Ketchum Energy Advisory Committee Annual Update and Recommendation for Electric Vehicle Charging Station

Similar documents
Yukon s Independent Power Production Policy

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION

Overview of California AB32 Regulations

To: Honorable Public Utilities Board Submitted by: Senior Energy Resources Analyst Deborah Whiteman Senior Energy Resources Analyst Approved by:

IN THE CITY COUNCIL OF THE CITY OF LIVERMORE CALIFORNIA A RESOLUTION AMENDING WATER RATES AND CHARGES FOR FISCAL YEARS THROUGH

4/15/2015 Item #10D Page 1

CITY OF ENCINITAS CITY COUNCIL AGENDA REPORT Meeting Date: July 18, 2012

RECOMMENDATION: It is recommended that the City Council, following a public hearing, adopt the attached resolution which:

To: Honorable Public Utilities Board Submitted by: /s/ Barry Leska AGM Energy Resources Planning. From: Sarah Liuba Approved by: /s/

YUKON DEVELOPMENT CORPORATION

Public and Fleet Electric Vehicle Charging Infrastructure Strategy

S T A F F R E P O R T

Department of Legislative Services

Considerations for Interconnecting with Renewable Generators

City-wide LED Street Light Conversion Program

Community Choice Aggregation A Tool for Municipalities

Community Solar Projects: Glossary of Terms

City Transfer Stations: Loading Services and Fees

To: Honorable Public Utilities Board Submitted by: /s/ Rebecca Irwin AGM-Customer Resources. From: Kelly Birdwell Brezovec Approved by: /s/

The Gambia National Forum on

Frequently Asked Questions Trico Proposed Net Metering Tariff Modifications

Taxis and Accessible Services Division Medallion Reform Background May 1, 2018

Electric Vehicle Charge Ready Program

Tune-Ups Policy Overview & Accelerator Program

Executive Summary. DC Fast Charging. Opportunities for Vehicle Electrification in the Denver Metro area and Across Colorado

Appendix C. Parking Strategies

ENERGY MANAGEMENT AT COOPER TIRE

Portland General Electric Company Eleventh Revision of Sheet No. 7-1 P.U.C. Oregon No. E-18 Canceling Tenth Revision of Sheet No.

Feasibility of Establishing an E85 Fuelling Station in Oshawa

Analysis of Waste & Recyclable Materials Collection Arrangements. Minnesota Pollution Control Agency Presented by Jeff Schneider

Michigan Renewable Energy Case Study

The Vehicle Sticker Proposal March 5, Chicago s City Sticker Model. The purpose of this report:

Energize Denver. Unlocking Opportunity in Denver. Public Input Session April 25, 2016

Solid Waste Management

Item No Halifax Regional Council June 21, 2016

Electric Vehicle Cost-Benefit Analyses

Illinois Renewable Energy Portfolio Net Metering Grid Interconnection Requirements Financing Options

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001

Merger of the generator interconnection processes of Valley Electric and the ISO;

City of Palo Alto (ID # 6416) City Council Staff Report

Trev Hall U.S. Department of Energy

Denver Car Share Program 2017 Program Summary

RATES, RULES AND REGULATIONS APPLICABLE TO ELECTRIC SERVICE. rendered in THE STATE OF OREGON

2017 Colorado Phase 2 Regulatory Rate Review Frequently asked questions

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT COMPRESSED NATURAL GAS TRANSIT FLEET UPDATE

City of, Kansas Electric Department. Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

Village of West Dundee Electric Aggregation Program

for Los Angeles Int l Airport Trade, Commerce, & Tourism Committee

STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted June 20, 2013)

PUBLIC Law, Chapter 539 LD 1535, item 1, 124th Maine State Legislature An Act To Create a Smart Grid Policy in the State

Overview of Plug-In Electric Vehicle Readiness. Coachella Valley Association of Governments

Natural and Economic Resources Appropriations Subcommittee 20 February W. Steven Burke President and CEO Biofuels Center of North Carolina

RE: Regulatory Proposal under the Condominium Act, 1998 (17-MGCS021)

EVSE Impact on Facility Energy Use and Costs

Delaware Electric Cooperative. Solar: What You Need to Know

Los Angeles. June 17, The Honorable City Council c/o Office of the City Clerk Room 395, City Hall Mail Stop 160

Assessment of Smart Grid Applications for the City of Palo Alto. City of Alameda Public Utilities Board September 19, 2011

Household Renewable Energy

R ANCHO C UCAMONGA MUNICIPAL U TILITY

Tomorrow s Energy Grid

Consumer Guidelines for Electric Power Generator Installation and Interconnection

Government Management Committee. Bruce Bowes, Chief Corporate Officer. P:\2008\Internal Services\Fleet\Gm08001Fleet - (AFS 5469)

The Regional Municipality of York. Purchase of Six Battery Electric Buses

a) The 2011 Net Metering and Buyback Tariff for Emission Free, Renewable Distributed Generation Serving Customer Load

Overview of S.L Competitive Energy Solutions for North Carolina

SDG&E Customer Distributed Generation Programs. Steve Jaffe Senior Market Advisor Customer Innovations Group September 14, 2009

Electric Vehicle Programs & Services. October 26, 2017

New Jersey Solar Roundtable

Residential Electricity Rates and Pricing in North Carolina September Casey J. Wichman Jeff Hughes

Impact of Energy Efficiency and Demand Response on Electricity Demand

ENERGY STRATEGY FOR YUKON. Independent Power Production Policy

B. Approval of the Statement of Proceedings/Minutes for the meeting of October 24, 2017.

Please visit the stations to provide your input: EV Charging Location Map EV Adoption ZEV Drivers Other Ideas

Overview of Proposed/Approved Peak Demand Reduction Demonstration Projections Memorandum to EEAC Peak Demand Reduction Subcommittee December 2, 2016

MEMORANDUM. PH-1c 09/22/16. Agenda Item: Meeting Date: Financial: City Commission TO: THROUGH: Douglas Hutchens, Interim City Manag9

A Guide to the medium General Service. BC Hydro Last Updated: February 24, 2012

MSRC CLEAN TRANSPORTATION FUNDING LOCAL GOVERNMENT PARTNERSHIP

Appendix C SIP Creditable Incentive-Based Emission Reductions Moderate Area Plan for the 2012 PM2.5 Standard

Purpose of Presentation

ERIC S. CASHER, CITY ATTORNEY WINSTON RHODES, AICP, PLANNING MANAGER

Draft Agenda. Item Subject Responsible Time. 4. GAS INFORMATION SERVICES PROJECT IMO 10 min. 5. OPTIONS FOR GAS BULLETIN BOARD SYSTEM IMO 15 min

Basic tariff guiding principles

Unitil Energy Demand Response Demonstration Project Proposal October 12, 2016

County of Sonoma Agenda Item Summary Report

Town of Holliston Board of Selectmen 703 Washington Street Holliston, MA 01746

ASSEMBLY, No STATE OF NEW JERSEY. 218th LEGISLATURE PRE-FILED FOR INTRODUCTION IN THE 2018 SESSION

Felix Oduyemi, Senior Program Manager, Southern California Edison

MEMORANDUM. Proposed Town of Chapel Hill Green Fleets Policy

Sanitation Services Proposed FY11 Budget. Council Briefing

To: Honorable Public Utilities Board Submitted by: /s/ Rebecca Irwin AGM Customer Resources

Summer Reliability Assessment Report Electric Distribution Companies Perspective

Low Carbon Green Growth Roadmap for Asia and the Pacific FACT SHEET

Net Meter and Production Meter installed by Xcel Energy

MEMORANDUM OF UNDERSTANDING Between Colorado, Idaho, Montana, Nevada, New Mexico, Utah and Wyoming Regional Electric Vehicle Plan for the West

City of Philadelphia Renewable Energy Power Purchasing RFP Pre-Proposal Meeting

1.963 Report: A Sustainable Transportation Plan for MIT Campus May 2007

6 York Region Transit (YRT/Viva) On-board Security Camera System Upgrade Contract Award

TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury

PARKING SERVICES. Off-Street Parking Revenues

Transcription:

March 21, 2016 Mayor Jonas and City Councilors City of Ketchum Ketchum, Idaho Mayor Jonas and City Councilors: Ketchum Energy Advisory Committee Annual Update and Recommendation for Electric Vehicle Charging Station Introduction/History The City Council created the Ketchum Energy Advisory Committee (KEAC) in February 2013, to advise the City on issues pertaining to energy efficiency, resiliency and climate change. The committee has met twice per month for over two years to discuss and strategize how to tackle these issues. On March 16, 2015, the KEAC brought recommended City of Ketchum Energy Conservation Goals to the City Council, and those goals were adopted at that meeting. In fiscal years 2014-2015 and 2015-2016, $25,000 was budgeted each fiscal year for projects to help achieve the adopted goals. The 2014-2015 funds were originally intended to be used to fund the solar installation at the Ore Wagon Museum, but an alternative funding mechanism, that did not require upfront funding, was approved. Therefore, those funds, along with the 2015-2016 funds, are still available to the City for KEAC proposed projects. At the Council s July 20, 2015, meeting, the KEAC identified an electric vehicle charging station at the Ore Wagon Museum and energy efficiency/renewable energy upgrades to the Recreation Center as high priority projects. In October 2015, KEAC members appeared before the City Council to make a request for the City to incentivize renewable energy installations on private residences by offering a building permit reduction. This would help achieve the Council s community-wide renewable energy goals. The Council advised staff to review the case studies provided by KEAC, look at the request s impact on the City s budget, consider how to make such a program equitable and available to all Ketchum property owners, and address energy efficiency in addition to renewable energy. Current Report This is the first annual report on the City of Ketchum Energy Conservation Goals. Those 2030 goals can be summarized as follows: City operations: o Achieve 75% reduction in energy use o Achieve 100% renewable energy use o Achieve 100% greenhouse gas reduction Ketchum community: o Achieve 50% per capita reduction in energy use o Achieve 50% local renewable energy generation o Achieve 75% greenhouse gas reduction

The following sections report on the actions taken by the City in the last year towards reaching the adopted energy goals: City Operations Reduction in Energy Use: Staff has benchmarked 2015 energy usage against 2007 and determined: Overall City operations electrical usage is down over 35%. Overall City operations natural gas usage is down almost 37%. The City of Ketchum has also received a Government Leading by Example grant from the Idaho Office of Energy Resources (OER) for an energy audit of the Recreation Center building. As part of the grant requirements, staff has prepared an Energy Star Portfolio Manager account, which shows a preliminary estimate that the building performs at an Energy Use Intensity (EUI) of about 153, which is about 58% higher than median usage for a similar building type. The City has also secured Idaho Power sponsored, more advanced Foundation Services assistance for a more in-depth analysis that will build on the OER audit. Both audits are free for the City. Depending on the outcome of the two free audits, the City may choose to participate in a Cost Share analysis which builds an energy model of the building and calculates the return on investment for the proposed retrofits in order to inform the Council s decisions to undertake certain improvements. The fee for this analysis be determined after the Foundation Services analysis and would be split - 25% paid by the City and 75% by Idaho Power funding. Prior to initiating this third phase of analysis, staff would come to the Council to present the results of the first two, cost-free phases and to receive the Council s direction as to how to proceed. City Operations Renewable Energy Use: The Ore Wagon Museum solar installation will provide about 19% of City Hall s current annual power needs when it comes on line. In addition, a solar system is being explored at the Recreation Center. Staff will return to council for more discussion and direction once the energy audit has been completed. City Operations Greenhouse Gas Reduction: Both the reduction in energy use and the increase in solar production result in greenhouse gas reduction by the City. Per the Environmental Protection Agency s online greenhouse gas equivalency calculator, the lower City operations power usage results in an annual reduction of 1,210 metric tons of carbon dioxide, and the lower natural gas usage results in an annual reduction of 68 metric tons. The Ore Wagon Museum solar installation will offset about 24 metric tons annually, resulting in a total annual reduction of 1302 metric tons. The 2007 baseline reported 3812 metric tons of eco 2, the vast majority of which was made up of carbon dioxide, so the current annual greenhouse gas reduction between 2015 and 2007 will be about 34%. Community-wide Reduction in Energy Use: In January 2015, the City Council adopted the 2012 International Energy Conservation Code that requires that new construction and additions are about 30% more energy efficient than was required by the code in effect at the time of the 2007 benchmark year. In addition, in August 2015, revisions were made to the Ketchum green building code (Municipal Code, Section 15.20) requiring that all new appliances installed in residential additions or remodels shall be Energy Star and/or be 95% efficient. The results of these measures have not been quantified at this time. City of Ketchum, 3/17/16, Page 2 of 5

Community-wide Renewable Energy Use: In August 2015, the City Council adopted provisions that streamline the code requirements for solar system permitting so that the need for structural engineering may be eliminated if prescriptive requirements are met. At that time, the Council also adopted a subsidized solar permitting fee of $100 to incentivize solar installations. Two (2) solar permits have been issued under the reduced fee and expedited permitting process. Staff has reviewed the KEAC request to incentivize renewable energy installations by reducing building permit fees for projects that include solar installations. Staff found that the case studies provided by the KEAC did not actually subsidize such projects, with the exception of waiver of very modest ($50 100) renewable energy permitting fees. Most of the case studies subsidized green building, which the City of Ketchum already mandates. Staff has analyzed Planning and Building Department revenues and found that the total annual budgeted revenue from all permits issued by the department accounts for just 30% of the department s annual operating budget. The remainder comes from the general fund. In order for an incentive to be equitable, it must be applied uniformly across the city s population. In addition, per state law, the City may not fund projects that would benefit private entities. Therefore, the Council could consider an alternative to the KEAC request in the form of a mandate for solar installations on building projects over a certain size (perhaps 2,400 square feet, which is the national average house size). Projects on sites where a solar installation is infeasible could pay into an in-lieu fund that could be utilized to pay for solar projects on City or non-profit properties to benefit the community at large. If the Council is inclined to consider this approach, it may direct staff to research this idea further and then develop code to implement it. Community-wide Greenhouse Gas Reduction: Both reduction in energy use and increase in solar production result in greenhouse gas reduction in the city. In addition, the KEAC and City staff have been researching installation of an electric vehicle charging station at the Ore Wagon Museum. The charging station would provide a public benefit to our citizens and our visitors, attract visitors and promote the use of electric vehicles that offset carbon emissions that would be produced by non-electric vehicles. A variety of stations have been investigated, including networked vs. non-networked and pedestal vs. wallmounted. The least expensive options (at about $600 hardware cost) are intended for indoor use and are not robust enough for an exterior installation in our climate. The mid-price options ($1,000 $2,000)do not provide data tracking or other services provided by a networked charger. The higher priced options are fully networked and provide reports on station utilization, energy costs and greenhouse gas savings, advertising on digital map apps and navigation systems and allow drivers to make reservations. They also monitor the system s health and would allow the city to bill for the energy consumed, if the city chose to do that in the future. City of Ketchum, 3/17/16, Page 3 of 5

The following chart shows the relative costs of the charging stations researched: Manufacturer Hardware Cost Installation Cost Annual Fees Total cost for 5 years AeroVironment $700 $2,300 $0 $3,000 AeroVironment $1,800 $2,300 $0 $4,100 Blink $2,000 $2,300 $0 $4,300 Bosch $1,000 $2,300 $0 $3,300 GE Wattstation $600 $2,300 $0 $2,900 Schneider $1,166 $2,300 $0 $3,466 Telephonix $1,795 $2,300 $0 $4,095 GE Durastation $1,300 $2,300 $0 $3,600 SemaConnect $3,990 $2,300 $240 $7,490 ChargePoint $4,777 $2,300 $225 $8,202 At the March 21 Council meeting, the KEAC will present their analysis and reasons for recommending a ChargePoint, net-worked, Level 2 (220V), wall-mounted, non-proprietary charging station. This station will provide medium speed charging at a mid-cost range level (as opposed to a DC fast charger like the Tesla Super Charger) for any model of electric vehicle. It is robust enough to handle the elements, tracks and reports station utilization, energy costs and greenhouse gas savings, advertises on digital maps apps and navigation systems and allow drivers to make reservations. It also monitors the system s health and would allow the city to bill for the energy consumed. Financial Requirement/Impact The City has budgeted $50,000 for KEAC recommended energy projects, and any proposed expenditures would come out of those funds. The estimated installed cost of the ChargePoint charging station is $8,627, including a one (1) year warranty and three (3) years of pre-paid network service at $235 per year. If additional networked stations are installed in the future, similar upfront costs and service fees would apply. Prior to committing to any network contract, the City Attorney would review that contract to ensure its legality. The current cost of additional years of network service is $280 per year, which would need to be identified and accounted for in the annual budget going forward. Recommendation Staff recommends that the Council consider the KEAC s recommendation to fund the ChargePoint electric vehicle charging station with the funds already budgeted for KEAC recommended projects. In addition, the Council may wish to direct staff to research and develop a mandatory solar energy policy for larger construction projects. Recommended Motion I move to approve the KEAC s recommended ChargePoint electric vehicle charging station and direct staff to review the contract to ensure its legality and then proceed with installation of the station and execution of the networking contract; and/or I move to direct staff to research and develop a mandatory solar energy policy for larger construction projects. City of Ketchum, 3/17/16, Page 4 of 5

Sincerely, Rebecca F. Bundy Senior Planner / Building and Development Manager City of Ketchum, 3/17/16, Page 5 of 5