TRANSMISSION SECTOR GROWTH & CHALLENGES. DATE 2 ND NOVEMBER 2012

Bangladesh s Power Sector : At a Glance

Case Nos. 12 & 48 of 2009

SOUTHERN REGIONAL POWER COMMITTEE BANGALORE

Indian Power System Framework

No. 15/3/2018-Trans-Pt(1) Government of India Ministry of Power Shram Shakti Bhawan, Rafi Marg, New Delhi **** OFFICE MEMORANDUM

SAUDAMINI, Plot No.2, Sector-29, Gurgaon, Haryana Powergrid Corporation of India Ltd., SAUDAMINI, Plot No.2, Sector-29, Gurgaon

UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow. Public Notice

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

दव ण त र य व द य त सवमवत

Before the. Case No. 106 of 2009

Seabrook Substation Reliability Improvement Project

Infrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India

REDUCING VULNERABILITY OF AN ELECTRICITY INTENSIVE PROCESS THROUGH AN ASYNCHRONOUS INTERCONNECTION

3mO :th c:tll '{ Government of India. Ministry of Power. Northern Regional Power Committee

100 MW Wind Generation Project

Agenda Note for Standing Committee Meeting of Power System Planning in ER

City of Palo Alto (ID # 6416) City Council Staff Report

¼ããÀ ¹ã㪠ã Ôãâ ãìêã ã ãäà¹ããñ Ã

Due to ease of transformation of voltage levels (simple transformer action) and rugged squirrel cage motors, ALTERNATING CURRENT is universally

Evacuation system from Chamera III HEP (231 MW).

Draft National Electricity Plan

Minutes of the 4 th Meeting of Standing Committee on Power System Planning of North Eastern Region held on 13 th Dec., 2014

HVDC Multi-Terminal Interconnections a viable and optimal solution for India

¼ããÀ ¹ã㪠ã Ôãâ ãìêã ã ãäà¹ããñ Ã

Next Generation of UHVDC System. R. Montaño, D Wu, L. Arevalo, B. Jacobson ABB - HVDC Sweden

Mohammad Alauddin Deputy Secretary Power Division Ministry of Power, Energy & Mineral Resources Govt. of the People s Republic of Bangladesh

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

-As per List enclosed- 27 th meeting of the Standing Committee on Power System Planning of

EEL303: Power Engineering - 1 Introductory Lecture

Power IT MV Live Tank Vacuum Circuit Breaker Model VBF

Efficient & Reliable Power Delivery

IJRASET 2013: All Rights are Reserved

New EU Regulation on General Safety. Implementation of Tyre Aspects

GC108: EU Code: Emergency & Restoration: Black start testing requirement

MILLIGAN SOLAR PROJECT

Transmission System Bottlenecks & Planning for Mumbai Metropolitan Region

Proposed Solution to Mitigate Concerns Regarding AC Power Flow under Convergence Bidding. September 25, 2009

Case No. 109 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd.

Case No. 163 of In the matter of

POWER SYSTEM OPERATING INCIDENT REPORT SIMULTANEOUS TRIP OF 5A6 MT PIPER BANNABY 500 KV LINE AND MT PIPER NO. 2 UNIT ON 9 FEBRUARY 2012

GC108: EU Code: Emergency & Restoration: Black start testing requirement

KERALA STATE ELECTRICITY REGULATORY COMMISSION Thiruvananthapuram. Present : Sri. T. M. Manoharan, Chairman Sri. K. Vikraman Nair, Member OP 11/2016

1.0 Revised procedure for allocation of Inter State Transmission Project(s) under Tariff Based Competitive Bidding (TBCB)

Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, Its. Regulations, 2016 STATEMENT OF REASONS

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting

Enhancement of Power Transfer Capability of Existing 400kV Transmission Lines

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

The Grid Link Project. Summary of the Report for the Independent Expert Panel

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR #

Transmission Planning & Engineering P.O. Box MS 3259 Phoenix, Arizona

SSF Section Location of Change SSF Issue Change(s) Comments Chapter Part B All Multiple Formatting, spelling and minor Changes applied -

15 Nelson-Marlborough Regional Plan

Energy from Waste Grid Connections

Status of PNM s Completed Transmission Construction Projects 11/30/2017

TECHNICAL SPECIFICATIONS

Transcription:

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi 100 66. No. 51/4/SP&PA-2001/ Date : 10-3-2004 To 1.The Member Secretary, Southern Regional Electricity Board, 29, Race Course Cross Road, Bangalore 560 009. FAX : 080-2259343 3.The Director (Transmission), Transmission Corp. of Andhra Pradesh Ltd., Vidyut Soudha, Hyderabad 500 082. FAX : 040-3317652, 3320565 5.The Member (Transmission), Kerala State Electricity Board, Vidyuthi Bhawanam, Pattom, P.B. No. 1028, Thiruvananthapuram - 695 004. FAX : 0471-446774 7.The Director (Power), Corporate Office, Block I, Neyveli Lignite Corp. Ltd., Neyveli, Tamil Nadu 607 801. FAX : 04142-52646 9.The Executive Director (Engineering), NTPC Ltd., Engg. Office Complex, A-8, Sector 24, Noida 201 301. FAX : 91-539462, 91-4410136, 91-4410137 11. The Director (Tech), Power Trading Corpn. of India Limited, 2 nd Floor, NBCC Tower, 15 Bhikaji Cama Place, NewDelhi 110066. FAX-011-51659504 2.The Executive Director (Engineering), Power Grid Corp. of India Ltd. B-9, Institutional Area, Katwaria Sarai, New Delhi 110 016. FAX : 011-6466823, 6564751 4.The Director (Transmission), Karnataka State Power Transmission Corp. Ltd., Cauvery Bhawan, Bangalore 560 009. FAX : 080-2228367, 221352 6.The Executive Director/ Planning, Tamil Nadu Electricity Board, 6 th Floor, Eastern Wing, 800 Anna Salai, Chennai 600 002. FAX : 044-8521210, 8544528 8.The Superintending Engineer I, First Floor, Electricity Department, Gingy Salai, Pondicherry 605 001. FAX : 0413-334277 10. Shri N.S.M. Rao The General Manager (Transmission), Nuclear Power Corp. of India Ltd., 9 th Floor, South Wing,Vikram Sarabhai Bhawan, Anushakti Nagar, Mumbai 400 094. FAX : 022-25563350 Sub: Eighteenth the Standing Committee on Power System Planning in Southern Region. Sir, Enclosed please find summary record of discussions in the 18 h meeting of the Standing Committee on Power System Planning in Southern Region held Chennai on 5-3-2004. Kindly acknowledge the receipt. Encl: As above. Yours faithfully, (A.K. Asthana) Director (SP & PA)

Summary record of discussions in the 18 th meeting of the Standing Committee on Power System Planning in Southern Region held at Chennai on 5 th March 2004. List of participants is enclosed at Annex-I Executive Director(SR-II), POWERGRID welcomed all the participants. Chief Engineer (SP&PA), CEA thanked POWERGRID for hosting the meeting and welcomed the participants. Initiating the discussions he stated that the surplus of Eastern Region was being utilized for the benefit of Southern Region and Regional Power Exchange between the Eastern Region and Western Region were taking place in a big way. With increasing inter-regional exchanges, the transmission system was required to be developed keeping in view the overall perspective. In this time-specific requirement, ROW constraints and the need for margins for open access was to be considered. The difficulty of getting ROW was causing delay in execution of projects. In this context he gave example of Madurai-Thiruvananthapuram 400 kv D/C line which was getting delayed due to severe ROW constraints faced in Kerala and Kaiga-Narendra 400kV D/C line which got delayed due to unduly long time consumed in getting forest clearance. In context of Kudankulam APP, which had been ahead of completion target and was expected in 2006-07, for timely completion of transmission system, it was necessary to finalise the requirements and take decisions without delay. The agenda items were thereafter taken up for discussion. 1. Confirmation of Summary record of discussions of the 17 h Standing Committee Meeting. 1.1 Chief Engineer (SP&PA), CEA stated that the summary record of the 17th meeting held on 15-9-2003 at SREB, Bangalore, were circulated vide No.51/4/SP&PA 2001/756-766 dt. 3-10-2003 and the same could be confirmed. 1.2 Director (Transmission), KPTCL stated that the following amendment was required to correctly record the views expressed by KPTCL: The following to be added at the end of para 2.9: Director (Transmission), KPTCL stated that KPTCL was agreeable to the proposed transmission system for Kudankulam subject to inclusion of Hassan 400 kv substation alongwith connecting 400 kv lines under the scheme. 1.3 Thereafter, the summary record was taken as confirmed with above amendment. 2. EVACUATION ARRANGEMENT FOR KUDANKULAM APP STAGE-I (2X1000MW) 2.1 ED, NPCIL stated that the commissioning schedule of the first unit had been advanced to March 2007 and the 2 nd unit to be followed subsequently after six months. As regards progress of works, he stated that 30% physical construction work was completed and the mechanical works was scheduled to start from end of this year. All equipments including turbines etc. would reach the site by December 2004.

2.2 Chief Engineer (SP&PA), CEA requested NPCIL to send a progress report to all the beneficiaries for information. 2.3 CE(SP&PA), CEA stated that the evacuation system for KAPP was discussed, finalised and agreed in September 2003 itself during the last meeting of the Standing Committee held at Banglore. However, in the SREB Board meeting held on 15.11.2003, TNEB wanted a review on account of APTRANSCO not availing power from Kudankulam APP and consequently TNEB getting more power from the project. In the SREB meeting, Member(GO&D), CEA had explained that since the power flows in the grid takes place by displacement, the proposed transmission would hold good and any additional transmission scheme under the project required for TNEB could be examined by CEA. However, TNEB insisted for a review. Subsequently, MoP, vide their letter No. 3/9/2003-OM dated 5 th February 2004 finalised the following allocation: Tamil Nadu: Kerala Pondicherry Karnataka Unallocated TOTAL 925 MW 266 MW 67 MW 442 MW 300 MW 2000 MW 2.4 CE(SP&PA), CEA stated that further studies were done considering the already evolved system and also the options suggested by constituents. As the power flow takes place through displacement, the system as already evolved had been found to holds as expected. He asked Director(SP&PA), CEA to make a presentation on the studies. 2.5 Director(SP&PA), CEA stated that base case and outage cases for the following options had been studied. Option-1: Option-2: Option-3: Option-4: Option-5: As per proposal evolved in the last Standing Committee meeting. Option-1 plus Madurai-Karaikudi 400kV D/C Option-1 plus LILO of one circuit of Madurai-Trichy 400kV D/C line at Karaikudi Option-2 with the change that one of 400kV quad D/C line from KAPP to Tirunelveli and one 400kV quad D/C line to Madurai with series compensation, and the 400kV D/C line to Udumalpet from Madurai instead of from Tirunelveli. Option-4 with the change that additional 400kV line Karaikudi- Jayamkondan-Melakottaiyur taken and 400kV D/C line from Cochin to Trissur deferred. He gave an overview of finding of the study results which had already been elaborated in the agenda note. The system as was already evolved and finalised in the last meeting worked out to be the most cost effective option. The proposal for 400kV line to from Karaikudi to Jayamkondan-Melakottaiyur was not felt justified. Karaikudi s/s could be considered with feeding arrangement through LILO of one circuit of Madurai-Trichy line (Option-3).

2.6 Director (Transmission), KPTCL stated that for catering to increased allocation to Karnataka from KAPP, 400kV Hassan s/s should be established and the 400kV Davanagere-Hassan-Mysore D/C line should also be included in the scheme. He stated that KPTCL had forwarded studies in this context to CEA. CE(SP&PA), CEA stated that the studies were examined in CEA and views of CEA indicating that the proposal of KPTCL was not justified were already communicated to KPTCL. While the s/s at Hassan, which could be justified late 11 th Plan or early 12 th Plan work, could be preponed and considered in KAPP time frame, the proposal for Davanagere-Hassan- Mysore 400kV D/C line was not found justified because Mysore was already planned to be connected from Neelamangala by 400kV D/C line which was sufficient to meet the requirements. KPTCL stated that they had not received observations of CEA on their studies/proposal. CE (SP&PA), CEA stated that the above views were communicated to KPTCL in October 2003 itself, when their proposal was received and a copy of CEA s letter would be sent again to KPTCL. However, Director (Trans.), KPTCL insisted that requirement of Hassan 400 kv substation would be needed to meet KPTCL system requirement on account of its increased allocation from Kudankulam APP. 2.7 Director (Transmission/GO), APTRANSCO stated that regional transmission system for power evacuation and also the regional system strengthening requirements should be planned as identified by CEA and he agreed with the system as proposed by CEA.CE (SP&PA), CEA thanked him for his remarks. Director (Transmission/GO), APTRANSCO further stated that the requirements to be covered under the regional scheme as suggested by State utilities should be studied by CEA for overall perspective. The scheme should be taken up only when found justified based on studies/examination done by CEA. In this process, due care of the transmission requirements for secured operation of grid is ensured with optimal investment and the State utilities should not insist if justification for their proposal was not established. In this context, he appreciated the efforts made by CEA in analyzing the requirements and proposal of the State utilities. 2.8 Member (Gen & Trans), KSEB endorsed the views expressed by APTRANSCO and stated that Kerala also agreed with the system as proposed by CEA. 2.9 TNEB stated that they agreed with the proposal as per Option-3. However, arrangement of multi-circuit line proposed in the existing corridor of Kayathar-Edamon 220 kv S/C line would need to be reviewed as they had planned a 220kV s/s at Kudikorchi by LILO of this line. Chief Engineer(SP&PA),CEA stated that with Kudikorchi s/s coming up in Tamil Nadu, new ROW for the multi-circuit line from Tirunelveli towards Edamon would be needed in Tamil Nadu area. However, in Kerala, where getting new ROW was not feasible, the existing ROW of Kayathar-Edamon line could be utilized. This was agreed. 2.10 Pondicherry representative had no comments. 2.11 After further discussions, it was agreed that the transmission system for evacuation of of power from Kudankulam APP (2x1000MW), as was finalised in the 17 th meeting of the Standing Committee held on 15 th September 2003 shall be taken up for execution by POWERGRID for evacuation of power from the project. This would include the following works:

400kV Transmission system for Kudankulam APP (2x1000MW): (i) (ii) (iii) (iv) KAPP-Tirunelveli 400kV Quad D/C line-1.* KAPP-Tirunelveli 400kV Quad D/C line-2.* LILO of both circuits of Madurai - Thiruvananthapuram 400 kv D/C line at Tirunelveli. (2xD/C LILO lines) Tirunelveli-Udumalpet 400kV D/C line. (v) Tirunelveli Cochin Trissur 400kV Quad D/C line. ** (vi) Tirunelveli Edamon 400kV D/C Initially to be operated at 220 kv. ** (vii) (viii) Establishment of new 400/220kV,2x315MVA Sub-station at Tirunelveli and Cochin (Muvattapuzha) 3rd 400/220kV, 1x315MVA transformers at Thiruvananthapuram and Udumalpet substations. * The two KAPP-Tirunelveli 400kV Quad D/C lines to be on different routes. ** The construction of 400 kv Tirunelveli-Cochin 400kV Quad D/C line and Tirunelveli -Edamon 400 kv TM D/C line (to be operated initially at 220 kv) would utilize the RoW of the existing 220kV inter-state Kayathar- Edamon S/C line in Kerala. As TNEB would establish Kudikorchi 220kV s/s in Tamil Nadu by LILO of Kayathar-Edamon S/C line, utilization of RoW of Kayathar-Edamon S/C line in Tamil Nadu would be considered only between Kudikorchi and Edamon. 2.12 In addition, with enhanced allocation from KAPP to KPTCL and TNEB, the following schemes ware also agreed by all the constituents for execution by POWERGRID under regional system strengthening scheme: (i) (ii) LILO of one circuit of the 400kV Madurai-Trichy line at Karaikudi alongwith 2x315 MVA 400/220kV s/s at Karaikudi. 400/220kV, 2x315 MVA s/s at Hassan alongwith interconnecting 400kV line for Hassan s/s which will be decided by CEA in consultation with KPTCL. The interconnecting line to Hassan s/s will also be executed by POWERGRID under the same regional strengthening scheme. The above (i) and (ii) will be covered under same regional strengthening scheme. 3. START-UP POWER ARRANGEMENT FOR KUDANKULAM APP 3.1 Chief Engineer (SP&PA), CEA stated that in the last meeting it was decided that start of power arrangement would be jointly worked out by NPCIL and TNEB. He requested NPCIL to inform the final arrangement as finalised by them.

3.2 ED, NPCIL stated that the start-up arrangement at 220kV would be through two sources one through LILO of Tuticorin-S R Pudur 220 kv line at KAPP and the other through 220kV Tirunelveli-KAPP S/C line. 3.3 ED (Engg), POWERGRID stated that for the S/C line from Tirunelveli, additional 220kV bay would be required to be provided. It was confirmed and agreed that the additional 220kV bay at Tirunelveli would be provided and considering 2 nos. 220kV line bays for each 400/220kV ICT, the total number of 220kV line bays at Tirunelveli would be 5. 3.4 Regarding the provision of 400/220kV ICT at KAPP station, ED, NPCIL stated that they had decided to have the ICT. This would be normally kept open so as to avoid power rushing to 220kV side and overloading the 220kV lines. 4. Enhancement of transfer capacity of Talcher-Kolar HVDC link and run back scheme for Talcher STPS-II generating units in the event of contingency of pole outage, so as to improve grid security. 4.1 CE(SP&PA), CEA stated that as the SR constituents had not agreed providing for back-up transmission system for Talcher-II and there is no back-up transmission system for evacuation of power from Talcher-II under the contingency of outage of any pole of the Talcher-Kolar HVDC line. Whenever there is any pole outage on this line, the additional power gets injected into ER-WR system causing heavy jerks because of sudden and large magnitude of change in load-generation balance. Such events have caused grid disturbance in the WR system in the recent past. To improve the security of grid, the following scheme was proposed. Enhancement of the capacity of each pole of Talcher-Kolar HVDC Bi-pole link to 1250 MW at an additional cost of Rs 90 crores. In the event of one pole outage, (with both poles are in operation prior to incident), power order on the other healthy pole to be automatically increased to 1250 MW. Simultaneously, automatic run-back/tripping of generating unit at Talcher-II so that jerk on ER-WR system is limited to about 150 MW. In the event of pole outage when only one pole is in operation prior to incident, automatic run-back/tripping of two generating units at Talcher-II so that jerk on ER-WR system is limited to about 350 MW. POWEGRID to implement upgrading of the HVDC terminal stations to achieve 1250 MW per pole capability and also implement necessary control logic for automatic increase of power order on HVDC to 1250MW in case of one pole outage. NTPC to implement control logic for automatic run back/tripping of generating units at Talcher-II to affect required reduction in ex-bus output. As the performance of HVDC, especially in the Indian conditions, has not been satisfactory particularly that of converter transformers, the enhanced capacity of the HVDC link is to be used only under contingency conditions and not for increasing the HVDC capacity for firm transfer of 2500 MW on the Bi-pole. 4.2 DGM, NTPC stated that NTPC was working for a scheme of runback when simultaneous outage of both poles took place and they had discussed this in the ERLDC/EREB forum.ce(sp&pa), CEA stated that the scheme proposed was to cater to grid security which was required to be ensured for the single pole outage contingency also. NTPC

representative stated that NTPC could not agree to the run back/tripping scheme unless transmission strengthening to provide back-up system to cover contingency of one pole outage on Talcher-Kolar HVDC link was also provided. 4.3 CE(SP&PA), CEA stated that such condition on issues connected with grid security measures could not be accepted. All the members agreed with this view. 4.4 Director(Transmission), KPTCL wanted to know the engineering details and break-up of investment of Rs 90 crores. ED (Engg.), POWERGRID stated that the capacity would be enhanced by providing additional cooling arrangement and filters. The thyristor models already had inherent higher capacity limit. The converter transformer was designed for ambient temperature of 50 o C. In practice, the ambient temperature would be lower. The margin would be utilized through an automated mechanism for raising loading limit of converter transformers. With increase in ambient temperature loading limit would automatically get reduced. Thus the capacity per pole could be increased to 1250MW to cater to contingency. 4.5 After discussion, all the participants agree to the scheme as proposed by CEA. 5. Provision of 80 MVAR bus reactor at Nellore. 5.1 CE(SP&PA), CEA stated that in the last meeting, provision of 80MVAR switchable reactor at Nellore was agreed considering the operational advantage. However, TNEB had suggested to review the provision of reactor at Nellore in view of APTRANSCO taking the ICT works. He stated that as the provision of switchable reactor at Nellore would provide operational flexibility in regulation voltages, this could be agreed. 5.2 The members agreed to the proposal. 6. SUMMARY OF DECISIONS: (1) Summary record of discussions of the 17 th Standing Committee Meeting as circulated vide No. 51/4//SP&PA-2002// 756-66 dated 03-10-2003 were confirmed with amendment as given in para 1.2. (2) The transmission system for Kudankulam APP as detailed in para 2.11 was agreed. (3) System strengthening scheme as detailed in para 2.12 was agreed. (4) Scheme for enhancement of transfer capacity of Talcher-Kolar HVDC link and run back/tripping of Talcher STPS-II generating units in the event of contingency of pole outage, so as to improve grid security, as detailed in para 4.1 was agreed. (5) Provision of 80 MVAR switchable reactor at Nellore was agreed. The meeting ended with a vote of thanks to the chair.

Annex-I List of Participants in the 18 th Standing Committee Meeting on Power System Planning in Southern Region held on 5th March 2004 at Chennai. ORGANISATION AND NAME DESIGNATION Central Electricity Authority 1. ShriV.Ramakrishna Chief Engineer (SP&PA) 2. Shri A.K.Asthana Director 3. Shri R.Saha Dy. Director S.R.E.B. 1. Shri S. Sivan Member Secretary 2. Shri P.Patel SE POWERGRID 1. Shri R.N. Nayak Executive Director (Engg.) 2. Shri K. Satyam ED (SR II) 3. Shri S. K. Soonee GM, SRLDC 4. Shri Y.K.Sehgal DGM. 5. Shri S.P.Kumar, SRLDC N.T.P.C 1. Shri Pramod Kumar DGM (Elect) N.P.C.I.L. 1. Shri V. K. Kaushik Executive Director (LWR) 2. Shri N.S.M.Rao GM (Transmission) 3. Shri M. K. Kannan CE (Transmission) P.T.C 1. Shri S.K.Dube Director (Operation) APTRANSCO 1. Shri G. Kesava Rao Director(Trans. & GO) K.P.T.C.L. 1. Shri S.Shivamallu Director (Trans) 2. Shri K.Balaraman AEE (Plg.) T.N.E.B. 1. Shri S. Velmurughan Chief Engineer (Plg.) 2. Shri S. Sowmyanarayanan Consultant 3. Shri C. Vijaykumar EE Neyveli Lignite Corpn. 1. Shri S. Muthu DGM.(Elect) K.S.E.B. 1. Shri P.N.Mohanan Member(Gen & Trans.) Pondicherry 1. Shri B. Krishnaswamy SE,Elecy. Deptt.