HSR Vancouver WA to Camas Commuter Des, by R.N.

Similar documents
This corridor section will carry commuter trains from Wilsonville to Portland and Portland to Longview/Kelso.

This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains.

Des. by R.N. HSR RQ_South_08

June WASHINGTON STATE DEPARTMENT OF TRANSPORTATION Alaskan Way Viaduct and Seawall Replacement Program Seattle, Washington

Mobile Ventilation Unit Tunnel Test BNSF Railway Seattle Tunnel (Great Northern / King Street Tunnel) November 14, 2002

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

PAPER FOR AREMA 2006 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS UNION STATION TERMINAL IMPROVEMENTS. Paul Mak, PE, SE HDR Inc

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Proposed Project I 35 Improvements from SH 195 to I 10

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

Sherman Oaks Community Traffic Plan

Develop ground transportation improvements to make the Airport a multi-modal regional

Danger CAUTION - RR tracks (2 sets) Food SERVICES - Quik Mart on left

PAPER FOR AREMA 2004 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS. Paul Mak, PE, SE - DMJM HARRIS

Railyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY

Central Park Drives Traffic Management Overview

Station Evaluation. Durham-Orange Light Rail Transit Project Spring 2012

RTID Travel Demand Modeling: Assumptions and Method of Analysis

1.3 OVERVIEW OF THE CORRIDOR

Extending TRACKS. Preliminary design plan review underway. Public comment and approval process in May & June. Municipal Consent Process

Countdown to the Closure Extended 53-Hour Closure of I-405 Freeway Between U.S. 101 and I-10 Planned in Mid-July for Mulholland Bridge Demolition

T-THIRD PHASE 3 CONCEPT STUDY C: DETAILED DESCRIPTIONS OF CONCEPT ALIGNMENTS D: CONSTRUCTABILITY ANALYSIS AND COST ESTIMATES (HNTB CONSULTANTS)

4 Circulation & Transportation

ALTERNATIVES ANALYSIS/ ENVIRONMENTAL IMPACT STATEMENT SCOPING BROCHURE

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE

Gold Line Status Report FasTracks Citizens Advisory Committee March 19, 2014

Design of the High Speed Rail System in California. Orange County to Los Angeles Segment

Harlem Avenue between 63 rd and 65 th

Hillsdale Academy Directions to Sporting Events

Development of 220 mph High Speed Rail Service for Illinois. Mark C. Walbrun, PE TranSystems Corporation


TRAIN, BUS & TRANSIT

EXCEPTION TO STANDARDS REPORT

2040 Metropolitan Transportation Plan -- Table XVII-1

Expanding Capacity for the Northeast Corridor The Gateway Program

B Line Update RTD FasTracks Citizens Advisory Committee Sept. 16, 2015

Plan and Profile for the Black Dog Natural Gas Pipeline Project Docket No. G002/GP

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis

ANDERSON PROPERTY SITE ANALYSIS

Development of the Preferred Option and Implementation Plan

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

Transitways. Chapter 4

Attachment E3 Vibration Technical Memorandum

VTA Board of Directors: We are forwarding you the following: Comments regarding 2016 Peninsula Corridor SEIR. Member of the Public. Thank you.

PUBLIC INFRASTRUCTURE PROJECTS

FRESNO COUNTY SUBSECTION OF THE CALIFORNIA HIGH- SPEED TRAIN (HST)

Leg 1 (D) 7.1 Miles - The Chase Begins. The majority of this leg is run on a trail / abandoned road while the remainder is on quiet country lanes.

Business Advisory Committee. July 7, 2015

VIADUCT LOCATION STUDY. October 19, 2009

Attachment F Transportation Technical Memorandum

2.0 Development Driveways. Movin Out June 2017

ALAMEDA CORRIDOR. A A Project of National Significance. TRB Summer Conference MTS as a Component of the Nation s Transportation System June 25, 2002

Service Planning Open House

Existing Facilities. 9. Bordeaux 10. Slater 11. Chugwater 12. LaGrange 13. Lambert 14. Farthing 15. Altus 16. Horse Creek 17.

Getting to EvCC: Bus, Bike & Carpool

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS

Welcome. Please Sign In

Port Terminal Railroad Association. Committed to Safety and Service

Chapter 9 Recommended Locally Preferred Alternative and Alternatives for Evaluation in Draft SEIS/SEIR

II. PROJECT DESCRIPTION

Bullhead City, AZ. Topock, Lake Havasu, Parker, Vidal Jct, Needles, AVI- 205 miles. Full day ride. Take Laughlin Ranch Blvd to Bullhead Pkwy

TECHNICAL MEMORANDUM

Appendix B. Tier 2 Final Environmental Assessment I-66 Transit/TDM Technical Report

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

NICTI Alternatives Analysis

Transportation Technical Report

Southern California - CHSRA

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report

Final Series of Public Meetings

Clifton Corridor Transit Initiative. Briefing to Medlock Area Neighborhood Association (MANA) February 15, 2016

Charter Bus Staging and Pick-Up

Clifton Corridor Transit Initiative. Briefing to Great Lakes Community February 11, 2016

engineering phase and during the procurement of design build contracts.

Attachment D Environmental Justice and Outreach

Central Loop Bus Rapid Transit

Elkhart River Greenway Trail

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Loop 375 Border Highway West Extension Project

APPENDIX H. Transportation Impact Study

I-494/I-35 Interchange Vision Layout Development - BRT Station Concepts S.P B SEH No

Mobility Corridor Updates. Transit & Active Transportation Projects

Directions to Belmont Switch (Spur 2) Turn RIGHT (North) onto Mill Creek NE. Veer RIGHT (North) onto West River Drive NE

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

Chapter 4 : THEME 2. Transportation

New Mexico Rail Runner

Rail alignment and benefits (rab) study

IMPROVEMENT CONCEPTS

Directions to The MITRE Corporation

3.1 Introduction Transportation Elements and Study Area Meeting the Need for the Project

Traffic Engineering Study

Leander ISD General Stadium Information

BERKS COUNTY FIELD DIRECTIONS

Chapter 1 Project Description

Plan Check Policies and Guidelines

East Link light rail: Bel-Red/Overlake Open House Summary

IH 35 FEASIBILITY STUDY

Corridor Sketch Summary

Transcription:

This plan will show the new route for the Portland-Vancouver Junction Railroad. Remove the existing Portland-Vancouver Junction Railroad leg from the Northeast Hazel Dell Avenue curve to the Burlington Northern-Santa Fee Railroad intersection. Use the savings for the new rail section from the Hazel Dell Avenue curve to connect with the Cascadia High-Speed Rail flyover. Use the HSR route for the 0.9 miles till the turnout just south of the 39 th Street. Install new single track for the PVJR to the existing BNSF yard tracks. Install new connector curved track to the Port rail line. This will allow the turnaround by the existing loop tracks. Direct connections for the PVJR railroad traffic to industries and class one RR s is now possible. HSR Vancouver WA to Camas Commuter Des, by R.N.

Legend x CHSR Stations Commuter Stations Flyovers Cuts Fills Tunnels Roadway over or under passes Revised Roadways Generally on ground Freight Railroads (BNSF) (UPRR) = Closed RR Crossings Elv. = Rail Elevation E = Ground surface Elevation R = Radius HSR_Legend

This is to connect the Portland Vancouver Junction Railroad to the Port. The PVJR will intersect with the BNSF, the HSR and then by the new route eastwards. M-M flyover not shown in this drawing. New connecting track 14.5 BNSF HSR M_M_Br_04b North North

The new PVJR track is below the 4 th Plain Boulevard, independent and west of the BNSF. Also shown, the HSR-BNSF-UPRR flyover and the roadway intersect. HSR and Freight Buses only PVJR Motor roadway BNSF Yard HSR Station and Bus Terminal 4th Plain Blvd intersection HSR M_M_Br_03

Longview Portland Northern RR is below on ground the HSR-BNSF-UPRR flyover. The LPNR single track is on the west side of the BNSF tracks. 1800' EL. 97' LPNR BNSF Yard BNSF Rail El. 54' HSR M_M_Br. 02

BNSF and UPRR go on fill south of 39 th Street to ascend the flyover and the M-M Bridge. The PVJR will junction off, stay at ground level, on the west and later underpass the flyover to the east side. Re-locate this Building to the West 39th Street 1166' Grade 1.3% Flyover El. 66' Fill El. 53' BNSF-UPRR N HSR PREVAILING WIND PLANT GEOMETRICAL BNSF-UPRR HSR M-M_Br_01 eye 775'

New HSR tracks west of the BNSF. In this segment the PVJR will share the HSR track till the turnout south of the 39 th Street. 39th Street North BNSF BNSF BNSF HSR HSR LPN RR BNSF HSR M_M_Br_01b

HSR and PVJR will go on flyover just north of 39 th Street. PVJR will then flyover the BNSF and enter the tunnel. To Battle Ground-Camas New CHSR Track on Flyover Grade 0.7% VAN_01 Eye 5500'

PVJR and commuter line flyover of the BNSF to tunnel, may be single track only. HSR will continue north wards. Elv. 50' Grade 0.6% NW 69th X To four lane road between 69th and 78th Street New roadway overpass from NW Lakeshore Ave to CHSR station and NW Lakeshore Ave Close this route X Elv. 95' New route to Battle Ground and Camas X Elv. 116' Grade 1.3% E 149' VAN_02b Elv, 72' Grade 1.3% E 143' Elv, 71' Grade 0.8%

BNSF Vancouver shortcut bypass will also lessen grade crossings and Vancouver rail traffic. This route may be canceled, The Logging RR may be closed. This maybe obsolete, see alternative above. E 48' To/from Seattle Flyovers To/from Vancouver E 48' Possible Loop Route for BNSF Freight and Amtrak Spokane Logging RR Tunnel entrance Elv. 48' VAN_03b

New route. Flyover 0.3 miles, tunnel to HSR 0.6 miles. Grades 1.3% VAN_03ba Closed X Elv. 116' To Battle Ground Elv. 138' X E 150' To BNSF and Portland Elv. 122' To Camas

General commuter route layout to Camas by tunnel and possible Empire Builder VAN_03h

Tunnel below I-5 and NE Hwy 99 intersection E=ground elevations. Tunnel to Camas 4 miles E 98' VAN_03c1 E 101' E 208'

Tunnel below I-5 and Hwy 500 intersection with possible new underground Commuter and Amtrak Empire Builder station. Tunnel Ventilation Shaft and access to underground Station VAN_03d1 HWY 500 E 190' E 117'

Tunnel below Central Park E 202' VAN_03f3 E 168'

Tunnel below Harney Elementary School E 139' VAN_03f2

Blandford Drive area, tunnel is single bore two tracks for this application with possible commuter stations. Possible route extension east to Camas. May be used for the Empire Builder and access for the BNSF to the M-M Br. E 186' Blandford Dr Tunnel entrance Elv. 52' E 84' VAN_03g Existing BNSF Elv, 52' E 76' Trench Cut Commuter Station Hwy 14 Overpass Grade 2%

New twin tunnel entrance for Portland connections over the M-M Bridge. (Layout example in southern Switzerland and under construction)

Camas section from S Blandford Drive (Dubois Park) to SE Union St in Camas. This segment may be needed in the future and may need to be on flyover the whole length due to the many grade crossings. (12 Mi) Parallel to BNSF and north side Flyover BNSF HWY 14 VAN_03i