EUROCULTURE SDN BHD EUROCULTURE SEA SDN BHD

Similar documents
LATAR News release TOLL-FREE CONGESTION-FREE AT LATAR EXPRESSWAY THIS HARI RAYA FOR THOSE HEADING NORTH VIA WEST COAST ROUTE

Contract Value Actual / Expected Date of (RM 'mil.) Commencement Completion

11 Annual Report 2013 OPERATIONS REVIEW

SETTLEMENT AGREEMENT BETWEEN D.J. DESIGN SUPPLIERS SDN. BHD., SOLID PROMENADE SDN. BHD. AND IKHMAS JAYA SDN. BHD., A WHOLLY OWNED SUBSIDIARY OF IJGB

MALAYSIAN STANDARD. Earthworks - Code of practice. NOTE. This Malaysian Standard has been reviewed and confirmed as being current.

STATUS OF BIODIESEL IMPLEMENTATION IN MALAYSIA AND BIODIESEL SPECIFICATIONS

ASIAN MAYOR S POLICY DIALOGUE FOR THE PROMOTION OF ENVIRONMENTALLY SUSTAINABLE TRANSPORT IN CITIES. 23 rd 24 th APRIL 2007, KYOTO JAPAN

COMPANY PROFILE YOUR ONE-STOP OFFICE FURNITURE SOLUTION

TRAFFIC ANNOUNCEMENT UPDATES ON TRAFFIC MANAGEMENT PLAN FOR MRT SSP CONSTRUCTION JALAN RAYA SATU, JALAN RAYA TIGA & JALAN UTAMA 30 MARCH 2018

OILFIELD TECHNICAL INSPECTION SDN BHD

Global Threat Reduction Initiative Foreign Research Reactor Spent Nuclear Fuel Shipments

CALENDAR.

Straits STRAITS CONSULTING ENGINEERS SDN BHD P

Hinkley Point C our approach to Health and Safety Iain Graham Head of Health & Safety

Media Release FOR IMMEDIATE RELEASE

ACCELERATE TOMORROW. TODAY.

FAMOUS AMOS RETAIL OUTLET [KLANG VALLEY]

CONFERENCE ON SMART TUNNEL

CALENDAR PROGRAM 2016 CONTINUING PROFESSIONAL DEVELOPMENT (CPD)

SAM S ALUMINIUM EXTRUSION SDN. BHD. COMPANY PROFILE

Key information. Network details. Klang Valley projected population growth (million) Line details. Length (km)

STATUS OF BIODIESEL IMPLEMENTATION IN MALAYSIA AND BIODIESEL SPECIFICATIONS

USE ONLY ISSUED ON 8-MARCH 2018 TUN RAZAK EXCHANGE. The New Financial City of Kuala Lumpur. Malaysian Annual Real Estate Convention 2018 (MAREC 18)

WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017

CLIMATOLOGICAL SUMMARY

PROPERTY TYPE PROPERTY ADDRESS SIZE (SQFT) FH /LH REMARKS AUCTIONEER AUCTION DATE RESERVE PRICE

The Malaysian Fertilizer Market

Pengerang Terminals Pengerang Rotterdam : Linked by Concept Pengerang Terminals Sdn Bhd. 8th January 2018

Benalec Secures DOE Approval for All 3 Phases of its Tanjung Piai Project

Construction commenced and ground breaking ceremony held for Mitsui Shopping Park LaLaport Kuala Lumpur (tentative name) Key Points of the Project

PRESS RELEASE. Significant fuel savings and rapid payback shown for rail flywheel hybrid technology. 16 June 2015

KUALA LUMPUR URBAN RAIL DEVELOPMENT: MALAYSIA EXPERIENCE

Central Region I - Kuala Lumpur & Selangor. Address: General Line: Fax:

MANHARI SOLAR. (Your own renewable energy management experts)

Where next for vegetable oil prices?

TABLE OF CONTENTS SECTION TITLE PAGE NUMBER

Section 9 Residual Impacts

Royal Selangor Malaysia Stores

CASB was incorporated in Malaysia on 16 July 1997 and its principal activities are construction and property development.

National Road Safety Action Plan in China

Grain LNG: A Collaborative Approach To LNG Terminal Business Performance Improvement

DIRECTORY OF WINDSCREEN REPAIRS / REPLACEMENT CENTER (WRC) WITH EFFECT FROM 01/07/2017

Kuala Lumpur soon to boom with mega projects

G20 TRANSPORT TASK GROUP 2018 UPDATE FIRST IN-PERSON MEETING SEPTEMBER 25, 2018 DIANA GALPERIN AND JOSH MILLER

Page 1 of 6. No PROPERTY TYPE PROPERTY ADDRESS SIZE (SQFT) FH /LH REMARKS AUCTIONEER AUCTION DATE RESERVE PRICE

Responsibility & Care. The leading safety products MANUFACTURER & EXPORTER with 30 years of service excellence

3. Atmospheric Supply of Nitrogen to the Baltic Sea in 2009

Oil Palm Growers Operational Profile 1. Main activities as a palm oil grower Palm oil grower & miller Operations and Certification Progress 2. Total l

Heavy Truck Conflicts at Expressway On-Ramps Part 1

Creating a Lean and Productive Processing Facility

FOR IMMEDIATE RELEASE

FREQUENTLY ASKED QUESTIONS

LOCAL CLIMATOLOGICAL DATA

ABC SDN BHD X. Revenue Net Worth Net Profit Margin

: Holiday Villa Alor Setar Property Address : Lot 162 & 163, Jalan Tunku Ibrahim, Alor Setar, Kedah Darul Aman.

Block batteries / Motive Power. Product Overview.» Durability through innovation «

WISMA ACADEMY PROPERTY INFORMATION. No. 4A, Jalan 19/1, Petaling Jaya, Selangor

JOINT VENTURE AGREEMENT FOR COST SHARING IN RELATION TO UPGRADING OF IWSS3 (LOW ZONE) FOR SUPPLY OF WATER

CB Industrial Product Holding Berhad Equipping Palm Oil Industries Around The World. CBIP Financial Highlights 2Q 2012

Hop On Media Rate Card 2018 ADVERTISING PROPOSAL HOP ON MEDIA ADVERTISING PROPOSAL

MLG Design & Construction Sdn Bhd

Rapid Coupled Loads Analysis and Spacecraft Load Reduction using SoftRide

CB Industrial Product Holding Berhad Equipping Palm Oil Industries Around The World. CBIP Financial Highlights FY 2012

SOLAR POWER SOLUTIONS

Cellasto Microcellular Polyurethane Elastomer

Railway noise control in urban areas. Jakob Oertli, SBB Infrastructure, Noise Abatement; Chair UIC Noise Groups

CHEMICAL COMPANY OF MALAYSIA BERHAD (5236-T) CHEMICAL COMPANY OF MALAYSIA BERHAD (5136-T) CHEMICAL COMPANY OF MALAYSIA BERHAD (5136-T)

Paramount to sell and lease back Sri KDU Schools

Covering the world. Protecting the Earth.

CALENDAR.

Expertise in Special Deep Foundation

Railyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY

Vision & Mission. Annual Conference & Gala Dinner PIKOM Leadership Summit PIKOM ICT Leadership Awards & Annual Dinner

Harlem Avenue between 63 rd and 65 th

PROJECT MANAGEMENT TRAINING COURSE 2018

TRAFFIC ANNOUNCEMENT UPDATES ON TRAFFIC MANAGEMENT PLAN FOR MRT SSP CONSTRUCTION ALONG JALAN SULTAN AZLAN SHAH AND JALAN KUCHING 17 OCTOBER 2017

SIAM Viewpoint for improved Inspection & Maintenance in India GITE Regional Workshop on Transport Sector Inspection & Maintenance Policy

We connect heavy equipment to global progress. Rugged, reliable, proven connector solutions.

GRITTING FOR IMPROVED EARLY LIFE SKID RESISTANCE OF STONE MASTIC ASPHALT SURFACES

HEALTH AWARENESS & NATIONWIDE BLOOD DONATION CAMPAIGN, 1 ST 5 TH OCTOBER 2018, LOBBY MEDAN MARA, JALAN RAJA LAUT, KUALA LUMPUR

Malaysia to implement Euro 4M in 2015

ANNOUNCEMENT FOR PUBLIC RELEASE OPERATION AND MAINTENANCE AGREEMENTS NO. 1, NO. 2 AND NO. 3

Euromoney Real Estate Survey 2016

GEA charge air cooler. Innovations that put big things into motion. GEA Heat Exchangers GEA Maschinenkühltechnik

Chapter 4 Geo-Economic Features of the Growth Corridor

SUBSIDIARY BODY FOR SCIENTIFIC AND TECHNOLOGICAL ADVICE Fourteenth session Bonn, July 2001 Item 3 (b) of the provisional agenda

M O T O R V E H I C L E S T A T I S T l C S

SOLAR ENERGY STATION

About Czarnikow. The Premier Provider of Sugar Market Services. Czarnikow has been in the sugar business since 1861

Exhaust Aftertreatment Technology for Emission Control of Diesel Engines

Week 4 March 25. Nada Nada Alam. Developer Sepang Cemerlang Sdn. Bhd. (Seri Pajam Development Group) J - P r o p v e s A n a l y z e

THE TRES AMIGAS PROJECT

Thirty Years of Climatological Data: 1969 to 1998

SENAI INTERNATIONAL AIRPORT AWARDED ASIA PACIFIC REGIONAL AIRPORT OF THE YEAR 2018

WISMA ACADEMY. No. 4A, Jalan 19/1, Petaling Jaya, Selangor

Industrial Batteries / Network Power. Sonnenschein A400 FT.»The dryfit range for modular performance adaption«

RUBBER PRODUCTS STATISTICS September 2018 (Data up to July 2018)

C-VIP. compressors. Every component of the VIP. frame is designed to provide. built-in reliability and simplicity.

MB WORLD GROUP BERHAD

Electric Vehicles and the Environment (EVE IWG)

Transcription:

www.euroculture.my EUROCULTURE SDN BHD EUROCULTURE SEA SDN BHD

www.euroculture.my EUROCULTURE SDN BHD EUROCULTURE SEA SDN BHD STRENGTH DURABILITY ENDURANCE SAFETY

Geobrugg protects people and infrastructures from the forces of nature.

WHY EUROCULTURE Euroculture is a Malaysian based company who is the appointed representative of Geobrugg AP for Malaysia, Indonesia and Oman. Euroculture has 10 years experience in slope protection technology using structural and biological solutions to protect people and green the earth. Euroculture has successfully installed Geobrugg solutions for several high profile clients like PLUS and JKR. All solutions are baked by the 45 years of Geobrugg experience and technology. EUROCULTURE SDN BHD EUROCULTURE SEA SDN BHD INSTALLED IN MAY `08 FOR PLUS EXPRESSWAY. THE STRONGEST INDEPENDENTLY FIELD TESTED 5000KJ DEBRISFLOW BARRIER IN THE WORLD

With Geobrugg in Malaysia, Indonesia & Oman EUROCULTURE SDN. BHD. 617275-K EUROCULTURE SEA SDN. BHD. 654122-D Principal: Dato Arulgnanam (Moohen) Office: EL-11-13, AMCORP MALL BUSINESS SUITE, MENARA MELAWANGI, PUSAT DAGANGAN AMCORP, 18, JALAN BARAT, PJ, SELANGOR, 46050, MALAYSIA TEL: 603 79550122 FAX: 603 79556122 MOBILE: 6012 2230715 MOF: 357-02104670 CIDB: G7

PRODUCTS EUROCULTURE SDN BHD EUROCULTURE SEA SDN BHD Rockfall barriers and catch fences Geobrugg rockfall protection mesh systems (catch fences and rockfall drapery/rockfall netting) made from hightensile steel wire consist of the following product groups to match different rockfall problems Slope stabilization The TECCO slope stabilisation system (boulder netting, flexible facing) stabilises steep, weathered slopes in place of concrete and shotcrete constructions and conventional net systems Rock protection The robust SPIDER spiral net of high-tensile 4 mm steel wire strand secures loose rocks, rock spurs and overhangs, also unstable rock formations with a very irregular surface structure and coarse block weathering Sinkhole protection The ERFA system pursues the notion of part protection with the aim of reducing the risk of sinkholes and the associated costs to an acceptable level through cost-effective and simple action. Debris flow barriers Our flexible ring net barriers withstand high static and dynamic loads. They can be installed with a low outlay of material and man hours, greatly reducing costs and construction time. Emptying is simple. Shallow landslide barriers Our flexible shallow landslide barriers made from high-tensile steel wire protect roads, residential areas and railway lines. Safe and Rapid Mining Geobrugg rockfall barriers for mines are based on a much tried and tested technology that was further developed for use on berm benches in mines for rockfall events up to a nominal energy of 5000 kj.

WHY GEOBRUGG Geobrugg a Swiss based Company has developed and produced technologically mature protection systems from steel wire nets, which are installed worldwide. Their dynamic and static protective structures provide proven protection against - rock fall - avalanches - Mud and debris flows - slope failures Since the introduction of dynamic rock fall protection barriers over 40 years ago in Switzerland, net designs were continually researched and developed to catch and retain rock fall, debris flow and small snow avalanches. From 1989 through 2001, several research projects with Geobrugg in the United States, Japan, Hong Kong, Spain, South Korea and in Switzerland, conducting 1:1 field tests have been realised with the target to improve the energy absorbing capacity, the economy and the safety of dynamic rock fall barriers, and static slope protection systems. EUROCULTURE SDN BHD EUROCULTURE SEA SDN BHD Rock anchors and soil nails offer the possibility to stabilize steep slopes comprising of loose, disintegrated and weathered rock as well as soil. These so called active systems provide a support to the rock surface as a combination of rock nailing, to guarantee the overall stability of the concerned slope section, with a special tensioned wire rope net or wire mesh in between the anchor grid. Similar to the rock fall barriers these systems can be designed and adapted to the local slope conditions and boulders to be retained. The materials and services offered in the following are based on the latest technology and knowledge, gained thru comprehensive field tests and practical applications worldwide. For a proper and safe function it is important that only originally manufactured material of Geobrugg is used and the systems are anchored and installed according to the product manual and instructions of Geobrugg.

WHY OUR APPROACH? EUROCULTURE SDN BHD EUROCULTURE SEA SDN BHD Our approach leads to functionally and economically convincing solutions. Our objective is to work out project-specific, optimal benefits for you. This is why we cooperate closely with your locally established specialists in each case. We provide the client with the necessary know-how, of course if necessary due to local circumstances we act as general contractor assuming the overall responsibility for planning, installation, costs and deadlines.

HOW WE DO IT? You set our task(s)... The implementation of protection constructions with Geobrugg systems can be structured in five interconnected phases. The procedure outlined below brings results that meet the original specifications and expectations, and guarantee optimal safety. This is the reason why our experts normally accompany the projects right until the installation is handed over. EUROCULTURE SDN BHD EUROCULTURE SEA SDN BHD Analysis We support you in the hazards analysis and show you possible approaches for solutions. Planning and design Having inspected the terrain, our specialists draw up a concept for the protection measure: They define the arrangement on the spot and calculate the layout of the individual components and the construction as a whole. Production and delivery We produce the individual components and deliver them to the building site made-up as far as possible, ready for installation and at the agreed time. 4. Installation Although our manuals leave hardly any questions unanswered, you are welcome to put the site management in the hands of our specialists if you wish. 5. Reception and handing over On request our professionals supervise the formal acceptance and handing over of the protective structure.

Is Malaysia Safe from Natural Disasters?

EFFECTS FROM THE CLIMATE EUROCULTURE SDN BHD EUROCULTURE SEA SDN BHD Comparison of Annual Rainfall Change (%): (a) For The Period 2000 2007 Relative To The Period 1990-1999 (Last Decade of the 20th Century), based on the MMD s Surface Observation Stations Data; and (b) for The Periods 2020 2029, 2050 2059, and 2090 2099 Relative To The Period 1990-1999 based on the Nine AOGCM Ensemble. The ensemble rainfall projection for the nine AOGCM for the 21st century exhibit an increase in precipitation over the West Coast states and a decrease over the East Coast states of Peninsular Malaysia (Figure (b)). For East Malaysia, the AOGCM models have projected the rainfall over western Sarawak to increase significantly by the end of the 21st century. An Extract from CLIMATE CHANGE SCENARIOS FOR MALAYSIA 2001-2099 By The Malaysian Meteorological Department Scientific Report, January 2009 Increase in Rainfall can cause flash floods and landslides

EFFECTS FROM THE CLIMATE EUROCULTURE SDN BHD EUROCULTURE SEA SDN BHD Though not directly on the Earthquake line. Malaysia is very close to it and can suffer from after shocks from a large quake in the neighboring region and minor quakes of its own Earthquakes and tremors can cause flash floods, sinkholes, rockfalls and landslides

EUROCULTURE Project Gallery

GEOBRUGG DEBRISFLOW SYSTEMS IMPLEMENTED0 IN MALAYSIA SINCE 2004 -PLUS EXPRESSWAY IN 2005 COMPLETED

INSTALLED IN MAY `08 FOR PLUS EXPRESSWAY. THE STRONGEST INDEPENDENTLY FIELD TESTED 5000KJ DEBRISFLOW BARRIER IN THE WORLD COMPLETED

ROCKFALL BARRIERS 345 METRE ROCKFALL BARRIERS INSTALLED AT BUKIT LANJAN, PLUS EXPRESSWAY AFTER THE MAJOR ROCKSLIDE IN 2004 132 METRE OF ROCKFALL BARRIERS FOR JKR AT KM 51 POSLIM - GUA MUSANG IN JUNE 2007 THE FENCE CONTAINED A SERIES OF ROCKFALLS IMMEDIATELY AFTER INSTALLATION ONE LATE RAINY NIGHT IN 2007

TECCO SOIL/ROCK SLOPE STABILISATION SYSTEM AT JELAPANG, THIRD LANE WIDENING FOR PLUS EXPRESSWAY 2007 DISASTERS AND LANDSLIDES ARE CREATED BY WATER. GEOBRUGG DEVELOPED A 3 DIMENSIONAL HIGH STRENGTH WIREMESH TO WRAP SLOPES WITH NAILING. THE SYSTEM ALLOWS WATER TO FLOW IN AND OUT, ENCOURAGING GREENING

4MM THREE DIMENSIONAL TECCO WIREMESH SYSTEM WITH ROCK NAILING AT ALAM DAMAI, CHERAS KUALA LUMPUR 2008

RAWANG REST & SERVICE AREA NORTHBOUND FOR PLUS EXPRESSWAY COMPLETED 12.12.08

SITE: BUKIT GASING CLIENT: SYABAS SYSTEM: 150 KJ DEBRISFLOW BARRIER INSTALLED: FEB. 09

PROJECTS DESIGNED FOR GEOBRUGG SYSTEM THE SPIDERNET 3 DIMENSIONAL WIREMESH PROPOSED AT KM 15 JELI GRIK HIGHWAY PATENTED SPIKEPLATE OR NAIL HEAD

REHABILITATION COMMENCED IN JAN 09 AND BEING INSTALLED WITH GEOBRUGG TECCO WIREMESH SYSTEM

TAMAN WANGSA UKAY ROCK SLOPE FAILURE SYABAS RESEVOIR APRIL 2009

ANTARABANGSA LANDSLIDE, SLOPE STABILISATION WORKS AT SURROUNDING AREAS, APRIL 09

STABILISATION OF GUNUNG LANG LIMESTONE SLOPE CONTRACTOR: EMRAIL CLIENT - UEM BUILDERS (DOUBLE TRACKING PROJECT)

STABILISATION OF GUNUNG LANG

INSTALLATION OF GABIONS TO RESIST DEBRISFLOW AT BUKIT FRASERS 2009-2010

INSTALLATION OF TWO DEBRISFLOW BARRIERS BY JKR PAHANG AT BUKIT FRASER WHEN GABION SYSTEM FAILED Failed System

SRI DAMANSARA HIGH END PROPERTY DEVELOPMENT INSTALLATION OF 4MM DIAMETER TECCO WIREMESH

IN CONCLUSION IT IS OBVIOUS THAT GEOBRUGG TECHNOLOGIES ARE FAR MORE SUPERIOR TO ANY OTHER PRODUCT PRESENTLY IN THE MARKET.AS, ALL MATERIALS ARE INDEPENDENTLY TESTED & VERIFIED BY LABS AND GOVERNMENTAL INSTITUTIONS, ALL MATERIALS INVOLVED ARE DEVELOPED AND ASSEMBLED BY GEOBRUGG IN THE FACTORY, WORLD LEADERS IN DEBRISFLOW INSTALLATIONS AESTHETICALLY EXCELLENT, LIGHTWEIGHT AND EASY TO INSTALL BY GEOBRUGG TRAINED CONTRACTORS, ENCOURAGES GREENING TO REDUCE CARBON FOOTPRINT, AS TESTED IN JAPAN. WATER FLOWS IN AND OUT OF THE SLOPE WITHOUT RESTRICTION, PROVIDES AN EVEN DISTRIBUTION OF LOAD OVER THE SURFACE, SIMILAR TO SHOTCRETE/GUNITING, ACCOMODATES LIMITED SLOPE FLEXING CAUSED BY TREMORS AS SEEN IN NZ, ITALY, GREECE & JAPAN. TECCO CAN BE REUSED. PLEASE SEE NEXT PAGE FOR CARBON FOOTPRINT TEST DATA. PAPERS DELIVERED AT `INTERNATIONAL SLOPE CONFERENCE MALAYSIA 08 ON TECCO AND DEBRISFLOW EUROCULTURE SDN BHD EUROCULTURE SEA SDN BHD

PROJECT LIST PROJECTS COMPLETED AND AWARDED TO EUROCULTURE SINCE 2004 EUROCULTURE SDN BHD EUROCULTURE SEA SDN BHD 1. ROCKFALL BARRIER AT BUKIT LANJAN 355M x 1.5M commenced work 30 th March 2004 Contract No: UEMC/ECSB/LA/L163/DMNI Contract Title NEW KLANG VALLEY EXPRESSWAY (NKVE) BUKIT LANJAN INTERCHANGE ROCK SLOPE REHABILITATION WORK INSTALLATIONOF GEOBRUGG ROCKFALL BARRIER AXI-015(150KJ) and completed in Jan 2005 CLIENT: PLUS EXPRESSWAY BERHAD 2. DEBRISLOW BARRIER 5 UNITS AT NORTHBOUND PROPOSED PREVENTIVE MEASURES FOR CRITICAL SLOPES (GEOBRUGG DEBRIS FLOW NETS / FENCE) AT KM 302.30 AND KM 302.50 SOUTHBOUND, GUA TEMPURUNG AND KM 263.55, KM 263.30, KM 261.75 SOUTHBOUND, JELAPANG (TURNKEY) Commence work 14 Sept 2005 and completed installation on 10 th Dec. 2005 JOB NO. PLUS/MMD/UUD/0427/N5,C1/05-016 CLIENT: PLUS EXPRESSWAY 3. SLOPE STABILISATION AT JELAPANG WITH THE TECCO SYSTEM PROPOSED MODIFICATION OF NON-STOP THROUGH TRAFFIC BETWEEN IPOH (S) AND JELAPANG (PACKAGE 5) Sub-Contract of Design and Build for 4000 square meters of TECCO High Tensile Wire Netting for Rock and Soil Slope Stabilisation Works with nailing from Ch 3510 to CH 3535 Commenced work 1st Feb 2007 and completed work Dec 2008 CLIENT: PLUS EXPRESSWAY BHD 4. SLOPE STABILISATION AT RAWANG R & R WITH TECCO SYSTEM Proposed Slope Rehabilitation Works with TECCO wiremesh system for 1250 square meters at Km440.00 Northbound, Section C3, Sungai Buloh-Tanjung Malim Expressway (Job No. Plus/MMD/HR/C3/08-002) CLIENT: PLUS EXPRESSWAY BHD 5. 1 UNIT DEBRISFLOW BARRIER 7M x 50M PROPOSED DESIGN AND BUILD PREVENTIVE MEASURES TO POTENTIAL DEBRISFLOW AT BUKIT MA OKIL, SECTION S3 PAGOH-MACHAP EXPRESSWAY (JOB NO:PLUS/MMD/UUD/S3/07-013) INSTALLATION OF GEOBRUGG RXI-500 (5000KJ) DEBRISFLOW BARRIER Commenced work on 16 th April 2008 and completed on 10 th July 2008 CLIENT: PLUS EXPRESSWAY BHD 6. ROCKFALL BARRIER 90M x 3M AND 4000 SQUARE METERS OF SLOPE STABILISATION WORKS WITH TECCO AT BUKIT LANJAN, SELANGOR PROPOSED CUT SLOPE REHABILITATION WORKS AT KM 21.97, WESTBOUND, BUKIT LANJAN INTERCHANGE, SECTION C4 To commence work in June 09 CLIENT: PLUS EXPRESSWAY BHD

7. ROCKFALL BARRIER AT GUA MUSANG PROJECT: JKR Jalan Raya Simpan Pulai Lojing Gua Musang Kuala Berang 132M of GEOBRUGG C3 Barrier CONTRACT NO JKR/IP/CJ/90/2006 Commenced work on 14th Fe. 2007 and completed on June 2007 CLIENT: JABATAN KERJA RAYA MALAYSIA(JKR) EUROCULTURE SDN BHD EUROCULTURE SEA SDN BHD 8. SLOPE STABILISATION AT CAMERON HIGHLANDS, BHARAT TEA SHOP, WITH THE TECCO SYSTEM FT 059- Seksyen 57 Jalan Ringlet - Tanah Rata Cameron Highlands Main Contractor: ROADCARE SDN BHD Nominated Specialist Contractor: EUROCULTURE SDN BHD Commence work 28 th August 2008 and to be completed 12 months later. CLIENT: JABATAN KERJA RAYA MALAYSIA 9. SLOPE STABILISATION AT JELI KM 15, KELANTAN, WITH SPIDERNET SYSTEM 2000 SQUARE METERS. Commence work Nov. 2008 and completed works Mar. 2009 CLIENT: JABATAN KERJA RAYA MALAYSIA 10. SLOPE STABILISATION WITH 1450 SQUARE METER OF TECCO SYSTEM AND 10M X 5M (150KJ DEBRISFLOW BARRIER AT BUKIT GASING, PETALING JAYA Commence work Oct 2008 completed in Jan 2009 CLIENT: SYABAS 11. ROCK SLOPE STABILISATION WITH 12,000 SQUARE METERS OF TECCO SYSTEM AT ALAM DAMAI, CHERAS, KUALA LUMPUR Commence work 29 th Dec 2007 and completed in June 2007 CLIENT: SPPK PROPERTY DEVELOPMENT 12. PROPOSED 696 SQUARE METERS OF ROCK STABILISATION WITH TECCO INSTALLATION AT RESERVOIR TAMAN WANGSA UKAY ANTARABANGSA, GOMBAK Work in progress from Mar 2009 and to be completed by end May 2009 CLIENT: SYABAS 13. 75M x 3M ROCKFALL BARRIER & 500 M SQUARE METER OF TECCO SYSTEM FOR ROCK SLOPE STABILISATION AT GUNUNG LANG, IPOH RAILWAY YARD MAIN CONTRACTOR: EMRAIL SDN BHD/ LEIGHTON CLIENT: KTM DOUBLE TRACKING Work in progress from 1 st May 2009 and completion due in end June 2009 14. 2 OFF UNITS OF RXI-500(5000KJ)FOR DEBRISFLOW BARRIERS AT BUKIT FRASERS AND 2000 SQUARE METERS OF TECCO SYSTEM Awarded and work to commence on1st June 09 and to be completed Oct. 2009 CLIENT: JABATAN KERJA RAYA MALAYSIA

15. PLUS EXPRESSWAY INSTALLED DEBRISFLOW BARRIER AND TECCO SYSTEM AT BUKIT LANJAN SECTION C4 Commence in late 2009 and completed in April 2010 16. SRI DAMANSARA DEVELOPMENT (subsidiary of Land & General Berhad) Commence work in Nov 2010 and to completed by mid 2011. Installation of 4mm Tecco to retain Granite rock

www.euroculture.my EUROCULTURE SDN. BHD. 617275-K EUROCULTURE SEA SDN. BHD. 654122-D Principal: Dato Arulgnanam (Moohen) Office: EL-11-13, AMCORP MALL BUSINESS SUITE, MENARA MELAWANGI, PUSAT DAGANGAN AMCORP, 18, JALAN BARAT, PJ, SELANGOR, 46050, MALAYSIA TEL: 603 79550122 FAX: 603 79556122 MOBILE: 6012 2230715 MOF: 357-02104670 CIDB: G7 EUROCULTURE SDN BHD EUROCULTURE SEA SDN BHD