ATTACHMENT B.1 VICINITY MAP

Similar documents
SYU LFC INTERIM TRUCKING DESCRIPTION

ExxonMobil SYU LFC Interim Trucking Industrial Risk Analysis

ATTACHMENT C.1 EXXONMOBIL INTERIM TRUCKING FOR SYU PHASED RESTART AIR QUALITY ANALYSIS

ExxonMobil SYU LFC Interim Trucking Industrial Risk Analysis

Lease Automatic Custody Transfer

DESIGN, OPERATION & MAINTENANCE OF L.A.C.T. UNITS

Oil & Gas Custody Transfer Data Sheet

LACT MEASUREMENT. Total Head = Or PSI = S.G. 2.31

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

Traffic Study for the United California, California and Bradley ( UCCB ) Energy Project, Orcutt, CA

TRAFFIC PARKING ANALYSIS

The purpose of this rule is to limit VOC emissions from the transfer of organic liquids.

Plan Check Policies and Guidelines

Countdown to the Closure Extended 53-Hour Closure of I-405 Freeway Between U.S. 101 and I-10 Planned in Mid-July for Mulholland Bridge Demolition

Dave Matthews Band 25 th Anniversary Show

Oryx Midstream Services - LACT and Measurement Manual

Plan Check Policies and Guidelines

LOADING OF ORGANIC LIQUID CARGO VESSELS. (Adopted 10/13/1992, revised 1/18/2001)

STAFF REPORT. To: Planning Commission Meeting date: April 12, 2017 Item: UN Prepared by: Robert Eastman

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Guideline for Expedited Application Review (GEAR) Oil Field Sump Replacement Tanks

Memorandum. To: Sue Polka, City Engineer, City of Arden Hills. From: Sean Delmore, PE, PTOE. Date: June 21, 2017

- JPJ Arena now has a clear bag policy, please see full information at the end of the attachment.

PUBLIC INFRASTRUCTURE PROJECTS

RULE 210 AND RULE 213 FEES FOR FISCAL YEAR July 1, 2017

APPENDIX H. Transportation Impact Study

2.0 Development Driveways. Movin Out June 2017

10 May 14, 2014 Public Hearing

Landside Access Modernization Program (LAMP)

ANDERSON PROPERTY SITE ANALYSIS

Construction Realty Co.

Project Description: Georgia Department of Transportation Public Information Open House Handout PI#(s): , County: Muscogee

APPENDIX A: BABCOCK CHAIN-OF-CUSTODY, DRIVING DIRECTIONS, AND LABORATORY PROCEDURES (Procedures provided electronically by request only)

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

Appendix H TRAFFIC IMPACT ANALYSIS

Chapter 9 Recommended Locally Preferred Alternative and Alternatives for Evaluation in Draft SEIS/SEIR

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

5.9 TRANSPORTATION AND TRAFFIC

GUIDE TO TRAFFIC MARSHALLING AT ExCeL LONDON

RULE 326. STORAGE OF REACTIVE ORGANIC COMPOUND LIQUIDS. (Adopted 12/14/1993, revised 1/18/2001)

CONCEPTUAL UTILITY REPORT FOR THE CANYONS PHASE 1 CITY OF CASTLE PINES, CO

Waste collection and transfer Thessaloniki - Greece

Madison BRT Transit Corridor Study Proposed BRT Operations Plans

SPECIFICATIONS FOR 456,000 SF

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

David W. Salter Collection AT&SF (Atchison, Topeka & Santa Fe) Railroad Photographs MS P

CITY OF BEVERLY HILLS STAFF REPORT

Welcome. Please Sign In

GUIDELINES FOR ADVERTISING SIGNS

Cedar View Subdivision No. 2 Hillcrest Dr. Montrose, Colorado 81401

CECO BUILDING SYSTEMS

New Jersey Turnpike Authority Interchange 6 to 9 Widening Program

Clean Harbors Canada, Inc.

Mid-Coast Corridor Transit Project

PAPER FOR AREMA 2006 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS UNION STATION TERMINAL IMPROVEMENTS. Paul Mak, PE, SE HDR Inc

Bullhead City, AZ. Topock, London Bridge, Lake Havasu, Yuma, Ogilby, Ripley, Needles. 437 miles. Two or three day ride

Consolidated Energy Holdings, LLC. 429 Murray Street, Suite 700 Alexandria, LA Ian M. Lawson

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

HYDROLOGIC/HYDRAULIC ANALYSIS REPORT FOR THE TROLLEY BROOK CULVERT ASHLAND, MA

Bi-County Transitway/ Bethesda Station Access Demand Analysis

City of Marina. Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: Transportation Agency for Monterey County

4. Manual Sampling of Petroleum and Petroleum Products Introduction Recommended Procedures for Manual Sampling of Tanks...

TRAFFIC ENGINEERING SERVICES TRAFFIC IMPACT STATEMENT NATREF CLEAN FUELS II, SASOLBURG, FREE STATE. October 2013 Revised: 2.0

Appendix J Traffic Impact Study

FERRY TERMINAL IMPROVEMENTS PROJECT City of Sausalito. 1 st Joint Hearing April 1, 2015

WILSHIRE/RODEO. Westside Subway Extension - DRAFT IMAGES FOR DISCUSSION PURPOSES ONLY. Torti Gallas and Partners, Inc. June SAAG Workshops 2011

SHELL PIPELINE COMPANY LP ZYDECO PIPELINE COMPANY LLC

Traffic, Transportation & Civil Engineering Ali R. Khorasani, P.E. P.O. Box 804, Spencer, MA 01562, Tel: (508)

Westland No. 1 Mine (Bob Ciminel 2012)

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

II. PROJECT DESCRIPTION

Olson-EcoLogic Engine Testing Laboratories, LLC

LOTUS RANCH TRAFFIC IMPACT ANALYSIS. LLG Ref Senior Transportation Engineer & Charlene Sadiarin Transportation Engineer II

Environmental Assessment Derry Road and Argentia Road Intersection

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension

CNG FUELING STATION INITIAL STUDY FULLERTON JOINT UNION HIGH SCHOOL DISTRICT. Appendices

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

SANTA BARBARA COUNTY ASSOCIATION OF GOVERNMENTS GOLETA RAMP METERING STUDY MAY 8, 2018 FINAL REPORT

I-405 and SR 522/NE 145th Bus Rapid Transit. Elected Leadership Groups Meeting November 30, 2018

Central Park Drives Traffic Management Overview

GAYLE MANUFACTURING FACILITY AVAI LABLE FOR S ALE 1455 E. KENTUCKY AVE, WOODLAND, CA 95776

Here is a map from the LBNL gate to Bldg. 55:

Bullhead City, AZ. Topock, Lake Havasu, Parker, Vidal Jct, Needles, AVI- 205 miles. Full day ride. Take Laughlin Ranch Blvd to Bullhead Pkwy

RULE 2260 REGISTRATION FOR EQUIPMENT SUBJECT TO CALIFORNIA S GREENHOUSE GAS OIL AND GAS REGULATION

TECHNICAL MEMORANDUM. Part A: Introduction

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

Costco Gasoline Fuel Station Transportation Characteristics

ENVIRONMENTAL SETTING

July 23, Tyler Diep (4:04 arrival) Joy L. Neugebauer Al P. Krippner Margie L. Rice Frank Cobo

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Characterization of Combined Use of County Road Segment

FOR SALE OR LEASE EBERHARDT & BARRY INC.

2005 City of Santa Paula Potable Water System Master Plan Amendment

APPENDIX B Traffic Analysis

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

Partridge Mine (Bob Ciminel 2012)

DOWNTOWN PARKING STUDY AND STRATEGIC PLAN

APPENDIX B. Origin Destination Study Data

LCPS Valley Service Center

Appendix M. Traffic Impact Analysis Report

Transcription:

ATTACHMENT B.1 VICINITY MAP

Project Site [ 0 1.25 2.5 5 Miles Prepared By SCS Tracer Environmental. Rev 1, June 2, 2015 Source: GCS, NAD 83 Santa Barbara County, California Vicinity Map Las Flores Canyon Facility Exxon Mobil

ATTACHMENT B.2 FACILITY PARCEL MAPS

081-100-024 081-100-012 081-110-016 081-110-017 081-110-011 081-110-012 081-110-013 081-110-014 081-110-015 081-120-010 081-120-012 081-120-013 081-100-013 081-100-061 081-220-015 081-220-016 081-220-002 081-200-016 081-220-017 081-200-029 081-220-020 081-200-004 081-220-014 081-240-044 081-200-028 081-200-017 081-230-029 081-230-037 081-240-039 081-230-028 081-240-048 081-210-050 081-210-051 081-230-027 081-230-019 081-230-018 081-230-036 081-210-047 081-210-046 081-230-021 081-230-025 081-250-014 081-250-016 081-210-013 079-080-001 081-210-028 081-230-013 079-080-022 [ 0 0.25 0.5 1 Miles Prepared By SCS Tracer Environmental. Rev 1, June 2, 2015 Source: GCS, NAD 83 Santa Barbara County, California Legend Project LFC Parcel Assessors Parcels Parcel Map Las Flores Canyon Facility Exxon Mobil

ATTACHMENT B.3 FACILITY SITE PLAN

101) (to US Corral Can y on Rd 0 5 10 20 Miles / 0 250 500 1,000 Feet Site Plan - Las Flores Canyon Facility Prepared by:

LFC Interim Trucking Site Photos ATTACHMENT B.4 SYU LFC INTERIM TRUCKING SITE PHOTOS

LFC Interim Trucking Site Photos Image 1: Entrance to LFC, photo taken from south facing north Image 2: Proposed truck loading location at LFC, photo taken from north facing south Page 1 of 2 September 2017

LFC Interim Trucking Site Photos Photo 3: LFC Truck Scale (on left), road (on right), photo taken from north facing south Page 2 of 2 September 2017

ATTACHMENT B.5 INTERIM TRUCKING ROUTES MAPS

166!( Plains Pentland Truck Rack!H!H P66 Santa Maria Truck Rack 101 Legend!H!H Loading Location Unloading Location Crude Oil Truck Route!H LFC SYU Facility 0 25 50 100 Miles / 0 2 4 8 12 16 Miles Crude Oil Truck Transportation Route - Las Flores Canyon to Unloading Destinations Prepared by:

0 5 10 20 Miles E Battles Rd P66 Santa Maria Truck Rack / Rosemary Rd E Betteravia Rd Exit 169 - E Betteravia Rd 101 Legend Crude Oil Truck Route / 0 375 750 1,500 Feet Crude Oil Truck Transportation Route - P66 Santa Maria Truck Rack from US HW 101 Prepared by:

ST 166 Plains Pentland Truck Rack 0 10 20 40 Miles Legend Crude Loaded Oil Truck Route / 0 375 750 1,500 Feet Crude Oil Truck Transportation Route - Plains Pentland Truck Rack from HW 166 Prepared by:

Refugio Rd On-Ramp to US 101 (N Bound) 101 101 Calle Real US 101 (S Bound) Exit 120 Off-Ramp Las Flores Canyon Santa Ynez Unit Facility Legend Crude Loaded Oil Truck Route Empty Truck Return Route US 101 Refugio Rd Corral Ca n yon Rd 101 0 0.25 0.5 1 Miles / 0 225 450 900 Feet Primary Route From/To Las Flores Canyon Facility US 101 - Exit 120 Interchange at Refugio Rd. Prepared by:

On-Ramp to US 101 (N Bound) Calle Real 101 101 US 101 (S Bound) Exit 117 Off-Ramp El Capitan State Be ach Rd Las Flores Canyon Santa Ynez Unit Facility Legend Crude Loaded Oil Truck Route Empty Truck Return Route US 101 Corral Ca n yon Rd 0 0.25 0.5 1 Miles 101 / 0 125 250 500 Feet Secondary Route From/To Las Flores Canyon Facility US 101 - Exit 117 Interchange at El Capitan Rd Prepared by:

ATTACHMENT B.6 SYU LFC INTERIM TRUCKING TRUCK UNLOADING FACILITIES INFORMATION

LFC Interim Trucking - Unloading Facilities Information 1. INTRODUCTION The two crude oil truck unloading facilities (truck unloading facilities) considered in this application are listed below with facilities information provided in Section 2 and Section 3, respectively. Phillips 66 Santa Maria Pump Station located at 580 East Battles Road, Santa Maria, CA 93454 in Santa Barbara County (Section 2), approximately 55 miles from the LFC, and Plains All American Pipeline (PAAPL) Pentland Station located at 2311 Basic School Road, Maricopa, CA 93252 in Kern County, approximately 139 miles from the LFC (Section 3). 2. PHILLIPS 66 SANTA MARIA PUMP STATION The P66 Station operates 24 hours/day, 7 days/week including holidays and weekends. Peak hours at the P66 Station are from 7 am to 4 pm daily and there is lighting for truck unloading at night. There are five truck unloading Lanes. Lanes 1 and 2 have Lease Automatic Custody Transfer (LACT) units (only the LACT unit in Lane 1 is operational). Lanes 3, 4, and 5 do not have LACT units. Lane 1 has local offload pumps. Lanes 2, 3, 4, and 5 do not have local offload pumps and require a pump on the unloading truck for fluid transfer. The LACT Unit on Lane 1 has a ticket printer with counter, basic sediment and water (BS&W) meter, insulated piping, pressure transmitter, temperature transmitter, 10- gallon sample pots, prover meter connections, and programmable logic controller (PLC) based control system. Page 1 of 9 September 2017

LFC Interim Trucking - Unloading Facilities Information If the unloading truck oil temperature is lower than 100 F, the truck is not allowed to unload since the oil would be more viscous and is unable to be efficiently transferred. Unloading trucks are only accepted with a weight ticket from one of the two scales located at the P66 unloading facility. The P66 Station has dry lock connections on the facility unloading hoses on Lanes 1 and 2 and 3 cam lock couplings on unloading Lanes 3, 4, 5. Truck unloading procedures are posted at each of the Lanes and P66 Station personnel attend every truck unloading. The facility has a single floating roof storage tank with 80,000 to 85,000 bbl shell capacity and a 60,000 to 70,000 bbl operating capacity. Trucks unload into the storage tank, and pumps transport the storage tank contents to the pipeline. The P66 Station is a truck unloading facility (not a truck loading facility) and there is no vapor recovery system at the five Lanes or for the tank. P66 personnel stated that before the PAAPL shutdown, the Station handled about 100 trucks/day and currently they handle about 200 trucks/day. The facility is not limited by permits to a specific number of trucks it can receive. The single storage tank is limited to 21,859 bbls/day (approximately 145 truckloads/day) oil throughput by the Santa Barbara County Air Pollution District Permit to Operate (APCD PTO). If the current 130 truck/day throughput is sustained, this would give an additional 15 trucks/day capacity under their APCD permit. P66 personnel indicated that some current deliveries could be backed out to make more room for the LFC trucks. A schematic of the Station based on an aerial is provided in Exhibit B.6-1 (Lane 4 is not depicted because there was no access to Lane 4 during the site visit, and no schematics were provided). Additional oil from LFC would constitute a fraction of the oil received by the facility, as the facility is designed for and already receives many oil trucks per day. Thus there will Page 2 of 9 September 2017

LFC Interim Trucking - Unloading Facilities Information be no change in the facility operations, and thus a Management of Change (MOC) or additional Process Hazard Analysis (PHA) are not warranted. 3. PAAPL PENTLAND STATION The PAAPL Station operates 24 hours/day, 7 days/week including all holidays and weekends. Peak hours at the PAAPL Station are from 7 am to 4 pm daily and there is lighting for truck unloading at night. The PAAPL Station does shutdown for 4 hours per month for month end close-out. There are six truck unloading Bays all without LACT units in the middle of the PAAPL Station, and one Bay with a LACT unit on the north side of the PAAPL Station. The six middle Bays have local offload pumps, and the north side Bay with LACT does not have a local offload pump. The north side Bay LACT has a ticket printer with counter, insulated piping, pressure transmitter, temperature transmitter, and sample pots. Producers provide weight ticket from the loading facility with periodic fluid property lab analysis. Unloading trucks are weighed on the onsite scale, oil is unloaded from the truck at one of the six middle Bays with transfer to storage tank, and the unloading trucks are weighed empty on the onsite scale prior to leaving the PAAPL Station. PAAPL performs periodic unloading truck spot check oil samples with lab analysis for basic sediment (BS&W) and API gravity. Since the PAAPL Station is a truck unloading facility (not a truck loading facility), there is not a vapor recovery system at the Bays. The PAAPL Station has dry lock connections on the facility hoses at the truck unloading Bays. Truck unloading procedures are posted at each of the Bays at the PAAPL Station. The facility has seven floating roof storage tanks. Trucks that enter the station unload into one of the storage tanks, from which the oil is shipped into the oil pipeline. PAAPL personnel stated that currently the PAAPL Station Page 3 of 9 September 2017

LFC Interim Trucking - Unloading Facilities Information handles approximately 100 trucks/day, and the facility is permitted to handle up to 210 trucks/day. The facility is not limited by permits to a specific number of trucks it can receive. PAAPL requires that the oil temperature in the incoming trucks is a minimum of 80 F and lower than 100 F for crude oil over 8 psi RVP. Crude oil with an RVP lower than 8 psi can be accepted at a higher temperature. A schematic of the Station based on an aerial is provided in Exhibit B.6-2. Additional oil from LFC would constitute a fraction of the oil received by the facility, as the facility is designed for and already receives many oil trucks per day. Thus there will be no change in the facility operations, and thus a Management of Change (MOC) or additional Process Hazard Analysis (PHA) are not warranted. Page 4 of 9 September 2017

Unloading Facilities Information Exhibit B.6-1 - Schematic of the Phillips 66 Santa Maria Station Page 5 of 10 September 2017

Unloading Facilities Information Exhibit B.6-2 - Schematic of the PAAPL Pentland Station Page 6 of 9 September 2017

Unloading Facilities Information Exhibit B.6-3 - Photos of the Unloading Stations Truck Unloading Area Lane 4 Image 1: Entrance to P66 Santa Maria Pump Station, photo taken from northeast facing southwest. Truck Unloading Area Lane 2 Truck Unloading Area Lane 1 Image 2: P66 Santa Maria Truck Pump Station lanes 1 and 2, photo taken from north facing south. Page 7 of 9 September 2017

Unloading Facilities Information Image 3: Entrance to PAAPL Pentland Station, photo taken from north facing south. Image 4: PAAPL Pentland Station truck scale (on left) and road (on right), photo taken from east facing west. Page 8 of 9 September 2017

Unloading Facilities Information Image 5: PAAPL Pentland Station truck unloading bay 2, photo taken from northeast facing southwest. Image 6: PAAPL Pentland Station truck unloading bay, photo taken from north facing south. Page 9 of 9 September 2017