Requirement Definition/Terms of Reference Satellite Beach City Hall - Solar Array Installation

Similar documents
40kW (and under) Solar/Inverter Installations Generation Interconnection Application to Minnesota Power

Installation Guide. PV Booster Single Axis Tracker. Mechanical Roof Attachment.

Thomas Alston Director of Business and Policy Development. Presented By N. Scottsdale Rd, Suite 410 Scottsdale Arizona 85257

All of Texas Has Excellent Solar Resources. United States Solar Installed (as of mid 2013): 10 GW Germany Solar Installed (end of 2013): 35.

Solar*Rewards Frequently asked questions system size and customer usage

Welcome To Meet Our Installer Event

Project Title: Lowertown Ballpark (CHS Field) Solar Arrays Contract Number: EP4-34 Milestone Number: 1 Report Date: June 21, 2016

Solarize Seattle: Northeast. January 28, 2012

3. Customer shall provide space for metering equipment and meter base as per Springville City Power requirements.

Solar Photovoltaic (PV) Design Considerations & Issues. By Paul M. Williams, President & CEO

Micro Embedded generation

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program

Net Meter and Production Meter installed by Xcel Energy

Renewable Energy. Presented by Sean Flanagan

LAYOUT REPORT OF ROOFTOP PROJECT. For 115 kwp. Order No. # Date 13 October, Name of Place California.

Solar Electric Modules

100kW GROUND MOUNTED SOLAR PHOTOVOLTIC POWER PLANT DETAILED PROJECT REPORT AERO SPACE MATERIALS PVT LTD

Glossary. * Credit for glossary starter: Florida Solar Energy Center. August 2015 PV Installer's Course: Glossary 1

Long Island Solar Installer Workshop

ETSU Solar Array. Suggestions for a potential solar array on campus. Scott Finney

Solar Seminar. July 21st, Barry Cinnamon

Datasheets. Residential On-Grid Photovoltaic System Kits

LOCAL GOVERNMENT IMPLEMENTATION CITY OF ELBERTON. 2 Solar Sites City Hall (10 kw) and Customer Service Center (15 kw) Summer

Do It Yourself Solar Photovoltaic (PV) Workshop. Jack Barnett Blair Buselli

SAMPLE PERMIT APPLICATION PACKAGE

Origin Solar Presentation

Designing Stand Alone Systems. Overview, components and function, Elements in Design

ALZ Electrical Solar Consumer Guide

Renewable Hybrid / Off-grid Solutions

Technical specifications

LAYOUT REPORT OF GROUND MOUNTED PROJECT

Consumer Guidelines for Electric Power Generator Installation and Interconnection

Energy & Cost Savings The Friends Meeting of Austin 3701 Martin Luther King Blvd. Austin, TX (46) Sharp 208 W Modules = 9.

SunWize SW and OEM Series Solar Modules GENERAL INSTALLATION & USER GUIDE

APPLICATION Net Energy Metering Interconnection For Solar And/Or Wind Electric Generating Facilities Of 30 Kilowatts Or Less

Tabuchi Electric Inverter Quality & Reliability Overview February 2017

Municipality Generator Interconnection Application Single Meter Application Part I

3.6 Kwp Solar system Supply, Installation, Commissioning & Maintenance of Solar Systems to YEMAC office in HADDA street, Sana a city

2016 Photovoltaic Solar System Plan Review List

Major Customer Connections. Preliminary Enquiry Form Embedded Generation > 30 kw

* Protected from tools and particles greater than 2.5 millimeters * Protected form low pressure water jets from any direction

Contents. Solar Select TM Frequently Asked Questions

Title Goes Here and Can Run Solar Photovoltaic up to 3 lines as shown here Systems as you see

Sun-Grid Electric Private Limited. Presented by:

OPTIMIZING COMMERCIAL SOLAR

Consumer guide. be brighter. actewagl.com.au/solar

SOUTH HADLEY ELECTRIC LIGHT DEPARTMENT Net Metering Policy As Amended 03/23/16 By the South Hadley Municipal Light Board

NET METER REQUEST FORM

Enquiry Form for Micro and Small Generators 5MW and Less

SunWize SWPB Series Solar Modules GENERAL INSTALLATION & USER GUIDE

ELG4126: Case Study 2 Hybrid System Design and Installation

Product Manual. Installation Instructions for CHSM-230M Series Solar Module

Puget Sound Energy Overview

Micro3 Grid Tied Residential Package

SECTION 1: Field Inspection Guide for Rooftop Photovoltaic (PV) Systems

Airports Going SOLAR! Michael Shonka

Installation and Operations Manual

Safety and Installation Instructions

OFF GRID SOLAR PV SYSTEMS

Powering Your Home With The Sun. Introduction to Residential Solar Energy Systems [Your Name] ISEA Solar Ambassador

Application for Operation of & Net Metering for Member-Owned Generation Name: Mailing Address: City: County: State: Zip Code: _

Get More When Shopping for Solar

Columbia Water & Light Interconnection & Net Metering Agreement Electrical Facility

Lassen MUD PV BUYDOWN PROGRAM Photovoltaic Systems Guidelines

City of Manhattan Beach Community Development

Your home and business energy independance. Energy Bundle CA5000TPV-3D

STREAMLINED SOLAR CHECKLIST Owner Name:

SPECIAL SPECIFICATION 8676 Solar Panel Power Supply System

Noble County Rural Electric Membership Corporation

General Installation Manual July 1, SANYO Energy (USA) Corp. All Rights Reserved.

SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT

Solar Power Installation Application

PV-Wind SOFTWARE for Windows User s Guide

The brand you can trust.

SolarMill SM1-1P, SM1-2P, SM2-3P, SM2-5P, SM2-6P. User manual. Draft. SM1 - Product shown may vary slightly from specific model shipped

- Solar PV systems and integration - GIZ - All rights reserved

Solarize Fairfax County Info Session. Agenda. Welcome Remarks by Chairman Bulova Remarks by Supervisor Gross Presentation by LEAP Q&A Session

Bill Johnson President Solar, Simply Brilliant.

24. SOLAR INCENTIVE PROGRAM II

672W Off Grid Residential Package

NET METERING APPLICATION

Todae Solar s 1.22 MWp Rooftop Solar Photovoltaic Installation for Stockland Shellharbour, NSW.

SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL

SOLAR ELECTRIC INVESTMENT ANALYSIS

Station Identification. Results. PV System Specifications. Energy Specifications. Solar Radiation (kwh/m 2 /day) Energy Value ($) AC Energy (kwh)

Power Optimization and Monitoring in Photovoltaic Systems. Perry Tsao, Ph.D. January 20, 2010

Portable. Emergency Solar. Table of Contents. Now featuring Portable. A New Energy Revolution

Solar Power for Home...


Onix Structure Private Limited. Solar PV Power Generation System Detailed Project Report

Contents. VBHNxxxSJ40 series. VBHNxxxSJ47 series. General Installation Manual. Photovoltaic Module HIT TM. VBHNxxxSJ40 series. VBHNxxxSJ25 series

Contents. VBHNxxxSJ40 series VBHNxxxSJ47 series. General Installation Manual. Photovoltaic Module HIT R. VBHNxxxSJ25 series VBHNxxxSJ40 series

YGE-Z 60 Cell Series PV Modules

Should I Get a Solar Array for my House? The Regulations, Available Equipment, and Benefits Steven Johnson

Photovoltaic Modules Installation Manual for Australia

Capture The Power of Photovoltaics. IEEE Power Engineering Society Meeting May 2005

SANTA CLARA CITY RENEWABLE NET METERING & INTERCONNECTION AGREEMENT

This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

General Installation Manual 2007 Sanyo Electric Co., Ltd. All Rights Reserved 6/15/07

THE NEW POWER TO FUEL OUR FUTURE

Transcription:

Requirement Definition/Terms of Reference Satellite Beach City Hall - Solar Array Installation RFP No. 16-17-07 Solar Energy for City Hall, Page 1 of 10

Contents Site Description... 3 Panels (provide panel data sheet with proposal)... 4 Mounting Structure (provide data and schematic sheet with proposal)... 4 Inverters (provide inverter data sheet with proposal)... 5 Monitoring (provide data sheet with proposal)... 5 Line items to be completed by contractor... 6 Basic PV system... 6 Appendix 1...10 RFP No. 16-17-07 Solar Energy for City Hall, Page 2 of 10

Satellite Beach City Hall/Civic Center Rooftop Photovoltaic (PV) Design and Installation Request for Proposals This RFP is organized into sections to better streamline the information needed to create your proposal. Site Description: Single Story Building Two flat roofs over City Hall and Civic Center are 14 feet, 10 inches above adjacent parking lot pavement Two roofs are steel reinforced concrete Two flat roofs over City Hall and Civic Center are watertight with an overlying granular white/grey rolling-roofing (tar down) over a 2 inch layer of board insulation membrane Undulating concrete center breezeway roof connects City Hall and Civic Center above an open plaza Breezeway roof is raised above level of two adjacent flat roofs Latitude: 28.171667, Longitude: -80.604481 Available installation spaces Eastern flat roof (City Hall) Area: 96 feet N/S by 63 feet E/W Minimally shaded on the west by breezeway roof panels whose tops are 72 inches above the adjacent flat roofs Surrounded on north, east, and south sides by a 14 inch high parapet (impact should be minimal) Breezeway roof Area: 100 feet N/S by 64 feet E/W Tops of roof panels are 72 inches above the two adjacent flat roofs Bottoms of roof panels are 44 inches above the two adjacent flat roofs Western flat roof (Civic Center) Area: 96 feet N/S by 63 feet E/W Shaded on the east by breezeway roof panels whose tops are 72 inches above the adjacent flat roofs and by a row of adjacent trees bordering the west side of the Civic Center Surrounded on north, west, and south sides by a 14 inch high parapet RFP No. 16-17-07 Solar Energy for City Hall, Page 3 of 10

Conditions: These conditions outline the minimum requirements that a PV system must have for a proposal to be considered. Design of annual PV system output should aim to achieve average annual City Hall load demands of 150,000 kwh. - Record of two years of electricity use. (Attachment 1) - Components to be FSEC-certified - System must be designed to withstand speeds and wind loading that comply with the prevailing building codes - System must be designed for a salt air environment (components must be protected from oxidation, including support structures) - System must comply with the following codes - Prevailing National Electric Codes - Prevailing International Fire Codes and Florida Fire Prevention Codes - No permit or inspection fees will be charged - Electric meter, input panel, and standby generator interconnect located on the west side of the Civic Center Panels (provide panel data sheet with proposal): 1. Well known and financially strong manufacturer to ensure relevant long-term warranty. 2. Monocrystal or polycrystal cells. 3. Glass which covers panels should not reflect solar radiation. 4. Minimum efficiency value of 15% under standard testing conditions. 5. Same brand, power capacity and structure used throughout system. 6. A minimum of 10 year physical warranty. This should be provided by contractor. 7. At least 25 year linear power warranty, power warranty has to ensure 90% of rated power over 10 years and 80% rated power over 25 years. 8. Three bypass diodes in case of power loss due to shading and power drawbacks into system. 9. Solar module junction box proved by certificates such as TUV, SGS and UL, which are internationally accredited to prevent components from short circuiting. 10. Operating temperature range has to be between 20 C and 50 C. Mounting Structure (provide data and schematic sheet with proposal): 1. Resistant against wind speeds of up to 130 mph (prevailing building codes). 2. Structural design minimally visible and aesthetically pleasing. 3. Minimum 25 year life span of system and resistant against oxidation, corrosion, and sand particles. 4. Connections must be water and dust resistant and withstand against impacts. 5. If glazing and color is damaged during construction, contractor is responsible for repairing. 6. Enough spacing between panels to facilitate cooling and accessibility. RFP No. 16-17-07 Solar Energy for City Hall, Page 4 of 10

Inverters (provide inverter data sheet with proposal): 1. Well known financially strong manufacturer 2. String type, preferred MPPT 3. High Efficiency at >98% 4. Outdoor capable and able to resist hurricanes (IP65) 5. Heat dissipating abilities 6. Have service capability in the US 7. Minimum inverter guarantee of 5 years and extended warranty of 15 years Monitoring (provide data sheet with proposal): 1. Able to monitor system both locally and remotely. 2. Weather station equipment to monitor the sun. 3. Inverter shall give current data of the DC inputs, and if DC combiner boxes are used these boxes shall be assessed by the monitoring system. If the system is designed with battery banks for power outages, all batteries used in the system should be able to withstand high temperatures within an appropriate temperature range for conditions relevant to East Central Florida. The batteries should also have low maintenance needs. Battery storage location should be near inverter in an electrical room. Create a system to reduce peak load of utility when readings taken (if possible). RFP No. 16-17-07 Solar Energy for City Hall, Page 5 of 10

Line items to be completed by contractor: Fill out these line items as specifically as possible, attaching data sheets as needed to fit any additional information Basic PV system: Minimum system size at quoted price Price break point(s) Systems loads (kw DC output) System payback period Reduction in price at the price break point(s) ($ per Watt DC output) Expected Capacity Factor of system Panels: Price Manufacturer Model Manufactured in which country (ies) Warranty available in which country/state Rated DC output per panel Design operational life Please attach data sheets Mounting hardware: Price Manufacturer Model Manufactured in which country (ies) Warranty available in which country/state Number of rails Please attach data sheets Inverters/Microinverters: Invertors Microinverters Price Manufacturer Model Manufactured in which country (ies) (Y/N) Warranty available in which country/state (Y/N) Inverter(s) only: design DC input/ac output per inverter (kw) Emergency AC output power (if any) per inverter when off-grid (kw) Design operational life If less than that of the solar panels, the current installed replacement cost ($ per unit per replacement cycle) Please attach data sheets RFP No. 16-17-07 Solar Energy for City Hall, Page 6 of 10

Optimizers: Manufacturer Model Manufactured in which country (ies) Design operational life If less than that of the solar panels, the current installed replacement cost ($ per unit per replacement cycle) Please attach data sheets Monitoring: Monitoring provider Cost of monitoring Initial cost ($) Recurring cost ($/year) Please attach description of monitoring interface Other significant component(s) (identify): Manufacturer Model Manufactured in which country (ies) Design DC or AC input/dc or AC output (kw) per unit Design operational life If less than that of the solar panels, the current installed replacement cost ($ per unit per replacement cycle) Please attach data sheets Suggested System Panel location(s) City Hall Breezeway Civic Center Provide the following for your design - Shading analysis report - State Number of panels - Please provide a planning-level schematic for the panels - Number of inverters/microinverters - Number of optimizers - Rated DC output (kw) - First year's estimated AC output (kwh) - Cost of full system ($) - Cost of system per month ($) - Payback period with incentives/ financial plan Payback period (Cost / (First year's AC output * $0.11)) RFP No. 16-17-07 Solar Energy for City Hall, Page 7 of 10

Potential component / system alternatives Same information as for the basic components / system, as appropriate Future removal and replacement Do you offer this option? For what period? At what cost? Payment schedule % of project payment due at contract signing % of project payment due midway through the project Milestone at which the mid-term payment is due % of project payment due at project completion Milestone that constitutes "project completion" Warranties: Reliability: Details of warranties on each major system component Details of warranty on installation workmanship Details of warranty on roof leaks Details of any other warranties offered If there is an option to extend any warranties, for how long is this extension and at what additional cost? Listing status of the company with Better Business Bureau and other rating entities Number of years the company has been in business Number of years the company has been designing and installing photovoltaic systems Number of years the company has been designing and installing 20-plus kw DC output photovoltaic systems Number of rooftop photovoltaic systems the company has installed in the past three years Number of 20-plus kw DC output rooftop photovoltaic systems the company has installed in the past three years - Smallest commercial system installed (kw DC output) - Largest commercial system installed (kw DC output) Has the company worked with any hybrid systems? Is the company tied with any manufacturing companies, if so state Number of photovoltaic systems (residential or commercial) the company has installed on barrier islands in the past three years Total DC output of photovoltaic systems the company has installed in the past three years Photographs and locations of representative commercial-size photovoltaic systems the company has installed in the past three years References (name, address, telephone, email) for commercial size rooftop photovoltaic systems installed in the past three years Nature of any complaints or post-installation adjustments/repairs made to PV systems installed in the past three years Key personnel and certifications Licenses and bonding RFP No. 16-17-07 Solar Energy for City Hall, Page 8 of 10

Community: Please describe any In-kind photovoltaic system / component donations to nonprofits and local governments in the past three years Please describe any other relevant community involvement on the part of the company or its principals Other: Earliest the project start date Length of time to complete the project once contract is signed Anything not covered by the rest of this RFP RFP No. 16-17-07 Solar Energy for City Hall, Page 9 of 10

Appendix 1: Figure 1. Civic Center (left) and City Hall (right) looking northeast. Figure 2. Satellite view of Civic Center and City Hall. The parking lot is directly south of the building. RFP No. 16-17-07 Solar Energy for City Hall, Page 10 of 10