Assembly instructions A B. A (mm) B (mm) C (mm) A A A A Walk-in Greenhouse

Similar documents
9'8" x 9'8" (8,8 m2)

Model HE-BOS 8FT DEEP LEAN-TO

SCREEN ROOM ITM./ART MODEL#L-GZ938PCO-B/L-GZ938PCO-B2 ASSEMBLY INSTRUCTIONS

6 3 X X X X X

42A FLB WOOD BUNKS 43A FLB ALUMINUM BUNKS ALUMINUM CANTILEVER BOAT LIFT

Clutch Operated Roller Shade with Fascia Installation Instructions

CABLE MANAGEMENT SOLUTIONS CATALOGUE2003/04 A COMPLETE CABLE MANAGEMENT SOLUTION FOR COMMERCIAL AND INDUSTRIAL APPLICATIONS.

Pontoon Assembly Instructions and manual. Read before using hoist.

PORTA-DOCK, INC. 100A 1200 LB. 84 WIDE ALUMINUM CANTILEVER BOAT LIFT 102A 1200 LB. 113 WIDE ALUMINUM CANTILEVER BOAT LIFT

Consort, Viscount, Regal, 814

MS Chevy Trucks Blazers/Jimmys Hood Hinge Installation Instructions

PORTA-DOCK, INC. 100A 1284 ALUMINUM CANTILEVER BOAT LIFT

Installing AMP-wiring in a New Beetle

insulated sectional 2180mm (h) x 2550mm (w) Opening Size: 2140mm (h) x 2500mm (w) suits single car garage

ClearSpan Curtain Tube Support System with Electric Drive Motor (300w)

Replacing MK4 Golf/Jetta radiator mounts in-car

Installation Instructions Table of Contents

Ford Racing BOSS 302 Engine Oil Cooler (11-14 GT)

Detailed Assembly Instructions. ATS Evacuated Tube - Solar Panel Units ATS10 / ATS20 / ATS30

7.5 10ft Rectangular Solar Offset Umbrella With Base Assembly and User Manual ITEM: UMB-MJ002

Important Information

Remove the 3-11mm nuts holding mirror on. Don t drop the nuts!

INSTALLATION & OWNER S MANUAL

Premium Dry Freight (Plywood) Door Installation REFERENCE FIGURE 1

DF Ford F Short Bed 2009-Current

NORTHSTAR TRAILERS. Assembly Guide for MULTISTAR Trailer

INSTALLATION & OWNER S MANUAL

Safety and Assembly instructions

NORTHSTAR TRAILERS. Assembly Guide for SPORTSTAR II Trailer

CAB #11606 FOR John Deere X500, X520, X530, X534, X540

DODGE RAM 1500 / 2500 / 3500

BELT DRIVE SYSTEM TROUBLESHOOTING CHART CAUSES CORRECTIVE ACTION ENGINE RUNS BUT PADDLES DO NOT TURN

XD Aussie Locker XD Installation Supplement Dana 35 Ford TTB

Modix Big-60 Assembly Manual Part 2

X.L. BAND W/ SPRING ASSIST INSTRUCTION MANUAL

Part# JL AIR IT UP 4 Tire On Board Air Delivery System. (Requires External Air Source)

Flexiglass - FlexiXover Canopy RTCFG02 RTCFG03

Sunroof Repair. Sunroof Repair TSB. The sunroof repair kit available for the J30 is part number Y20. See images at bottom of document.

CAB #11670 FOR JOHN DEERE 2320 TRACTOR

Prius XM Radio Installation Instructions. Eddie Bell

CHEVROLET TAHOE/DENALI/AVALANCHE/YUKON/ SILVERADO/SIERRA 2007+

INSTALLATION & OWNER S MANUAL

NORTHSTAR TRAILERS. Assembly Guide for SPORTSTAR I Trailer

Lifting height 5.5" - 72" with adapters " Height overall 165" Width between columns 122" Drive through 109" Width overall 151.

J & D Machine / Hyperdrive / MSA 3711 Moon Bend Rd. Chapel Hill, TN 37034

Competitor. Ultra Light Plus, Semi Electric Bed. Item # Owner s Assembly And Operating Manual

MEYLAND-SMITH A/S EST User manual for MEYWALK 2000 model Medium and Large

J&M Mustang Adjustable Panhard Rod (05-09) - Installation Instructions

Performance Brake Caliper Guide Bushing Set Installation Guide

Peg-Harness installation instructions

PORTA-DOCK, INC. 65A 1155 DOUBLE PERSONAL WATERCRAFT LIFT

Toyota Kluger RSP31. Maximum load carrying capacity: 80kg / 176lbs. Important Information. 1. Check Part No./Kit is correct 3. Fit roof rack accessory

Tools Required. Metric Wrench Set Screwdriver Set Metric Socket Set Pliers Heavy duty hydraulic Jack and Car Stands Box knife or similar Hacksaw WD40

Helios 200/25. Helios Hobby. Type A (cm) X B(cm) M 2 H1(cm) H2(cm) Mounting difficulty. ALU (no color)

Supertop Replacement Top with Tinted Side and Rear Windows Installation Instructions

Toyota FJ Cruiser Backbone RFJB1

Tooling Assistance Center

BUICK SKYLARK & GS CHEVROLET CHEVELLE & MONTE CARLO PONTIAC GTO & LEMANS OLDSMOBILE CUTLASS & 442

Forge Motorsport BMW N54 Diverter Valves

Shown with optional GFR-1017R Body Posts. J & D Machine / Hyperdrive / MSA 3711 Moon Bend Rd. Chapel Hill, TN

The HMC Heavy Metal Chassis Construction Guide

INSTALLATION INSTRUCTIONS AND OWNER S MANUAL

Installation Instructions LamboStyleDoors

OnBoard Drum Major Podium

Installation Instructions LamboStyleDoors

For: Model Year Jeep Wrangler/TJ Part Number: For: Model Year Jeep Wrangler/TJ Part Number: 58709

Assemble your grill immediately. Missing or damaged parts should be claimed within 30 days of purchase.

panelclaw.com Polar Bear III for 10 Degree

Toyota Kluger/Highlander SUV XU50 RLCP37

INSTALLATION INSTRUCTIONS

Perfect Park 7000 Installation & Unloading Instructions Operating Manual

RTS536 Toyota Prado 150 Track Mount

Installation Instructions LamboStyleDoors (The instruction are to be used as a reference. Please repeat for both doors)

Eos 200/40. Eos. Type A (cm) X B(cm) M 2 H1(cm) H2(cm)

710 Splicing Rig. Instructions. January E

Table of Contents. Exploded View

Installation Instructions Vanishing Lid Bracket

Genesis Roll Up Tonneau Cover

Exhaust Heat Shield Instructions ND

Toyota 4Runner Track Mount Kit (RTS545)

SERIES A & AA ROLLER DOORS INSTALLATION GUIDE

User manual. meywalk. Model Small, Medium and Large

INSTALLATION & OWNER S MANUAL

MR6K-48X. Mid-Rise Scissor Lift ASSEMBLY & OPERATION INSTRUCTION MANUAL. 6,000 lbs.

SIM RIG GT. Product Manual

Assemble your grill immediately. Missing or damaged parts should be claimed within 30 days of purchase.

Installation Instructions Studio Makeup Station

User Manual and Parts List. P/n:

B5 A4 1.8t Front Mount Intercooler Install Instructions

INSTALLATION & OWNER S MANUAL

Assemble your grill immediately. Missing or damaged parts should be claimed within 30 days of purchase.

GrilleGuy.com, LLC. Installation Instructions and Care guide : Scion tc : Honda S2000 : Honda Civic

CAUTION - PUT SAFETY FIRST

How to use this file...(installation Instruction Sheets)

ALUMINUM FORD F BED LENGTH. Installation Instructions: DF4 TOOLS REQUIRED 2015-CURRENT FOLLOW #DECKEDUSA

WARNING Carefully Read These Instructions Before Use

DODGE RAM 1500 / 2500 / 3500

Installation Instructions

Turbo-House Air Inlet Installation & Operator s Instruction Manual

Bag 1. Bag 1. Center Pivot. Center Pivot

Transcription:

ssembly instructions C MODEL (mm) (mm) C (mm) 907 34 90 950 689 4 9 3666 94 438 Walk-in Greenhouse

Statement Dear Customer! May we congratulate you on your new Greenhouse. We feel sure that by following the detailed assembly instructions you will find as much pleasure in actually building the greenhouse as the time you will spend in your greenhouse in the future. The assembly instructions mainly consist of detailed illustrations and no specific technical knowledge is required for the assembly of the greenhouse. There are four packages for one set of rched greenhouse totally. The base is packed in one carton, no matter aluminum base or steel base. The house frames are packed in two cartons, one for straight profiles and all of fittings, one for curved frames. ll the polycarbonate panels are packed in one carton. ll of the aluminum profiles are marked with a part number corresponding to the numbers given on the drawings and in the parts list. Nuts, bolts and fittings will be found in the relevant package. ll of the rear gable section straight frames are in package No. ll of the front gable section straight frames are in package No. ll of the roof/side wall section straight frames are in package No.3 ll of the frames and components for the window are in package No.4 ll of the frames and components for the door are in package No.5 The panels of Polycarbonate are not marked with a part number, but the sizes appear in the overview. When fitting the Polycarbonate, the side with the opal film/text must turn outward. ccessories We offer a wide range of accessories which contribute to a better yield and make life easier for the gardener. selection of the range is shown in the supplements to these instructions. Your dealer will be pleased to assist you with further information and a special brochure. Winter Protection In areas where snow might be expected we recommend the following in order to protect your greenhouse:. Support the ridge at the center of the greenhouse.. Removed larger snow loads. 3. Take precautions against snow falling down, for instance from a roof. Complaints We put severe demands on quality to secure that you get a faultless product. However, should a problem occur, we kindly ask you to contact the dealer from whom you have bought the greenhouse. For a quick service, you should specify the extent of the defect by means of the parts list in the assembly instructions. Please also note the model number which is marked on the front page of these instructions. Guarantee We grant a 0 year comprehensive guarantee which covers replacement or repairs of defective parts due to material or manufacturing defect. The guarantee does not cover polycarbonate, transport, erection. The guarantee is invalid if the greenhouse is not assembled according to these instructions. Insurance Not all insurance companies automatically cover greenhouses. We recommend you contact your insurance company to ensure that you are covered.

Statement Foundation The base is not included in this delivery. However, we do recommend you buy our origin base easy to build. The base is maintenance free and, of course all fittings are included. Remember to order concrete pipes and concrete at your local dealer as these are not included in the delivery. Cautions Remove approximately inches of film from all sheet edges before installing. Remove all film immediately after the constructions is completed. Handle with care! Dropping can bend the frame, and it won t fit properly. The UV-protected side of the sheet is covered with opal white film/text and must face towards the sun. Keep sharp instruments away from the polycarbonate sheets. Please put on gloves avoid slitting your hands. Tips. The base has to be fastened in a non-freezing depth(80cm).. The greenhouse is to be fastened to the base. 3. The base has to be 00% level and square. The easiest way to ensure this is to make sure that the two diagonal measurements are identical. 4. We recommend that you grease screws for doors and windows for easier assembly. 5. Erection of the greenhouse should only take place in calm and dry weather. 6. ll frames are to be assembled around the polycarbonate as shown on the drawings. We recommend that you start with the back gable. 7. IMPORTNT efore assembling aluminum base, the end trough centers of four legs should match both end trough centers of side sills and front & rear sills at the same time. Please match four corner troughs together at the same time side sills front & rear sills 3

ase a m7 # m7 907 8 90 0 lu. ase 9 94 4 a m7 # m7 907 3 90 5 Steel ase 9 7 94 9 a m5 # m5 907 3 90 5 Concrete 9 7 94 9 X Y 907 689 34 90 689 950 9 689 3666 94 689 438 X Y 907 8 0 7 4 90 8 0 9 8 9 8 0 94 8 0 4 5 4

ase The left illustration shows length and width marked with X and Y. Part No. m5 shows a bracket used to secure the inside base when not using the original supplier s foundation. Prior to the assembly of the greenhouse, you should have a 0 mm nut driver, 0 mm open-end wrench, Philips head and slotted screw driver, spirit level, and some WD-40 lubricant. 5

Polycarbonate sheet C C D D I H G I E E D D p8 p8 p7 p7 p7 p8 F p6 F p6 p8 Note: If panel edge can t enter into alu. Frame channel, please use a bracing bar to squeeze panel edge into channel. Frame Panel racing bar # Size 907 90 9 94 700x049 4 4 4 4 700x84 0 4 6 C 60x487/6 D 60x95 4 4 4 4 E 60x534/057 F 60x84 G 700x333 4 4 H 696x73 4 4 I 700x0 5 6 6 8 p6 59 p7 68 6 8 0 p8 660 4 4 4 4 p6/p7/p8 p6/p7/p8 This page shows the positioning of the polycarbonate panels for the front and rear gable as well as the roof and the sides. It also indicates where the parts #P6, #P7 and #P8 are used. When fitting parts #P6/P7/P8 on the ends of the panels, try using a narrow piece of bar soap through the part first. It will allow it to slide on much easier. #P6/P7/P8 must be fitted on one end of polycarbonate in advance before polycarbonate be inserted into aluminum frame. The square illustration on the page shows the placement of the gray plastic U shape strips. To transfer the size of the panels from mm to inches, divide by 5.4. 6

Louvre Louvre is an optional extra and is not included in the price. 456 475 the new polycarbonate panel #E p6 p6 p6 Using lu. clip to connect louvre and PC panel lu. profile PC Panel 573x97x4mm lu. profile 456 x 60 L 573 x 97 5 7

The list of Section Section Part Profile Size 907 90 9 94 No. 90 965 90 965 005 95 R E R F R O N T R O O F / S I D E 006 95 907 380 908 68 009 683 00 594 9 653 0 0 93 66 903 965 904 965 009 683 0 0 04 95 05 95 96 66 97 465 98 0 99 484 0 97 0 93 03 369 04 4345 06 76 07 89 08 3608 09 434 03 68 03 884 033 3600 034 436 036 68 037 884 038 3600 039 436 040 6 8 8 8 8 04 683 6 8 0 943 959 4 6 8 0 955 400 3 4 5 Section Part No. V E N T D O O R Profile Size 907 90 9 94 04 683 4 4 044 698 4 4 045 698 4 4 946 750 4 8 8 047 300 4 4 048 00 4 4 049 594 050 594 4 4 4 4 05 870 95 870 953 870 054 558 a M6x0 00 6 36 48 a M6 3 57 7 a3 M6x8 3 3 3 3 a4 Φ4.x9.5 4 8 6 6 a5 Φ3.5x9 8 0 0 a6 Φ3.5x5 a7 Φ4x8 4 4 4 4 a8 M6x5 6 8 0 M6x0 a9 Crop 4 8 8 a0 Φ3x5 4 4 4 4 a M3 4 4 4 4 m - m3-5 7 m6 - n - 4 4 4 4 p - p3-4 8 8 p4-4 4 4 4 p5 - p6 59 p7 68 6 8 0 p8 660 4 4 4 4 m - FLUFF 3.8m 8

Step Rear Gable Package No. With this page, you will assemble the rear gable (back). It is far easier if you have an elevated surface such as two 4 8 pieces of plywood on a sawhorses. If not, lay the aluminum profiles out on a hard surface as shown in the main illustration. Remember you are building from the inside with the outside facing down. Start with one of the E panels and build the aluminum around the polycarbonate panel. the polycarbonate side with the opal film/text must facing down. Part No. 90 90 005 006 907 908 009 00 9 0 93 m a a p6 p8 Size 965 965 95 95 380 68 684 594 653 0 66 - M6x0 M6 59 660 Qty 6 6 908 E E 90 006 907 005 90 009 00 00 009 9 3 4 0 F F 0 93 5 6 9

90 907 90 m Square No. This the Ridge. The square headed bolt slides into the channel in part #90 & #90, and connect them with part #m, Our bolts and nuts were made of stainless steel. Square No. Insert part #006 into Part #90 channel, contact with part #908 together, Please insert extra bolt #a into the channel of Part #006 for attaching part #9 use later. Do the same for the opposite end. 908 90 006 Note: Please connect Part #9 with Part #90, #90, #005, #006,#907 firstly before you are inserting PC panel # &#E into profiles channel. 908 90 90 E E 9 Square No.3 fter PC panels in position, then dismantle part #9 and adjust the distance to 5mm between PC panel and trough edge. 3 9 006 907 005 90 5mm 009 90 9 E E 009 009 00 00 009 0 0

4 9 9 00 009 Square No. 4 ssembly part #009, #00 in place, then connect with part #9 again. Please Note: Don t let this bolt block polycarbonate panel to insert into part #90&90 alu. frame channel. Insert PC panel first, then slide this bolt in part #90&90 profile s trough. 90 90 5 90 p8 93 F F p8 p6 p6 p8 93 6 Square No. 5 Inserting PC panel #,#F in profiles 0 channel. With PVC p8 anti-dust strip #p6 & #p8 on bottom. 93 p6 Square No.6 Connect Part #93. Please note: 4 olts will need to be slid into each Part #90 and #90 for ridge, hanging basket bar or horizontal rail and side sill beam in advance, Finger tightens the nuts for later use.(olts and nuts in Package No.3 of Roof/Side wall) When finished with the back gable, stand it up out of the wind so it will not blow over.

Step Front Gable Package No. Part No. 903 904 009 0 04 05 96 97 98 99 m m3 a a a3 p8 Size 965 965 683 0 95 95 66 465 0 484 - - M6x0 M6 M6x8 660 Qty 3 8 3 99 C 97 C 3 98 903 904 009 009 5 4 04 05 0 0 7 6 96 m Square No. this step is very much like the rear gable. 90 97 90

C C 903 904 a3 97 m3 98 98 3 a3 904 98 05 903 904 Square No.3 ssemble polycarbonate panel #C on part #903,#97,#9 04, use part #98 to fix it. 4 5mm 904 009 009 009 009 904 Square No.4 fter PC panels in position, then adjust the distance to 5mm between PC panel and trough edge. 0 5 04 Square No.5 Use the part #m3 to connect the part #009 & #04. m3 009 3

Please Note: Don t let this bolt block polycarbonate panel to insert into part #903&904 alu. frame channel. Insert PC panel first, then slide this bolt in part #903&904 profile s trough. 903 904 6 904 p8 96 p8 p8 76 7 0 04 Square No. 6 Inserting PC panel # in profiles channel. With PVC anti-dust strip #p8 on bottom. p8 Square No.7 Connect Part #96. 96 8 Square No.8 The bolt #a3 to fix #98 is an extra long stainless bolt. The bolt slides into part #99 and extends through parts #903 & #904. 99 Section view 98 a3 99 a3 Please note: 4 olts will need to be slid into each Part #903 and #904 for Ridge, hanging basket bar or horizontal rail and Side sill beam in advance, Finger tightens the nuts for later use.(olts and nuts in Package No.3 of Roof/Side wall) 4

Step3 Connect front gable with rear gable by Ridge and side sill beam. Part No. Size 907 90 9 94 0 97 0 93 03 369 04 4345 m 06 76 07 89 08 3608 09 434 Square No. ttaching the ridgepole to the gables, this is where you may have to adjust bolts in plate #m to fit the pole into gables. Slide the bolt with the nut on up the trough of ridgepole and tighten. Square No. Connect side sill beam with curved corner bar, this can be one of the easiest. This is where you will use an open-end 0mm wrench. ecause of the tight corner, it is difficult to work with the nut driver. Once you have attached side sill to curved corner bar, bring the corner together and slide the bolt down into the slot. Tighten with the open-end wrench. a/a 5

ssemble greenhouse frame on lu. base. breach a-m6x0 a-m6x0 Square No. You may loosen the bolts in corners and re-tighten it at the trough of base legs. Corner Corner breach If you forgot sliding extra bolts into glazing bar or corner bar channels in advance, please add it through this breach. a8-m6x5 m7 a8-m6x5 Square No. ssemble greenhouse frame on base by connector m7 in the middle of bottom. Center Center 6

ssemble greenhouse frame on Steel base. m7 a-m6x0 breach a-m6x0 Square No. You may loosen the bolts in corners and re-tighten it together with base connect m7. Corner Corner breach If you forgot sliding extra bolts into glazing bar or corner bar channels in advance, please add it through this breach. a8-m6x5 a8-m6x5 Square No. ssemble greenhouse frame on base by connector m7 in the middle of bottom. m7 Center Center 7

Step4 Roof/side wall Package No.3 efore assembling polycarbonate panel and glazing bar. Please connect hanging basket bar and horizontal rail on front and rear corner bars. also connect roof and sidewall bracing bars (#040). Then the greenhouse will be in straight shape structure. Then we can start to assemble PC panels and glazing bars smoothly. 040 03 Hanging basket bar 040 4 036 Horizontal rail 040 040 Part No. Size 907 90 9 94 03 68 03 884 033 3600 3 034 436 036 68 037 884 038 3600 039 436 040 6 8 8 8 8 04 683 6 8 0 040 040 943 959 4 6 8 0 955 400 3 4 5 a M6x0 48 60 7 84 a M6 5 66 80 94 a8 M6x5 4 6 8 0 p7 68 6 8 0 040 3 4 8 040

Now we are starting to assemble Polycarbonate panels and glazing bar.. Sliding PC panel # between cross bar part #04 and side sill beam with PVC anti-dust strip P7 on bottom.. Connect curved glazing bar #943 with ridge and hanging basket bar, and tighten it. 3. Inserting polycarbonate panel # I into the alu. Frame channel and curve it along the curved alu. Channel. 4. You could squeeze PC panel up and down, and adjust the depth of inserting of cross bar part #04 on horizontal rail. Very Important: 3 #a olts will need to be slid into each glazing bar for ridge cantilever & hanging basket bar & horizontal rail, #a8 bolt be slid into each glazing bar for connect side sill in advance, and finger tightened for later use. Please note: t this stage you will need to insert an extra bolt into each glazing bar either side of a vent opening. So you will have to decide now where your roof vents are positioned so that you can work out the correct number of bolts in each glazing bar. nd slide roof vent to decided position from Ridge immediately, otherwise glazing bar will block its slide after glazing bar is fixed. Hanging basket bar a 04 a a a Horizontal rail assembling cross bar part #04 on horizontal rail PC panel bottom with PVC antidust strip P7 040 943 943 tighten first 943 I You should attach glazing bar #943 with ridge and hanging basket bar first. Separate curved glazing bar #943 a little from bottom, and make an angle and then insert PC panel into alu. Frame channel. 9

djust depth of PC panel in cross bar channel I 3 tighten first tighten first tighten third tighten fourth 943 943 040 3 a8/a 943 943 955 Square No. From bottom to top, you could squeeze polycarbonate panel both edges into alu. Profile s channel gradually. Please use bolt and nut to tighten the glazing bar#943 with hanging basket bar or horizontal rail in time once it s in position. Square No. On the bottom, Use olt #a8 (M6x5) to attach glazing bar #943 with bracing bar #040 and side sill beam together, and fix them on base by base connector. 0

Step5 Vent efore finishing glazing bars and PC panels assembly. We should assemble windows in place first. Package No.4 Part No. 04 044 045 946 047 048 m3 a a a4 a5 a9 p3 Size 683 698 698 750 300 00 - M6x0 M6 Φ4.x9.5 Φ3.5x9 M6x0 - Qty 4 6 4 4 907 90 9 94 Vent No. 4 4 H 045 3 3 a4 Square No.3 8 4 045 946 044 047 04 The push rod should be mounted so the handle extends up. 946 p a5 946 044 a5 946 045 Square No. & No. When assembling the vent using screw #a5, it is essential to use a lubricant on the screws. power screwdriver here is almost too much force, as it is easy to strip the heads. If possible turn the screws in by hand. 6 Square No.6 The completed vent slide into the ridgepole which act as a self-hinge. Square No.4 When mounting part #048 onto part #04, the left post should be directly in line with the center of the vent. 5 04 m3 a/a a/a 048 943 If you forgot to insert extra bolt a in lu. channel. Please use crop head bolt a9 instead. Square No.7 Part #p3 is plastic barrel shaped piece that is used on either side of the vent to keep it from moving side to side. The screw #a4 will expand the plastic and hold it firm. 7

Step6 For the last polycarbonate panel assembly. t first, You should dismantle the curved corner bar, by loosening the bolts attaching base, sill beam and horizontal rail and hanging basket bar (Don t loosen ridge top bolt and nut). nd separate curved corner bar a little from bottom, and make an angle with glazing bar (Like a trapezoid with right angle).. Put on cross bar #04 on top of PC panel #, and PVC anti-dust strip P7 on bottom of PC panel # firstly. Then assemble them on horizontal rail together. 3. Then insert polycarbonate panel #I between curved corner bar and curved glazing bar. 4. Finally, push them together, and tighten all the bolts and nuts which loosened before. 5. Repeat this on the opposite side. Loosen the bolts and separate from bottom at an angle 04 I PC panel bottom with PVC anti-dust strip P7 I G I

Step8 Door Package No.5 Part No. 049 050 05 95 953 054 a a a5 a6 a7 a8 a0 a p4 p5 m m6 n FLUFF Size 594 594 870 870 870 558 M6x0 M6 Φ3.5x9 Φ3.5x5 Φ4x8 M6x5 Φ3x5 M3 - - - - - - Qty 4 4 6 4 4 4 4 4 4 3.8m n a7 FLUFF 049 049 050 D D 05 3 D 4 5 6 a5 p5 95 7 050 953 D 99 a0/a 050 m 05 05 050 a0/a 3 4 049 050 050 05 05 05 a6 a6 p4 a6 Square No. & No. & No.3 &No.4 When assembling the door, use the same lubricant for the screws. Do not forget the plastic door glides for bottom when assembling the door. It should be adjusted to suitable extended length before and after the door assembly. The roller #n was fixed on the part #049 with a7 screw. 99 054 m6 8 054 a/a Square No.7 Part #054 is a vertical post used at the end of part #99 to keep it level. Loosen #a3 to adjust the #99 in suitable place in order to keep door sliding space. a/a a8/a 3

Description 907 90 9 94 Rear Gable Front Gable 3 Roof/side wall 4 Window 4 4 5 Door 6 Curved front corner bar 7 Curved rear corner bar 8 Curved glazing bar 4 6 8 0 9 Polycarbonate panels 0 Tools ssembly Instruction Contact Information: MODULR ORGNICS LLC EMIL: INFO@MODULRORGNICS.COM WWW.MODULRORGNICS.COM