Benoit Premium Threading, LLC Recommended Practice. Approved By: Benoit Quality Assurance Department Date: May 1, 2013

Benoit Premium Threading, LLC Recommended Practice. Approved By: Benoit Quality Assurance Department Date: January 6, 2017

JFETIGER RUNNING MANUAL. Downloaded From JFETC.COM Thu, 20 Sep :15: JFETIGER. * valid at time of download * JANUARY 2015

JFEBEAR RUNNING MANUAL

U. S. STEEL TUBULAR PRODUCTS PROPRIETARY THREAD CONNECTION MANUAL

U. S. STEEL TUBULAR PRODUCTS PROPRIETARY THREAD CONNECTION MANUAL

FIELD INSPECTION OF JFETIGER THREAD. Downloaded From JFETC.COM Fri, 16 Nov :49: * valid at time of download * JFETIGER.

Drill Pipe Connection Care and Handling

Running Procedure. Rev.:2 VAGT.

Running Procedure. VAsuperior. Rev.:2.

Blue Series and Legacy Series Make up Acceptance

SEC Connection. . Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Equipment, Material & Documents

BVM Corporation TYPE MS TONG 6,500 FT/LBS. TORQUE

OCTG Mill RUNNING AND PULLING PROCEDURE FOR TPS-MULTISEAL (ALL TYPES & GRADES) QP 05-16E Revision No. 7 Page 1 of 11

MS & MS XT/XC Connections

Running Procedure. VAxplorer. Rev.:1.

Running Procedure. VAroughneck. voestalpine Tubulars GmbH & Co KG Rev.: 0

3SB Connection. . Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Equipment, Material & Documents

. Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Equipment, Material & Documents

Wedge 533 / 503 / 553

2. The power tong snub line should be attached to a back up post, leveled and positioned at a 90 angle to the power tongs.

22. TenarisHydril Blue Thermal Liner Connection

Maintenance Instructions

. Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Equipment, Material & Documents

S02. MAGNETIC PARTICLE TESTING

Blue Quick Seal Connection

ER Connection. . Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Equipment, Material & Documents

DRILL PIPE CARE AND HANDLING Complete Group AVENUE Leduc AB T9E 0W1 +1 (780) CG.ENG.

Running Procedure for Casing with GB Drilling with Casing Connections

Wedge TenarisHydril Running Manual.. Premium connection approved thread compounds TSH-MD

TAM International, Inc. QI Visible Magnetic Particle Inspection

DACAPO TYRE MEASUREMENT STATION

Trust but verify: the value of acceptance testing

GUIDELINES FOR HINGED AND BOLTED MANWAY ASSEMBLY

I-795/906. Series 795 and 906 Installation-Ready Knife Gate Valves WARNING INSTALLATION AND MAINTENANCE INSTRUCTIONS

I-231.T2S1/CLAD. Victaulic Style 231 Non-Restrained, Flexible Expansion Coupling with Cladding on Expansion Side of Pipe WARNING IMPORTANT INFORMATION

Installation, Operating and Maintenance Instructions. Rotating Machine Screw Actuators. With Parts List Publication Part No.

Operating Procedures for GripTight High Pressure Test Plug

WELD PLATE GAUGE TOOL INSTRUCTIONS

I & M 8000 Series. Ideal Installation Schematic. Preferred Installation. Trouble Shooting

McCannalok HIGH PERFORMANCE BUTTERFLY VALVE OPERATION AND MAINTENANCE MANUAL. The High Performance Company

Contents. RE PS Revision 5

Model DF233 Control Valve

Baumann Mikroseal Control Valve

GB Connection Performance Properties Sheet Rev. 3 (10/07/2015) E N G I N E E R I N G T H E R I G H T C O N N E C T I O N S TM

PNEUMATIC PIPE PLUGS

SM64052 Maintenance & Repair Manual Commercial 2" Unisex Coupling - Valved Model 64052

Baumann 24000C Carbon Steel Little Scotty Control Valve Instructions

Maintenance Manual. 3-Inch Internal Valve. F660 Series

Maintenance Manual 3-INCH INTERNAL VALVE F660 SERIES

GENERAL GUIDELINES FOR THE APPLICATION OF TECTYL AUTO/TRUCK/TRAILER RUSTPROOFING COMPOUNDS

GT-200 GATE VALVES PN16, Screwed end

PLP Compression Dead-end & Jumper Terminal for ACSR & ACSS Conductors

Maintenance Manual. 4-Inch Internal Valve. F614 Series

REDUCTION OF IDLE-HUNTING IN DIESEL FUEL INJECTION PUMP

Mechanical Actuators

DEAD ENGINE FIXTURE PORTION

Maintenance Manual 6-INCH INTERNAL VALVE F620 SERIES

GROOVED COUPLINGS - STANDARD FLEXIBLE Model 101

GS-37 FLARE FLANGE SYSTEM

CRANKSHAFT & MAIN BEARINGS

SERVICE MANUAL L130B / L4130 Series Logstacker Drive Axle With Bolt-On Stub End Retainer

Bray/McCannalok High Performance Butterfly Valve Operation and Maintenance Manual

GS-90 FLARE FLANGE SYSTEM

Installation & Calibration

NYL Resilient Seated Butterfly Valves Operation and Maintenance Instructions

Tooling Assistance Center

SKF Flex Coupling Installation Instructions

M-18 Controllable-Pitch Propeller

OWI 35C-7/ 35C-7H PIPE SPINNER

Ch. 157 ESTABLISHED SOUND LEVELS CHAPTER 157. ESTABLISHED SOUND LEVELS

INSTRUCTIONS FOR CONTINUED AIRWORTHINESS STC SR00180SE

THIS BULLETIN MODIFIES THE A4A BULLETIN , DATED DECEMBER 11, 2017

I-232.T3S2 Victaulic Style 232 Restrained, Flexible High-Pressure Coupling

PowerLink GW series Eddy Current Dynamometer User Manual

RFC SPECIALTY LOCKING DEVICES

Instructions for checking caliper gauges of the series Int/Odi and ID/OD - absolute measurement

/ Marley HP7000 Fan / User Manual B

VdS-Guidelines for water extinguishing systems. VdS en. Sprinkler Pumps. Requirements and test methods. VdS en : (03)

Instruction Manual for PTI Split Block Bearing Units For SAF, SDAF, SN, SNG, SNHF, S3000K & SD Series Housings

8296 Portable Monitor Operating & Maintenance Instructions

Baumann Way Control Valve

DESIGN ENGINEERS O-RING SIZE GUIDE

Wedge /8" TO 13 5/8"

JCM 101 Universal Clamp Couplings

Technical Manual MSI Hydraulic Adjustable Choke

V-Belt Installation, Maintenance & Storage Installation

ET1187 Crimp Machine. Operator s Manual. Portable Variable Crimp Machine

OVERLOAD CLUTCHES FOR INDEX DRIVES

Ball-Bearing Products

Applicability Aircraft serial Nos. affected: The maintenance manual to be referenced is this stated or subsequent issue.

P-1 LOAD PROPORTIONAL VALVE, (60%), Pc.No

Bray/ VAAS Slurry Series Knife Gate Valve 760/762/765/766/767/768 Series Operation and Maintenance Manual

Transcription:

1.0 SCOPE 1.1 This document sets forth the specification for the mill end make-up or bucking of SEAL-LOCK HT connectors. 2.0 DEFINITION 2.1 Make-up shall be defined as the power tight application of a coupling or box connector to a pin connector. 3.0 EQUIPMENT 3.1 The following list of equipment is required in the making-up or the bucking-on of couplings to pin connectors. 3.1.1 Appropriate size, grade, type box connector, or coupling to match the pipe and pin connector. 3.1.2 An adequate supply of thread compound. A) Mill End: The mill end of the coupling shall be made-up using Seal Lube TM under the coupling as follows: Seal Lube LTF 4444 for any size larger than 3 1/2. Seal Lube HTM 1001 for 3 1/2 and smaller. B) Field End: The field end of the coupling shall be made-up using clean uncontaminated thread compound. NOTE: Hunting recommends Best-O-Life 2000, Best-O-Life PTC, OCR 325, Seal Lube TM (LTF 4444 HTM 1001), and Jet Lube Envirosafe as the tested and approved thread compounds for Hunting thread sealing products. NOTE: Hunting does not recommend API modified thread compound for Hunting proprietary connections. However, when an API modified thread compound is specified by the end user, Hunting has standardized on Best-O-Life 72732/72733 as the API modified thread lubricant used for connection qualification testing. Using another thread compound may substantially change the recommended torque listed on the sales data sheet. 3.1.3 Thread lubricant application brushes (Model 58235 moustache brush recommended.) 3.1.4 Appropriate SEAL-LOCK HT barrette pair for the specified size connection. Both barrette members must have the same serial number. Barrettes are not used for accessory make-up as the box ID shoulder determines the make-up position. 3.1.5 Power tongs capable of producing the required torque at 5-14 RPM. 3.1.6 Molybdenum disulfide spray or equivalent (Molykote). NOTE: The power and back-up tongs shall have sufficient dies, evenly spaced around the coupling and pipe circumferences, so that an even gripping pressure is applied, both axially and circumferentially, to prevent distortion to the connection. 3.1.7 Latest Hunting sales drawing with specified torque values for the appropriate size, weight and grade product of SEAL-LOCK HT. 3.1.8 OPTIONAL - Torque turn monitoring system. Page 1 of 7 Pages

(Drawing SLHTMU2) Page 2 of 7 Pages

4.0 CERTIFICATION 4.1 The torque unit shall be calibrated for accuracy every four (4) months. 5.0 MAKE-UP PROCEDURE 5.1 Thoroughly clean and visually inspect both sides of the connection to be made-up. 5.1.1 Ensure that the pin thread start and full form threads are free from tears and burrs. 5.1.2 Ensure that the coupling or box connector is free from burrs or tears on the starting threads and throughout the full form thread length. 5.1.3 Both connectors shall be free of any debris such as chips, shavings, dirt or other foreign particles that could create galling or damage to the connection during make-up. 5.1.4 Make-up lines properly applied to both pin and box connectors in accordance with ancillary Specification Make-up Position Using Barrettes, SEAL-LOCK HT. 5.2 Apply a light to moderate, even coating of thread lubricant, per Section 3.1.2 NOTES of this procedure, to cover the full box/coupling threaded surface. NOTE: See Section 3.1.2 for recommended thread compounds. 5.3 Apply a very light coat of the recommended thread lubricant to the imperfect thread area only on the pin connector. The imperfect thread area is defined as those threads whose crests have not been machined. #58235 Do Not Use Bottle Brush Preferred Moustache Brush #58235 Alternate Acceptable Modified Paint Brush NOTE: A light to moderate, even coating of thread compound is defined as all thread surfaces, root and crest, and pin face/torque shoulder covered with an even coating of thread compound. However, the thread form should remain clearly visible. NOTE: Adjust the amount of lubricant applied to the pin and coupling connectors to cause a gradual increase in torque throughout the make-up. An indicator of connection overlube is during the last one-half of a turn to final make-up position there is no gradual increase of torque even though the pin is continuing to advance into the coupling. Page 3 of 7 Pages

THIS PAGE IS INTENTIONALLY BLANK Page 4 of 7 Pages

5.4 Apply the box or coupling to the pin end by hand to the hand-tight position. 5.5 Position the connection in the power tongs. 5.6 Apply the specified torque to the connection at 5-14 RPM. Make-up speed should not exceed 14 rpm. Make-up speed should not vary excessively during make-up and should be continuous with no gear changing. TARGET MAKE-UP RPM 8 PITCH 5 PITCH 2 3/8" - 14 RPM 5" - 10 RPM 2 7/8" - 12 RPM 5 1/2" - 9 RPM 3 1/2" - 10 RPM 7" - 7 RPM 4" - 8 RPM 4 1/2" - 8 RPM 5.7 OPTIONAL Make-up Torque/Turn Monitoring 5.7.1 Optional Torque-Turn Equipment - A torque-turn /time or torque/turn monitoring system may be utilized. Monitoring equipment should be capable of resolving torque to 1/100th of a turn increments as a minimum but equipment capable of resolving torque to 1/1000th of a turn should be utilized when available. An enhanced computer display should be part of the torque-turn monitoring equipment and should be utilized to monitor make-up. The monitoring equipment should be capable of dumping during the make-up by either the computer technician or when maximum parameters are reached. As the torque enters the acceptable window, the technician should be able to depress a function key to manually terminate the make-up. The system should be capable of automatic dumping as input parameters are met. The load cells used with the torque monitoring equipment should be calibrated every four (4) months, traceable to the appropriate national standard. 5.7.2 If the optional torque/turn monitoring equipment is used, a make-up torque/turn graph should be generated for every connection. NOTE: If an appreciable amount of thread lubricant is being pushed to the tube ID and/or the tube OD during make-up, too much thread lubricant is being applied to the connection. NOTE: If torques are high or low, adjust the thread compound application to give good make up torque curves. For high torque, apply more compound. For very high torque, apply Molybdenum disulfide to both pin and box connectors prior to the application of the thread compound. NOTE: The SEAL-LOCK HT connection is a position make-up connection. The make-up indicator lines must be properly aligned for the connection to work as designed. The internal torque shoulders on box accessories determines the correct make-up position on accessory connections. 6.0 MAKE-UP ACCEPTANCE AND REJECTION 6.1 For an acceptable make-up both position and torque requirements must be met. 6.1.1 The criteria for proper make-up shall be as described in Section 5.0 of Ancillary Specification Make-up Position Using Barrettes, SEAL-LOCK HT. Page 5 of 7 Pages

THIS PAGE IS INTENTIONALLY BLANK Page 6 of 7 Pages

6.1.2 The torque applied to the connection must meet the minimum published torque when the position requirements are met. 6.1.3 Accessory connections must exhibit a positive shoulder; pin face to box shoulder engagement. The delta torque of the shouldered connection shall be a minimum of 10% of the actual shoulder torque. The maximum published torque may be exceeded on thick wall accessories but shall not exceed 80% of the published minimum yield torque. 6.2 Connections which do not meet the criteria of Paragraph 6.1 should be set aside and a Hunting representative contacted as soon as possible. 6.3 Following buck-up, the ovality or out-of-roundness shall be within the specified manufacturing tolerances for the product when measured on the open end of the coupling and documented on Bucking Report. 6.4 End drift the made-up connection in accordance with the Hunting "Full Length Drift/End Drift Inspection Procedure" (Generic). 7.0 REWORK 7.1 If the connection does not shoulder or make-up to the proper position, remove the coupling, clean and visually examine both pin and box for damage. If no damage is found remake up as directed in Section 5.0 and inspect as directed in Section 6.0 of this document. The amount of the thread lubricant may be altered and a higher make-up torque (up to maximum recommended torque) may be used. 7.2 Connections which will not meet the criteria of Section 6.0 should be set aside and a Hunting representative contacted. 8.0 RUNNING PROCEDURE FOR ACCESSORIES MADE UP USING THREAD LOCKING COMPOUND / LUBRICANT 8.1 Using steam, soap and hot water, or safety solvent, remove all thread storage or running compound from both pin and box connectors. 8.2 Ensure that the thread and sealing surfaces are clean, dry, and free of oil, grease, or residues. 8.3 On thread sealing connections, apply the Hunting recommended thread compound on the first three (3) thread of the pin and last three (3) threads of the box (area of the perfect threads engagement). 8.4 Just prior to make up, the thread locking lubricant shall only be applied on the pin threads (not on the box), on the area that has not been covered by the approved thread compound. 8.5 When making up accessories like float equipment, hangers, thick wall accessories, and others, shoulder torques might be higher than normal due to relationship of the friction factors of the thread locking lubricant in comparison with the API Modified thread compounds and the wall thickness. 8.6 The make up torque of the accessories should be aimed to the maximum recommended torque. Therefore, if necessary, the published torque may be exceeded but in any case shall not exceed 80% of the published minimum yield torque. Page 7 of 7 Pages