INSTALLATION INSTRUCTIONS CRL ESK2/ESP2 ELECTRIC STRIKE KEEPER FOR DOUBLE DOORS NOTE: Sensor feature available on ESP s only. ALUMINUM Phone: (800) 421-6144 Fax: (800) 587-7501 crlaurence.com usalum.com crl-arch.com 11M0254
ORDER OF ASSEMBLY AND INSTALLATION INTRODUCTION/TOOLS REQUIRED...03 PARTS IDENTIFICATION...04 HEADER PREPARATION... 05-06 ELECTRIC STRIKE APPLICATIONS...07 ESK2/ESP2 - ELECTRIC STRIKE INSTALLATION... 08-11 VOLTAGE AND WIRING...08 ELECTRIC STRIKE ATTACHMENT...09 ELECTRIC STRIKE ADJUSTMENT (WHEN REQUIRED)...10 RE-ATTACH STRIKE COVER MAKE AND FINAL ADJUSTMENTS...11 The rapidly changing technology within the architectural aluminum products industry demands that C.R. Laurence/U.S. Aluminum reserve the right to revise, discontinue, or change any product line, specification, or electronic media without prior written notice. NOTE: Dimensions in parentheses ( ) are millimeters unless otherwise noted. 02
INTRODUCTION ESK2/ESP2 ELECTRIC STRIKE KEEPER FEATURES Designed for use with 1/2" or 3/4" (12 or 19 mm) tempered glass doors. Used in conjunction with CRL glass door Panic and Deadbolt Handles. Fail secure. (Fail safe optional) Latch/Deadbolt Monitor (ESP s only). This Electric satisfies the following safety standards: a. American National Standards Institute (ANSI/BHMA) i. A117.1 Providing Accessibility and Usability for Physically Handicapped People ii. A156.3 Exit Devices iii. A156.18 Materials and Finishes b. Americans with Disabilities Act (A.D.A.) c. American Society for Testing and Materials (ASTM) d. National Fire Protection Association (NFPA 101) e. Underwriters Laboratory (UL) i. 305 Panic Hardware Tools Required Drill Bits: 1/4" Taps: 5/16-18 Tape Measure Saw Horses Cordless Drill Phillips Head Screwdriver 1/4" Hex Key 3/16" Hex Key 3/4" Masking Tape Center Punch Metal Flat File Metal Round File Jigsaw with Metal Cutting Blade Framing Square/Straight Edge Stepladder ESP040 Adjustable Gauge (Ordered Separately) NOTE: Any modifications, other than those specified in this document, could result in this product's failure to meet UL safety ratings and void the manufacturer's warranties. 03
PARTS IDENTIFICATION FASTENERS AND PARTS LIST CALL OUT QTY. FASTENER FASTENER DESCRIPTION PART USED WITH PART NUMBER A 3 5/16-18 x 3/4" ESK2/ESP2 Electric for Double Doors B 3 10-32 x 1/2" FHMS Electric Cover (Included with ESP2) C 4 1/4-20 x 1/2" ESK2/ESP2 Electric for Double Doors CALL OUT PARTS LIST QTY PART PART NO. DESCRIPTION D 2 ESK01 5/16-18 x 1" Stop Screw for Rail Mount Doors (Bumper Sold Separately) E 2 ESK02 5/16-18 x 1" Stop Screw for Glass Mount Doors (Bumper Sold Separately) F 2 BMPRBR Rubber Bumper for 04
HEADER PREPARATION REMOVE HEADER AND PREPARE PER ATTACHED TEMPLATE 1. Place the header horizontally on the work surface, interior side up. 2. Mark the centerlines and the layout on the header as shown in. (Fig. 1) DOOR OPENING INTERIOR 7-1/8" (181) 4-3/16" (106) 4-3/16" (106) 3-15/16" (100) 1-13/16" (46) 3-15/16" (100) 1-13/16" (46) 3" (76) 3" (76) Drill and Tap 5/16-18 x 1" UNC (3) Places 7-1/8" (181) 1-13/32" (35.7) 1-9/32" (32.5) 11/16" (17.5) Face of Glass 1-5/32" (29) 29/32" (23) 29/32" (23) R 1/8" (3) (Typ.) 29/32" (23) 29/32" (23) 13/32" (10.3) Centerline of Pivot 1" (25) on 1/2" (12) Glass 1-1/8" (28) on 3/4" (19) Glass 1/4" (6.4) Center Line for 1/2" (12.7) Glass 3/8" (9.5) Center Line for 3/4" (19) Glass EXTERIOR VIEW SHOWN FROM BELOW FIG. 1 crlaurence.com usalum.com 05
HEADER PREPARATION (CONTINUED) REINSTALL THE PREPARED HEADER AND CONTINUE WITH THE ELECTRIC STRIKE INSTALLATION Hardware Configuration ESP SHOWN FIG. 2 Interior Edge of Header Exterior Edge of Header FIG. 3 Drill and Tap 5/16-18 x 3/4" (3) Places Use Template from Box 06
ELECTRIC STRIKE APPLICATIONS DOOR RAIL APPLICATION AND DIRECT TO GLASS APPLICATION Folger Adam 310-1 Electric with 3/4" (19) Straight Adjustable Bolt/Stop D ESK01 Rail Stop Screw Folger Adam 310-1 Electric with 3/4" (19) Straight Adjustable Bolt/Stop E ESK02 Glass Stop Screw Header 3/16" (5) Gap Header 3/16" (5) Gap Electric Parallel to Door 2 F.O.G. 2 F.O.G. DOOR RAIL MOUNTING FIG. 4 DIRECT TO GLASS MOUNTING FIG. 5 Electric Wires Folger Adam 310-1 Electric with 3/4" (19) Straight Electric Mounting Bolts Header 87º Face of the factory preset at 87 degrees Door Stop Mounting Bolts NOTE: Face of the MUST be set at 87 degrees as illustrated in Figure 6. To adjust the refer to page 10. Door Stop Cover (included) FIG. 6 Cover Retaining Screw 07
ELECTRIC STRIKE INSTALLATION VOLTAGE AND WIRING NOTE: Proper operating voltage must be supplied to the for it to function correctly. Voltage must be within +10% of the required voltage that is listed on the Label. 1. Before installing the, make the necessary wire connections. Refer to the table below in. (Fig. 7) 6A 6B for ESK/ESP s. for latch/deadbolt and monitor on ESP s only. 2. When you are installing the into the frame cut-out (Fig. 3, page 06), tuck the wiring away from the area to avoid pinching. Specifications Handle material: 1-1/4" (32) diameter Stainless Steel Tubing. Switch, SPDT, maximum contact rating 5 Amps @ 250 Volts. Watertight precision body. 10 million cycle mechanism. Meets with IP67 (IEC 529) requirements. ELECTRICAL RATINGS FOR SOLENOID 6A Black Wire 1 CONTINUOUS DUTY 24V DC RESISTANCE IN OHMS 96 2 Purple Wire Mechanism AMPS.25 4 Mechanism Blue Wire Black Wire 3 MINIMUM GAGE REQUIREMENTS 300 FEET OR LESS 18 ga. 300-400 FEET 16 ga. 6B WIRE STANDARDS 5 Red Wire ELECTRIC STRIKE WIRE # COLOR USAGE 1 BLACK RETURN ( ) Sensor FIG. 7 BOLT MONITOR SWITCH 2 PURPLE 24V DC POWER 3 BLACK COM 4 RED NO 5 BLUE NC crlaurence.com usalum.com 08
ELECTRIC STRIKE INSTALLATION (CONTINUED) ELECTRIC STRIKE ATTACHMENT 1. Fasten the Electric to the header using A (3) 5/16-18 x 3/4". (Fig. 8) 2. Check the horizontal alignment. Make sure that the centerline of the latch bolt is aligned with the centerline of the. 3. In case of misalignment, a 3/16" (4.8) horizontal adjustment may be made between the mechanism and the face plate. (Fig. 9) FIG. 8 A (3) 5/16-18 x 3/4" Mechanism C (4) 1/4-20 x 1/2" Face Plate FIG. 9 09
ELECTRIC STRIKE INSTALLATION (CONTINUED) ELECTRIC STRIKE ADJUSTMENT *THIS IS REQUIRED ONLY IF: 1. Electric is replaced. 2. The latch sensor gives a false reading when the door is pushed out while secured. To Adjust: A) Remove the A (3) 5/16-18 x 3/4". B) Remove the from the header. C) Loosen the C (4) 1/4-20 x 1/2". D) Apply pressure to the to create a gap. (Fig.10) E) Insert the ESP040 Electric Offset Jig while holding the. (Fig.11) F) Push and hold the in against the Jig and re-tighten the C (4) 1/4-20 x 1/2". (Fig.12) G) Remove the ESP040 Electric Offset Jig. (Fig.13) H) Install the Electric Assembly using the A (3) 5/16-18 x 3/4". A (3) 5/16-18 x 3/4" C (4) 1/4-20 x 1/2" ESP040 Electric Offset Jig ordered separately. For ESP s Only FIG. 11 FIG. 10 C (4) 1/4-20 x 1/2" ESP040 Electric Offset Jig ordered separately. For ESP s Only FIG. 12 FIG. 13 10
ELECTRIC STRIKE INSTALLATION (CONTINUED) RE-ATTACH STRIKE COVER AND MAKE FINAL ADJUSTMENTS 1. Install the Cover using B (2) 10-32 x 1/2" FHMS. (Fig. 14) 2. When the door closes against the rubber stop pads, the retractable bolt should automatically move upward to engage the. 3. If it does NOT engage, the door stops should be adjusted inward. Do not overtighten. This can cause the door to rattle. 4. To adjust the stop, remove the rubber bumper covering a socket for a 1/4" Allen wrench. (Fig. 15) Insert the wrench and rotate in or out as needed (Fig. 16). One full turn is equal to approximately 1/16" of adjustment. Re-attach the rubber bumper. FIG. 14 B (3) 10-32 x 1/2" FHMS FIG. 15 F BMPRBR Rubber Bumper Allen Wrench FIG. 16 11