Appendix G Examples and Recommended Methods

Similar documents
Appendix L-2 Calculating Combined-Cycle and Cogeneration

Appendix L-1 Calculating Combined-Cycle and Cogeneration

Artesis MCM Case Studies. March 2011

NPCC Natural Gas Disruption Risk Assessment Background. Summer 2017

PART PROGRESSION LIST AND PART PRICE LIST S As of October 12, 2006

CEO PROGRAM September 2018

Date Event or Holiday :Sun, 2:Mon North Orchard Delong Preschool North Orchard Delong Preschool

Electricity Industry Code Minimum Service Standards & Guaranteed Service Levels Quarterly Report July September 2008

Meter Insights for Downtown Store

Bulk Storage Containers

TECHNICAL SERVICE BULLETIN

Inventory Levels - All Prices. Inventory Levels - By Price Range

No. CONSUMER PRICE INDICES. Information bulletin. Moscow 2019

Outage dates (duration): March 2, 1993 to April 20, 1994 (1.1 years) Reactor age when outage began: 11.7 years

Docket No EI Date: May 22, 2014

Sprinkler System Waiver Application Packet

WIM #37 was operational for the entire month of September Volume was computed using all monthly data.

PLANT HATCH FEEDWATER SYSTEM OPERATING EXPERIENCE. Significant events from 2015

CONTROLS UPGRADE CASE STUDY FOR A COAL-FIRED BOILER

September 2016 Water Production & Consumption Data

Global Threat Reduction Initiative Foreign Research Reactor Spent Nuclear Fuel Shipments

Annex A-4 DIESEL UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES BALANCE OF PLANT GENERATOR DIESEL ENGINE

Total Production by Month (Acre Feet)

CCHMP Comments on ConocoPhillips Incident Report For 10/22/10 Flaring Event

Docket No. DE Dated: 05/04/2015 Attachment CJG-1 Page 1

ANCR CRU Statistics February 2007 to December 2007

Generation Resource Cold Weather Operational Exercise

SGT5-8000H / Irsching 4 Siemens H class gas turbine Pioneering efficiency with world class flexibility

Units of Instruction MISD Pacing Guide Days Date Range Test Date

GAZIFÈRE INC. Prime Rate Forecasting Process 2017 Rate Case

August 15, Please contact the undersigned directly with any questions or concerns regarding the foregoing.

FOR IMMEDIATE RELEASE

Algebra II Pacing Guide

Inventory Levels - All Prices. Inventory Levels - By Price Range

VEHICLE / PEDESTRIAN COLLISIONS

<Nationwide> Improving moderately ( )

2017 Adjusted Count Report February 12, 2018

CHEVROLET CASTING NUMBERS 1924 to 1928; 1929 to 1931 Revised April PART 2: 1929 to 1931

October 17, Please contact the undersigned directly with any questions or concerns regarding the foregoing.

Presented by Eric Englert Puget Sound Energy September 11, 2002

Inventory Levels - All Prices. Inventory Levels - By Price Range

System Status Briefing

Fuel Adjustment Clause

February 10, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

Water side Economizer WC chiller

Thirty Years of Climatological Data: 1969 to 1998

The Peoples Gas Light and Coke Company

7th Grade Social Studies Pacing Guide Units of Instruction MISD Pacing Guide Days Date Range Test Date

VC ACADEMIC CALENDAR. Sun Mon Tue Wed Thu Fri Sat. Sum 10 Wk. & Sum II Final Exams. Cancel Fall 16 wk. & Fall I Non-Pays

Primary Heat Transport (PHT) Motor Rotor Retaining Ring Failure

STATISTICS BOTSWANA ELECTRICITY GENERATION & DISTRIBUTION 2016/2 STATS BRIEF, FIRST QUARTER Copyrights Statistics Botswana 2016

April 2, Docket No. ER Independent Assessment Department of Market Monitoring Report on Performance of Energy Imbalance Market

FOR IMMEDIATE RELEASE

Appendix E Water Supply Modeling

Predict Future Failures From Your Maintenance Records

FOR IMMEDIATE RELEASE

Energy use in potato stores

FLEXIBILITY & NUCLEAR ENERGY MANAGEMENT IN FRANCE

Sound Transit Operations July 2016 Service Performance Report. Ridership

Solar and Smart Meter Update. 1 April 2014 to 30 June 2014 Released July 2014

Operational Opportunities to Minimize Renewables Curtailments

April 10, Dear Customer:

AP1000 European 7. Instrumentation and Controls Design Control Document

Jeff Hanley Vice President Sales Energy Tubulars

PET(S) FIRST & LAST NAME: January 2019

August 2018 MLS Statistical Report

IOWA MOLD TOOLING CO., INC. BOX 189, GARNER, IA TEL: IMT PART NUMBER

Summary of. Operating Experience. in Swiss Nuclear Power Plants SVA ASPEA.

The IAEA does not normally maintain stocks of reports in this series.

Appendix B6 Gas Turbine Unit Cause Codes

TABLE C-42. Sales and inventories in manufacturing and trade, [Amounts in millions of dollars] Manufacturing. Inventories Ratio 3.

Regulation Update. Operating Committee September 12, PJM 2017

Making Electricity since December Melody Collis Facilities Engineering Assistant Manager Toyota Motor Manufacturing Canada

A9 Data Monitoring and Analysis Report. March Content. 1. Executive Summary and Key Findings. 2. Overview. 3. Purpose

Retrofitting of Mitsubishi Low NOx System

Residential Load Profiles

Monthly Hog Market Update United States Hog Production

National Research Council

ANALYSIS OF BREST-OD-300 SAFETY DURING ANTICIPATED OPERATIONAL OCCURRENCES

Hospitality & Tourism Management January 2015 Calendar Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3

up the formulas. You can copy/paste the formulas for the days within the same October 2017 Jan 1, 2 & 5 Student Christmas Break April 2018

Who has trouble reporting prior day events?

Steam Turbine Seal Rub

Price Category Breakdown - February 2010

ANCR CRU Statistics Februa.. to December 2007

ELECTRICITY GENERATION AND DISTRIBUTION. Electricity Generation & Distribution Q2,

Engineers Ireland Site Visit 23 rd March 2010

i-pcgrid Workshop 2017

Operational Overview. Operational Forum, 24 th March 2010

Action Requested From AMWG

ON-SITE ASSESSMENT REPORT. <Engineering Firm> Presented to: <Customer> <Presentation Date> Funding by: <Report Date>

Energy Performance Information Request Timeline

Crane Inspection Log. Mailing Address: P.O. Box Tulsa, OK Phone: (918) Fax: (918)

Analysis of Turbine Missile & Turbine-Generator Overspeed Protection System Failure Probability at NPPs: A case study from PSA perspective

Capacity Market Rules for Energy Storage Resources

Cost Reflective Tariffs

Energy Efficiency Benefits

Wheat Marketing Situation

NYISO Tariffs. New York Independent System Operator, Inc. Document Generated On: 2/27/2013

PUBLIC SERVICE COMMISSION OF WEST VIRGINIA %% CHARLESTON

Transcription:

Reporting Outages to the Generating Availability Data System (GADS) Introduction The examples in this appendix illustrate the reporting of outages and deratings to GADS. They are based on a fictional 600 MW coal-fired unit, Riverglenn #1, operated by the fictional U.S. Power & Light Company. All the System/Component Cause Codes shown in these examples are real and found in Appendix B1 Fossil Steam Units. Each example includes a description of circumstances surrounding the event, the effect of the event on unit availability, and component repair time. For the sake of space, the verbal description element (reported in Sections C and D of the event report (07)) is left out of the event description. Completing this information provides details about a failure s cause and appearance, identifies any contributing factors, and describes the corrective actions taken. Please refer to pages III-29 through III-30 for a discussion regarding the verbal description. Index of Examples Example 1 Simple Outage Example 2 Simple Derating Example 3A Overlapping Deratings Second Derating Begins and Ends During First Derating Example 3B Overlapping Deratings. Second Derating Begins and Ends During First Derating. Second is Partially Shadowed Example 3C Overlapping Deratings. First Derating Ends Before Second Derating. Capability of Unit Changes Example 3D Overlapping Deratings. First Derating Ends Before Second Derating. Capability of Unit Does Not Change Example 4 Derating During a Derating of a Greater Reduction. Example 5 Derating During a Reserve Shutdown Example 6A Derating Overlapped by a Full Outage. Derating Ends Before Full Outage Example 6B Derating Overlapped by a Full Outage. Full Outage Begins and Ends During Derating Example 7 Startup Failure Example 8 Fuel Conservation Example 9 Event Transitions: U2 to RS to SF

Example 1: Simple Outage Event Description On January 3 at 4:30 a.m., Riverglenn #1 tripped off-line due to high turbine vibration. The cause was Low Pressure (LP) turbine bearings. Repairs began January 3 at 8:00 a.m. and were completed on January 8 at 9:30 a.m. The unit synchronized on January 8 at 5:00 p.m. Report the following on Records 01, 02 and 03 of Event Report (07): Event Number: 0001 U1 Start of Event: January 3 at 04:30 End of Event: January 8 at 17:00 System/Component Cause Code: 4240 Time: Work Started: January 3 at 08:00 Time: Work Completed: January 8 at 09:30 Man Hours Worked: Records 02/03 Effect on Unit Availability The duration of this event was 132.50 hours (January 3, 4:30 a.m. to January 8, 5:00 p.m.). Unit availability was affected for 132.50 hours. Component Repair The LP turbine bearings took 121.50 hours to repair (January 3, 8:00 a.m. to January 8 at 9:30 a.m.). G-2

600_ Unit Capacity (MW) 500_ 400_ 300_ 200_ 100_ 0_ Jan 3 Jan 8 04:30 17:00 Figure 1-G - Simple Outage G-3

Example 2: Simple Derating Appendix G Examples and Recommended Methods Event Description On January 10 at 8:00 a.m., Riverglenn #1 reduced capacity by 400 MW due to a fouled north air preheater. Fouling began a few weeks earlier, but the unit stayed on-line at full capacity to meet load demand. Repair crews completed their work and the unit came back to full load (600 MW) on January 11 at 4:00 p.m. Report the following on Records 01, 02 and 03 of Event Report (07): Event Number: 0002 D4 Start of Event: January 10 at 08:00 Event of Event: January 11 at 16:00 Gross Available Capacity as a Result of Event: * Net Available Capacity as a Result of Event: 200 System/Component Cause Code: 1491 Time: Work Started: January 10 at 08:00 Time: Work Completed: January 10 at 16:00 Man Hours Worked: 100 Records 02/03 Effect on Unit Availability To measure the impact of this event on unit availability, the duration of the derating is converted to Equivalent Derated Hours. This conversion enables availability losses caused by deratings to be assessed on the same basis as losses caused by outages. It is done by multiplying the event duration (hours) by the size of reduction and dividing by the unit s Net Maximum Capacity (NMC). Size of Reduction is calculated by subtracting the reported Net Available Capacity as a result of the derating (NAC) from Net Dependable Capacity (NDC) of the unit. Equivalent Derated Hours for this event are: [(600 MW 200 MW) * 32 hours]/600 MW = 21.33 Thus, the availability of Riverglenn #1 is impacted for 21.33 Equivalent Derated Hours. Component Repair The air preheater required 32 hours to repair. The hours are not equivalent. G-4

600_ Unit Capacity (MW) 500_ 400_ 300_ 200_ 100_ 0_ Jan 10 Jan 11 08:00 16:00 Figure G-2 Simple Derating G-5

Example 3A: Overlapping Deratings Second Derating Begins and Ends During First Derating Description of Events Riverglenn #1 experienced an immediate 75 MW derating on March 9 at 8:45 a.m. The cause was an A pulverizer feeder motor failure (Derating A ). Net Available Capacity (NAC) as a result was 525 MW. At 10:00 a.m. the same day, the unit lost another 75 MW due to a trip of the B pulverizer feeder motor. The Net Available Capacity (NAC) as a result of the second derating (Derating B ) was 450 MW. The motor was restarted and Derating B ended an hour later. The capability of the unit increased by 75 MW at this time. Derating A ended when the A feeder motor was repaired and the unit brought back to full load at 6:00 p.m. on March 9. Report the following on Records 01, 02 and 03 of Event Report (07): Derating A Event Number: 0003 D1 Start of Event: March 9 at 08:45 End of Event: March 9 at 18:00 Gross Available Capacity as a Result of the Event: * Net Available Capacity as a Result of the Event: 525 System/Component Cause Code: 0250 Time: Work Started: * Time: Work Completed: * Man Hours Worked: Records 02/03 Derating B Event Number: 0004 D1 Start of Event: March 9 at 10:00 End of Event: March 9 at 11:00 Gross Available Capacity as a Result of the Event: * Net Available Capacity as a Result of the Event: 450 System/Component Cause Code: 0250 Time: Work Started: * Time: Work Completed: * Man Hours Worked: 2 Records 02/03 Effect on Unit Availability In GADS, overlapping deratings are considered additive (unless the second derating occurs wholly within a derating of greater magnitude as in Example #4). When two deratings overlap, the size of reduction caused by G-6

the second derating is determined by subtracting the Net Available Capacity as a result of second derating from the Net Available Capacity of the unit as a result of the first derating. The following shows the availability impact these two deratings had on the unit: Derating A : [(600 MW - 525 MW) * 9.25 hour]/600 MW = 1.16 Equivalent Derated Hours Derating B : [(525 MW - 450 MW) * 1.00 hour]/600 MW = 0.125 Equivalent Derated Hours Component Repair When Time: Work Started and Time: Work Completed are blank or asterisk-filled, the reported Start of Event and End of Event determine component repair time. In this example, 10.25 hours are charged against the pulverizer feeder motor for repair (9.25 hours for Derating A and 1 hour for Derating B. ) These hours are not equivalent. G-7

600_ Unit Capacity (MW) Derating A 500_ Derating B 400_ 300_ 200_ 100_ 0_ March 9 March 9 March 9 March 9 08:45 10:00 11:00 18:00 Figure G-3A Overlapping Deratings Second derating begins and ends during first derating G-8

Example 3B: Overlapping Deratings Second Derating Begins and Ends During First Derating Second is Partially Shadowed Description of Events A derating began on July 3 at 2:30 p.m., when capacity was reduced to 575 MW for condenser maintenance. The maintenance began July 13 at 8:00 a.m. The event ended on July 23 at 11:45 a.m. On July 19 at 11:15 a.m., while the maintenance derating was in progress, a feedwater pump tripped. Load immediately fell to 360 MW. (This would have been the case, whether or not the unit was already derated.) The feedwater water pump was back in service at noon the same day. Report the following on Records 01, 02, and 03 of Event Report (07): Derating A Event Number: 0005 D4 Start of Event: July 3 at 14:30 End of Event: July 23 at 11:45 Gross Available Capacity as a Result of the Event: * Net Available Capacity as a Result of the Event: 575 System/Component Cause Code: 3112 Time: Work Started: July 13 at 08:00 Time: Work Completed: July 23 at 11:45 Man Hours Worked: 550 Records 02/03 Derating B Event Number: 0006 D1 Start of Event: July 19 at 11:15 End of Event: July 19 at 12:00 Gross Available Capacity as a Result of the Event: * Net Available Capacity as a Result of the Event: 360 System/Component Cause Code: 3410 Time: Work Started: * Time: Work Completed: * Man Hours Worked: * Records 02/03 G-9

Effect on Unit Availability GADS assumes these deratings are additive, and treats them like the deratings described in Example 3A. The second derating caused the unit s available capacity to change from 575 to 360 a 215 MW reduction. Under normal conditions (no other events in progress) the feedwater pump trip would have caused a reduction in load to 360 MW a loss of 240 MW. This means that 25 MW, which would be attributed to Derating B if it had occurred alone, are shadowed by Derating A. Because of the additive assumption, these equivalent hours are not double counted. The unit s availability is affected as follows: Derating A : [(600 MW - 575 MW) * 477.25 hours]/600 MW = 19.88 Equivalent Derated Hours Derating B : [(575 MW - 360 MW) * 0.75 hours]/600 MW = 0.27 Equivalent Derated Hours Component Repair Condenser maintenance took 243.75 hours. The feedwater pump was out of service for 0.75 hours. These hours are not equivalent. G-10

600_ Unit Capacity (MW) A shadows B Derating A 500_ 400_ Derating B 300_ 200_ 100_ 0_ July 3 July 19 July 19 July 23 14:30 11:15 12:00 11:45 Figure 2: G-3B Overlapping Deratings Second derating begins and ends during first derating Second is partially shadowed G-11

Example 3C: Overlapping Deratings First Derating Ends Before Second Derating Capability of Unit Changes Description of Events A 50 MW load reduction occurred on January 13 at 8:00 a.m. for a feedwater heater inspection (Derating A ). The inspection had been planned several months earlier. At 10:00 a.m., Riverglenn #1 experienced excessive pulverizer vibration. Available Capacity changed from 550 MW to 350 MW a 200 MW reduction as a result. A foreign object was the cause. While the mill was under repair, the feedwater heater was put back in service, ending Derating A at 1:00 p.m. on January 13. This caused a 50 MW increase in the unit s Net Available Capacity. Derating B ended on January 14 at 8:00 p.m. after completing pulverizer repairs. Report the following on Records 01, 02 and 03 of Event Report (07): Derating A Event Number: 0007 PD Start of Event: January 13 at 08:00 End of Event: January 13 at 13:00 Gross Available Capacity as a Result of the Event: * Net Available Capacity as a Result of the Event: 550 System/Component Cause Code: 3340 Time: Work Started: January 13 at 08:30 Time: Work Completed: January 13 at 13:00 Man Hours Worked: * Records 02/03 Derating B Event Number: 0008 D1 Start of Event: January 13 at 10:00 End of Event: January 14 at 20:00 Gross Available Capacity as a Result of the Event: * Net Available Capacity as a Result of the Event: 350 System/Component Cause Code: 0320 Time: Work Started: * Time: Work Completed: * Man Hours Worked: 160 Records 02/03 G-12

Effect on Unit Availability These two deratings are additive (See Example 3A). Availability is affected as follows: Derating A : [(600 MW - 550 MW) * 5.00 hours)/600 MW = 0.42 Equivalent Derated Hours Derating B : [(550 MW - 350 MW) * 34.00 hours)/600 MW = 11.33 Equivalent Derated Hours Component Repair The feedwater heater took 5 hours to repair and the pulverizer took 34 hours. G-13

600_ Unit Capacity (MW) DERATING A 500_ 400_ 300_ DERATING B 200_ 100_ 0_ Jan 13 Jan 13 Jan 13 Jan 14 08:00 10:00 13:00 20:00 Figure G-3C - Overlapping deratings First derating ends before second derating capability changes G-14

Example 3D: Overlapping Deratings First Derating Ends Before Second Derating Capability of Unit Does Not Change Appendix G Examples and Recommended Methods Description of Events A circuit breaker tripped, causing an immediate 100 MW load reduction on March 10 at 6:30 a.m. (Derating A. ) At 7:45 a.m. the same day, a traveling screen jammed, causing one of the unit s circulating water pumps to shut down (Derating B ). Net Available Capacity as a result of the event was 360 MW. Derating A ended at 10:30 a.m. on March 10 when the circuit breaker repairs were completed. However, the traveling screen problem continued, forcing the unit to remain at 360 MW. The unit was available for full load on March 7 at 7:00 p.m. after completing repairs to the traveling screen. Report the following on Records 01, 02 and 03 of Event Report (07): Derating A Event Number: 0009 D1 Start of Event: March 10 at 06:30 End of Event: March 10 at 10:30 Gross Available Capacity as a Result of the Event: * Net Available Capacity as a Result of the Event: 500 System/Component Cause Code: 3661 Time: Work Started: March 10 at 08:00 Time: Work Completed: March 10 at 10:30 Man Hours Worked: * Records 02/03 Derating B Event Number: 0010 D1 Start of Event: March 10 at 07:45 End of Event: March 10 at 19:30 Gross Available Capacity as a Result of the Event: * Net Available Capacity as a Result of the Event: 360 Dominant Derating Column D Record 01 System/Component Cause Code: 3260 Time: Work Started: March 10 at 08:15 Time: Work Completed: March 10 at 19:30 Man Hours Worked: * Records 02/03 G-15

Effect on Unit Availability As shown in Examples 3A and 3B, GADS assumes that overlapping deratings are additive. In this example, however, Derating A and Derating B are not additive because the Net Available Capacity of the unit remains at 360 MW after the Derating A ends. The utility must report a dominant derating turn off of the additive assumption. To do this, end Derating A as normal and mark Derating B as a dominant derating (column 65 with a D ). Net Available Capacity as a result of dominant derating all that is necessary to retain the 360 MW available capacity. The following losses are charged against unit availability: Derating A : [(600 MW - 500 MW) x 1.25 hours]/600 MW = 0.21 Equivalent Derated Hours Derating B : [(600 MW - 360 MW) x 11.25 hours]/600 MW = 4.50 Equivalent Derated Hours Component Repair The circuit breaker and the traveling screen are charged with 2.50 clock hours of repair and 11.25 clock hours of repair, respectively. G-16

600_ Unit Capacity (MW) B Shadows A Derating A 500_ Derating B Derating B 400_ 300_ 200_ 100_ 0_ March 10 March 10 March 10 March 10 06:30 07:45 10:30 19:00 Figure G-3D - Overlapping Deratings First derating ends before second derating Capability of unit does not change G-17

Example 4: Derating During a Derating of a Greater Reduction Event Description A generator output breaker failed at 6:30 a.m. on April 10 causing a 300 MW reduction. Repairs began at 8:00 a.m. The unit returned to full capacity at 7:00 p.m. April 10. During the generator repair, a problem with the feedwater chemistry developed, and it was corrected by 3:45. If it had occurred alone, a reduction of 200 MW would have been needed. This was not necessary because of the derating already in existence. Report the following on Records 01 through 05 of Event Report (07): Event Number: 0012 D1 Start of Event: April 10 at 06:30 End of Event: April 10 at 19:00 Gross Available Capacity as a Result of the Event: * Net Available Capacity as a Result of the Event: 300 System/Component Cause Code: 4810 Contribution Code: 1 Time: Work Started: April 10 at 08:00 Time: Work Completed: April 10 at 19:00 Man Hours Worked: * Records 02/03 System/Component Cause Code: 3352 Contribution Code: 3 Time: Work Started: April 10 at 08:30 Time: Work Completed: April 10 at 15:45 Man Hours Worked: 14 Records 04/05 Effect on Unit Availability The generator output breaker caused the problem that affected Riverglenn s availability. The feedwater chemistry problem did not impact availability because it occured wholly within the larger derating. The unit availability impact is: [(600 MW - 300 MW) * 12.50 hours]/600 MW = 6.25 Equivalent Derated Hours Component Repair Although the feedwater chemistry problem does not affect unit availability, its occurrence should be reported. This information is important for analysis purposes. Use Section D Additional Component Worked During Event of the Event Report (07) to do so. Repair of the generator output breaker took 10.25 hours. It took 7.25 hours to correct the feedwater chemistry problem. G-18

600_ Unit Capacity (MW) 500_ Additional Components Worked 400_ 300_ 200_ 100_ 0_ April 10 April 10 06:30 19:00 Figure G-4 Derating During Derating of a Greater Reduction G-19

Example 5: Derating During a Reserve Shutdown Description of Event A reserve shutdown began on May 31 at 7:30 p.m. Maintenance crews took advantage of the off-line time and took one boiler feedpump (BFP) out of service (two other BFP were available). The work started at 8:00 a.m. on June 1 and ended on June 2 at 3:30 p.m. While the BFP valve maintenance was underway, the unit would have been able to synchronize, but would have been limited to 400 MW. Riverglenn #1 was back in service on June 3 at 8:30 a.m. Report the following on Records 01, 02 and 03 of Event Report (07): Event Number: 0013 RS Start of Event: May 31 at 19:30 End of Event: June 3 at 08:30 Event Number: 0014 D4 Start of Event: June 1 at 08:00 End of Event: June 2 at 15:30 Gross Available Capacity as a Result of the Event: * Net Available Capacity as a Result of the Event: 400 System/Component Cause Code: 3412 Time: Work Started: June 1 at 08:00 Time: Work Completed: June 2 at 15:30 Man Hours Worked: 80 Records 02/03 Effect on Unit Availability Although it is off-line, a unit on reserve shutdown is available for full load. The cause of the event is economics, not equipment-related problems. However, if equipment is taken out of service that results in the unit s inability to come back on-line and achieve full load, the reserve shutdown status has changed. A new event that accurately reflects the available status of the unit is required. In this example, Riverglenn was available for full load until the BFP valve work began. The status of the unit changed because it was no longer available for full load. A derating event must be reported. (An outage would be reported if the unit would have been unable to synchronize while the BFP work was in progress.) The unit availability impact resulting from the BFP valve maintenance is: [(600 MW - 400 MW) * 31.50 hours]/600 MW = 10.50 Equivalent Derated Hours Component Repair The feedwater pump steam turbine required 31.50 hours to repair. G-20

600_ Unit Capacity (MW) 500_ Derating 400_ 300_ 200_ Reserve Shutdown 100_ 0_ May 31 June 1 June 2 Jan 8 19:30 08:00 15:30 17:00 Figure G-5 Derating During a Reserve Shutdown G-21

Example 6a: Derating Overlapped by a Full Outage Derating Ends Before Full Outage Description of Events Riverglenn #1 lost 100 MW due to a feedwater heater high-level trip at 9:45 a.m. on February 27. An L.P. heater tube leak was the cause. Repairs began March 2 at 8:00 a.m. A superheater tube leak on March 2 at 1: 15 a.m. caused the unit to trip off-line. The feedwater heater (cause of the derating) was repaired by March 4 at 6:30 p.m. Repairs to the superheater (cause of the outage) were completed on March 4 at 10:00 p.m. The unit synchronized on March 5 at 9:22 a.m. Report the following on Records 01, 02 and 03 of Event Report (07): Event Number: 0015 D1 Start of Event: February 27 at 09:45 End of Event: March 4 at 18:30 Gross Available Capacity as a Result of the Event: * Net Available Capacity as a Result of the Event: 500 System/Component Cause Code: 3340 Time: Work Started: March 2 at 08:00 Time: Work Completed: March 4 at 18:30 Man Hours Worked: 234 Records 02/03 Event Number: 0016 U1 Start of Event: March 2 at 01:15 End of Event: March 5 at 09:22 System/Component Cause Code: 1050 Time: Work Started: March 2 at 12:00 Time: Work Completed: March 4 at 22:00 Man Hours Worked: 600 Records 02/03 Effect on Unit Availability The feedwater heater problem impacts availability until the outage begins: [(600 MW - 500 MW) * 63.50 hours]/600 MW = 10.58 Equivalent Derated Hours Once initiated, the outage assumes full responsibility for loss of availability. That is 80.12 hours in this example. Component Repair The feedwater heater was unavailable for 128.75 hours, the superheater for 80.12. G-22

600_ Unit Capacity (MW) Outage Shadows Derating Derating 500_ 400_ 300_ 200_ Outage 100_ 0_ Feb 27 Mar 2 Mar 4 Mar 5 09:45 0 1 : 1 5 18:30 09:22 G-23

Example 6B: Derating Overlapped by a Full Outage Full Outage Begins and Ends During Derating Description of Events A pulverizer motor failed on May 18 at 09:45 a.m. causing a 100 MW derating. While the unit was derated, a maintenance crew discovered a severe water wall tube leak, forcing the unit offline immediately. That occurred on May 20 at 6:45 p.m. The tube was welded, and the unit brought back into service at 2:42 a.m. on May 24. Pulverizer repairs were still in progress, so the unit was limited to 500 MW. The unit was available for full load on May 25 at 2:30 p.m. when pulverizer repairs were completed. Report the following on Records 01, 02 and 03 of Event Report (07): Event Number: 0017 D1 Start of Event: May 18 at 09:45 End of Event: May 25 at 14:30 Gross Available Capacity as a Result of the Event: * Net Available Capacity as a Result of the Event: 500 System/Component Cause Code: 0250 Time: Work Started: * Time: Work Completed: * Man Hours Worked: 16 Records 02/03 Event Number: 0018 U1 Start of Event: May 20 at 18:45 End of Event: May 24 at 02:42 System/Component Cause Code: 1000 Time: Work Started: * Time: Work Completed: * Man Hours Worked: 60 Records 02/03 Effect on Unit Availability The outage interrupts the derating for 79.95 hours. The derating affects availability for 57 hours before the outage and 35.80 hours after the outage. Availability losses due to the derating are: [(600 MW - 500 MW) * (57.00 Hours + 35.80 Hours)]/600 MW = 15.47 Equivalent Derated Hours Component Repairs Repair of the pulverizer motor, the cause of the derating, took 172.75 hours. The waterwall tube section repairs took 79.95 hours. G-24

600_ Unit Capacity (MW) 500_ Outage Shadows Derating 400_ 300_ 200_ Outage 100_ 0_ May 18 May 20 May 24 May 25 09:45 18:45 02:42 14:30 Figure G-6B Derating Overlapped by an Outage Outage Begins and Ends during Derating G-25

Example 7: Startup Failure * Event Description Riverglenn began its normal 15-hour startup cycle following a two-week planned outage on October 1, 7:00 a.m. At the end of the normal cycle; however, the unit was not ready to synchronize. The reason was excessive H.P. turbine rotor vibration. The problem was corrected and Riverglenn #1 synchronized at 3:00 a.m. on October 3. Report the following on Records 01, 02 and 03 of Event Report (07): Event Number: 0019 SF Start of Event: October 1 at 22:00 * End of Event: October 3 at 03:00 System/Component Cause Code: 4030 Time: Work Started: October 1 at 23:00 Time: Work Completed: October 2 at 16:00 Event Contribution Code: 1 Man Hours Worked: * Records 02/03 Effect on Total Unit Availability The startup failure event began when the 15-hour startup cycle was exceeded. The unit is charged with a forced outage for the 29 hours it took to repair the H.P. turbine vibration problem and synchronize the unit. Component Repair The H.P. turbine rotor shaft took 17 hours to repair. *An outage or reserve shutdown must immediately precede a Startup Failure event. The end of the outage must be the same as the start of the SF event (see Page III-8). G-26

600_ Unit Capacity (MW) 500_ 400_ Planned Outage 300_ Startup Failure 200_ 100_ 0_ From Oct 1 Oct 3 September 22:00 03:00 Figure G-7 Startup Failure G-27

Example 8: Fuel Conservation Appendix G Examples and Recommended Methods Description of Events On June 10 at 8:00 a.m., management decided to operate Riverglenn #1 at 50% capacity 300 MW in order to avoid a potential fuel shortage. If system demand increased, Riverglenn would be returned to full load. Because Riverglenn was not limited by equipment, the decision to operate at a reduced load was an economic issue. On August 25 at 5:00 a.m., the station reported that fuel was in short supply and the unit could no longer reach full load as a result. An unplanned derating began when fuel became a limitation. The Net Available Capacity as a result of the derating was 300 MW. Riverglenn s fuel supply was exhausted on September 3 at 9:00 p.m. and the unit was forced out of service. A new supply of fuel was delivered on September 4. The unit was restarted and synchronized at 4:00 p.m. on September 6. Report the following on Records 01, 02, and, 03 of Event Report (07): Event Number: 0029 D1 Start of Event: August 25 at 05:00 End of Event: September 3 at 21:00 Gross Available Capacity as a Result of Event: * Net Available Capacity as a Result of Event: 300 System/Component Cause Code: 9130 Time: Work Started: * Time: Work Ended * Man Hours Worked: * Records 02/03 Event Number: 0030 U1 Start of Event: September 3 at 21:00 End of Event: September 6 at 16:00 System/Component Cause Code: 9130 Time: Work Started: * Time: Work Ended: * Man Hours Worked: * Records 02/03 Effect of Unit Availability Availability was unaffected until the fuel limitation prevented the unit from returning to full load. When that occurred, unit availability was affected. Equivalent Derated Hours for the derating are 116 ([(600 MW - 300 MW * 232.00 hours)/600] = 116). The outage was responsible for 67.00 unavailable hours. The situation described typically affects fossil and hydro units. Nuclear units are sometimes operated at reduced levels to stretch the core in order to prolong the time to the next refueling. If the reactor core is capable of full load, the decision to operate at a lower level is an economic issue and therefore not reportable to GADS. When G-28

the core can no longer support operation at full load, a planned derating (PD) is reported. This condition is sometimes referred to as coasting down. The magnitude of these deratings usually increase incrementally and should be reported as a series of PD events. 600_ Unit Capacity (MW) 500_ Forced Derating 400_ 300_ Forced Outage 200_ 100_ 0_ From Aug 25 Sept 3 Sept 6 June 05:00 21:00 16:00 Figure G-8 Fuel Conservation G-29

Example 9: Transitions - U2 to RS to SF Appendix G Examples and Recommended Methods Description of Events After experiencing several hours of excessive scrubber ID fan vibration, Riverglenn was taken off line for repair on December 3 at 3:30 p.m. After pinpointing the problem, repairs were made. The unit was ready to begin its normal 15-hour startup cycle by 21:30 p.m. on December 5. However, due to low demand, Riverglenn entered the reserve shutdown state. Startup began at 2:30 a.m. the following morning. Several waterwall tubes burst during the startup, requiring immediate repair. The tube problem occurred at 9:00 a.m. on December 6. After repairing the tubes and a successful startup, Riverglenn synchronized on December 9 at 5:00 p.m. Report the following on Records 01, 02 and 03 of Event Report (07): Event Number: 0026 U2 Start of Event: December 3 at 15:30 End of Event: December 5 at 21:30 System/Component Cause Code: 8262 Time: Work Started: December 3 at 16:00 Time: Work Completed: December 5 at 06:30 Man Hours Worked: 72 Records 02/03 Event Number: 0027 RS ** Start of Event: December 5 at 21:30 End of Event: December 6 at 09:00 Event Number: 0028 SF Start of Event: December 6 at 09:00 End of Event: December 9 at 17:00 System/Component Cause Code: 1040 Time: Work Started: * Time: Work Completed: * Event Contribution Code: 1 Records 02/03 G-30

Effect on Unit Availability In this sequence of events U2 to RS to SF Riverglenn s availability is affected for 54.00 actual hours due to ID fan problems and 80.00 actual hours due to the water wall tube failure. Component Repair The scrubber ID fan is charged with 38.50 repair hours, and the water wall tubes with 80.00 repair hours. ** Reporting a primary cause of event for Reserve Shutdowns is optional. In this example, Records 02/03 were omitted. G-31

600_ Unit Capacity (MW) 500_ 400_ 300_ Forced Outage Reserve Shutdown Startup Failure 200_ 100_ 0_ Dec 3 Dec 5 Dec 6 Dec 9 15:30 21:30 09:00 17:00 Figure G-9 Event Transitions U2 to RS to SF G-32