Net Metering Webinar

Similar documents
Net Metering & Compensation Seminar

D.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES

The Commonwealth of Massachusetts

MASSACHUSETTS ELECTRIC COMPANY NANTUCKET ELECTRIC COMPANY NET METERING PROVISION

NET METERING. The terms set forth below shall be defined as follows, unless the context otherwise requires.

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

Thank you for your time and attention to this matter. Please feel free to contact me if you have any questions regarding the filing.

The Commonwealth of Massachusetts

(2) Scope. 220 CMR applies to all Distribution Companies subject to the jurisdiction of the Department.

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

Schedule Z Additional Information Required for Net Metering Service. Is the Host Customer a: Municipality Other Governmental Entity

Net Energy Metering and Interconnections. Community Solar in the District of Columbia

Creating A Greener Energy Future For the Commonwealth. Massachusetts RPS Solar Carve-Out: Overview & Program Basics.

Net Metering and Solar Incentive Proposed Framework

Interconnection Process Simplification Webinar

MA SREC Update August 21, SRECTrade, Inc.

THE EMPIRE DISTRICT ELECTRIC COMPANY P.S.C. Mo. No. 5 Sec. 4 1st Revised Sheet No. 23

Solar Massachusetts Renewable Target (SMART) Program Summary Kaitlin Kelly Renewable Energy Program Coordinator

INTRODUCTION. June 15, Mark D. Marini, Secretary Massachusetts Department of Public Utilities One South Station Boston, MA 02110

Duke Energy Carolinas North Carolina Interconnection Request Checklist

RIPUC No Cancelling RIPUC No Sheet 1 THE NARRAGANSETT ELECTRIC COMPANY NET METERING PROVISION

Michigan Renewable Energy Case Study

RIDER NM NET METERING

P.S.C.U. No. 50 Original Sheet No ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO. 136 STATE OF UTAH

GENERAL INFORMATION. 13. SERVICE CLASSIFICATION RIDERS (Continued) RIDER N NET METERING FOR CUSTOMER GENERATORS

COMMUNITY SOLAR PROGRAM

THE PUBLIC SERVICE COMMISSION OF MARYLAND

Community Shared Solar Opportunities in Massachusetts Emma Krause Rooftop Solar Challenge Coordinator MA DOER

SMART Program Overview and Transition Process

Household Renewable Energy

WASHINGTON ELECTRIC COOPERATIVE, INC. NET METERING TARIFF POLICY BULLETIN NO. 38 NM

SCHEDULE 62 COGENERATION AND SMALL POWER PRODUCTION SCHEDULE - IDAHO

WASHINGTON ELECTRIC COOPERATIVE, INC. NET METERING TARIFF POLICY BULLETIN NO. 38 NM

JEA Distributed Generation Policy Effective April 1, 2018

Solar Massachusetts Renewable Target (SMART) Program Summary

MISSOURI SERVICE AREA

EASTERN ILLINI ELECTRIC COOPERATIVE REGULATION NO. 26A

National Grid s Solar Initiatives and Net-Metering

a) The 2011 Net Metering and Buyback Tariff for Emission Free, Renewable Distributed Generation Serving Customer Load

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 RULE NO. 17 NET ENERGY METERING

Creating A Cleaner Energy Future For the Commonwealth. Growing Solar in MA. MMA Annual Meeting. Boston, 1/24/14

City of, Kansas Electric Department. Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources

Overview of S.L Competitive Energy Solutions for North Carolina

City of Washington, Kansas Electric Department. Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources

Springfield Utility Board Net Metering Policy Adopted on February 13, 2008 (Resolution 08-1)

First Revision of Sheet No P.S.C.U. No. 50 Canceling Original Sheet No ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO.

Creating A Greener Energy Future For the Commonwealth. Massachusetts Solar Carve-Out (SRECs): Overview & Program Basics.

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program

HydroGenerations PROGRAM HANDBOOK

JACKSON ELECTRIC COOPERATIVE POLICY NO. 305

Interconnection Process Simplification Webinar

A GUIDEBOOK FOR Generator Owners

THE CONNECTICUT LIGHT AND POWER COMPANY dba EVERSOURCE ENERGY AND THE UNITED ILLUMINATING COMPANY

Municipality Generator Interconnection Application Single Meter Application Part I

Producing your own energy? Great Decision. ComEd.com/Interconnection. Let s connect you to our smart grid.

Wind Interconnection and Net-Metering in MA. Tim Roughan - National Grid Joe Feraci - NStar

Reactive Power Requirements and Financial Compensation. Addendum to Draft Final Proposal

SERVICE CLASSIFICATION "CEF" COMMUNITY ENERGY FACILITY

Illinois Renewable Energy Portfolio Net Metering Grid Interconnection Requirements Financing Options

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

Contents. Solar Select TM Frequently Asked Questions

PG&E California Solar Initiative (CSI) & Net Energy Metering (NEM) Interconnection Webinar. March 26, 2009

Impact of Distributed Energy Resources on Transmission System Reliability

Capacity Market Rules for Energy Storage Resources

MA SMART The EDC Perspective. Chris Porter - National Grid Brian Rice - Eversource

Douglas Electric Cooperative Roseburg, Oregon

NET METER REQUEST FORM

Net +Plus Connection Code

SOUTH HADLEY ELECTRIC LIGHT DEPARTMENT Net Metering Policy As Amended 03/23/16 By the South Hadley Municipal Light Board

MENARD ELECTRIC COOPERATIVE POLICY MANUAL. SECTION IV Operating Rules for Cooperative Members

Energy Storage System Application Guidelines

Topic Small Projects (< 100 kw) Large Projects (>100 kw)

Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION

Application for Interconnection and Net Metering Revision: 1 Revised: November 7, 2017

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-27 CUSTOMER GENERATION PRICE PLAN FOR RESIDENTIAL SERVICE

Kansas Legislator Briefing Book 2009

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655)

Please Refer to Attached Sample Form

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

Puget Sound Energy Overview

2019 NYC Solar Installer Workshop: Solar and Storage. March 18, 2019

Village of Enosburg Falls Water & Light Department. Tariff No. NM-1. Net Metering

Application for Operation of & Net Metering for Member-Owned Generation Name: Mailing Address: City: County: State: Zip Code: _

Participation of Beacon Power s Flywheel Energy Storage Technology in NYISO s Regulation Service Market

SSEFITAPP 2012_08_07 v2.1. FeeD-In TArIFF APPlICATIon ForM

06/05/2018. COMMUNITY SOLAR OVERVIEW For Generation Owners and Subscribers

Ameren Missouri. AMENDED Renewable Energy Standard Compliance Report Prepared in Compliance with 4 CSR

Application for Commission Approval to Construct a Generating Station Pursuant to Public Utilities Article Section and

Taxis and Accessible Services Division Medallion Reform Background May 1, 2018

Other Fuels Carbon Levy Remitter Return INSTRUCTION GUIDE

216B.164 COGENERATION AND SMALL POWER PRODUCTION.

RET PROCESS FOR OWNERS OF SMALL GENERATION UNITS (SGUs)

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

78th OREGON LEGISLATIVE ASSEMBLY Regular Session. House Bill 4036

HOUSE BILL 589: Competitive Energy Solutions for NC.

Distributed Generation Interconnection Seminar

BC Hydro Rate Schedules Effective: August 1, 2015 Fourth Revision of Page 30

U.S. Department of Transportation

Merger of the generator interconnection processes of Valley Electric and the ISO;

Schedule SP SOLAR PURCHASE (Experimental)

Transcription:

Net Metering Webinar The information summarized in this Webinar for the convenience of customers is current as of September 12, 2018 and neither the slides nor related recording should be relied on. Customers are responsible for ensuring that they comply with all net metering rules and regulations, including the net metering tariff and D.P.U. orders. 1

Agenda Introduction to Net Metering Programs Schedule Z Single Parcel Rule Blanket Exceptions Blanket Exception Application Process Aggregation of Capacity Q&A 2

Net Metering All non-simplified Applications for net metering (NM) must receive a Cap Allocation via the System of Assurance (SoA) at http://www.massaca.org as well as simplified projects that are not cap exempt (i.e. > 10 kws, single phase; >25kW three phase; and all non-renewables) Guidance on submitting an Application for Cap Allocation is available at: http://www.massaca.org/help.asp, via the Help@MassACA.org email, or the MassACA Helpline (877) 357-9030 Need to determine whether project is a Public, Private, or Small Hydroelectric Facility Public: Host Customer is certified as a Municipality or Other Governmental Entity by the DPU and has Class II or Class III Facility. Host Customer (HC) allocates to only customers who are certified Public. Ten MW limit per entity in Massachusetts. Must apply to DPU to be certified as a Public Facility Host Customer and all allocated customers must get this certification as a Public Facility Need to send copy of certificate(s) to utility Private: All other Host Customers. Small Hydroelectric: Must net meter though Small Hydroelectric Net Metering Program (SHP) while SHP is open 3

Net Metering Eligibility Three Factor Approach (order 11-11C, issued 8/24/12) Single parcel / single interconnection point / single meter Enacted to limit gaming and limits one meter per parcel of land with a limit of 2 MWs on the parcel for private entities subject to blanket exceptions A public entity can have 2 MWs per each unit of a facility on a parcel of land, but is limited to a total of 10 MWs of net-metered accounts throughout the state (which may all be located on a single parcel). The DPU defined unit in order 11-11-C We can not provide more than one interconnection point (POI) Subdivision Restrictions. Parcel boundaries are established as of January 1, 2010. Where a parcel is subdivided after such time, DPU approval may be required to be eligible for NM. Otherwise separate metered project could earn higher credits than if it was behind an existing meter 4

Schedule Z All NM projects must fill out a Schedule Z. Schedule Z tells the Company where the NM credits are allocated Beginning on August 1, 2018, HC must include electronic Excel spreadsheet in template form (with two-decimal place limit on allocations) with any Schedule Z form (new or revised) submitted to Company; earlier filed Schedule Z remains valid until revised 5

Single Parcel Rule Exception All of the NM facilities are located on rooftops (offground structure capable of supporting NM facility, including buildings, garages, carports, canopies) Maximum aggregate nameplate capacity rating of all NM facilities on the parcel is 10 kw AC on a singlephase circuit or 25 kw AC on a 3-phase circuit Each NM facility is tied behind the electrical service of structure on which it is located Each NM facility has a separate meter 6

Single Parcel Rule Exception Multiple Technologies Only one type of a renewable energy (e.g., solar, wind, anaerobic digestion) technology may be located on a single parcel Each NM facility must be separately metered to precisely measure the electricity produced by that technology; Company must provide and install the meter The NM facilities can be in the private and/or public cap If any of the NM facilities are in the private cap, the maximum aggregate nameplate capacity of all NM facilities on the parcel is 2 MW AC If all of the NM facilities are in the public cap, the maximum aggregate nameplate capacity of all NM facilities on the parcel is 10 MW AC (minus any of the 10 MW capacity that has been allocated to NM facilities located elsewhere) 7

Single Parcel Rule Continued Small Hydro Program facilities are exempt from single parcel rule* and may operate on same parcel as a NM facility with another renewable technology without having to submit information to DPU to confirm eligibility for Multiple Technologies Blanket Exception An agricultural NM facility is not a separate technology Grandfathered NM facilities are not exempted from these requirements * Also exempt from subdivision rule 8

Blanket Exception Application Process HC electronically submits a complete Net Metering Blanket Exception Application Form (https://www.mass.gov/net-metering) to DPU (no filing fee) Director of Electric Power Division (to whom DPU has delegated this authority) will issue written determination electronically to HC If exception is granted, HC must provide copy of Blanket Exception approval to Company and to Mass ACA Administrator if NM facility requires a cap allocation HC may petition DPU for a case-specific determination if blanket exceptions do not meet its needs 9

Aggregation of Capacity Net metering rules have been silent on whether, when an exception is granted to the single parcel rule to permit multiple NM facilities on a single parcel, the capacity of those multiple facilities should be aggregated for the purpose of calculating net metering credits (NMC) DPU recently clarified that if a HC is granted a multiple technologies blanket exception, HC is not required to aggregate the capacity of those NM facilities for the purpose of: Applying for a cap allocation (this also applies to future petitioners for a multiple technologies exception) Calculating NMC (DPU will determine on a case-by-case basis whether future petitioners for a multiple technologies exception must aggregate the capacity of those NM facilities for the purpose of calculating NMC and may require non-cap Exempt facilities to do so) 10

Net Metering Summary If planning to Net Meter, submit Schedule Z with interconnection application or as soon as is practical. Correctly fill out Schedule Z. Host Customer is primary account holder on the electric account. Must be signed by Host Customer If allocating, verify name/address/account info of electric customer(s) or will need to submit corrected form. Public Host Customers must apply to DPU for certification as a Municipality or Other Governmental Entity and submit confirmation to Distribution Company. If allocating credits to customers, those customers must also obtain certification. Must obtain a qualified cap allocation from Mass ACA. (If on waiting list and still looking to interconnect became a QF), with the exception of Class I exempt facilities. Production reporting is required. Class II and III Facilities - ISO registration required and associated ISO-NE OP 18 metering. 11

Resources National Grid Net Metering Tariff (M.D.P.U No. 1360, effective June 15, 2018) (Incorporates SHP) Net metering regulations (220 C.M.R. 18.00)(Effective December 1, 2017) D.P.U. 17-10-A: Order Promulgating Final Regulations, November 17, 2017 (Order establishing SHP) D.P.U. 17-22-A: Order Announcing Net Metering Blanket Exceptions and Streamlining Process, May 31, 2018 D.P.U. 18-54: Order of Delegation, May 31, 2018 (Order delegating authority to Electric Power Division Director for blanket exception determinations) MassACA website (www.massaca.org) DPU website: Apply for a net metering blanket exception (https://www.mass.gov/how-to/apply-for-a-net-metering-blanket-exception) 12