Installation Instructions for Type SM Safety Handle Mechanism for L-Frame Series C Circuit Breakers and Molded Case Switches

Similar documents
! WARNING I.L D WARNING GENERAL INFORMATION

Installation Instructions for the 14" Walking Beam Interlock for L-Frame and MDL-Frame Series C Circuit Breakers and Molded Case Switches

Cutler-Hammer I.L. 29C160G WARNING NOTICE 1-0 INTRODUCTION. General Information

Cutler-Hammer. Installation Instructions for Undervoltage Release Mechanism (Handle Reset) with LED for E 2 L and E 2 LM Mining Circuit Breakers

I.L. 29C184A File WARNING

Q and M-Frame Circuit Breakers Instruciton Leaflet for Alarm Switch and Auxiliary Switch Combinaiton

Q and M-Frame Circuit Breaker Instruction Leaflet for Installation and Operation for Thermal Magnetic Trip Units

I.L. 29C121A WARNING 1. INTRODUCTION. Maximum Freq. Maximum Dielectric Voltage Current Withstand (V) (A) Voltage (V)

Cutler-Hammer. Installation Instructions for the ND OPTIM 550 PowerNet and/or Zone Interlock Accessories (ICK 550N, ZGK550N, ZGPK550N) I.L.

a WARNING Allen-Bradley Parts K-Frame Circuit Breaker Instruction Leaflet for Alarm Switch and Alarm /Auxiliary Switch Combination Bul.

Installation Instructions for JDB, JD, HJD, JDC, JW HJW, JWC Circuit Breakers and Molded Case Switches

A WARNING. Installation Instructions for KD, HKD, KDC, CKD, CHKD Circuit Breakers I.L. 29C092C

CCP2-FLR1-21_ flange-rod operating mechanism

Cutler-Hammer. Installation Instructions for the Digitrip OPTIM Pole Trip Unit Installation and Operation with L-Frame Series C Circuit Breakers

Installation Instructions for KPS and KPH Circuit Breakers and Molded Case Switches

Installation Instructions for TMQV Circuit Breakers and Molded Case Switches

Bulletin 1494V Variable Depth, Flange Operated Disconnect Switch Kits for 400 and 600 Amperes (Series A) Switches

Installation Instructions for R-Frame Circuit Breakers and Molded Case Switches

Installation Instructions For Motor Control Center (MCC) Units

www. ElectricalPartManuals. com Digitrip Retrofit System for BBC LKD 8 Breakers IL 33-LK8-2

Installation Instructions for NW, HNW, and NWC Circuit Breakers and N-frame Series C Molded Case Switches

Feeder Circuit Breaker Units Secure Support Pan and Change Door Latch

Installation Instructions

OPERATOR ADAPTER A21ABA

Bulletin 1494V Variable Depth Disconnect Switch Installation Instructions (Cat 1494V-DS400; -DSX400 - Series D)

Bulletin 1494C Cable Operated Disconnect Switch Kit (600A) Installation Instructions (Cat 1494C- _ Series 2 : 600A)

www. ElectricalPartManuals. com Digitrip Retrofit System for Allis-Chalmers LA-4000 F Fused Breakers IL 33-A1K-1 WARNING

Digitrip Retrofit System for the Federal Pioneer 25-H(L)-2, 30-H(L)-2, 30-H(L)-3, and 30-3 Breakers

Cutler-Hammer. Instructions for Potential Transformer and Auxiliary Control Power Disconnecting Means for Use in Ampgard Lineups, 7.2 kv I.B.

Advanced Test Equipment Rentals ATEC (2832)

OPERATOR ADAPTER WAMTF

3-way multi-family drawout cable interlock kit - type 32 - RF

OPERATOR ADAPTER ABF

www. ElectricalPartManuals. com Digitrip Retrofit System for the Westinghouse DA-50 IL 33-DAC-2 WARNING

CM52 Network Protector with Arc Flash Reduction Module

Digitrip Retrofit System for the ITE LG-3000 (Frameless) Circuit Breaker

Two-way cable interlock kit for Magnum drawout circuit breakers

Digitrip Retrofit System for Allis-Chalmers LA-600 F Electrically Operated Fused Breakers

Digitrip Retrofit System for BBC LKD 8 Breakers

Two-way cable interlock kit for Magnum fixed circuit breakers

Flush Mount AIN ALPHA Meters. General. Hardware Kit

Digitrip Retrofit System for ITE K-3000, K-3000 S, K-4000 and K-4000 S Breakers

Installation and removal instructions for Series NRX RF fixed breaker three-way Type 32 cable interlock kit

ibusway for Data Center

Bulletin 1494V Variable Depth, Flange Operated Circuit Breaker Kits for 125A, 150A 250A and 400A Frame Sizes

Bulletin 1494C Cable Operated Disconnect Switch Kit (400A) Installation Instructions (Cat 1494C- _ Series 2 : 400A)

EXTERNAL DISCONNECT ENCLOSURE INSTALL

Digitrip Retrofit System for General Electric AKR/AKRU-6D/7D-30S Series Breakers

M9206-Bxx-2S Series On/Off Electric Spring Return Actuators

Metal Enclosure. Application Note: Metal Enclosure Page 3

Installation Instructions for Series 3100V Low Level Indicator

N-frame Circuit Breaker

Technical Support (707)

WARNING. Instructions for Combination Bypass Isolation and Transfer Switches Amps I.L A FILE APPLICATION SAFETY PRACTICES

Digitrip Retrofit System for Siemens-Allis RLX-1600 Breakers

Standard Product Low Profile Type 12 One-Door Disconnect Enclosures

Table of Contents. Quick Installation Guide 2 - Disconnect Switch Installation - Disconnect Handle Installation - Cutting Connecting Rod

OPERATOR ADAPTER ABBSV

INSTALLATION INSTRUCTIONS

O & M Manual for the EATON Generator Ready Loadcenter

Page 2 DS LOW VOLTAGE POWER CIRCUIT BREAKERS Digitrip Trip Unit Inside Wiring Guide Outside Wiring Guide Shutter Drawout Unit Position Indicator Escut

Installation Instructions for R-Frame G-Series (RG) 310+ Trip Unit

NOVO LIGHTED MIRROR. Installation Instructions

M x Series Valve Linkage Kits

INSTALLATION & OWNER S MANUAL

SEQUESTR. External Disconnect Enclosure. Rev. A 2014 Pentair Equipment Protection PH hoffmanonline.com P/N

Westinghouse Molded Case Circuit Breakers Engine Generator FG Amperes

Cradle Mounted Key Interlock Guide Frame Accessory

INSTALLATION INSTRUCTIONS

Installation and Service Instructions for Self Adjust Brakes 81,000 Series

Digitrip Retrofit System for Allis-Chalmers G-25 Breakers

DANGER. Instruction Bulletin WARNING. Shunt Trip Kit for Manual DS/DSL Circuit Breakers POWER ZONE III Low Voltage Switchgear Class 6035 INTRODUCTION

Isolation Switch (behind barrier & inspection window) Power Fuses. Load Cable Connection Box. Contactor. Control Power Transformer Secondary Fuse

70 Series 8700 Coupler 2-pc Hub & Shaft Three Phase Brake Instructions IP43 & IP56 (NEMA 2 & 4) Housing

Installation Instructions for Interlocking Trip Indicator with Remote Reset for Magnum Low Voltage Circuit Breakers

Installation, Service and Parts List Series 56,800 for Class I & II, Division 2 Manual Adjust Brakes

Digitrip Retrofit System for the General Electric AKR 6D/7D-30/50 and AKRT 6D/7D-50 Series Breakers

Installation Instructions for Replacement Mechanism Kit

PFadvantage MF 6850/6855; Ideal 9080/9090

IL 33-DRC-1 Retrofit System for Westinghouse and Cutler-Hammer DS Power Circuit Breakers. Table of Contents

Installation Instructions for Series C F-Frame 310+ Electronic Circuit Breaker Types FDE, HFDE, FDCE

INSTALLATION & OWNER S MANUAL

RotoTract Remote Racking Operating Manual

INSTRUCTION MANUAL AND PARTS LIST FOR 3E CANNED MOTOR PUMPS

www. ElectricalPartManuals. com Instructions for Field Testing of Ground Fault Systems Utilizing Cutler-Hammer Magnum DS Circuit Breakers

Operation and Maintenance Manual

E-200 O-rings Service Kit

INSTRUCTIONS, RAM DUAL REAR WHEEL TRUCKS INSTALLATION KIT (C2 LIFTGATES)

QUICK CLEAN CHEMICAL HYDRAULIC VALVES

AE012 Enclosure for E5x Series Energy Meters With Swing Panel Kit Product Overview

IMPORTANT SAFETY INSTRUCTIONS

SecoVac * Ground & Test Device

INSTALLATION INSTRUCTIONS

Bulletin 1494F Fixed-Depth Flange-Mounted Disconnect Switches. Selection Guide

401B/1KDB CoolRite/FreezeRite Installation Manual I003

Modular Metering - Trip Unit for >1200A Mains DEH41187 Application Guide

Self-Priming Centrifugal Pumps Refer to pump manual for General Operating and Safety Instructions.

Westinghouse Electric Corporation Distribution and Control Business Unit Electrical Components Division Pittsburgh, Pennsylvania, U.S.A.

IM K IM K. Instructions for Cutler-Hammer Jockey Pump Controllers

Installation & Maintenance Instructions for FSQC 100 Ampere Receptacle

Transcription:

I.L. 29C284B File 29-000 Installation Instructions for Type SM Safety Handle Mechanism for L-Frame Series C Circuit Breakers and Molded Case Switches DO NOT ATTEMPT TO INSTALL OR PERFORM MAINTENANCE ON EQUIPMENT WHILE IT IS ENERGIZED. DEATH, SEVERE PERSONAL INJURY, OR SUBSTANTIAL PROPERTY DAMAGE CAN RESULT FROM CONTACT WITH ENERGIZED EQUIPMENT. ALWAYS VERIFY THAT NO VOLTAGE IS PRESENT BEFORE PROCEEDING WITH THE TASK, AND ALWAYS FOLLOW GENERALLY ACCEPTED SAFETY PROCEDURES. CUTLER-HAMMER IS NOT LIABLE FOR THE MISAPPLICATION OR MISINSTALLATION OF ITS PRODUCTS. The user is cautioned to observe all recommendations, warnings, and cautions relating to the safety of personnel and equipment as well as all general and local health and safety laws, codes, and procedures. The recommendations and information contained herein are based on Cutler-Hammer experience and judgement, but should not be considered to be all-inclusive or covering every application or circumstance which may arise. If any questions arise, contact Cutler-Hammer for further information or instructions. Introduction WARNING General Information The SM safety handle mechanism (Fig. 1-1) provides a means of externally operating a circuit breaker mounted in an enclosure, and is designed to reduce the possibility of circuit breaker tampering. The handle mechanism is especially suited for use in automotive and machine tool industries through its conformance with NEMA 12 and J.l.C. requirements. A specially modified handle for NEMA 4 enclosure applications is also available. The handle mechanism accepts up to three padlock shackles, each with a maximum diameter of 3/8 inch (9.52 mm). A flange-mounted electrical interlock can also be installed. This handle mechanism is for use with L-frame Series C circuit breakers; the mounting instructions are for handle mechanism catalog numbers SM600R and SM600L. In this l.l., the term circuit breaker includes molded case switches. Associated Instruction Leaflets Flange Mounted Electrical Interlock...I.L. 13287 2. INSTALLATION Installation consists of: modifying customer enclosure; mounting handle mechanism; installing circuit breaker mounting plate and circuit breaker; attaching cradle to mounting plate; attaching U-shaped operator to cradle and operating handle mechanism; and testing function of installed handle mechanism. To install the handle mechanism perform the following steps: Fig. 1-1 Type SM Safety Handle Mechanism Installed on L-Frame Series C Circuit Breaker WARNING IF REPLACING AN EXISTING HANDLE MECHANISM, OR MOUNTING A NEW CIRCUIT BREAKER IN AN EXISTING ELECTRICAL SYSTEM, MAKE SURE THERE IS NO VOLTAGE PRESENT WHERE WORK IS TO BE PERFORMED. SPECIAL ATTENTION SHOULD BE PAID TO REVERSE FEED APPLICATIONS TO ENSURE NO VOLTAGE IS PRESENT. THE VOLTAGES IN ENERGIZED EQUIPMENT CAN CAUSE DEATH OR SEVERE PERSONAL INJURY. 2-1. Inspect the handle mechanism for completeness. (See Fig. 2-1.) Supersedes I.L. 29C284A dated 10/96

Page 2 I.L. 29C284B Fig. 2-1 Handle Mechanism Components

I.L. 29C284B Page 3 Fig. 2-2 Drilling Plan and Dimensions

Page 4 I.L. 29C284B 2-2. Using the drilling plans and dimensions provided in Fig. 2-2, drill and cutout enclosure flange for operating handle mechanism. 2-3. Drill clearance holes in back plate of enclosure for circuit breaker mounting plate hardware. Note: If nameplate is assembled to operating handle module, unscrew retaining screws and remove nameplate before doing the next step. When replacing existing LA, LAB, or HLA circuit breaker handle mechanisms, the original operating handle module can be retained if desired. 2-4. Check that gasket is in place on operating handle mechanism. Insert mechanism through cutout (from the inside) in enclosure flange. (See Fig 2-3.) 2-7. Mount the cradle over the circuit breaker handle and engage over special pin on mounting plate (see Fig 2-4). Fig 2-4 Securing Circuit Breaker and Cradle to Mounting Plate CAUTION Fig. 2-3 Positioning Operating Handle Mechanism in Enclosure Flange 2-5. Position nameplate over handle and secure to mechanism with two screws and washers supplied. (See Fig. 2-3.) 2-6. Secure circuit breaker on mounting plate. (See Fig. 2-4.) DURING THE FOLLOWING STEP, DO NOT OVERTIGHTEN SPECIAL BOLT SECURING CRADLE TO MOUNTING PLATE. EXCESSIVE TIGHTENING MAY STRIP THREADS. 2-8. Secure cradle to mounting plate with special bolt (see Fig. 2-4). 2-9. Position U-shaped operator over operating handle mechanism lever and cradle (see Fig 2-5). Slots in mechanism lever allow for some adjustment. 2-10. Secure U-shaped operator to operating handle mechanism lever with two bolts and lockwashers supplied (see Fig. 2-6). 2-11. Secure circuit breaker mounting plate to operating handle mechanism with two bolts, lock washers, and flat washers supplied (see Fig. 2-5).

I.L. 29C284B Page 5 Fig. 2-5 Securing Circuit Breaker and Mounting Plate to Operating Handle Mechanism and Enclosure Backplate Note: If dimensions greater than K (Fig. 2-2) are found between backplate of enclosure and circuit breaker mounting bracket, spacers must be used. Clearance holes may be required in the spacers to accommodate protusion of circuit breaker hardware. 2-12. Secure circuit breaker mounting plate to enclosure backplate using customer-supplied hardware (see Fig. 2-6). 2-13. Install cover interlock on enclosure cover. (See Fig 2-2.) 2-14. Test function of installed handle mechanism in the following manner. a. Close enclosure door. Switch handle mechanism to ON. b. Check that handle mechanism switches circuit breaker to ON position and that enclosure door cannot be opened. c. Switch handle mechanism to OFF position. Fig. 2-6 Securing U-Shaped Operator and Final Assembly d. Check that handle mechanism switches circuit breaker to OFF position and that enclosure door can be opened. e. Close enclosure door. Switch handle mechanism/circuit breaker to ON. f. Turn defeater mechanism button (Fig. 2-6) counterclockwise with a flat-blade screwdriver. g. Press Push-to-Trip button in the circuit breaker trip unit with a small flat-blade screwdriver to trip circuit breaker. h. Close enclosure door. i. Switch handle mechanism to extreme OFF (reset) position. Check that circuit breaker resets.

Page 6 I.L. 29C284B WARNING FOR TYPE SM SAFETY HANDLE MECHANISM STYLES LISTED BELOW, FLEXIBLE INSULATOR CAPS MUST BE INSTALLED OVER THE HEADS OF THE FASTENERS THAT SECURE THE HANDLE MECHANISM MOUNTING BRACKET TO THE ENCLOSURE. FOR PREVIOUSLY INSTALLED SAFETY HANDLE MECHANISMS: 1. Install one flexible insulator cap over the fastener head for each of the four customer-supplied fasteners that secure the handle mechanism mounting bracket to the enclosure. Refer to Figure 1. Ensure that the entire fastener head is completely covered by the flexible insulator cap. Note: The flexible insulator cap will stretch and conform to the size and shape of the fastener head (i.e. pan-head, hex-head, etc.). FOR NEW SAFETY HANDLE MECHANISM INSTALLATIONS: 1. Install Safety Handle Mechanism in conjunction with I.L. 13282-M, Dated January, 1985, or later revision (for SM400L/SM400R); or, in conjunction with I.L. 29C284, Dated April, 1990, or later revision (for SM600L/SM600R). 2. Install one flexible insulator cap over the fastener head for each of the four customer-supplied fasteners that secure the handle mechanism mounting bracket to the enclosure. Refer to Figure 1. Ensure that the entire fastener head is completely covered by the flexible insulator cap. Note: The flexible insulator cap will stretch and conform to the size and shape of the fastener head (i.e. pan-head, hex-head, etc.). Note: This Notice applies to the following Type SM Safety Handle Mechanisms: SM400L SM400R SM600L SM600R

I.L. 29C284B Page 7 NOTES

Page 8 I.L. 29C284B Cutler-Hammer Pittsburgh, Pennsylvania U.S.A. Style No. 6633C13H03 Printed in U.S.A./CCI