Ghana Kumasi-Paga Road Rehabilitation Project. Report date: March 2001 Field survey: July Project Profile and Japan s ODA Loan

Similar documents
Report date: March 2001 Field survey: September Project Profile and Japan s ODA Loan

Disaster Prevention and Rehabilitation Project (Philippine-Japan Friendship Highway and Naguilian Road)

Philippines Metro Manila Rail Commuter Maintenance Depot Construction Project

Ex-Ante Evaluation (for Japanese ODA Loan)

Madhya Pradesh Road Development Corporation: A Case Study of ADB Assistance for Institutional Development in the Transport Sector in India

Locomotive Building Project

(1) Current State and Issues of the Electricity Sector in Indonesia

Japanese ODA Loan. Ex-ante Evaluation

Pakistan Second 220KV Guddu-Sibbi-Quetta Transmission Project

main type of locomotive in use, but over half of those had surpassed their durable lifespan. China Project Site Afghanistan Nepal Pakistan India

Slovakia Ex-Post Evaluation of Japanese ODA Loan Project Motorway Construction Project (SLO-P1)

Rehabilitation of Diesel Railcars Project, Diesel Railcar Rehabilitation Project

ECONOMIC AND FINANCIAL ANALYSIS: PROJECT 1

Three Toll Roads Construction Project Report Date: October, 2002 Field Survey: August, Project Profile and Japan s ODA loan

Back ground Founded in 1887, and has expanded rapidly Altitude about 2500 meters above MSL Now among the ten largest cities in Sub Saharan Africa

Feasibility Study for Promotion of International Infrastructure Projects in FY2011

Implementation Status & Results Bosnia and Herzegovina ROAD INFRASTRUCTURE AND SAFETY PROJECT (P100792)

! " # $ % # & " ' % ( ' ) "

Rwanda Biofuels Limited. Powering Rwanda s Development

Urban Transport Development Investment Program (RRP MON 39256) SECTOR ROAD MAP

Sales and Use Transportation Tax Implementation Plan

Item

ECONOMIC SURVEY STATISTICAL APPENDIX

Item

Tajikistan Ex-Post Evaluation of Japanese Grant Aid Project The Project for Improvement of Dusty Nijiny Pyandzh Road

Country Report 9. Lao PDR Country Report. Leeber Leebouapao National Economic Research Institute. March 2008

China Dadong-Qinhuangdao Railway Construction Project (1)(2)

COMMERCIALISATION OF UGANDA S OIL AND GAS SECTOR: REFINERY AND ATTENDANT INFRASTRUCTURE DEVELOPMENT

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT

The Regional Municipality of York. Purchase of Six Battery Electric Buses

Study on Economic Partnership Projects. in Developing Countries in FY2010. Study on the Kiev Metro Line 4 in Kiev City, Ukraine SUMMARY.

The Philippines. Manila

Signs of recovery in the Russian construction market

Gold Saskatchewan Provincial Economic Accounts. January 2018 Edition. Saskatchewan Bureau of Statistics Ministry of Finance

Indian engineering TRANSFORMING TRANSMISSION

To Our Business Partners

Review of Retail Electricity Tariffs

The Case for. Business. investment. in Public Transportation

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT. 1. Sector Performance, Problems, and Opportunities

Philippines Ex-post Monitoring for the ODA Loan Project South Luzon Expressway Construction Project

NATIONAL REPORT: SPAIN. At 31/12/2015

FREQUENTLY ASKED QUESTIONS

Review of Operations in FY2012

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017

Dear New Clean Cities Stakeholder:

ASEAN became Korea s second largest trading partner under FTA

SUBSIDIARY BODY FOR SCIENTIFIC AND TECHNOLOGICAL ADVICE Fourteenth session Bonn, July 2001 Item 3 (b) of the provisional agenda

Head of Division for Road Traffic Technology; Road Infrastructure Safety; Routine Road Maintenance Management

4 COSTS AND OPERATIONS

ECONOMIC AND FINANCIAL ANALYSIS

AIR POLLUTION: Policy, actions and short term countermeasures to reduce air pollution of Ulaanbaatar city

Introduction of tractor based rural road maintenance approaches in Zambia

USDOT CMAQ Program. Southeast Diesel Collaborative Annual Conference September, 2017

building liveable cities

Implementation Status & Results Uzbekistan Alat and Karakul Water Supply Project (P118197)

NATIONAL WORKSHOP FOR PROMOTION OF LOW SULPHUR FUELS IN BOTSWANA, MARCH 2016.

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016

MSRC CLEAN TRANSPORTATION FUNDING LOCAL GOVERNMENT PARTNERSHIP

Manitoba Economic Highlights

The Preferred Alternative: a Vision for Growth on the Northeast Corridor

Yukon Resource Gateway Project

The Russian building market

EBRD Transport & Energy in Serbia

LIST OF OPEN TRAINING TRAINING PLANNER 2016/2017 Course location: Lagos, Abuja, Port Harcourt.

Financing Public Transport Projects by EBRD

Brief Description, Overall Objective and Project Objectives with Indicators

Priority Transport Projects in Republic of Armenia. 10th Eastern Partnership transport panel Brussels, 11 May 2016

Aim: Integration of Road Infrastructure of Georgia with European Standards and effective satisfaction of the Road User needs. Annual Report 2013

Overview of Transit Funding and Planning in the PACTS Region

1.2 Objectives To rehabilitate C-BMPP and K-BMPP, which were constructed with funding from a Japanese ODA loan.

Press release on the business development of the MAHLE Group in 2013

Transportation Demand Management Element

Precision Station Stopping Progress Update

A Forward March towards an Energy Empowered Nation Case Study in Sri Lanka

RIETI BBL Seminar Handout

Performance Based Contracts (PBC) in Serbia

Modernising the Great Western railway

Fuel Cells and Hydrogen 2 Joint Undertaking (FCH 2 JU) Frequently Asked Questions

Table 1 ANTIGUA AND BARBUDA: MAIN ECONOMIC INDICATORS

EMERGING REQUIREMENTS

Public Transportation Problems and Solutions in the Historical Center of Quito

Kingdom of Cambodia. Ministry of Public Works and Transport. Ministry of Rural Development WORKSHOP ON

BASELINE STUDY ON VEHICLE INVENTORY AND FUEL ECONOMY FOR MALAWI (KEY FINDINGS)

2013/2014 Strategic Priorities Fund Application Overview

India Anpara Power Transmission System Project (1) (2)

STUDY ON THE DEVELOPMENT OF LEBAK BULUS STATION AREA IN JAKARTA THE REPUBLIC OF INDONESIA

Document from the Ministry of Transport of the People s Republic of China

QUARTERLY REVIEW OF BUSINESS CONDITIONS: MOTOR VEHICLE MANUFACTURING INDUSTRY / AUTOMOTIVE SECTOR: 4 TH QUARTER 2016

Yukon s Independent Power Production Policy

Electricity Access in Lao PDR

Annual Report on National Accounts for 2015 (Benchmark Year Revision of 2011) Summary (Flow Accounts)

PROMOTING THE UPTAKE OF ELECTRIC AND OTHER LOW EMISSION VEHICLES

ASIAN DEVELOPMENT FUND (ADF) ADF XI REPLENISHMENT MEETING 7 9 March 2012 Manila, Philippines. Post-Conflict Assistance to Afghanistan

Contents 1. Country Background 2. Lao Power Sector 3. Power Sector Policy 4. Current Electric Power Situation (statistics) 5. Demand Forecasting 6. Ex

General Overview. Ernesto Macias ARE President MUNICH Copyright Alliance for Rural Electrification. All rights reserved.

The first successful concessioner

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001

Western ND Meeting. February 19, 2014 Grant Levi, NDDOT Director

TORONTO TRANSIT COMMISSION REPORT NO.

FLEET SERVICES OVERVIEW and ACCOMPLISHMENTS Public Works Commission August 10, 2017

Transcription:

Ghana Kumasi-Paga Road Rehabilitation Project Report date: March 2001 Field survey: July 2000 1. Project Profile and Japan s ODA Loan Site Map: major road network in the Republic of Ghana Kumasi-Paga Road 1.1 Background The most important transport corridor in the Republic of Ghana is the so-called Golden Triangle, which connects three cities: the capital, Accra; Takoradi, an export port; and Kumasi, the country s second largest city and a major transport hub. This corridor has served as a major route for transporting Ghana s principal export commodities (cocoa, gold, timber, manganese, bauxite and other products) to two trade ports (Accra and Takoradi). It runs from north to south through central part of Ghana, from Kumasi to the neighboring country of Burkina Faso via Tamale, Ghana s third largest city. The Ghanaian government s 3-year public investment plan for the period from 1988 to 1990 called for 59% ( 120,300 million) of total investment, which stood at 203,600 million (362,988 million cedis), to be spent on economic infrastructure. Of the investments in economic infrastructure, 53% were targeted at the transport sector, 59% ( 37.1 billion) of which were allocated to roads; this indicates that roads were considered the most important aspect of the public investment plan. In particular, the present improvement project for the Kumasi-Paga Road, which links the vast northern region, containing half the total population, and the southern region, was given high priority in the overall investment plan for the road sector. Five of the administrative regions along the Kumasi-Paga Road are major agricultural regions. Many development plans, including irrigation schemes and stockbreeding technology promotion programs, had been made, and these regions were expected to play an increasingly significant role as a major supply base for agricultural 1

products. In the Kumasi-Kintampo and Bolgatanga-Paga road sections, however, potholes and ruts were becoming conspicuous on the surface. In the Tamale-Bolgatanga section, the road was so heavily damaged that its blacktop had practically disappeared. These problems hindered smooth distribution, creating a bottleneck in agricultural growth in the northern region. 1.2. Objectives One objective of this project was to repair the major trunk road linking Kumasi with the northern border, thereby contributing to bolstering the agricultural foundation of the northern region. Another was to improve the trunk road extending from the northern border with Burkina Faso to the southern coastline in conjunction with the preceding industrial road rehabilitation project funded by Japanese ODA loan, thus promoting distribution and contributing to economic growth. 1.3. Project Scope The ODA loan provided funds to all of the foreign currency portion and 50% of the local currency portion of procurement of i) the materials/equipment, and services required for civil engineering, and ii) the consulting services. The loan agreement was concluded in December 1990. The project road consisted of the 180-km Kumasi-Kintampo section, or Section I, and the 200-km Tamale-Bolgatanga-Paga section, or Section II, for a total of 380 km. * The 196-km Kintampo-Yapei-Tamale section is being rehabilitated with funds provided by the British and Ghanaian governments. Financed by the Japanese ODA loan Kumasi Kintampo Section I: 180km Yapei Tamale Bolgatanga Section II: 200km Paga 1.4. Borrower/Executing Agency The Government of the Republic of Ghana/The Ghana Highway Authority (GHA) 1.5. Outline of Loan Agreement Loan amount/loan disbursed amount 8,439 million/ 8,437 million Exchange of notes/loan agreement December 1990/December 1990 Terms and conditions : 2.5% p.a. Interest rate Repayment period (grace period) Procurement 30 years (10 years) Partially untied Final disbursement date February 1999 2

2. Results and Evaluation 2.1. Relevance The project road comprised part of the important north-south traffic route that linked Paga located in the north along the border with Burkina Faso, with Accra and Takoradi in the south. The project was part of the transport sector rehabilitation program supported by the World Bank. Ghana s Vision 2020 long-term development plan laid in 1995 and other subsequent plans also emphasized the importance of the road sector, including the trunk roads mentioned above. The project was relevant at the time of appraisal, and remains relevant. In the future, the project road section will continue to serve as a pivotal line connecting distribution and economic activities in the north with those in the south, and to be positioned as an important part of the transport infrastructure. 2.2. Efficiency (2.2.1.) Project Cost The project cost was initially estimated at approximately 9,450 million, but actual costs rose to 13,020 million. One reason was that it took seven years from appraisal, in 1988, to the start of construction. During this interval, GHA did not conduct sufficient maintenance on the project road, causing it to become increasingly worn. In addition, due to greater increases in traffic volume than expected and to other factors, road surfaces deteriorated rapidly, adding scopes of rehabilitation. Another reason was that Ghana s Ministry of Roads and Transport revised its road surfacing design standards, necessitating the review of designs and plan revisions. A third reason was inflation. (2.2.2.) Implementation Schedule At the planning stage, the implementation schedule spanned 53 months, from August 1990 to December 1994, but the project actually took 92 months, from December 1990 to July 1998. The actual completion occurred three years and three months later than projected, due to the considerable time required to review feasibility study plans and detailed designs and to revise implementation plans (a total of 32 months from September 1992 to April 1995 were spent reviewing detailed designs), which postponed the start of civil engineering work from January 1992, as initially scheduled, to May 1995. One of the major reasons it took additional time to conduct the above-mentioned tasks was that after the feasibility study plans were completed, Ghana s Ministry of Roads and Transport revised its road surfacing design standards in 1989, making alterations to the detailed designs necessary. Another reason was that several of the conditions envisaged when feasibility study plans were developed had become 3

obsolete in the intervening three years. A third reason was that the revision of the detailed designs based on the reviewed feasibility study plans necessitated the revision of project plans and project cost allocation plans, and it took time to obtain approval for the revised plans. 2.3. Effectiveness (2.3.1.) Increase in Traffic Volume With the completion of the project, traffic conditions improved dramatically; the time required to travel between Bolgatanga and Tamale fell from seven to two hours. As a result, the traffic volume for the project road section grew overall as compared to initial plans, as shown in Table 1, and it can be said that the project contributed to increasing traffic volume and promoting distribution. Table 1 Changes in the Traffic Volume for Road Sections between Kumasi and Paga Sections Plan (Unit: Vehicles/day) Actual (achievement level as compared to plan) 1998 (project completion date) 1999 (second year) Kumasi-Techima 1,196 3,356 (280%) 3,582 (299%) Techima-Kintampo 775 817 (105%) 838 (103%) Kintampo-Tamale 1,604 674 (42%) n.a. Tamale-Bolgatanga 629 706 (112%) n.a. Bolgatanga-Paga 92 465 (505%) 500 (543%) Source: GHA materials (2.3.2.) Economic Internal Rate of Return (EIRR) The results of recalculation of the EIRR indicated that the EIRR for the entire project was 15.8%, almost the same as the 16.0% estimated at the time of appraisal. (Preconditions) Project life: 20 years (5 years for construction and 15 years for post-completion operation/ maintenance) Benefits: (1) Fuel and oil savings; (2) decline in wear on tires; (3) increase in the useful life of vehicles; and (4) savings on travel time, etc. Costs: (1) Road construction costs and (2) operation and maintenance costs 2.4. Impact (2.4.1.) Impact on the Revitalization of Local Economies After the project was completed, the average traveling time between Bolgatanga and Tamale, both major provincial cities, was shortened from seven to two hours. As a result, Bolgatanga has grown as a trade and transport hub linking northern and southern Ghana and connecting Ghana with its neighboring countries -- including Burkina Faso, Niger and Mali -- and economic activities in these regions have become increasingly energetic. With the increases in traffic and distribution 4

volumes for the Kumasi-Paga section, meanwhile, many small markets have been established along the road, and local residents are actively engaged in small-scale commercial activities. Thus the project has had a certain economic impact on local communities. (2.4.2.) Environmental Impact There was no particular environmental impact during the construction period. Although increases in post-completion traffic volume were greater than expected, no particular environmental problems, including air pollution, have been reported so far. 2.5. Sustainability As of March 2000, GHA had a total of 3,306 employees, and its organization comprised three major divisions: administration (249 employees), development (215) and maintenance (475). The maintenance division is responsible for the overall operation and maintenance of GHA-controlled roads. In addition to its head office, the division has ten regional offices nationwide, and annual regular maintenance is carried out under the leadership of the head office with routine maintenance led by regional offices. Routine maintenance consists of pothole patching, side ditch cleaning, grass cutting for hard shoulders and the leveling of unpaved roads. Routine maintenance is performed several times a year, though the frequency varies among sections. In 1997, GHA introduced the Pavement Management Maintenance Program (PMMP) 1, a maintenance method developed with the aid of the World Bank, which has since been implemented. In introducing the new maintenance method, GHA was also active in acquiring new technologies. Its efforts included providing practical training for all regional office employees and holding other educational programs, including various training sessions, seminars and workshops, on a regular basis. In addition, GHA has shifted from an in-house maintenance system to an outsourcing system using private contractors (90% of maintenance work is outsourced with the remaining 10% undertaken in-house). The role of GHA in maintenance operations is also shifting to coordination and supervisory functions, including maintenance planning, contract management and maintenance supervision. Placing orders for maintenance work with private enterprises, procurement, contracting and other operations are controlled by GHA s head office or regional offices, depending on the section, the scale and costs for maintenance. Although GHA has some maintenance equipment at its mobile 1 PMMP is a system for promoting understanding of the condition of GHA-controlled roads in a unified manner and for prioritizing maintenance according to the degree of damage and deterioration. To those end, the condition of paved and unpaved roads as well as that of hard shoulders is rated according to the designated checkpoints, and information gathered by regional offices is analyzed by the GHA head office. GHA uses the results to develop road repair and budget allocation plans for the following year. Thus this system enables the agency to make efficient use of maintenance budgets and to implement maintenance operations effectively. 5

maintenance units, it basically utilizes the technology and materials/equipment of private contractors. It is striving to improve the road maintenance abilities of the private sector by, for example, providing opportunities to attend seminars and training programs. Partly due to the improved maintenance system and institutional reforms described above, the operation and maintenance abilities of GHA have increased every year and the condition of trunk roads has gradually improved in the past few years (see Table 2). 1998 1999 Table 2 Condition of Trunk Roads Good Fair Poor 19.4% (2,569.5km) 32.7% (4,331.1km) 24.7% (3,271.5km) 36.9% (4,887.4km) 55.9% (7,404km) 30.3% (3,973.5km) 2005 (planned) 70% 20% 10% Source: GHA annual reports With the assistance of the World Bank, the Ghanaian government established the Road Fund to provide funds for the maintenance of roads nationwide. GHA also receives road maintenance funds from the Fund. Currently, the Fund covers approximately 70% of funds required for the maintenance of roads across the country. It is urged to consider strengthening the revenue foundation of the Fund in the future. 6

Comparison of Original and Actual Results Item Plan Results 1. Project scope 1) Design standards - Design speed 100 km/h (flat), 80 km/h (hill) Same as left - Width and the 3.65 m/one lane Same as left number of lanes - Width of road 2.0 m for one side Same as left shoulder - Pavement method 2) Consulting services 2. Implementation schedule (a) Tamasi-Kintampo section (180 km) Asphalt overlay (b) Tamale-Bolgatanga section (170 km) New pavement, including roadbed construction (c) Bolgatanga-Paga section (30 km) Asphalt overlay (a) Tamasi-Kintampo section Simple pavement for the 7-km portion of the section and maintenance only for the other portions (b) Tamale-Bolgatanga section New pavement, including roadbed construction, for the 146.2 km portion of the section (c) Bolgatanga-Paga section Asphalt overlay for the 23.0-km portion of the section and new pavement, including roadbed construction for the 15.9-km portion 267 M/M 275 M/M August 1990 to December 1994 (53 months) (The signing of the loan agreement is considered the start of construction work) December 1990 to July 1998 (92 months) (1) Loan agreement August 1990 December 1990 (2) Detailed design August 1990 to January 1991 August 1992 to September 1993 (3) Bidding January to September 1991 December 1994 to January 1995 (4) Evaluation of bids (5) Civil engineering work October to December 1991 January 1995 January 1992 to December 1994 May 1995 to July 1998 (6) Completion December 1994 July 1998 3. Project cost Foreign currency Local currency Total ODA loan portion Exchange rate 7,431 million 2,016 million 9,447 million 8,439 million GHC100 = 56.00 (November 1988) 8,437 million 5,473 million 13,902 million 8,437 million (US$1.00 = GHC230 = 129) GHC100 = 9.45 (September 1998) GHC: Ghana cedi 7