Business Advisory Committee. July 7, 2015

Similar documents
Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015

Business Advisory Committee. November 3, 2015

Committee Report. Transportation Committee. Business Item No

West Broadway Reconstruction/LRT Design. March 19, 2015

Community Advisory Committee. October 5, 2015

Tracking the Blue Line Extension

Tracking the Blue Line Extension

Meeting Summary. 1 August 3, 2015 CAC Meeting Summary

Extending TRACKS. Preliminary design plan review underway. Public comment and approval process in May & June. Municipal Consent Process

METRO Orange Line BRT American Boulevard Station Options

Operating & Maintenance Cost Results Report

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date,

SWLRT Business Advisory Committee. October 10, 2012

Extending TRACKS. Peer reviews, advanced design next for Southwest LRT

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Meeting Summary. 1 October 6, 2015 BAC Meeting Summary

VIRGINIA RAILWAY EXPRESS MANASSAS PARK STATION PARKING EXPANSION. Public Meeting June 20, 2017

I-20 East Transit Initiative

Midtown Corridor Alternatives Analysis Capital Cost Estimation Methodology and Assumptions

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007

Durham-Orange County Corridor Alternatives Analysis JULY Prepared by: U R S Team

Transit Project Delivery Status Report. Significant Issues

STH 60 Northern Reliever Route Feasibility Study Report

FREQUENTLY ASKED QUESTIONS

engineering phase and during the procurement of design build contracts.

Transitways. Chapter 4

Metro Transit Update. Christina Morrison, Senior Planner Metro Transit BRT/Small Starts Project Office. John Dillery, Senior Transit Planner

Arterial Bus Rapid Transit. System Policy Oversight Committee April 7, 2014

Snelling Bus Rapid Transit. May 13, 2013 Technical Advisory Committee Meeting #1

I-35W Past, Present, and Future: METRO Orange Line

Exhibit A Sound Transit Board Resolution R Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup

Mobility Corridor Updates. Transit & Active Transportation Projects

Background Information for MPRB Community Advisory Committee for 2010 Southwest Light Rail Transit Project DEIS Comment Letter Section 2

West LRT. Alignment Update and Costing Report May Calgary Transit Transportation Planning Clifton ND Lea Consultants

San Rafael Transit Center. Update. Golden Gate Bridge, Highway & Transportation District Transportation Committee of the Board of Directors

Letter EL652 City of Mercer Island. Page 1. No comments n/a

Note: The October 2007 version of this report has been updated in this December 2008 report to present costs in year 2007 dollars.

C LINE: LONG-TERM GLENWOOD REALIGNMENT STUDY

METRO Light Rail Update

FREQUENTLY ASKED QUESTIONS

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

City of Pacific Grove

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

Bi-County Transitway/ Bethesda Station Access Demand Analysis

Welcome. Green Line in Your Community

CTA Blue Line Study Area

Peninsula Corridor Electrification Project (PCEP)

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

Detailed Definition of Alternatives

Welcome. Highway 23 Gap New London to Paynesville. Open House. - Please Sign In -

4.0 TIER 2 ALTERNATIVES

Sound Transit East Link: Bus/LRT System Integration Study

VAN NESS AVENUE BUS RAPID TRANSIT

I-35W & Lake Street Station

Key Project Elements Status Report

NJ TRANSIT West Trenton Rail Line Passenger Service Rail Study West Trenton, NJ to Manville, NJ 10/26/2007 PREFERRED ALTERNATIVE CAPITAL COST ESTIMATE

Draft Results and Open House

City of Grand Forks Staff Report

REVISED AGENDA. Special Southwest LRT Corridor Management Committee Meeting

ACTION TRANSMITTAL No

Alternatives Analysis Summary Report

CEDAR AVENUE TRANSITWAY Implementation Plan Update

ACTION TRANSMITTAL No

Policy Advisory Committee Meeting November 13, 2013

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

5. OPPORTUNITIES AND NEXT STEPS

Update on Transportation Activities in Fairfax County

Link LRT: Maintenance Bases, Vehicles and Operations for ST2 Expansion

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION

Recommended Transportation. Capital Improvement Program

Peninsula Corridor Electrification Project (PCEP)

MOTION NO. M Preferred Alternative for the Puyallup Station Access Improvement Project

Develop ground transportation improvements to make the Airport a multi-modal regional

Sales and Use Transportation Tax Implementation Plan

Waco Rapid Transit Corridor (RTC) Feasibility Study

IMPROVEMENT CONCEPTS

8/18/2014. Peoria Station Meeting. August 14, Project Update. Tina Jaquez RTD Aurora Line/I-225 Rail Public Information Manager

Draft Station Plan. Tuesday, November 17th

D Line Station Plan: Table of Contents

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.

I-494/I-35 Interchange Vision Layout Development - BRT Station Concepts S.P B SEH No

Federal Way Link Extension

BART Silicon Valley. Berryessa Extension Project Community Update. October 27, 2010

FREQUENTLY ASKED QUESTIONS

Purple Line Light Rail P3 Project

Valley Metro Overview. ITE/IMSA Spring Conference March 6, 2014

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3. April 19, 2018 NHHIP April 19, 2018

Clifton Corridor Transit Initiative. Briefing to Great Lakes Community February 11, 2016

Harlem Avenue between 63 rd and 65 th

5 VAUGHAN METROPOLITAN CENTRE AND SURROUNDING AREAS TRANSPORTATION STUDY PROGRESS

Transportation Infrastructure Investment Program moving

Ottawa LRT Stage 2. McKellar Park Information Session

Highway 23 New London Access & Safety Assessment. Public Open House #2 October 3, :00 to 7:00 PM

Draft Results and Recommendations

LAX Specific Plan Amendment Study. CONCEPT DEVELOPMENT Public Meeting Series #5 August 23 & 26, 2006

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Public Information Workshop

We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network:

Attachment D Environmental Justice and Outreach

Transcription:

Business Advisory Committee July 7, 2015 1

Today s Topics Outreach Update TI #1 and 2: Target Field Station Connection to I-94: Recommendation 85 th Station Configuration 93 rd Station Configuration DEIS Scope and Cost Estimate Update 2

3 Outreach Update

June 1 Community Advisory Committee 4

June 2 Business Advisory Committee 5

June 4 Minneapolis/Golden Valley Open House 6

June 11 Robbinsdale Open House 7

June 17 Brooklyn Park Open House 8

corridor Station area planning update Community Advisory Committee July 6, 2015 Business Advisory Committee July 7, 2015

What is station area planning?

Station area planning Sets the table for the look, feel and fit of the station into the community AND Results in recommendations for local communities and agencies to consider

Station area planning is Community-based planning that considers: 42nd Avenue Station Area ½ mile area surrounding proposed LRT station

Station area planning is Transit supportive plans that consider: Land use Types and character of buildings Access and circulation (bike, walk, car, bus) Public spaces, including streets and trails 5

Station area planning and health equity Strive to improve community health and health equity by planning for: Housing, transportation, jobs, parks, and land uses that are safe, accessible and affordable to all.

Station area planning» Local effort with Hennepin County and partners» 11 stations total Minneapolis 2 Golden Valley/ Minneapolis 2 Brooklyn Park 5 Robbinsdale 1 Crystal 1 Station Area Planning in late 2014-2016 Station Area Planning in 2014-2015

9 Technical Issues Update

10 Technical Issues

11 Technical Issue #1 and #2: Target Field Station Connection to I-94 Interchange: Recommendation

Technical Issue #1: Target Field Station Connection Background Plan view from Target Field Station through I-94 Interchange 12

Technical Issue #1: Target Field Station Connection Key Issues: Connection requires coordination with SWLRT 7 th Street intersection has a unique geometry Intersection is challenging for safe pedestrian and bike access 13

Technical Issue #1: Target Field Station Connection- Existing Configuration 14

Technical Issue #1: Target Field Station SWLRT Connection 15

Technical Issue #1: Target Field Station SWLRT and BLRT Connection 16

Technical Issue #1: Target Field Station Connection viewed through 7 th St. Intersection 17

18 Technical Issue #1: 7 th St and Olson Memorial Highway Intersection Key movements are Olson Memorial Highway EB right-turn in the AM and 7 th Street NB left-turn in the PM Existing signal operations have 2-stage pedestrian crossings With recommended lane geometry, LRT will operate on its own phase EB right-turn will be allowed to be green with LRT phase All other phases will be red Pedestrian crossings are proposed to be 1-stage Intersection is expected to have acceptable operations in 2040 with recommended geometric changes and the addition of LRT

Technical Issue #1: 7 th St and Olson Memorial Highway Intersection 19

Technical Issue #1: 7 th St and Olson Memorial Highway Intersection 7 th Street design to include: 7 th Street intersection design as proposed in presentation BLRT crossing east of 7 th Street to center median Center running LRT on TH55/Olson Memorial Highway 20

Technical Issue #2: I-94 Interchange Key Issues: LRT center running on existing bridge Bridge requires structural reinforcement under LRT guideway Bridge left intact outside of guideway New signals systems installed at intersections 21

Technical Issue #2: I-94 Interchange 22

Technical Issue #2: I-94 Interchange Cross section of existing bridge 23

Technical Issue #2: I-94 Interchange Cross section of proposed improvements (removal) 24

Technical Issue #2: I-94 Interchange Cross section of proposed improvements 25

Technical Issue #2: I-94 Interchange Recommendation Center running LRT on existing I-94 bridge Continue coordination with the MnDOT and City of Minneapolis on final design of interchange 26

27 85 th Station Configuration

28 85 th Station from DEIS

85 th Station Configuration Issues to be resolved: Platform configuration Pedestrian access Bus stop locations Passenger drop off 29

85 th Station Configuration Platform configuration Changed from split side platform to center platform Pedestrian access from 85 th Ave and from pedestrian crossing at southern end of station platform Bus stops on West Broadway and on 85 th Ave Passenger drop off Continue to analyze in conjunction with City 30

31 85 th Station Configuration

32 93 rd Station Configuration

33 93 rd Station from DEIS

93 rd Station Configuration Issues to be resolved: Track layout and platform location oprivate development on DEIS park and ride location Track continuing on West Broadway Modified station platform location Pedestrian access Bus stop locations Passenger drop off without park and ride 34

93 rd Station Configuration Track layout and platform location Track remains on West Broadway Center platform on south side of 93 rd Pedestrian access from 93 rd and from pedestrian crossing at southern end of station platform near 92 nd Ave Bus stops on West Broadway and on 93 rd Ave Passenger drop off Continue to analyze in conjunction with City 35

36 93 rd Station Configuration

37 Overview of DEIS Scope and Cost Estimate

Cost Uncertainty By Project Phase % Design Complete Cost Uncertainty % Design Complete 1% 15% 30% 60% 100% Cost Uncertainty DEIS Municipal Consent Project Development Engineering Construction 38

Cost Estimate vs. Budget Cost Estimate Preliminary cost of project based on DEIS scope, minimal engineering, and initial risk identification As level of design increases and risks are further defined the cost estimate is updated and refined Includes soft costs (engineering, project office, etc.), right-of-way, construction (YOE$), vehicles, and contingency Project Budget Cost of the project based on: oscope - revised and approved orisk - identified and accounted for ocontingency unknown unknowns Prepared for FTA New Starts application into Engineering Phase (anticipated June 2016) 39

Project Delivery Process DEIS Municipal Consent Project Development Engineering Construction Bid Packages % Design 1% 15% 30% 60% 90-100% Level of Design Detail General station locations, route and cost allowances Station footprints, general track location and grade, and OMF location Stations, track, facilities and structure dimensions Station types, track, facilities and structure detail Electrical and communications systems Color and texture of facilities Construction methods Survey Work Aerial mapping Phase I: Desk review and field observation Geotechnical Borings Phase II: Technical field work Preliminary Soils Analysis Final soils analysis Archaeological recovery, mitigation measures 40

Capital Cost Overview: DEIS Assumptions DEIS Cost Estimate $1.002 B Total Project Contingency 34% Escalation Factor 3% Base Year Estimate 2012 Forecast Year 2017 (mid-point of construction) 41

Contingency and Risk Contingency is budget set aside to account for project risks Requirements Design Market Construction Xcel Transmission Towers BNSF Negotiations Municipal Consent Floodplains Poor Soils Wetlands Construction Bids Right-of-Way Finance Costs Schedule Delay Light Rail Vehicles Unforeseen Conditions Contaminated Soils 42

Cost Contingency Targets 40% 35% 30% 25% 20% 15% 10% 5% 0% DEIS Project Development Entry into Engineering Contingency Engineering BLRT Cost Contingency Construction Mid End Bids Construction Construction/ Rev Ops 43

Guideway and Track: Included in DEIS Cost Estimate Ballasted track Guideway structures TH 610 LRT bridge (Brooklyn Park) TH 100 LRT bridge (Robbinsdale) TH 100 BNSF bridge (Robbinsdale) LRT bridge over existing CP Rail Line (Crystal) I-94 bridge modifications HERC LRT bridge (Minneapolis) Soil mitigation costs: at exploration level Ballasted track Direct fixation track 44

Guideway and Track: Not Included in DEIS Cost Estimate Embedded track Grade separation at intersections 42nd Ave 73rd Ave Corridor protection: BNSF Embedded track 45

Stations Included in DEIS cost estimate: 10 stations 1 elevator at Golden Valley Rd Station Not included in DEIS cost estimate: Plymouth Ave Station that requires vertical circulation and bridge replacement Pedestrian Overpass at 63 rd Ave Station 46

Support Facilities Included in DEIS cost estimate: Operations and Maintenance Facility (OMF) for routine maintenance Storage space for 26 vehicles Not included in DEIS cost estimate: OMF site roadway realignment Space and equipment for major repairs Storage area Wheel truing machine 47

Sitework and Special Conditions: Included in DEIS Cost Estimate Roadway bridge reconstruction TH 55 Roadway bridge minor modifications 36th Ave Golden Valley Rd Theodore Wirth Pkwy Plymouth Ave Partial reconstruction of Olson Memorial Highway Reconstruction of all at-grade crossings 48

Sitework and Special Conditions: Included in DEIS Cost Estimate (cont.) Park-and-Ride sites 93rd Ave(structure)/Oak Grove Parkway (surface ): 800 stalls 63rd Ave: 725 stalls 565 existing 160 additional stalls with a 3 rd level to existing facility Robbinsdale: 500 structured stalls Xcel Energy Transmission relocation of 14 towers 49

Sitework and Special Conditions: Not Included in DEIS Cost Estimate Park and Ride Golden Valley Rd Station Bass Lake Rd Station Roadway reconstruction on West Broadway Candlewood to 93rd Ave (Funded by Hennepin County Capital Improvement Program) Full reconstruction of Olson Memorial Highway Grade separated pedestrian crossings 50

Systems Included in DEIS Cost Estimate: 13 Traction Power Substations Grade crossing protection gates for LRT and/or freight o 10 at-grade crossing o 12 signalized intersections Not Included in DEIS Cost Estimate: Gated crossings along West Broadway Traction power substation Signal bungalow 51

Right-of-Way Included in DEIS Cost Estimate: 17 full acquisitions 56 partial acquisitions Acquisition of 50-feet of BNSF right-of-way Not Included in DEIS Cost Estimate: Acquisition for additional Park and Ride sites 52

Vehicles Included in DEIS Cost Estimate: 26 vehicles 15% spare ratio Assumption of 2-car consists Not Included in DEIS Cost Estimate: 3-car gap train 20% spare ratio 53

Next Steps July-Aug 2015: Review DEIS cost estimate and scope with advisory committees, Met Council Nov 2015: Refine project scope for Municipal Consent and update cost estimate June 2016: Prepare project budget for request to enter engineering 54

55 Next Meeting: August 4, 2015

More Information Website: BlueLineExt.org Email: BlueLineExt@metrotransit.org Twitter: @BlueLineExt 56