This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains.

Similar documents
This corridor section will carry commuter trains from Wilsonville to Portland and Portland to Longview/Kelso.

HSR Vancouver WA to Camas Commuter Des, by R.N.

Des. by R.N. HSR RQ_South_08

Corridor Sketch Summary

June WASHINGTON STATE DEPARTMENT OF TRANSPORTATION Alaskan Way Viaduct and Seawall Replacement Program Seattle, Washington

I-394 Corridor Performance

Proposed Project I 35 Improvements from SH 195 to I 10

Expanding Capacity for the Northeast Corridor The Gateway Program

Extending TRACKS. Preliminary design plan review underway. Public comment and approval process in May & June. Municipal Consent Process

Transportation Improvement Program (TIP) Candidate Project List for Public Review

VIADUCT LOCATION STUDY. October 19, 2009

AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

system performance I-820 East Loop FM 156 TxDOT is working to expand its busiest metropolitan corridors.

DELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT

IMPROVEMENT CONCEPTS

B Line Update RTD FasTracks Citizens Advisory Committee Sept. 16, 2015

Business Advisory Committee. July 7, 2015

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

PUBLIC INFRASTRUCTURE PROJECTS

1.3 OVERVIEW OF THE CORRIDOR

Population Trends. US 12 Corridor Performance

US 10 Corridor Performance

XI. W-3 TRINITY RAILWAY EXPRESS (WEST) CORRIDOR CONSIDERATIONS

New Jersey Turnpike Authority Interchange 6 to 9 Widening Program

Final Series of Public Meetings

RTID Travel Demand Modeling: Assumptions and Method of Analysis

Hot Spot Recommendations

Development of 220 mph High Speed Rail Service for Illinois. Mark C. Walbrun, PE TranSystems Corporation

Railyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY

Plan and Profile for the Black Dog Natural Gas Pipeline Project Docket No. G002/GP

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs)

Technology Evaluation Scorecard Suitability

Existing Facilities. 9. Bordeaux 10. Slater 11. Chugwater 12. LaGrange 13. Lambert 14. Farthing 15. Altus 16. Horse Creek 17.

FRESNO COUNTY SUBSECTION OF THE CALIFORNIA HIGH- SPEED TRAIN (HST)

FREQUENTLY ASKED QUESTIONS

Elected Officials Briefing. North Metro Rail Line Update. February 9, 2017

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

TABLE 4-4 DAILY LRT ALTERNATIVE STATION PASSENGER VOLUMES IN 2030

Current Corridor Characteristics. MN 62 Corridor Performance

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report

WELCOME PUBLIC OPEN HOUSE FOR US-64 FROM THE SH-18 INTERSECTION EAST 6.5 MILES JANUARY 10TH, 2017 PAWNEE CITY HALL, 5:30 PM

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

Alignment Comparison Report (May 9, 2002) PARK BRIDGE TO BRAKE CHECK (10 Mile Bridge) TRANS CANADA HIGHWAY (CCR)

Committee Report. Transportation Committee. Business Item No

Transportation Infrastructure Investment Program moving

BARTON COUNTY GENERAL HIGHWAY MAP PREPARED BY THE KANSAS NE 120 RD NE 100 RD NE 80 RD NE 70 RD NE 50 RD NE 60 RD T18S T19S. County Ellsworth County

RECOMMENDATIONS. 7-1 Anchorage Metropolitan Area Transportation Solutions

Transitways. Chapter 4

ALTERNATIVES ANALYSIS/ ENVIRONMENTAL IMPACT STATEMENT SCOPING BROCHURE

EXCEPTION TO STANDARDS REPORT

FREQUENTLY ASKED QUESTIONS

Appendix F-1 Description of the Long-Term Alternatives

Harlem Avenue between 63 rd and 65 th

INFRASTRUCTURE AND TRANSPORTATION ADVERTISING SCHEDULE 2015/2016 CONSTRUCTION AND MATERIAL SUPPLY TENDERS

T-THIRD PHASE 3 CONCEPT STUDY C: DETAILED DESCRIPTIONS OF CONCEPT ALIGNMENTS D: CONSTRUCTABILITY ANALYSIS AND COST ESTIMATES (HNTB CONSULTANTS)

Development of the Preferred Option and Implementation Plan

NORTHWEST HIGHWAY S-CURVE PEDESTRIAN/BICYCLE ACCESS FEASIBILITY STUDY. Northwest Highway (US 14) From Seegers Road to Western Avenue

LCV Operating Conditions & Routes (August 2017) Page 1 of 5

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007

Note: The October 2007 version of this report has been updated in this December 2008 report to present costs in year 2007 dollars.

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP)

Station Evaluation. Durham-Orange Light Rail Transit Project Spring 2012

STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS

CONFEDERATION LINE EAST SEGMENT

Exposition Light Rail Transit Project

NICTI Alternatives Analysis

EGLINTON CROSSTOWN LIGHT RAIL TRANSIT (LRT) PLEASE SIGN IN

Delaware County Engineer s Office

Attachment E3 Vibration Technical Memorandum

2015%Island%City%Academy%Basketball%Schedule%

Welcome. Public Open House Schedule. Super 8 West Kelowna 1655 Westgate Rd, West Kelowna. West Kelowna. Wednesday, March 2, :00 p.m. 8:00 p.m.

FALL 2017 ADVERTISING SCHEDULE

Bridging the Columbia: 100 Years Young

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3. April 19, 2018 NHHIP April 19, 2018

Southern California - CHSRA

METRO Orange Line BRT American Boulevard Station Options

4.0 TRANSPORTATION IMPACTS

Rail~Volution 2005 Hal Ryan Johnson, AICP, Bus Rapid Transit Project Manager Utah Transit Authority September 7, 2005

Directions to Belmont Switch (Spur 2) Turn RIGHT (North) onto Mill Creek NE. Veer RIGHT (North) onto West River Drive NE

Richmond Area MPO Regional Priority Transportation Projects

Elected Officials Briefing North Metro Rail Line Update. November 10, 2016

PAPER FOR AREMA 2006 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS UNION STATION TERMINAL IMPROVEMENTS. Paul Mak, PE, SE HDR Inc

Gold Line Status Report FasTracks Citizens Advisory Committee March 19, 2014

ADDITIONAL UTILITY RELOCATION COSTS ARE MISSING FROM THE ESTIMATE.

Port Terminal Railroad Association. Committed to Safety and Service

Community Meeting Station Elements

The Northeast Corridor Master Plan Amtrak s Next Generation High-Speed Rail and Northeastern Maryland

STH 60 Northern Reliever Route Feasibility Study Report

Chapter 5 Route Window NE4 Ilford station. Transport for London

Montour No. 10 (Bob Ciminel 2012)

20 Minutes. Panos D. Prevedouros, PhD. October 2010

Traffic Analysis Report Build Conditions (2040)

Danger CAUTION - RR tracks (2 sets) Food SERVICES - Quik Mart on left

American Center for Mobility

Site DNL Calculator. Guidelines:

Chapter 4 : THEME 2. Transportation

Layout Track Plans. All Rights Reserved.

Transcription:

Alignment is double tracked for 186 mph speeds. This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains. BNSF right-of-way will be avoided wherever possible. There are no grade crossings on the CHSR corridor. There are new or improved grade crossings that benefit both CHSR and BNSF-UPRR. The electrified CHSR passenger rail corridor will be completely separated from diesel powered freight rail except at the Columbia River crossing. HSR_vancouver_wa_to_kelso_section_one 4 pass

x Legend = Closed RR Crossings Elv. = Rail Elevation E = Ground surface Elevation R = Radius CHSR Stations Sheltered commuter platforms Flyovers Cuts Fills Tunnels Roadway over or under passes Revised Roadways On ground Freight Railroads (BNSF) (UPRR) existing Freight Railroads modified HSR_Legend

Portland to Longview/Kelso CM= commuter IC= inter-city trains Quarter (ICE-IC-CM) Vancouver 78th Street (IC-CM) 12 minutes Ridgefield (CM) Woodland (CM) C M 12 min 6 min I C 18 min 14 min Longview (IC-CM) CHSR Portland Map_03

North Vancouver BNSF Yard. CHSR is on west side. Branch line to Sunnyside- Camas Spur to industry To Battle Ground-Camas New CHSR Track on Flyover Grade 0.7% 1.4 Mi VAN_01 Eye 5500'

Alternative western route with stop near 78 th street and new line east Elv. 50' Grade 0.6% NW 69th X To four lane road between 69th and 78th Street New roadway overpass from NW Lakeshore Ave to CHSR station and NW Lakeshore Ave Close this route X Elv. 95' New route to Camas and Sunnyside X Elv. 116' Grade 1.3% E 149' VAN_02b Elv, 72' Grade 1.3% E 143' Elv, 71' Grade 0.8%

Vancouver Lake NW 78th St New CHSR Corridor on flyover New Single lane traffic X Commuter track, this will intersect farther south to the - not shown here two tracked CHSR line CHSR Platforms X Fruit Valley Rd to four lane Existing BNSF Closed RR line X VAN_02c

CHSR flyover and commuter train stop with motorway flyover to NW 78 th St BNSF CHSR 180 mph> HSR 69th_03 R5700' (110 mph) NW 78th St Lakeshore Commuter Express Station

End of alternative Vancouver-Felida CHSR route. HSR on west side of BNSF Elv. 46' and on ground next to BNSF End of 4.2 mile long HSR flyover VAN_60_w

Typical Triple Track Corridor, 2 BNSF and 1 CHSR. Alternative twin tracks will be on the west side; not shown here. New CHSR Track Existing BNSF Double Track VAN_07

Salmon Creek railway crossing This CHSR section does require Fill, Material from South side Curtis Lake Farm Road Underpass Tunnel will need extension CHSR will need new Bridge to cross Salmon River Existing BNSF Double Track VAN_08

Curtis Lake Area; note rail crossing problems CHSR Track Existing BNSF Double Track This Rail Crossing must be Closed VAN_09 Curtis Lake Tunnel may need widening and deepening to allow Farm Machineries Passage

Green Lake Area CHSR on Fill in this section Existing BNSF Double Track Low Side of Land Mass, Excavation Deposit Area High Side of Land Mass, move Excavation to the Westside VAN_10

Continuation of the western alternative route north wards Campbell Lake Alternative western route Existing BNSF Double Track CHSR, note; curve degree reduction Will require Retaining Wall B Fill to Elv. 35' with dredged material E 14' VAN_11

HSR alternative on west side of BNSF and on fill, 3 miles long E 14' Fill to Elv. 35' with dredged material E 10' Existing BNSF Double Track Fales Road underpass A. CHSR with some curve degree reduction VAN_12

Near WA 501 Bridge Elv. 35' B E 14' Future CHSR Tunnel segments, or just cut and fill 2500' long Existing BNSF Double Track E 136' A.K CHSR intersect with BNSF Elv. 44' E 76' Fill to Elv. 35' New CHSR Track VAN_13

CHSR west near Long Lake. Provide several underpasses for wildlife and farm access New CHSR Track Fill to Elv. 35' CHSR interchange with BNSF Track Elv. 45' Fill this area and restore old BNSF corridor to Nature A.D E 45' 1500' long E 195' E 14' Existing BNSF Double Track E 17' 500' long Future BNSF and CHSR corridor instead Tunnel we may cut and fill this segment E 152' 1000' long E 44' 400' long VAN_14 B

Just south of Ridgefield and now on flyover Future Tunnel for real CHSR E 250' Existing Double BNSF Track E 10' CHSR intersection with BNSF Track Elv. 43' B E 193' NW Hall Palace Rd. Overpass to be built with Tunnel option To Flyover Fill to Elv. 35' New CHSR Track Long Lake VAN_15

Alternative west side CHSR route. Pioneer St flyover over BNSF. Loop design is to reduce grade to 5%. This road will underpass the CHSR allowing Platform access. Mill St will be closed. Optional Division St overpass or gate this crossing, open only for emergency traffic Elv. 45' Cut-Cover with Water Fall E 200' Grade 6% HSR Station BNSF Elv. 45' E to 25' X X Elv. 45' Elv. 67' Future CHSR Tunnel 1.9 miles CHSR Flyover 750' Elv. 71' Future CHSR Tunnel 0.65 Miles E 180' New Road connections to Station Future Richfield Station and Parking E 125' E 46' New Road connections to Station E 78' VAN_16 B Grade 0.2% Grade 5% E 230'

Alternative western route CHSR is on flyover and north of Ridgefield E 130'.C E 140' HSR is on Flyover Elv. 53' E 195' Future CHSR Tunnel Tunnel diameter 9.6m BNSF Track in this section E 150' VAN_18

Still showing the route options. The western route is on flyover, the eastern route is in tunnels. CHSR Flyover above BNSF CHSR Elv. 72' E 130' Existing BNSF from Triple Track to Double Track Elv. 44' E 130' HSR on Flyover Grade 0.1% E 130' Future CHSR Tunnel? 1.9 miles Excavation material 217000m³ VAN_19

Just south of the Lewis River and merging the eastern and western route Existing BNSF Double Track in tight curve Western CHSR route Grade 0.1% B Eastern route CHSR Flyover with large radius curve Grade 0.6% VAN_20

CHSR and BNSF over the Lewis River Lewis River CHSR Flyover Existing BNSF Double Track VAN_21

Note, the western route is twin track all the way from Woodland to Portland. Lewis valley region will require fill for flood protection CHSR on additional Fill Build Flyover first, then transport material via Rail side dump cars and forward via Conveyor System No Hwy usage CHSR to Double Track for Crossovers, midway between E 18' E 18' Vancouver and Longview Station CHSR Flyover termination Point Elv. for CHSR and BNSF 35' CHSR is single Track on Flyover Existing BNSF on Fill E 17' Lewis River Eastern route CHSR Flyover 1.7 miles long E 19' CHSR Flyover Grade 0.4% A.H VAN_22

South Woodland Area E 27' E 25' E 22' Walled in Underpass with Pump Station at Whalen Road Will require detour of 5.5 miles Maximum during construction Re-laid Kuhnis Rd E 18' Move Kuhnis Rd.to the West by 100'< Existing BNSF on Fill Elv. 34' E 20' Double Track CHSR on Fill, 21700m³ material from North Ridgefield Tunnels, transported via CHSR RW. No Highway usage. Use Side dump Railcars and Conveyor systems to handle Materials VAN_23

CHSR/BNSF Track on Fill Elv. 35' CHSR is on Double Track in this Region for crossings E 23' E 22' Existing BNSF Double Track on Fill VAN_24 E 22' E 25'

Woodland Platform commuter train stop with Park and Ride possibility Industrial Tracks BNSF Elv. 35' CHSR Elv 57' Davidson Ave. Underpass E 22' Platform length 600' E 26' Woodland Station and Parking VAN_25

CHSR on Flyover Existing BNSF Double Track and Spurs Elv. 35' E 25' E 27' Scott Ave. underpass, grade 2.8% VAN_26