EG1 361 THROTTLE BODY

Similar documents
Throttle Body (3S GTE)

THROTTLE BODY. Port name. Clearance between lever and stop screw. 0 mm (0 in.) 0.50 mm (0.020 in.) 0.80 mm (0.031 in.) Throttle valve fully open

THROTTLE BODY ON VEHICLE INSPECTION EG INSPECT THROTTLE BODY (a) Check that the throttle linkage moves smoothly.

THROTTLE BODY. ON VEHICLE INSPECTION 1. INSPECT THROTTLE BODY (a) Check that the throttle linkage moves smoothly. EG1 182

Throttle Body (4A FE)

EG2 173 EXHAUST GAS RECIRCULATION (EGR) SYSTEM

EG1 509 OIL COOLER COMPONENTS FOR REMOVAL AND INSTALLATION

TIMING BELT COMPONENTS

FUEL PRESSURE REGULATOR

EXHAUST GAS RECIRCULATION (EGR) SYSTEM (4A FE)

CH 10 ALTERNATOR COMPONENTS FOR REMOVAL AND INSTALLATION (3S GTE)

EG1 485 OIL PUMP COMPONENTS FOR REMOVAL AND INSTALLATION

EXHAUST GAS RECIRCULATION (EGR) SYSTEM

EXHAUST GAS RECIRCULATION (EGR) SYSTEM

SUPERCHARGER. ON-VEHICLE INSPECTION 1. INSPECT SUPERCHARGER OIL LEVEL HINT: With the engine cold, check the oil level on the dipstick.

ON-VEHICLE INSPECTION

Cylinder Head Setting Bolt Tightening Adaptor Injection Measuring Tool Set EFI Fuel Pressure Gauge

Injectors (4A FE) FI 155. (b) If you have no sound scope, you can check the injector transmission operation with your finger.

FUEL PUMP. ON VEHICLE INSPECTION 1. CHECK FUEL PUMP OPERATION (a) Using SST, connect terminals +B and FP of the data link connector 1.

CYLINDER HEAD COMPONENTS FOR REMOVAL AND INSTALLATION

STARTER COMPONENTS FOR REMOVAL AND INSTALLATION (3S GTE)

INJECTOR ON VEHICLE INSPECTION 1. CHECK INJECTOR OPERATION

THREE WAY CATALYST (TWC) SYSTEM

TURBOCHARGER ON VEHICLE INSPECTION TC 7

TURBOCHARGER SYSTEM TURBOCHARGER TC 1

GENERATOR CH-9 COMPONENTS FOR REMOVAL AND INSTALLATION

2001 Ford Windstar ENGINES 3.8L V6 - VIN 4 - Windstar

FUEL PUMP SYSTEM CIRCUIT

GENERATOR REMOVAL OF GENERATOR (4A FE) CH 6

DISTRIBUTOR (5S FE) REMOVAL OF DISTRIBUTOR IG 30

INTAKE MANIFOLD COLLECTOR. 1. Electric throttle control actuator 2. Gasket 3. Vacuum hose

1992 Toyota Cressida

FUEL PUMP SYSTEM CIRCUIT

FI 135. Fuel Pump (3S GTE)

DISTRIBUTOR DISTRIBUTOR REMOVAL

INJECTOR COMPONENTS SF-18. Air Cleaner Hose. Accelerator Cable Water Bypass Hose Air Hose. PCV Hose. Throttle Position Sensor Connector.

1991 Volkswagen Vanagon Syncro

Before performing any on-vehicle adjustments to fuel or ignition systems, ensure engine mechanical condition is okay.

TUNE UP EG2 12 ENGINE MECHANICAL

D - ADJUSTMENTS - 4-CYL

IN-VEHICLE REPAIR. Upper Intake Manifold

REMOVAL AND INSTALLATION OF TRANSAXLE (4WD)

REMOVAL. Fig Sized for Print

REMOVAL FU 11 2TR-FE FUEL FUEL INJECTOR. Pinch. Checker. Detaching Switch Pull Out. Retainer. Fuel Hose Connector. Pipe. O-ring. Pinch.

D - ADJUSTMENTS Article Text 1992 Dodge Colt For a a a a a Copyright 1998 Mitchell Repair Information Company, LLC Saturday, April 27, :46PM

2003 ACCORD - Intake Manifold Removal and Installation

1989 Nissan 300ZX. 3.0L V6 - VIN [H] & 3.0L V6 TURBO - VIN [C] 1989 Engines - 3.0L & 3.0L Turbo V6

IG 1 2GR-FE IGNITION IGNITION SYSTEM IGNITION SYSTEM ECM ENGINE ROOM R/B - IG2 FUSE - ST/AM FUSE IGNITION COIL NOISE FILTER NOISE FILTER A137458E01

ENGINE ADJUSTMENTS. Remote Controls

STARTER COMPONENTS FOR REMOVAL AND INSTALLATION

2000 Chrysler SEBRING

1994 ENGINE PERFORMANCE TOYOTA SYSTEM & COMPONENT TESTING

TURBOCHARGER Toyota Celica DESCRIPTION OPERATION TURBOCHARGING SYSTEMS All Models

1996 Aerostar/Ranger/Explorer

FUEL SYSTEM PRECAUTION FU 1

2003 Nissan-Datsun Truck Frontier 4WD V6-3.3L (VG33E)

5. FUEL SYSTEM FUEL SYSTEM 5-0

ENGINE TUNE-UP INSPECTION OF ENGINE COOLANT INSPECTION OF ENGINE OIL INSPECTION OF BATTERY. INSPECTION OF AIR FILTER (Paper Filter Type)

TIMING BELT COMPONENTS EM 15

FREE $15 Gift Card for every $100 spent on Ship To Home orders. Find Out How

INTEGRATED IGNITION ASSEMBLY (IIA) (4A FE)

11A-1 ENGINE CONTENTS

EM 112 1GR-FE ENGINE MECHANICAL ENGINE ASSEMBLY INSPECTION. Intake Air Surge Tank Side

VALVE CLEARANCE ADJUSTMENT EM 7

INSTALLATION EM 8 1NZ-FE ENGINE MECHANICAL DRIVE BELT INCORRECT CORRECT. Generator Vehicle Front A077960E03. Adjusting Bar. Bolt A. Bolt B.

CARBURETOR SERVICE INFORMATION TROUBLESHOOTING THROTTLE VALVE DISASSEMBLY THROTTLE VALVE INSTALLATION...

EM 6 VALVE CLEARANCE ENGINE MECHANICAL EM11I 01 ADJUSTMENT HINT:

2001 Ranger Workshop Manual. 1. Drain the cooling system. For additional information, refer to Section

ADJUSTMENTS Mazda MX-3. Fig. 1: Identifying Engine Code & Number Courtesy of MAZDA MOTORS CORP. VALVE CLEARANCE ADJUSTMENT

REMOVAL. 5. REMOVE OIL DIPSTICK GUIDE (a) Remove the bolt, dipstick guide and engine wire bracket. (b) Remove the O ring from the dipstick guide.

Intake Manifold Removal and Installation

VALVE CLEARANCE ADJUSTMENT EM 8

TROUBLESHOOTING PROBLEM SYMPTOMS TABLE


REMOVAL OF ALTERNATOR

ENGINE COOLING FAN Toyota Celica ELECTRIC COOLING FAN RADIATOR COOLING FAN SYSTEM TEST ENGINE COOLING Toyota Engine Cooling Fans

1999 E-Series Workshop Manual

ACC CUT RELAY INSPECTION

SECTION 6B ENGINE COOLING

ENGINE TUNE UP. (See steps 1 and 2 on page CO 5)

INTAKE AND EXHAUST GROUP CONTENTS INTERCOOLER GENERAL INFORMATION SERVICE SPECIFICATIONS

2. Disconnect the accelerator control cable and the cruise control cable from the throttle body. 3. Disconnect the vacuum hose from the throttle body.

WARNING: ALWAYS relieve fuel pressure before disconnecting any fuel related component. DO NOT allow fuel to contact engine or electrical components.

ARTICLE BEGINNING SERVICE PRECAUTIONS

FUEL PUMP SYSTEM CIRCUIT

11. CARBURETOR 11-0 CARBURETOR ZX / SCOUT 50

REPAIR INSTRUCTIONS ON-VEHICLE SERVICE

SPECIFICATIONS TEST AND ADJUSTMENT SPECIFICATIONS SPECIFICATIONS ENGINE FD620D, K SERIES

Intake air temperature sensor may be also identified using appropriate illustration in THEORY/OPERATION article.

BE 66 COMBINATION METER PARTS LOCATION

SR 75. Power Steering (Gear Housing) Gear Housing (4WD) REMOVAL AND INSTALLATION OF GEAR HOUSING Remove and install the parts as shown.

ENGINE MECHANICAL (4A FE)

ENGINE AND EMISSION CONTROL

FU-1 FUEL SYSTEM. Page PRECAUTIONS... TROUBLESHOOTING... ON-VEHICLE INSPECTION...

ENGINE 6G74 3.5L-SOHC-24 VALVE

2002 Mitsubishi Montero Limited

1983 Mazda RX-7 GSL TUNE-UP' 'Mazda Rotary

COOLING SYSTEM ON-VEHICLE INSPECTION CO 1

INTAKE AND EXHAUST 15-1 CONTENTS SERVICE ADJUSTMENT PROCEDURES... 2 EXHAUST MANIFOLD EXHAUST PIPE AND MAIN MUFFLER...

1.8L & 2.2L 4-CYL Article Text 1998 Subaru Impreza

Transcription:

3SGTE ENGINE EG1361 THROTTLE BODY

EG1362 3SGTE ENGINE ONVEHICLE INSPECTION 1. INSPECT THROTTLE BODY (a) Check that the throttle linkage moves smoothly. (b) Check the vacuum at each port. Start the engine. Check the vacuum with your finger. Port name At idle Other than idle No vacuum Vacuum No vacuum Vacuum 2. INSPECT THROTTLE POSITION SENSOR (a) Disconnect the sensor connector. (b) Disconnect the vacuum hose from the throttle opener. (c) Apply vacuum to the throttle opener. (d) Insert a feeler gauge between the throttle stop screw and stop lever. (e) Using an ohmmeter, measure the resistance between each terminal. Clearance between lever and stop screw 0 mm (0 in.) 0.50 mm (0.020 in.) 0.70 mm (0.028 in.) Throttle valve fully open Between terminals VTA E2 IDL E2 IDL E2 VTA E2 VC E2 Resistance 0.2 5.7 k 2.3 k or less Infinity 2.0 10.2 k 2.5 5.9 k (f) Reconnect the vacuum hose to the throttle opener. (g) Reconnect the sensor connector.

3SGTE ENGINE SM PI SYSTEM EG1363 3. INSPECT THROTTLE OPENER A. Warm up engine Allow the engine to warm up to normal operating temperature. B. Check idle speed Idle speed: 800 ± 50 rpm C. Check and adjust throttle opener setting speed (a) Disconnect the vacuum hose from the throttle opener, and plug the hose end. (b) Check the throttle opener setting speed. Throttle opener setting speed: 900 1.900 rpm (w/ Cooling fan OFF) If the throttle opener setting is not as specified, re place the throttle body assembly. (c) Stop the engine. (d) Reconnect the vacuum hose to the throttle opener. (e) Start the engine, and check that the idle rpm returns to the correct speed. Idle speed: 800 ± 50 rpm

EG1364 3SGTE ENGINE COMPONENTS FOR REMOVAL AND INSTALLATION THROTTLE BODY REMOVAL (See Components for Removal Installation) 1. DISCONNECT CABLE FROM NEGATIVE TERMINAL OF BATTERY CAUTION: Turn the ignition switch to LOCK. Discon nect the negative terminal from the battery. Wait at least 20 seconds before proceeding with work. 2. DRAIN ENGINE COOLANT 3. DISCONNECT ACCELERATOR CABLE FROM THROTTLE BODY 4. REMOVE NO.1 INTAKE AIR CONNECTOR

3SGTE ENGINE SM PI SYSTEM EG1365 5. REMOVE INTAKE AIR CONNECTOR Remove the two bolts, two nuts and intake air con nector. 6. REMOVE INTAKE AIR CONNECTOR STAY (a) Remove the six bolts and intake air connector stay. (b) Remove the spacer. 7. REMOVE THROTTLE BODY (a) Disconnect the following connector: Throttle position sensor connector IACV connector (b) Disconnect the following hoses: (1) Vacuum hose from port P of throttle body (2) Vacuum hose from port E of throttle body (3) PCV hose from port PCV of throttle body (4) Vacuum hose from throttle opener. (c) Remove the four bolts, and disconnect the throttle body from the intake manifold. (d) Remove the throttle body gasket. (e) Disconnect the following hoses from the throttle body, and remove the throttle body: (1) Water bypass hose (from upper side of No. 1 air tube) (2) Water bypass hose (from lower side of No. 1 air tube) (3) Air hose (from No. 1 air tube)

EG1366 3SGTE ENGINE THROTTLE BODY INSPECTION 1. CLEAN THROTTLE BODY (a) Using a soft brush and carburetor cleaner, clean the cast parts. (b) Using compressed air, clean all the passages and apertures. NOTICE: To prevent deterioration, do not clean the thr ottle position sensor. 2. INSPECT THROTTLE VALVE (a) Apply vacuum to the throttle opener. (b) Check that there is no clearance between the throttle stop screw and throttle lever when the throttle valve is fully closed. 3. INSPECT THROTTLE POSITION SENSOR (a) Apply vacuum to the throttle opener. (b) Insert a feeler gauge between the throttle stop screw and stop lever. (c) Using an ohmmeter, measure the resistance between each terminal. Clearance between lever and stop screw 0 mm (0 in.) 0.50 mm (0.020 in.) 0.70 mm (0.028 in.) Throttle valve fully open Between terminals VTA E2 IDL E2 IDL E2 VTA E2 VC E2 Resistance 0.2 5.7 k 2.3 k or less Infinity 2.0 10.2 k 2.5 5.9 k 4. IF NECESSARY, ADJUST THROTTLE POSITION SENSOR (a) Loosen the two set screws of the sensor.

3SGTE ENGINE (b) Apply vacuum to the throttle opener. (c) Insert a 0.60 mm (0.024 in.) feeler gauge between the throttle stop screw and stop lever. (d) Connect the test probe of an ohmmeter to the termi nals IDL and E2 of the sensor. EG1367 (e) Gradually turn the sensor clockwise until the ohm meter deflects, and secure it with the two set screws. (f) Recheck the continuity between terminals IDL and E2. Clearance between lever and stop screw 0.50 mm (0.020 in.) 0.70 mm (0.028 in.) Continuity (IDL E2) Continuity No continuity THROTTLE BODY INSTALLATION (See Components for Removal and Installation) 1. INSTALL THROTTLE BODY (a) Connect the following hoses to the throttle body: (1) Water bypass hose (from upper side of No. 1 air tube) (2) Water bypass hose (from lower side of No. 1 air tube) (3) Air hose (from No. 1 air tube) (b) Install a new gasket on the throttle body, facing the protrusion upward.

EG1368 3SGTE ENGINE SMP! SYSTEM (c) Install the throttle body with the four bolts. Torque: 19 Nm (195 kgfcm, 14 ftlbf) Different bolt lengths are used for the upper and lower sides. Bolt length: 45 mm (1.77 in.) for upper side 70 mm (2.76 in.) for lower side (d) Connect the following hoses: (1) Vacuum hose to port P of throttle body (2) Vacuum hose to port E of throttle body (3) PCV hose to port PCV of throttle body (4) Vacuum hose to throttle opener (e) Connect the following connector: Throttle position sensor connector IACV connector 2. INSTALL INTAKE AIR CONNECTOR STAY (a) Install the spacer. (b) Install the intake air connector stay with the six bolts. Torque: 7.8 Nm (80 kgfcm, 69 in.lbf) for 10 mm head 19 Nm (195 kgfcm, 14 ftlbf) for 12 mm head 3. INSTALL INTAKE AIR CONNECTOR Install the intake air connector with the two bolts and two nuts. Torque: 19 Nm (195 kgfcm, 14 ftlbf) 4. CONNECT ACCELERATOR CABLE TO THROTTLE BODY 5. INSTALL NO.1 INTAKE AIR CONNECTOR 6. CONNECT CABLE TO NEGATIVE TERMINAL OF BATTERY 7. REFILL WITH ENGINE COOLANT 8. START ENGINE AND CHECK FOR ENGINE COOLANT