Armored Helmet Hardtop Product Description

Similar documents
PARTS LIST FOR HMMWV CAPS Effective: January 2005

ARDEC Rapid Design Projects for Field Support Part 1

Oshkosh Corporation MTVR On Board Vehicle Power Program Update. May 5, Built Strong. Building for the Future.

ARMORED MASTIFF SWAT TRUCK Typically Armored to Level A9/B6+ Against 7.62x39, 5.56x45, 7.62x51, M193, & M80 ball. Can be Armored to Any Level.

ARMORED CHEVROLET TAHOE Typically Armored to Level A9/B6+ Against 7.62x39, 5.56x45, 7.62x51, M193, & M80 ball. Can be Armored to Any Level.

RECONNAISSANCE SURVEILLANCE AND TARGETING VEHICLE (RST-V) Mike Byerly Naval Surface Warfare Center

ARMORED CHEVROLET SUBURBAN LIMO

ARMORED TOYOTA LAND CRUISER GXR

ARMORED TOYOTA LAND CRUISER. Professionally Armored to Level A9/B x39, 5.56x45, 7.62x51, M193, & M80 ball

Transparent Armor Cost Benefit Study

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Family of Heavy Tactical Vehicles

ARMORED FORD F-550 BOXER

COMPOSITE ARMOR SOLUTIONS LAND, SEA AND AIR

Fire Power Forum. DISTRIBUTION A: Approved for Public Release.

ARMORED NISSAN PATROL Typically Armored to Level A9/B6+ Against 7.62x39, 5.56x45, 7.62x51, M193, & M80 ball. Can be Armored to Any Level.

Assessing the Methodology for Testing Body Armor

ARMORED LEXUS LS 600H L Typically Armored to Level A9/B6+ Against 7.62x39, 5.56x45, 7.62x51, M193, & M80 ball. Can be Armored to Any Level.

ARMORED BMW X5 Typically Armored to Level A9/B6+ Against 7.62x39, 5.56x45, 7.62x51, M193, & M80 ball. Can be Armored to Any Level.

ARMORED CHRYSLER 300C Typically Armored to Level A9/B6+ Against 7.62x39, 5.56x45, 7.62x51, M193, & M80 ball. Can be Armored to Any Level.

PM Light Tactical Vehicles

Tank-Automotive Research, Development, and Engineering Center

Transparent Armor Cost Benefit Study

BUSHMASTER FAMILY OF VEHICLES.

Project Number 56b January Hard Cab Design for HMMWV

ARMORED MERCEDES-BENZ S550. Professionally Armored to Level A9/B x39, 5.56x45, 7.62x51, M193, & M80 ball


P3B delivers lightweight, ballistic products that include a full line of personal protection shields, ballistic fragmentation systems and mobile

Integrated Trailer-ECU-Generator (ITEG)

PE" " 1TAT10N PAGE omb Iyo ,88. I-e El. -a Sl sl.or-o'',,ip9oc.a-,,.

2010 Structural armor SyStemS

Panzerhaubitze mm Self- Propelled Howitzer - Archived 4/2000

UNCLASSIFIED: DIST A. APPROVED FOR PUBLIC RELEASE. ARMY GREATEST INVENTIONS CY 2009 PROGRAM MRAP Overhead Wire Mitigation (OWM) Kit

Light-weight ballistic plates

INCH-POUND. MIL-PRF-46103E 6 January 1998 SUPERSEDING MIL-A-46103D 23 June l989 PERFORMANCE SPECIFICATION ARMOR: LIGHTWEIGHT, COMPOSITE

VEHICLE ARMOR AVAIL enlight BODY ARMOR RISE TRUTH SNAP SPECIAL USE ARMOR ALLY ONE CUSTOM SOLUTIONS 30

XM153 CROWS Vehicle Integration. Presented By: Joseph M. Scheneck, PE Lead Systems Engineer XM153 CROWS (SOCOM Team)

SFI SPECIFICATION 7.2 EFFECTIVE: DECEMBER 15, 2006 *

THE USE OF PERFORMANCE METRICS ON THE PENNSYLVANIA TURNPIKE

Leader in Premium Quality Armored Vehicles Parts

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

Mega Engineering vehicles. the next generation of advanced apc

Gallet TC 800 and TC 500 series ARCH Helmet System

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

SALES QUOTE. Prepared for: Reference Number: SA-II-3 BUYER:

Army Ground Vehicle Use of CFD and Challenges

HDT DRASH UTILITY SUPPORT TRANSPORT Intelligent Power Technology, ECU, and Cargo Trailers

Center for Ground Vehicle Development and Integration

Product Manager Crew Served Weapons Overview For the Small Arms Symposium & Exhibition National Defense Industrial Association

Report No. D November 24, Live Fire Testing of Light Tactical Wheeled Vehicles was Effective for the Portions Completed

LtCol Tom Atkinson Program Manager

MULTIPRODUCTOS INTERNACIONALES, S.A.

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

Testing in the Design Phase. Regis Luther

BALLISTIC AND BLAST RESISTANT SECURITY SOLUTIONS

NIJ s Body Armor Testing Program 8 th Annual Technologies for Critical Incident Preparedness September 7, 2006

SFI SPECIFICATION 4.2 EFFECTIVE: OCTOBER 26, 1994*

Ti for Military Ground Vehicles: Are Hopes Dashed?

Defense Green Technology of KOREA

TRAILERS MODULAR RAPIDLY DEPLOYABLE MOBILE RUGGED RELIABLE VERSATILE

S.O.F COMMAND & CONTROL ARMORED VEHICLE. Leader in Supplying Special Operation Forces Equipment and Training TA04032

PN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

HDT ENGINEERING SERVICES AN OBJECTIVE APPROACH FROM PROOF-OF-CONCEPT TO FINAL ASSEMBLY AND TEST. The prevailing force in the field.

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

USMC Vehicle Power Prototype Joint Service Power Expo Brief

Establishment of Light Tactical Vehicles Program Office

COMPOSITES AND DEFENCE SYSTEMS

Electric Drive Approach to Mobile Power Platforms

HDT DRASH UTILITY SUPPORT TRANSPORT Intelligent Power Technology, ECU, and Cargo Trailers

Application of Airbag Technology for Vehicle Protection

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 11 R-1 Line #130

Afghan Armored Vehicle Rental Co.

U.S. Army s Ground Vehicle Energy Storage R&D Programs & Goals

Our Approach to Automated Driving System Safety. February 2019

MULTI-MISSION FAMILY OF VEHICLES M-ATV INNOVATION DRIVES FORWARD

PART 665 BUS TESTING. Subpart A General. 49 CFR Ch. VI ( Edition)

WORLD CLASS through people, technology and dedication

LIGHT TACTICAL ARMOURED VEHICLE

UNCLASSIFIED UNCLASSIFIED

TESTING OF PROTECTIVE COVERS FOR SPECIAL VEHICLES

ARCHIVED REPORT. Commando Scout - Archived 8/98

Cygnus Payload Accommodations: Supporting ISS Utilization

Ing. & CAP Carlos Alberto Martínez Gutiérrez. Presentación General. Aspas para aerogeneradores

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

TELEDYNE STORM MICROWAVE. even in space TELEDYNE. Everywhereyoulook. Tel Fax Toll Free

Collecting In-theatre Vehicle Blast Data using Stand-alone On-board Data Acquisition Technology

LAW ENFORCEMENT. Phone: +1 (360) Fax: +1 (360)

SFI SPECIFICATION 14.3 EFFECTIVE: AUGUST 25, 2017 *

SALES QUOTE. Prepared for: Reference Number: SA-II-2 BUYER:

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Materials for Ground Platform Survivability

MODULAR ARMOR SYSTEMS. The Building Blocks for Saving Lives

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

MILITARY VEHICLES KIA MOTORS MILITARY VEHICLES MODEL RANGE

Gallet TC 800 and TC 500 series ARCH Helmet System

Offshore Application of the Flywheel Energy Storage. Final report

US Army utilizes TQG s for power generation & PDISE for power distribution. Power grid is setup based on recommendations of PM MEP.

Adams-EDEM Co-simulation for Predicting Military Vehicle Mobility on Soft Soil

U.S. Army s Ground Vehicle Programs & Goals

* * Inside Ram. Tools Required 1500, 2500, 3500 IMPORTANT

ARCHIVED REPORT. For data and forecasts on current programs please visit or call

Transcription:

31-October 2005 Amtech Corporation 180 East Jones Rd Wapato, WA 98951 Byron R. Burson Director of Engineering & Military Sales 509-877-6451 bburson@amtechcorp.com Proprietary Information Amtech Corporation

Table of Contents General Description... 1 Background... 1 Design Objectives... 2 Ballistic Performance... 2 Physical Configuration... 2 Mounting... 3 Aberdeen Test Center Testing... 4 Dynamics & Stability... 4 Durability... 4 Ballistic... 4 Production... 4 Proprietary Information Amtech Corporation Page i

General Description The Lightweight Composite Armored Helmet Hardtop (LCA HHT) built by Amtech Corporation is a monolithic composite armor covering for the HMMWV. It was designed to take the place of the roof and back wall supplied with other armor kits. The composite recipe being used to manufacture the current configuration of the LCA HHT provides protection against National Institute of Justice (NIJ) Standard 0101.04 level III threats and.50 caliber Fragment Simulating Projectiles. The LCA HHT was designed to allow increased threat protection levels to be spiraled into the configuration as they become available. Background Amtech Corporation began producing the standard Helmet Hardtop (HHT) in 1991, as a more durable replacement for canvas tops for the HMMWV. The HHT was unique in that it provides a single compartment that is shared by the crew and the cargo, similar to a typical sport utility vehicle. The HHT has been made available in multiple configurations, including mid-height and tall tops for the HMMWV, and tops for trailers. In 1998, PM Soldier Support in Natick, Massachusetts requested that Amtech Corporation provide HHTs for testing at Aberdeen Test Center (ATC). Successful testing at ATC paved the way for the assignment of National Stock Numbers (NSNs) and a 10-year contract with Defense Supply Center Columbus (DCSC). Since that time, U.S. Military units have been able to purchase HHTs for their HMMWVs using Class Nine Funds. Amtech has worked with various military programs to provide specialized communications and electronic attack versions of the HHT that integrate EMI Shielding and Antenna Mounting Hardpoints. These programs include: PROPHET The U.S. Army s principal signals intelligence and electronic warfare system for Division and Armored Calvary Regiment commanders MBCOTM Mounted Battle Command On-The-Move CESAS Communications Emitter Sensing and Attacking System CONDOR C2 On-The-Move Network Digital Over-The-Horizon Relay In order to meet increased demand during the military build-up for Operation Iraqi Freedom, Amtech was able to ramp-up the production of HHTs from an average of 40 units per month in the second quarter of 2003 to over 900 per month in December of 2003. This represents an increase in production rate of over 1,250%. During this ramp-up period, Amtech Corporation was able to produce in excess of seven times its annual contract requirement while maintaining a 100% Quality Rating. At the request of the Project Offices for CONDOR and CESAS, Amtech Corporation developed the LCA HHT to provide a composite armored solution for those programs. Working with the University of Delaware, Center for Composite Materials this top was developed per specifications outlined by the Project Offices. Testing of the LCA HHT began at Aberdeen Test Center in October 2005. Proprietary Information Amtech Corporation Page 1 of 4

Design Objectives Armored Helmet Hardtop Product Description In developing the LCA HHT, several key design characteristics were set as objectives: 1. The initial design objectives for the LCA HHT were to provide a composite armor version of the HHT. The top was to provide a threshold level of ballistic protection equal to or better than NIJ Level III. 2. The top was to interface with existing armor kits. 3. The top was to be mounted so as not to cause damage to the HMMWV during operation. 4. The form of the top was to resemble the standard HHT as much as possible 5. The top was to be constructed from readily available materials. 6. The top was to provide Electromagnetic Interference (EMI) shielding equivalent to that provided in the unarmored CONDOR and CESAS HHTs. 7. The method of manufacture was to be such that increased levels of protection could be achieved by modifying the ballistic recipe, with no change to tooling. 8. The manufacturing process was to be designed to be fully documented for traceability and verifiability. Ballistic Performance The ballistic recipe used to manufacture the LCA HHT provides ballistic performance equal to or greater than that specified in National Institute of Justice (NIJ) Standard 0101.04 level III. At this threat level, no spall is projected into the passenger compartment of the vehicle. The materials used to manufacture the LCA HHT have undergone preliminary ballistic testing at the H. P. White Laboratory in Street, Maryland. Physical Configuration The Armored Hardtop is designed to be installed on the HMMWV, and to interface with the existing armor kits. It is very similar in shape and size to the standard HHT (see Figures 1 & 2). Key dimensions of the LCA HHT are shown in Figure 3. The overall weight of the LCA HHT including mounting hardware is approximately 1380 lb. Figure 1: Standard HHT Figure 2: Armored HHT (with Marine Armor Kit) Proprietary Information Amtech Corporation Page 2 of 4

Figure 3: Dimensional Requirements for Armored Hardtop Mounting The Hardtop is mounted securely to the vehicle so as not to cause damage to the vehicle during vehicle operations. Attachment points to the HMMWV are at the rear corners, behind the rear seats, and at the top of the roll bar. Because the LCA HHT is a very rigid structure, as compared to the flexible body of the HMMWV, Amtech developed a mounting suspension that allows for body flex between the top and the HMMWV (Figure 4). Figure 4: Rear, Mid Point, and Forward Mounting Proprietary Information Amtech Corporation Page 3 of 4

Aberdeen Test Center Testing Dynamics & Stability The LCA HHT, mounted on a MAK-equipped HMMWV was delivered to Aberdeen Test Center (ATC) for baseline testing in October 2005. The results of this testing will be made available as they emerge. The performance criteria include: Physical characteristics Gradeability Side Slopes Standard Obstacles Speed and Acceleration Braking Steering and Handling Human Factors Evaluation Durability The LCA HHT, mounted to the MAK-Equipped HMMWV shall undergo 3000 miles of durability at ATC. The profile will include 30% Highway, 30% Cross Country, and 40% Trails, as defined in the HMMWV mission profile. During the testing, the integrity of the shelter is not to be compromised. Furthermore, the integrity of the vehicle is not to be compromised as a result of having the shelter mounted to it. Ballistic The armored solutions used in the construction of the LCA HHT will be tested at ATC, as well. The current phase of testing will include coupon testing of all three solutions, as well as any specific geometry that is required by the testers. These coupon tests will verify NIJ Level III performance, and characterize performance on certain OIF/OEF threats as deemed appropriate by the testers. Follow-on phases may include full vehicle level testing against various threats, to include OIF/OEF. Production The production process by which the LCA HHT is produced has been engineered so that full process documentation is maintained for each Hardtop. This is to ensure production consistency, allow for verification that each individual Hardtop was manufactured to specification. The production process begins in the lay-up station, where each individual piece of fabric or core material is placed with the use of a Laser Projection System. A digital photo is taken at the completion of each step in the lay-up in order to verify that the operation was completed properly before the next piece is projected onto the mold by the laser. Once the entire LCA HHT is through the lay-up process, the mold is vacuum bagged, and infused with resin. A post curing operation is then used to ensure that the Hardtop resin achieves the proper performance across a full operational temperature range. The part is then removed from the mold, trimmed, and painted with CARC paint. Proprietary Information Amtech Corporation Page 4 of 4