Three ULTra Case Studies examples of the performance of the system in three different environments

Similar documents
Personal Rapid Transit as an Alternative to Bus Service in Two Communities

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6

Submission to Greater Cambridge City Deal

The full passenger trip from starting point to boarding the aircraft has many components

Bus The Case for the Bus

Travel Time Savings Memorandum

Metropolitan Council Budget Overview SFY

Chapter 4. Design and Analysis of Feeder-Line Bus. October 2016

The Boston South Station HSIPR Expansion Project Cost-Benefit Analysis. High Speed Intercity Passenger Rail Technical Appendix

Converting BRT to LRT in the Nation s Capital Ottawa, Canada. John Manconi City of Ottawa Ottawa, Canada

Ministry of Environment and Forests. Ministry of Communication

Procurement notes for councils (Scotland)

Back ground Founded in 1887, and has expanded rapidly Altitude about 2500 meters above MSL Now among the ten largest cities in Sub Saharan Africa

The City of Toronto s Transportation Strategy July 2007

Light rail, Is New Zealand Ready for Light Rail? What is Needed in Terms of Patronage, Density and Urban Form.

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016

PSTA as a Mobility Manager

ASSESSING TERRITORY READINESS FOR AUTONOMOUS TRANSPORT SERVICE AND EVALUATING MARKET SIZE. N. Faul S. Sadeghian B. Créno

Chapter 4 : THEME 2. Transportation

Sustainable Urban Transport Index (SUTI)

Public Meeting. June 15, :30 7:30 p.m.

The ACT s Transition to Zero Emissions Vehicles Action Plan Anna McGuire Senior Policy Officer, Climate Change Policy

Economic Viability and Environmental Sustainability Dimensions of Passenger Rail Service Integration for Commuter and Casino Traffic on the Gulf Coast

The Engineering Department recommends Council receive this report for information.

Kenosha-Racine-Milwaukee (KRM)

May 23, 2011 APTA Bus & Paratransit Conference. Metro ExpressLanes

Draft Marrickville Car Share Policy 2014

Transit Vehicle (Trolley) Technology Review

Fiji Bus Industry: improving through greening

Road Map for Sustainable Transport Strategy for Colombo Metropolitan Region with Cleaner Air, through Experience

MEDIA RELEASE. June 16, 2008 For Immediate Release

Presentation to the Portfolio Committee on Transport Gautrain Update. Jack vd Merwe (Pr. Eng) CEO: Gautrain Management Agency 25 August 2009

Moscow International Transport Experts Council. Laurence A. Bannerman

The project faces a number of challenges:

BCA Benefits and Assumptions Summary

Findings from the Limassol SUMP study

IKORODU- CMS BRT EXTENSION PROJECT

Click to edit Master title style

Public Transport Proposals including: Subsidised Bus Services, Concessionary Travel and Community Transport Draft Passenger Transport Strategy 2016

FREQUENTLY ASKED QUESTIONS

SEPULVEDA PASS CORRIDOR

Innovation in London. Policy approaches to mobility management and sustainable travel. Transport for London

HOT Lanes: Congestion Relief and Better Transit

Mobility on Demand, Mobility as a Service the new transport paradigm. Richard Harris, Xerox

More persons in the cars? Status and potential for change in car occupancy rates in Norway

Rui Wang Assistant Professor, UCLA School of Public Affairs. IACP 2010, Shanghai June 20, 2010

Factors affecting the development of electric vehiclebased car-sharing schemes

ROCHESTER, MINNESOTA

TORONTO TRANSIT COMMISSION REPORT NO.

UTA Transportation Equity Study and Staff Analysis. Board Workshop January 6, 2018

Evaluation of Automated Transport Systems. Francesco Filippi, Daniele Stam, Adriano Alessandrini

Future Funding The sustainability of current transport revenue tools model and report November 2014

TORONTO TRANSIT COMMISSION REPORT NO.

EXTENDING PRT CAPABILITIES

HOW TO DELIVER PUBLIC TRANSPORT ON REDUCED BUDGET

Downtown Transit Connector. Making Transit Work for Rhode Island

Bi-County Transitway/ Bethesda Station Access Demand Analysis

Financing Public Transportation Operations

OPTIMAL POLICIES FOR TRANSIT INFRASTRUCTURE

TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury

Needs and Community Characteristics

Program Overview. February 2018

Roundtable New Delhi, India

A Light Rail, Group Rapid Transit, Personal Rapid Transit Comparison Peter J. Muller, P.E., MASCE 1 Ingmar J. Andreasson, PhD, Prof. Em.

Ultra Global PRT. Low cost transport for a sustainable future.

Halifax Commuter Rail: A Fresh Concept

Sales and Use Transportation Tax Implementation Plan

Regional Integration of Public Transit - From the Perspective of a Transit Company. April 2019 Thomas Werner MVG Munich

Appendix G: Rapid Transit Technology Backgrounder July 2017

ATLAS PUBLIC POLICY WASHINGTON, DC USA PUBLISHED MAY 2017 VERSION 2.0

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION

Low Emission Vehicle Policy Development in London

PEACHTREE CORRIDOR PARTNERSHIP. Current Status & Next Steps

Two years since our book

Help shape your community investment in Wake Transit. Fiscal Year 2019 Draft Work Plan Summary

Connect. Thrive. Develop. KC Streetcar Riverfront Extension & Multi-Modal Feasibility Study

Intelligent Mobility for Smart Cities

Waco Rapid Transit Corridor (RTC) Feasibility Study

TRAIN, BUS & TRANSIT

10 Th Urban Mobility Conference / CODATU XVII Innovative Funding For Urban Mobility Case study: RATP & Ile-de France mobility

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

RELEASED UNDER THE OFFICIAL INFORMATION ACT 1982

Bus and coach transport for greening mobility

PROMOTION OF EFFICIENT PUBLIC TRANSPORT IN MALAWI BY CHIMWEMWE KAUNDA

2 VALUE PROPOSITION VALUE PROPOSITION DEVELOPMENT

Energy Technical Memorandum

Sofia Urban Transport challenges and strategies

TRAVEL DEMAND FORECASTS

Vehicle Sharing for Resilient Cities U-Haul Truck Share 24/7

APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY]

2.1 TRANSIT VISION 2040 FROM VISION TO ACTION. Expand regional rapid transit networks STRATEGIC DIRECTION

WATFORD LOCAL PLAN PART 2. Review of Car Parking Policy and Standards. Evidence Base. February 2012

DAVID DAVID BURNS BURNS RAILROAD RAILROAD INDUSTRIAL INDUSTRIAL ENGINEERING ENGINEERING CONSULTANT CONSULTAN CHICAGO CHICAGO, USA, USA

Economy. 38% of GDP in 1970; 33% of GDP in 1998 Most significant decline in Manufacturing 47% to 29%

12/5/2018 DRAFT. December 6, Item #1 CITIZENS PARTICIPATION

Introduce clean vehicles in a large fleet of urban buses

Future Fuel for Britain s Railways. Stephen Kent, University of Birmingham Shawn Laight, Land Transport Authority, Singapore

Presentation A Blue Slides 1-5.

AUTONOMOUS TRANSPORT. Investment Opportunity Brief

Executive Summary October 2013

Transcription:

Three ULTra Case Studies examples of the performance of the system in three different environments airport application: London Heathrow : linking business and staff car parks through the access tunnel into a redeveloped Central Terminal Area, replacing the existing shuttle buses. 8,000 passengers per day, cost (including capital) 0.80 per passenger trip, saves 8.4 minutes per trip urban application: Cardiff: links city centre with newly developing Bay Area. 15,000 passengers per day at 1 fare. Revenues likely to cover operating costs and capital costs at 6% links extensive greenfield development to existing town centre. 37,000 passengers per day. Direct comparison with alernative LRT network. ULTra attracts 70% more passengers than LRT, and 17% of current car users. Covers capital costs at 6%, while LRT falls far short. greenfield site application: Corby:

LHR Objectives ULTra for Heathrow solve critical problems of congestion in tunnel access to Central Terminal Area (CTA) - both for staff and air passengers alternative to the Kiss and Fly drop off in the CTA transport solutions that minimize impact during construction and operation high availability operation highly resistant to disruption of service

Heathrow ULTra connects three northside passenger and staff car parks to Central Terminal Area (Terminals 1, 2 and 3) T3A T1 Q T3D T2 N4 Pink Elephant 500 m P1 PRT guideways carried in existing sidebores alongside main road access tunnel Tunnel CTA 7.6 kms guideway, 2.4 kms elevated, 27 stations (simple berths in car parks), 78 vehicles

Tunnel Links Existing sidebore tunnels are well matched to ULTra Up to four tracks per sidebore Full use of sidebore offers considerable excess capacity over north side connectivity requirements Outline Safety case approved by HMRI 2083 2642 4013 Main tunnel carries two road lanes in each half 6096 4826 13132

Car Park & Terminal Connections Results of Initial Studies Excellent service to car parks can be provided Service to stops at Terminals 1, 2, 3 with stations inside buildings where appropriate Unexpectedly simple integration with complex CTA site Small scale infrastructure permits service at high or low level floors Low interference during construction Simulation results confirm practicability

Travel Times* by ULTra vs Bus Car Park Users per Day Time Shuttle Buses Time ULTra Time Saving minutes Time Saving % Pink Elephant 3590 16.0 6.8 9.2 58% Park 1 532 6.4 4.0 4.0 38% Staff N1/N2 3014 18.0 6.9 11.1 62% Staff N4 2034 15.0 5.0 10.0 67% Average 9170 16 6.3 9.7 60% *Time in minutes includes sum of walking, waiting and trip

Cost Benefit Analysis Results based on detailed costing, reported car-park demand, travel time measurements and simulation of network User benefits (time saved) 5 million p.a. Operating costs 0.7 million p.a. less than shuttle buses Capital cost (incl. vehicles) 3M per kilometre First year rate of return 25% 30-year Net Present Values at 6% discount: 88M user benefits; 12.5M operator benefits overall NPV after investment 73M (some of user benefit could be converted to higher charges if required) Reduced emissions by 2.9 tonnes CO, 0.9t VOC, 12.9t NO x, 1.7t PM 10, 311t CO 2 Noise much lower than background

Conclusions for LHR ULTra is excellent solution to landside transport needs of LHR Excellent value for money, especially compared to APM: 30- year NPV of + 73M at 6% discount Saving in operating cost of 40% over current bus service Typical passenger time saving of 60% Premium service for passengers Valuable reduction in emissions Risks of introduction are manageable Benefits to BAA Reductions in emissions Improved passenger service Efficient use of space Value for money

BAA Position (October 2005) ULTra selected as preferred PRT system for Heathrow Contract Awarded for Detail Route Design Studies Installation 2007 Expanded installations 2009 and on against 20 year framework contract

Cardiff Objectives ULTra for Cardiff improve public transport connections between city centre and rapidly developing Bay Area support Cardiff s development as a thriving and attractive European Capital City, serving commercial, retail and leisure activities in the Bay protect and enhance the new environment, encouraging transfer from car to public transport and reducing air pollution from traffic address the needs of those people who are most disadvantaged

Cardiff capital city of Wales, is rapidly redeveloping its old docklands with shops, leisure facilities, offices and homes. PRT provides high quality access to the Bay Area, with fast, nonstop, no-waiting and private access direct to the major attractions. Phase 1 network (red) assessed in detail blue shows envisaged future expansion. Transit time from Central Station to the Bay Area is about 5 minutes. 1 fare assumed Shopping area Phase 1 network assessed 7.7kms Phase guideway, 2 later expansion 80% elevated, 12 stations, 134 vehicles Bay Area

System performance DEMAND for Phase 1 predicted by logit modal split modelling calibrated on Stated Preference surveys: 5.7 million passenger per year cost of 0.72 per trip attracts 8% commuters from car, 60% bus users, 9% from short walks average waiting time 0.3 minutes most passengers don t wait at all PLUS attitude surveys of riders on prototype vehicle show very positive acceptance and disability audit shows system is more accessible to disabled and elderly people than conventional public transport

Benefits of the system BENEFITS assessed using standard social cost-benefit methodology: saves 900 hours of passenger travel time per day (average 3.5 minutes/passenger) saves 65,500 car-kms per day transfer from car saves congestion worth 1.7M per year reduced road traffic casualties (mainly pedestrian) saves 0.5M per year saving in energy equivalent to 3M litres of fuel per year net reduction in pollutants of 45 tonnes of CO, 3.5 tonnes VOCs, 5.7 tonnes NO x, 0.3 tonnes particulates, 3750 tonnes of CO 2

Costs: Financial prediction total capital cost (including vehicles) 4.5M per guideway km annual operating cost 2.05M revenue 4.30M system not only covers operating costs but returns about 6% on capital investment Net Present Value over 30-year life of benefits plus revenue less operating and capital costs: + 142M if discounted at standard 6%

Conclusions for Cardiff ULTra easily covers its operating costs comes very close to covering capital costs at standard public sector 6% discount factor even at the low 1 fare assumed (and in practice is likely to do so completely as travel patterns adapt to make more use of PRT). Surveys of passengers riding the prototype show they are willing to pay several times this fare, and are very enthusiastic about all aspects of the system. Commuters transferring from car to public transport plus PRT increase bus and rail use by 5%. Large social benefits give a very good rate of return: + 133M NPV, benefit/cost ratio 392%, first year rate of return 27% Conventional public transport cannot meet this performance.

ULTra for Corby Objectives link rapidly expanding new development on greenfield sites to a modernised town centre make the centre attractive by bringing passengers directly into the shops and facilities increase the use of public transport in the town (currently very low) contribute to an environmentally sustainable transport policy provide a direct comparison with LRT as an alternative

CORBY has seen much of its traditional industry vanish, but is rapidly modernising. It plans much new development on greenfield sites, and the town centre is to be renewed. Town centre Industrial area Phase 2 expansion Phase 1 expansion A recent study evaluated a proposal for conventional LRT, giving opportunity for direct comparison of PRT with LRT Phase 1 expansion network developed in 2 phases as town expands: complete network has 30kms guideway, 44% elevated, 30 stations, 900 vehicles at maximum demand

PRT vs LRT serving the same areas Colin Buchanan & Partners had recently analysed a proposed LRT system for Corby. The same trip matrices and modal split model were used to provide comparison on exactly the same basis. Developed in two phases, the full system has 28.4 kms of track

Demand Both PRT and LRT serve same catchment area, but ULTra s loops improve access for passengers on edges of area compared with corridor LRT. DEMAND predicted in first year of operation of full system (both phases) : ULTra LRT 13.4 million passengers 7.8 million passengers 17% transfer from car 10% transfer from car 19.3% of all trips in area 11.4% of all trips in area 15.1M revenue 8.5M revenue @ 1.13 average fare @ 1.09 average fare

Costs ULTra LRT Total capital cost per track km 3.2M 3.3M Operating cost p.a. 5.1M 5.8M Although the guideway costs of ULTra are much less than those of LRT, PRT attracts almost twice as many riders as LRT and therefore requires much higher vehicle capacity. The requirement for 895 vehicles makes the overall investment similar to that for LRT, but the performance is much superior.

COST-BENEFIT ASSESSMENT 30-year financial NPV (revenue less operating and capital costs) + 4M ULTra - 69M LRT ie both systems cover their operating costs, but LRT falls far short of covering its capital costs (at 6%) while ULTra covers both operating and capital 30-year NPV of social benefits less costs is + 188M with a benefit/cost ratio of 260% Social benefits include 16.9M in passenger time and money savings, accident cost savings at 0.2M, energy savings at 0.4M per year. Mean passenger waiting time is 0.3 minutes Reductions in air pollution of 62 tonnes CO, 5 tonnes VOCs, 10 tonnes NO x, 1 tonne particulates, and 3600 tonnes CO 2 per year. Noise is below background.

Conclusions for Corby very strong case for ULTra in Corby, both financially and socially covers both operating costs and capital attracts over 70% more passengers than LRT, 17% transfer from car: high socio-economic NPV PRT offers an excellent modern underpinning to the new development, can be integrated architecturally, and run within new stores in the town centre. even in the older parts of town, roads are wide enough to offer many practicable and aesthetically acceptable routes in the new developments it can be designed integrally to offer maximum accessibility with minimum severance, and enhance the attractiveness of both residential and commercial areas.