Resource Prospector Traverse Planning

Similar documents
Lunar Architecture and LRO

Building an Economical and Sustainable Lunar Infrastructure To Enable Lunar Science and Space Commerce

INTERNATIONAL LUNAR NETWORK ANCHOR NODES AND ROBOTIC LUNAR LANDER PROJECT UPDATE

Analysis of Power Storage Media for the Exploration of the Moon

Exploration Architecture Update

From MARS To MOON. V. Giorgio Director of Italian Programs. Sorrento, October, All rights reserved, 2007, Thales Alenia Space

NEXT Exploration Science and Technology Mission. Relevance for Lunar Exploration

Lunette: A Global Network of Small Lunar Landers

European Lunar Lander: System Engineering Approach

Abstract #1739. English. French. Author(s) and Co Author(s) Mining the Moon with ispace, a Lunar Exploration Company

Moon Exploration Lunar Polar Sample Return ESA Thematic information day BELSPO, 3 July 2012

Landing Targets and Technical Subjects for SELENE-2

Initial Concept Review Team Alpha ALUM Rover (Astronaut Lunar Utility Mobile Rover) Friday, October 30, GMT

RIMRES: A project summary

Next Steps in Human Exploration: Cislunar Systems and Architectures

Cooperative EVA/Telerobotic Surface Operations in Support of Exploration Science

FEDERAL SPACE AGENCY OF RUSSIAN FEDERATION LAVOCHKIN ASSOCIATION PROGRAM OF THE MOON EXPLORATION BY AUTOMATIC SPACE COMPLEXES

Human Exploration of the Lunar Surface

The European Lunar Lander Mission

Long-Range Rovers for Mars Exploration and Sample Return

LUNAR DAYLIGHT EXPLORATION Cost Constrained Human and Robotic Exploration Brand Norman Griffin 1 A.M., ASCE

Massachusetts Space Grant Consortium

Brief overview of lunar surface environment Examples of rover types and designs Steering systems Static and dynamic stability

Mars Surface Mobility Proposal

On Orbit Refueling: Supporting a Robust Cislunar Space Economy

An Overview of CSA s s Space Robotics Activities

Europa Lander Mission Overview and Update


3 DESIGN. 3.1 Chassis and Locomotion

WHAT WE WILL DISCUSS IN THIS VIDEO

Canadian Lunar & Planetary Rover. Development

Analysis of Architectures for Long-Range Crewed Moon and Mars Surface Mobility

Suitability of reusability for a Lunar re-supply system

Solar Electric Propulsion Benefits for NASA and On-Orbit Satellite Servicing

Light-Lift Rocket II

Name: Space Exploration PBL

Electric Vehicle Simulation and Animation

Robo$cs Mission Experience from Mars. Brian Wilcox Mark Maimone Andy Mishkin 5 August 2009

This is Ground Control... Professor Derek Long Department of Informatics King s College London

White Paper. How Do I Know I Can Rely on It? The Business and Technical Cases for Solar-Recharged Video Surveillance Systems

Collaborative Autonomous Ground Vehicles Achieving Energy Independence

Propulsion Controls and Diagnostics Research at NASA GRC Status Report

Mobile Payload Element (MPE)

On the feasibility of a fast track return to Mars

Two Related Primary Challenges for Successful Renewed Lunar Exploration

Silicon-Germanium Integrated Electronics for Extreme Environments Applied to the Design of a Lunar Hopper

Abstract #1756. English. French. Author(s) and Co Author(s) ispace & Team Hakuto s 2017 Lunar Mission

Transatlantic Mining Corporation Kearsarge Drilling Update.

ASX RELEASE. PAK receives drilling permit for Elko Coking coal project. Summary

Solar Emergency Preparedness Signs

The Common Spacecraft Bus and Lunar Commercialization

Over-Snow Rovers for Polar Science Campaigns

Europa Lander. Mission Concept Update 3/29/2017

Appendix E3. Open Pit Pioneering and Pre-production

lights on, down 2 ½ 40 feet, down 2 ½ Kickin up some dust 30 feet, 2 ½ down faint shadow

Project Report Cover Page

Sample Fetching Rover - Lightweight Rover Concepts for Mars Sample Return

Targeting Energy Efficiency and Demand Response Projects. Sam Borgeson Energy and Resource Group UC Berkeley

BUS STOP DESIGN & PLANNING GUIDE

Lunar Robotics. Dr. Rob Ambrose, NASA JSC December Dr. Robert O. Ambrose

Lunar Surface Access from Earth-Moon L1/L2 A novel lander design and study of alternative solutions

Critical Chain Project Management (CCPM)

A New Facility for Lander Touchdown and Rover Mobility Testing at DLR

F/A-18A/B/C/D Flight Control Computer Software Upgrade

Reference Science Scenario for SDT Report

CHANGING ENTRY, DESCENT, AND LANDING PARADIGMS FOR HUMAN MARS LANDER

Planetary Surface Transportation and Site Development

Challenges of Designing the MarsNEXT Network

UAV Magnetometry for Mineral Exploration

The Role of Nuclear Power

DER Commissioning Guidelines Community Scale PV Generation Interconnected Using Xcel Energy s Minnesota Section 10 Tariff Version 1.

GROVER: An Autonomous Vehicle for Ice Sheet Research

Rocketry Projects Conducted at the University of Cincinnati

Materials First use of high performance ceramics for full ocean depth floatation. HROV will be the first project to exploit high strength ceramic tech

Hawaii Fire Risk Mapping Project

Automated Vehicles: Terminology and Taxonomy

Exhibit R-2, RDT&E Budget Item Justification

Travel: Detailed Flight Plan

Multi-INT Manned Airborne ISR

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

LUNAR INDUSTRIAL RESEARCH BASE. Yuzhnoye SDO proprietary

City of Palo Alto (ID # 6416) City Council Staff Report

Western NY Public Policy Transmission Planning Report

AN The SmartSensor HD as an Automatic Traffic Recorder. Automatic Traffic Recorders

Autonomous Sample Acquisition for the ExoMars Rover

FINAL REPORT CATHODIC PROTECTION EVALUATION. 42-Inch Water Transmission Pipeline Contract 1 Station 0+00 to South Texas Water Authority

BATTERY FOR EXTENDED TEMPERATURE RANGE EXOMARS ROVER MISSION

MARS-OZ: A Design for a Simulated Mars Base in the Arkaroola Region

VACCO ChEMS Micro Propulsion Systems Advances and Experience in CubeSat Propulsion System Technologies

350 International Atlas of Lunar Exploration

The Airline Industry Delta Air Lines, Inc. Technical Operations Engine Maintenance Operations

Unmanned autonomous vehicles in air land and sea

ASIP on the U-2U. 560 th Aircraft Sustainment Group (C2ISR)

Lunar Cargo Capability with VASIMR Propulsion

ANDERSON, ECKSTEIN AND WESTRICK, INC.

Implementation of telecontrol of solar home system based on Arduino via smartphone

How O&G know-how can leverage the geothermal industry

Mars 2018 Mission Status and Sample Acquisition Issues

SMT. Installation and Operation Manual. Model:SMT WITH MPPT TECHNOLOGY

TACOMA PUMP STATION 4103 FORCE MAIN HDD PROJECT: A SHORT BORE WITH TALL CHALLENGES

Transcription:

Resource Prospector Traverse Planning Jennifer Heldmann (NASA Ames / NASA Headquarters) Anthony Colaprete (NASA Ames Research Center) Richard Elphic (NASA Ames Research Center) Ben Bussey (NASA Headquarters) Andrew McGovern (JHU / Applied Physics Lab) Ross Beyer (NASA Ames Research Center / SETI Institute) David Lees (NASA Ames Research Center) Matthew Deans (NASA Ames Research Center) N. Otten (Carnegie Mellon University) H. Jones (Carnegie Mellon University) D. Wettergreen (Carnegie Mellon University)

Lunar Site Selection Depth to Stable Ice (m) LCROSS South pole Depth to ice, m

Lunar Site Selection Maximum Days of Sunlight Using LOLA DEM LCROSS South pole

Lunar Site Selection Landing Site Sweet Spot Subsurface volatiles Direct to Earth (DTE) comm Traversable terrain Sun illumination

Lunar Site Selection Combined Site Analysis Mission duration 2-7 days of expected sunlight. Due to the limited operational time, science operations must be near real time. Shallow Frost Line Site: A B C <0.1 m <0.2 m <0.1 m Slopes <10 <15 <10 Neutron Depletion 4.5 cps 4.7 cps 4.9 cps Temporary Sun* 4 days 2-4 days 5-7 d Comm Line of Sight* 8 days 17 days 17 days * may not coincide Requires immediate situational awareness, data analysis and decision support tools. Site selection affects concept of operations.

Science Concept of Operations Select Science Positions Front Room Real-Time Science: Direct comm with Rover Driver to recommend RT science-based rover operations decisions Science Lead: Overall science management & assurance Science Operations Center (SOC) Includes Strategic and Tactical planning roles. SciCom: Direct comm between Science Backroom to Front Room Traverse Planning: Update rover traverse plans based on RT science data NIRVSS, NS, Camera, LOVEN Sci data positions: RT monitoring of data, ops recommendations based on datastream

Traverse Plan Data/Model Inputs The traverse plan includes the following inputs: Solar illumination as a function of time Direct to Earth (DTE) communications coverage as a function of time Terrain slopes Camera imagery PSR (Permanently Shadowed Region) locations PSR Map Slopes DTE

Notional Study Site: Haworth Crater a) LRO LOLA elevation Mission Study Site LRO LEND Frost temp depth (cm) LP neutron counts # days sun/month Haworth M3 water LRO LOLA slopes

Mission Planning Assumptions At/After landing, while still on lander: NSS and NIRVSS calibrated on lander Drill/OVEN/LAVA checked-out Localization from lander: Identified landing site in operating area map Any immediate (tactical) updates to traverse plan Once on ground: 48 hours of roving/prospecting to understand systems and calibrate thresholds If NSS or NIRVSS is on we can accomplish the L1 requirements while doing this Pursue Full Success goals, in priority order: 1. 1 st Shallow subsurface assay (sunlit) 2. 1 st Sample acquisition and processing (sunlit) 3. Prospect to reach 1000 meter baseline 4. 2 nd Shallow subsurface assay (sunlit) 5. 2 nd Sample acquisition and processing (sunlit) 6. Prospect to selected PSR 7. Prospect in PSR 8. 3 nd Shallow subsurface assay (shadow) 9. 3 nd Sample acquisition and processing (shadow) 10. Identification of location to sample material for ROE 11. Rove to, sample and perform ROE demo

ConOps Assumptions Rover speed is kept constant at 0.02 m/sec. This represents a conservative traverse plan since nominally the rover speed could be increased after 48 hours of roving. A 15 minute halt is included before entering a shadowed region for decision making purposes. The first entry into shadow is a toe-dip (enter shadow, return to sunlight, assess, then reenter shadow for AIM and sample acquisition). Battery recharge after entering shadow is while rover is halted for twice the length of time the rover was in shadow. Rover will operate in areas of sunlight (illumination maps) unless specifically entering a region of shadow / PSR for science purposes. Plan will aim to maintain DTE (note only not possible when entering large PSRs). Plan will aim to traverse low slope regions (below 10-15, note this plan is below 10 slope).

Science Activities

Exploration Ground Data Systems (xgds) xgds (Exploration Ground Data Systems) software is used to create traverse plans.

Haworth Landing Site Landing site is chosen in a region of low slope and in sunlight. Also chosen in an area that will enable sunlit operations to achieve mission success criteria.

Traverse Plan Minimum Success (100 m distance) @ 1 hr 23 min. 1 st AIM and assay (sun) complete @ 9 hr 19 min.

Traverse Plan 1 km roving distance achieved at 20 hr 23 min. 2 nd AIM & assay (sun) complete at 33 hr 53 min.

Traverse Plan 2 day driving objective met at 61 hr 05 min in xgds. Note this represents 48 hours of roving/prospecting (13 hours are when rover is conducting AIM/Assay at waypoints 3 and 5. Technically AIM (30 mins each) can be counted towards drive time, so total rover stop time until this point is 12 hours 2 day driving objective met at 60 hr).

Traverse Plan Explore first PSR. Choose small PSR on order of 20 m diameter. WP 8: Stop at rim to assess (15 min halt). WP 9: Entered PSR, PSR midpoint. WP 10: Egress PSR, recharge batteries, decision making halt (15 mins) WP 11: Re-enter PSR, AIM, assay. WP 12: Exit PSR, conduct ROE, full success. WP 8 @ 68 hr 50 min. WP 12 @ 95 hr 22 min.

Traverse Plan Continue traverse path from small PSR (previously explored) towards large PSR. Follow route to avoid topography (higher slopes). Conduct sunlit augers along the way (WPs 13, 14, 15, 16) to achieve stretch goals. Previously explored small PSR Large PSR of interest

Traverse Plan WP 18 is the shadow edge for this location and time. Note the edge of shadow is ~85 m away from the edge of the actual PSR. Include 15 min halt for decision making at WP 18. Enter PSR and at WP 19 perform AIM and sample acquisition. Egress PSR at End location. Note this site is still illuminated when DTE is lost. Plan ends at 140 hr 19 min.

Lessons Learned for Haworth 1/2 Landing site is critical. This plan lands at edge of shadow and traverses to follow the sunlight. Sites outside of this region experience significant periods of shadow during this time period and thus are not suitable for an RP traverse. Note the most interesting areas with the highest density of PSRs occur in regions where shadow prohibits rover traverses so must find the sweet spot between presence of PSRs and illumination. Illumination conditions change significantly on timescales of hours and days. Illumination drives the general traverse plan location (10s to 100s of km scale) and also affects tactical traverse plan decisions (<10 m scale). Permanent shadow is not the same as shadow. Especially near large PSRs, the rover will often enter shadow before entering the PSR. Must be aware of the time-dependent illumination conditions.

Lessons Learned for Haworth 2/2 Because non-psr shadow often surrounds PSR regions (~85-100 m of shadow prior to entering the large PSR in this traverse plan), it takes a significant amount of time to traverse into the PSR, back to the light, and recharge batteries. Therefore, the first PSR visited is a small PSR (several 10s m diameter), which allows for faster access to the PSR of interest and requires less driving distance in shadow to access the PSR. DTE does not change significantly over the ~6 days of the mission for this site. DTE exists in most locations and only at the very end (final hours) does DTE disappear DTE does not exist is most large PSRs at any time, though, so traveling into a large PSR results in comm loss. End location can be strategically chosen to maximize time in sunlight. This plan ends in a location which is still in sunlight when DTE is lost. Increasing the effective rover traverse speed allows for additional exploration and science. Increasing the rover speed to 0.10 m/s after the 48 hour roving threshold is reached results in 25 additional mission hours which would allow additional exploration of the sea of PSRs near the planned End location.

Heldmann, J.L., Colaprete, A.C., Elphic, R., Bussey, B., McGovern, A., Beyer, R., Lees, D., and M. Deans. Site selection and traverse planning to support a lunar polar rover mission: A case study at Haworth Crater, submitted, 2015. Summary a) Haworth Crater Case Study a) Demonstrates RP mission closes and can be executed at Haworth Crater near lunar south pole Identifies need for advanced traverse planning tools

Heldmann, J.L., Colaprete, A.C., Elphic, R., Bussey, B., McGovern, A., Beyer, R., Lees, D., and M. Deans. Site selection and traverse planning to support a lunar polar rover mission: A case study at Haworth Crater, submitted, 2015. Nobile Context Is a longer duration mission possible?

Heldmann, J.L., Colaprete, A.C., Elphic, R., Bussey, B., McGovern, A., Beyer, R., Lees, D., and M. Deans. Site selection and traverse planning to support a lunar polar rover mission: A case study at Haworth Crater, submitted, 2015. Nobile-North Ridge Landing Sites These landing sites generally allow of significant solar illumination Consider as starting points for traverse Large PSR Permanent shadows shaded in grey Plains : Shallow ice-stable temps Nobile A: 85.1943 o S, 35.4360 o E Nobile B: 85.3127 o S, 37.0174 o E Nobile C: 85.4230 o S, 31.8427 o E For now just consider Nobile B Start: General plan is to get to Plains and prospect into one of several large PSRs Possibly skirt along ridge lines surrounding plains and Large PSR and conduct sorties into plains through several possible entry points Next several slides gives an example of a sortie and the activities planned for each sortie No PSR sortie is exampled, but could be after review of the first few steps

Heldmann, J.L., Colaprete, A.C., Elphic, R., Bussey, B., McGovern, A., Beyer, R., Lees, D., and M. Deans. Site selection and traverse planning to support a lunar polar rover mission: A case study at Haworth Crater, submitted, 2015. Notional Traverse Planning: Nobile-North Terrain Larger PSR Ridge line that may be traversable Plains : Shallow ice-stable temps

Heldmann, J.L., Colaprete, A.C., Elphic, R., Bussey, B., McGovern, A., Beyer, R., Lees, D., and M. Deans. Site selection and traverse planning to support a lunar polar rover mission: A case study at Haworth Crater, submitted, 2015. Notional Traverse Planning: Nobile-North Slopes Slopes (10 meter baseline) in North Nobile Region Assume start at Nobile B, 6 hours of activities around (within 100 meters) of landing site Traverse <15deg Drilling <5 deg Larger PSR Ridge line that may be traversable 1. Landing Site Activities (6 hours: Includes driving 100 meters and conducting a 1 hour AIM)

Heldmann, J.L., Colaprete, A.C., Elphic, R., Bussey, B., McGovern, A., Beyer, R., Lees, D., and M. Deans. Site selection and traverse planning to support a lunar polar rover mission: A case study at Haworth Crater, submitted, 2015. Notional Traverse Planning: Nobile-North Slopes Slopes (10 meter baseline) in North Nobile Region Assume start at Nobile B, 6 hours of activities around (within 100 meters) of landing site Traverse <15deg Drilling <5 deg Larger PSR Ridge line that may be traversable 1. Landing Site Activities (6 hours: Includes driving 100 meters and conducting a 1 hour AIM)

Heldmann, J.L., Colaprete, A.C., Elphic, R., Bussey, B., McGovern, A., Beyer, R., Lees, D., and M. Deans. Site selection and traverse planning to support a lunar polar rover mission: A case study at Haworth Crater, submitted, 2015. Notional Traverse Planning: Nobile-North Slopes Plan showing possible ridge run (solid yellow curve) and entry points from ridge to the plains Possible Entry Points 2. Traverse to Plains need to arrive at location(s) such that steps 3. thru 5. can be accomplished (next slides) Possible Entry Points

Heldmann, J.L., Colaprete, A.C., Elphic, R., Bussey, B., McGovern, A., Beyer, R., Lees, D., and M. Deans. Site selection and traverse planning to support a lunar polar rover mission: A case study at Haworth Crater, submitted, 2015. Notional Traverse Planning: Nobile-North Slopes Assuming we take the first entry we proceed to plains and conduct an AIM (0.5 hrs) NSA (1.5 hrs) 3. AIM #1 (0.5 hours) + NSA (1.5 hour) 2. Enter into plains at first opportunity

Heldmann, J.L., Colaprete, A.C., Elphic, R., Bussey, B., McGovern, A., Beyer, R., Lees, D., and M. Deans. Site selection and traverse planning to support a lunar polar rover mission: A case study at Haworth Crater, submitted, 2015. Notional Traverse Planning: Nobile-North Slopes After first AIM and NSA we proceed to next Area of Interest (here picked to be toward larger PSR) and conduct another AIM and NSA Capture sample (0.5 hr) for VA in sun rich area (next slide) 5. AIM #2 (2 hours) + NSA (1 hour) 4. Traverse to next Area of Interest in Plains (if possible)

Heldmann, J.L., Colaprete, A.C., Elphic, R., Bussey, B., McGovern, A., Beyer, R., Lees, D., and M. Deans. Site selection and traverse planning to support a lunar polar rover mission: A case study at Haworth Crater, submitted, 2015. Notional Traverse Planning: Nobile-North Slopes Retreat to sun & comm rich area for VA analysis VA duration is 4.5 hrs. 7. VA (4.5 hrs) Move to next entry opportunity 6. Retreat to Sun

Heldmann, J.L., Colaprete, A.C., Elphic, R., Bussey, B., McGovern, A., Beyer, R., Lees, D., and M. Deans. Site selection and traverse planning to support a lunar polar rover mission: A case study at Haworth Crater, submitted, 2015. Notional Traverse Planning: Nobile-North Terrain Larger PSR Ridge line that may be traversable Example of 40-day traverse solution Plains : Shallow ice-stable temps

Heldmann, J.L., Colaprete, A.C., Elphic, R., Bussey, B., McGovern, A., Beyer, R., Lees, D., and M. Deans. Site selection and traverse planning to support a lunar polar rover mission: A case study at Haworth Crater, submitted, 2015. Notional Traverse Planning: Nobile-North Slopes Example solution that used sun and comm constraints, but not slopes Example of a 40 day traverse with 2 sorties into the Plains

Questions