Ferrostaal Industrieanlagen GmbH - Germany Ferrostaal Christof Romania SRL - Romania A Joint Venture of Ferrostaal and the Christof Group OMV PETROM Hurezani Gas Delivery Project Compressor Station Bulbuceni Ferrostaal Industrieanlagen GmbH
General Project Information Initial situation: Seasonal fluctuation (between 14 and 20 barg) in gas delivery to major consumers especially in summertime was causing significant production losses for OMV Petrom, due to the pressure increase in the National Transport System. Project Objective: The new Hurezani Gas Delivery System will ensure OMV Petrom to deliver gas continuously to National Transport System with a constant pressure of 40barg. Ferrostaal Industrieanlagen GmbH Oil & Gas Division East 03/02/2011 2
Ferrostaal s Scope of Work Front End Engineering Design (Feed) Completion Basic Engineering Detail Engineering Authority Engineering Site Clearance from underground pipes & facilities Procurement, (Turbo Compressor packages provided by OMV Petrom) Construction Commissioning Two (2) months operation assistance Maintenance Contract for 8 months Ferrostaal Industrieanlagen GmbH Oil & Gas Division East 03/02/2011 3
Project Overview Ferrostaal Industrieanlagen GmbH Oil & Gas Division East 03/02/2011 4
Project Key Data Project Configuration: Three (3) identical Compressor trains consisting of one (1) Solar Gas Turbines, 7MW each (Taurus 70) with Solar Centrifugal Compressors C50. Two trains being in operation and the third one in stand-by. Each train comprises an inlet filter scrubber, a centrifugal compressor driven by a gas turbine of 7 MW power and a gas cooler. In addition, one finger type slug catcher, LP & HP fuel gas skids, an open & closed drain system, a flare system, instrument air & Nitrogen gas generation, emergency diesel generation, well water treatment, fire fighting system and control & emergency shutdown system (ESD & DCS) are provided. Type of Contract: Fast Track (EPCC) Feb 2009 - Nov 2009 (Open Book) From Dec 2009 Lump Sum Turn Key Execution Period: Feb 2009 Aug 2010 (PAC issued) Construction Start: Nov 2009 First Gas Delivery: 29th Mai 2010 Special Agreements: Solar Turbo-compressor packages furnished by Client Ferrostaal Industrieanlagen GmbH Oil & Gas Division East 03/02/2011 5
Project Key Data Station Configuration: Design pressure: 64 barg Operating pressure: 45 barg Capacity, normal 5.500.000 Ncm/d. Capacity, max. 6.050.000 Ncm/d Capacity, min. 1.200.000 Ncm/d Capacity per train 2.750.000 Ncm/d Ferrostaal Industrieanlagen GmbH Oil & Gas Division East 03/02/2011 6
Project Milestones Ferrostaal Industrieanlagen GmbH Oil & Gas Division East 03/02/2011 7
March 2009 Initial Situation Ferrostaal Industrieanlagen GmbH Oil & Gas Division East 03/02/2011 8
August 2009 - Site Clearance Ferrostaal Industrieanlagen GmbH Oil & Gas Division East 03/02/2011 9
November 2009 - Start Construction Ferrostaal Industrieanlagen GmbH Oil & Gas Division East 03/02/2011 10
Civil Works TUCO foundations Ferrostaal Industrieanlagen GmbH Oil & Gas Division East 03/02/2011 11
Installation of 1 st compressor Ferrostaal Industrieanlagen GmbH Oil & Gas Division East 03/02/2011 12
TUCO s on foundation Ferrostaal Industrieanlagen GmbH Oil & Gas Division East 03/02/2011 13
Two shift system installed Ferrostaal Industrieanlagen GmbH Oil & Gas Division East 03/02/2011 14
Winter measures for concrete works Ferrostaal Industrieanlagen GmbH Oil & Gas Division East 03/02/2011 15
Gas cooler installation Ferrostaal Industrieanlagen GmbH Oil & Gas Division East 03/02/2011 16
Steel structure compressor building Ferrostaal Industrieanlagen GmbH Oil & Gas Division East 03/02/2011 17
Fire water tanks under construction Ferrostaal Industrieanlagen GmbH Oil & Gas Division East 03/02/2011 18
Simultaneous construction activities Ferrostaal Industrieanlagen GmbH Oil & Gas Division East 03/02/2011 19
Lift of 1 st flare section by 500 to mobile crane Ferrostaal Industrieanlagen GmbH Oil & Gas Division East 03/02/2011 20
View from the flare during construction Ferrostaal Industrieanlagen GmbH Oil & Gas Division East 03/02/2011 21
75 m high flare Ferrostaal Industrieanlagen GmbH Oil & Gas Division East 03/02/2011 22
2 x 1.100 m3 fire water tanks Ferrostaal Industrieanlagen GmbH Oil & Gas Division East 03/02/2011 23
Gas cooler and suction scrubber Ferrostaal Industrieanlagen GmbH Oil & Gas Division East 03/02/2011 24
TUCO package train #1 Ferrostaal Industrieanlagen GmbH Oil & Gas Division East 03/02/2011 25
Control Room Ferrostaal Industrieanlagen GmbH Oil & Gas Division East 03/02/2011 26
Station overview after completion of all works Ferrostaal Industrieanlagen GmbH Oil & Gas Division East 03/02/2011 27