NEWS RELEASE November 8, 2017

Similar documents
ODOT District Two Monthly Construction Update

ODOT District Two Monthly Construction Update

Countdown to the Closure Extended 53-Hour Closure of I-405 Freeway Between U.S. 101 and I-10 Planned in Mid-July for Mulholland Bridge Demolition

CITY OF BEVERLY HILLS STAFF REPORT

Metro Highway Program

I-405 Sepulveda Pass Improvements Project

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION OFFICE OF ENGINEERING AMENDMENT NO. 4 TO: IN THE LETTING OF FEBRUARY 21, 2013

Click to edit Master text styles

Purple Line Extension, Section 2 Southern California Edison, Phase I

Purple Line Extension, Section 2 Southern California Edison, Phase I June 7, 2017

2.1.5 Traffic and Circulation. Table Level of Service Criteria for Highway Segment Regulatory Setting Affected Environment

ST. LOUIS DISTRICT MOBILITY

FREQUENTLY ASKED QUESTIONS

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

Expo Light Rail Line Project Status Update Meeting Holman United Methodist Church January 27, 2011

ORDINANCE NO. 14,336

Appendix H: Construction Impacts H-2 Transportation

FREQUENTLY ASKED QUESTIONS

Figure 1 Map of intersection of SR 44 (Ravenna Rd) and Butternut Rd

Project Working Group Meeting #5

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange

I-405 Sepulveda Pass Improvements Project

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results

30-Day Look Ahead Summary August 2011

PARKING. Passenger vehicles and vans must park in the regular daily parking lot and pay the daily rate.

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D

Kansas City Missouri Public Works 414 East 12th Street Kansas City, Mo

Portland-Milwaukie Light Rail Project Johnson Creek Boulevard

ST. LOUIS DISTRICT MOBILITY

Sepulveda Pass Corridor Systems Planning Study

PARKING. Passenger vehicles and vans must park in the regular daily parking lot and pay the daily rate.

WIM #31 US 2, MP 8.0 EAST GRAND FORKS, MN JANUARY 2015 MONTHLY REPORT

IMPROVEMENT CONCEPTS

Pole Mounted Speed Display Pilot Program Study. January, 2016

Traffic Engineering Study

Sepulveda Pass Corridor Systems Planning Study Update

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents SR-91 IMPLEMENTATION PLAN i

Evaluation of Renton Ramp Meters on I-405

Capital Improvement Program (CIPs) City of Industry FY 2017/18 Adopted Budget

ST. LOUIS DISTRICT MOBILITY

SOUTH ACCESS TO THE GOLDEN GATE BRIDGE DOYLE DRIVE DOYLE DRIVE. Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009

Project Information. Highway 2 /Gaetz Avenue Interchange. Highway 2, Gaetz Avenue and Taylor Drive Interchange Improvements

Start Time. LOCATION: Scotts Valley Dr QC JOB #: SPECIFIC LOCATION: 0 ft from Tabor St. DIRECTION: EB/WB CITY/STATE: Scotts Valley, CA

Lacey Gateway Residential Phase 1

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios:

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output

ARE DIAMONDS LRT S BEST FRIEND? AT-GRADE LRT CROSSING AT A DIAMOND INTERCHANGE

IV. REVISIONS TO THE DRAFT IS/MND

December 12, Dear Secretary Foxx:

State Route 1/State Route 41/ Main Street Intersection Control Evaluation (Step 2) Report. City of Morro Bay. Prepared for: Prepared by:

Congestion Management Program 2015 Monitoring Report

Technical Feasibility Report

Winnetka Avenue Bike Lanes Traffic Impact Analysis

DISTRICT 10, STOCKTON WEEKLY ACTIVITY REPORT 03/03/19 to 03/09/19 Contact: Rick Estrada (209)

SANTA BARBARA COUNTY ASSOCIATION OF GOVERNMENTS GOLETA RAMP METERING STUDY MAY 8, 2018 FINAL REPORT

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC

APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM

The Design-Builder shall meet local road criteria provided by the local governing agencies.

Welcome. Please Sign In

Appendix SAN San Diego, California 2003 Annual Report on Freeway Mobility and Reliability

Central Park Drives Traffic Management Overview

Sherman Oaks Community Traffic Plan

Peachtree Streetscape Atlanta, Georgia

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

Oakbrook Village Plaza City of Laguna Hills

4.14 TRANSPORTATION AND CIRCULATION

V. DEVELOPMENT OF CONCEPTS

I-405 Sepulveda Pass Improvements Project. Community Advisory Committee July 28, 2011

April 15, 2016 PUBLIC HEARING RESULTS

Traffic Impact Analysis Update

/13/D /14/W /14/D /12/D /16/D /15/D /14/D /18/D /15/D /11/W SR 18

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

Interchange Operations Study

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization

APPENDIX A Interstate 26 Widening Traffic Analysis Report

Metropolitan Freeway System 2007 Congestion Report

APPENDIX E. Traffic Analysis Report

Shirk Road at State Route 198 Interchange Analysis Tulare County, California

AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 3rd Street Tunnel at Massachusetts Avenue Exit

I-225 Rail Line Iliff and Florida Stations Information Meeting

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

Study Area and Location District PSA Ward ANC Phase Description C Planned Suitland Parkway Westbound at Stanton Road Southeast

City-Wide Major Traffic Study. Study Report

New Jersey Turnpike Authority Interchange 6 to 9 Widening Program

Reduction of Vehicle Noise at Lower Speeds Due to Quieter Pavement. By Paul R Donavan

Transportation Improvement Program (TIP) Candidate Project List for Public Review

MEMORANDUM FPN: State Road: 91 County: Osceola (92)

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Expo Light Rail Line. Expo Line Community Meeting Final Phase 2 Construction Update Santa Monica June 2015

City of Beverly Hills North Santa Monica Blvd Reconstruction. Traffic & Parking Commission June 04, 2015

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Bayers Road / Highway 102 Corridor Study Component 3 - Highway 107 Final Report March 2010

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization

Transcription:

NEWS RELEASE November 8, 2017 Contact: Marsha Roa Public Information Manager 909.839.7055 mroa@diamondbarca.gov GRAND AVENUE INTERCHANGE AT SR-57 (ORANGE) AND SR-60 (POMONA) MULTIPLE ROADWAY, RAMP AND FREEWAY CLOSURES STARTING NOVEMBER 14, 2017 THROUGH FEBRUARY 2018 (Diamond Bar, CA November 8, 2017) As part of the ongoing construction of the 57/60 Interchange Improvement project, multiple roadway and ramp closures along Grand Avenue are scheduled to take place as follows: Starting Tuesday, November 14 AND Wednesday, November 15 from 12:00 a.m. (Midnight) to 3:00 a.m. (full wb SR-60 freeway closure) Full closure of westbound SR-60 (Pomona) between Diamond Bar Boulevard and Brea Canyon Road for the installation of overhead signage Starting Friday, November 17 at 10:00 p.m. to Monday, November 20 at 5:00 a.m. (55-hour closure) Full closure of Grand Avenue (north and southbound lanes) between Baker Parkway (Industry) and the SR-60 (Pomona) eastbound on- and off-ramps, westbound on- and off-ramps at Grand Avenue, and Old Brea Canyon Road to complete pavement work and construction of the new westbound on-ramp. Note: Southbound Grand Avenue traffic will be detoured to Baker Parkway to Brea Canyon Road and motorists exiting eastbound Grand Avenue off-ramp will be restricted to right turns only onto southbound Grand Avenue toward Golden Springs Drive. - more - 21810 Copley Drive Diamond Bar, CA 91765 909.839.7000 DiamondBarCA.gov

City of Diamond Bar GRAND AVENUE INTERCHANGE CLOSURES November 8, 2017 Page 2 Starting November 18 through February 2018 (approximately 3.5 months) (Long-term wb SR-60 Grand Avenue on-ramp closure) Full long-term closure of westbound SR-60 (Pomona) on-ramp and right-turn only restrictions for westbound off-ramp at Grand Avenue for the construction of new westbound on-ramp. Note: Traffic exiting westbound Grand Avenue off-ramp will be restricted to make right turns only onto northbound Grand Avenue towards Industry/Walnut. Traffic will NOT be permitted to make a left turn to travel towards Diamond Bar/Chino Hills. Motorists are encouraged to plan ahead. For real time freeway traffic information, please visit the Caltrans Quickmap: http://quickmap.dot.ca.gov/ For project information, contact the City's Public Works Department at 909.839.7040 or email at publicworks@diamondbarca.gov or visit project page at www.diamondbarca.gov/5760 for updates and additional detour information. About the project - 57/60 Confluence at Grand Avenue The three phase project is designed to improve traffic operation on Grand Avenue from Golden Springs Drive to the interchange at SR-60 (Pomona), increase capacity at the Grand Avenue Interchange, improve traffic operation on the freeway mainline, reduce traffic weaving and increase weaving distance and improve safety. ###

Full Closure of Westbound SR60 (Pomona) November 14 AND November 15 from 12:00 a.m. (Midnight) to 3:00 a.m. -WB On-Ramp Closed *Traffic on SB Grand will be detoured to Baker ParkwayBrea Canyon Road. Traffic Closure Details: on NB Grand will be deall Lanes in WB direction of SR 60 between toured to Golden Springs Diamond Bar Boulevard and Brea Canyon Road will Drive-Brea Road. be CLOSED from Midnight to 3am oncanyon November 14 AND November 15 for an overhead sign installation. Traffic on WB SR 60 will be-wb detoured Diamond Bar Exittowill be restricted to Boulevard exit -Golden Springs Drive Brea Canyon Road Right Turn ONLY. Traffic on SB SR 57 will be detoured to use Temple *Traffic that regularly Avenue exit -Valley-Brea Canyon Road. turns left to head south on Grand will need to exit Sunset Crossing on SR 57 SB or Diamond Bar Blvd. on SR 60 WB.

55 Hour Closure Beginning 10:00 p.m. Friday, November 17 to 5:00 a.m. Monday, November 20 WESTBOUND OFF-RAMP CLOSED Traffic on SR 57 SB will be detoured to Sunset Crossing exit-diamond Bar Blvd.-Golden Springs. Traffic on SR 60 WB will be detoured to Diamond Bar Blvd. exit Golden Springs Drive WESTBOUND ON-RAMP CLOSED Traffic on SB Grand will be detoured to Baker Parkway-Brea Canyon Road. Traffic on NB Grand will be detoured to Golden Springs Drive-Brea Canyon Road. GRAND AVENUE IN BOTH DIRECTIONS WILL BE CLOSED FROM BAKER PARKWAY TO SR 60 EB RAMPS Traffic along NB Grand will only be permitted to turn right onto EB SR 60 On-ramp. Traffic from EB SR 60 offramp will only be permitted to turn right. Access to Old Brea Canyon Road will be closed

Long Term Closure SR60 (Pomona) WB Grand Avenue On-Ramp November 18, 2017 to February 18, 2018 WESTBOUND ON-RAMP CLOSED Traffic on SB Grand Avenue will be detoured to Baker Parkway/Brea Canyon Road. Traffic on NB Grand Avenue will be detoured to Golden Springs Drive/Brea Canyon Road. WESTBOUND OFF-RAMP WILL BE RESTRICTED TO RIGHT TURN ONLY Traffic that regularly turns left (south) onto Grand Avenue may exit at Sunset Crossing Road (SR 57 SB) or Diamond Bar Boulevard (SR 60 WB).