PF Coil Fabrication Overview

Similar documents
PF Coil 2-6 Supply. Main technical aspects. P. Valente

GENERAL ATOMICS ITER CEnTRal SolEnoId ModulE FabRICaTIon September 2018

GENERAL ATOMICS ITER CENTRAL SOLENOID MODULE FABRICATION

GENERAL ATOMICS ITER CEnTRal SolEnoId ModulE FabRICaTIon August 2016

4.1. Manufacturing field F2 Preformed and field coil windings

ITER Magnets Update European perspective

The Results of the KSTAR Superconducting Coil Test

Life Extension Testing of Electrical Penetration Assemblies

EU TF coils status. A.Bonito Oliva F4E Magnets Project Manager

Cold Shrink QS T Trifurcating Transition Splice Kit

Excitation system is of Static Silicon Excitation System, including excitation transformer, thyristors, and AVR.

Industrial, Heavy Insulated Mono-Tape. and Duo-Tape

EU Procurement of In Vessel Components for ITER

Presented by B. Nelson for the QPS team QPS Conceptual Design Review June 23-24, 2003 ORNL

4. SHIELDS. 4.1 Power Cable. 4.2 Electronic Cable Conductor Shield (Strand Shield) Outer Shield (Insulation Shield) 60

VITALink Taped Splice Pigtail Crimp

E/ECE/324/Rev.2/Add.109/Rev.3/Amend.4 E/ECE/TRANS/505/Rev.2/Add.109/Rev.3/Amend.4

High Voltage Copper, Smooth Aluminum Shield/Sheath

3M Cold Shrink Silicone Rubber Termination QT-III 7600-S-3G Series Three-Core Outdoor Termination

Design specifications

Introduction. What is Powercore? Powercore Welding Rod is an " Electro-fusion System" used for joining all types of thermoplastic parts together.

Data sheet chainflex CF10

3M Cold Shrink QT-III Silicone Rubber Three-Core Termination Kits

Overview of the ITER In-Vessel coil (IVC)

1. Review of the Test

Flex Tube Elbow w/ Marmon or Flare

SICON. Connectors with Stepless Shear-Off Bolts. the power connection THE PFISTERER GROUP

Integrated Process Solutions. Series 88. CF Component Ultra high vacuum fittings Sizes 1 1/3'' to 4 5/8''

Epoxy Resin L Unit Value

WATTSYS Power distribution system

Data sheet chainflex CFSOFT1

STAMANT-Safety Pipe. System Description SMR

High Voltage Aluminum, Smooth Aluminum Shield/Sheath

Technical Specification No. M H For the Supply of Solid (mono-block) Wheels

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER E: THE REACTOR COOLANT SYSTEM AND RELATED SYSTEMS

Data sheet chainflex CF6

Overhead transmission lines Spacers

O-Ring Swivel Joints

Power-Limiting Cables

Broetje-Automation Company Standard Structural component specification for welded parts

Water Treatment Pressure Vessel

TUBES CONTENTS ACCESSORIES GENERAL CATALOG AIR TREATMENT, AUXILIARY, VACUUM, AND FLUORORESIN PRODUCTS. Caution TUBES

11. Completing the Fuselage Engine Installation

Plastics Machinery Thermocouples - Type 4, 7, 10, 11 & 19

Generator Test Report

Module 7: Cooling System Components

Data sheet chainflex CF140.UL

Cold Shrink QS2013-3T-WS Trifurcating Transition Splice Kit

SAFE USE AND HANDLING OF HOSES AND FLEXIBLE CONNECTIONS IN THE SOLVENTS INDUSTRY

CYLINDRICAL ROLLER BEARING CATALOG TIMKEN THRUST AND PLAIN BEARINGS CATALOG

Installation and Operating Instructions Electric Vibrators HV/VFL Series

BEST MANAGEMENT PRODUCTS, INC. The SNOUT OIL-WATER-DEBRIS SEPARATOR SPECIFICATIONS U.S. Patent # Canadian Patent #

Lower Fuselage Assembly. Controls

This chapter gives details of the design, development, and characterization of the

Ministry of New and Renewable Energy Block-14, CGO Complex, Lodhi Road, New Delhi ,

ITER G A0 FDR R1.0

Torus Coil. Construction and Geometry for Modeling. D. Kashy CLAS12 Collaboration Meeting March 6, 2018

Power Connection Kit installation instructions

Generators for the age of variable power generation

SEALED PLATINUM SURFACE TEMPERATURE SENSOR MODEL 29399

AIR CORE REACTORS. Phoenix Electric Corporation

Data sheet chainflex CF130.UL

PSI Anti-Corrosion Tape

This is trial version

PBM VALVES HANDLE PAINTS, COATINGS, RESINS AND ADHESIVES

S A F E & S U R E BETTER PRACTICES OF TERMINATION ON TO SWITCHGEAR

Mineral Insulated Resistance Thermometers (RTD)

HVS S 15kV Class

KSTAR Assembly. National Fusion Research Center, Daejeon, Korea

Remy HVH250 Application Manual Remy HVH250 Application Manual

ENGLISH Datasheet Platinum Resistance Pt100 4 wire class B Resistance Thermometer with Compact KNS Head

Development and Performance Evaluation of High-reliability Turbine Generator

Complete HVAC Capability

Alternating Current Motors in Detail

OFFSHORE WIND FEASIBILITY STUDY APPENDICES Appendix C.2 Subsea Cable Data Sheets

British Standard institute-bs Valve Standards

SOLENOID CONTROL VALVE

Data sheet chainflex CF5

ARI 300 Tank Car and Underframe Structural Inspection Bulletin

Section 13. Tail Rotor Drive. RotorWay International A600 TALON Construction Manual. Section 13. Page A

SECTION HIGH-SPEED ROLLING DOORS. B. Wiring from electric circuit disconnect to operator to control station.

Turbogenerators. With Top Performance for Steam and Gas Applications. Specifically tailored 4-pole Synchronous Turbogenerators

ABB Group August 27, 2010 Slide 1

Global VPI Insulated Indirectly Hydrogen-Cooled Turbine Generator for Single-Shaft Type Combined Cycle Power Generation Facilities

Installation manual. Exhaust system. Marine engines DI09, DI13, DI16. 02:04 Issue 9.0 en-gb. Scania CV AB 2017, Sweden

Electrical Machine Service. Overhaul, Conditioning, On-Site Service and Diagnostics. Excellent Technology, Efficiency and Quality

SERVICE BULLETIN. Fuselage Tail Cone Damage

FLEX-O-POWER FLEXIBLE WELDING

Autoclave Thermocouples (Type 9) and Pt100 Sensors (Type 69)

TECHNICAL SPECIFICATIONS FOR A WATER COOLED ACTIVELY SHIELDED GRADIENT SYSTEM WITH RT SHIM SET SGRAD 205/120/HD

Part/Assy 7527 ECN Ref S000000

Low Beta Cryomodule Development at Fermilab. Tom Nicol March 2, 2011

PUMPS STEAM TURBINES BUILDING & FIRE WASTEWATER SERVICE PUMP CLINIC 15 MECHANICAL SEAL DESIGN, OPERATION AND MAINTENANCE PROBLEMS

Data sheet chainflex CF240

ISO INTERNATIONAL STANDARD. Liquid hydrogen Land vehicle fuel tanks. Hydrogène liquide Réservoirs de carburant pour véhicules terrestres

Case Study Pulsating Heat Pipes By The Peregrine Falcon Corporation

Series Base mounted pump. Installation and operating instructions

Installation device. HelaTape. Electrical tapes for sealing, insulation and bundling of cable and conduits.

Installation Instructions

Flexible Heaters. Silicone Rubber Heaters

Transcription:

PF Coil Fabrication Overview PF Coils Information Meeting Barcelona - 15 th October 2012 This presentation is intended for reference purposes only and is not a legally binding document

PF Building Layout Possible Building Layout for fabrication of PF2 to PF6 (overlap of several stages at the same time) Workflow goes from left to right, where coils exits Building will have area for extension on the north side Clean Areas (ISO Class 9) areas B and D PF Coils Information Meeting, Barcelona - 15 th October 2012 2

PF Coil Fabrication CICC preparation DP Impregnation Winding & Insulation Clamping & Covering VPI(vacuum Pressure Impregnation) DP Stacking & Ground Wrapping PF Coils Information Meeting, Barcelona - 15 th October 2012 3

PF Conductor CICC PF 6 PF 2,3,4 PF 5 PF Coils Information Meeting, Barcelona - 15th October 2012 5

1.2 = 0.4 (bounding layer)+0.8 (pancake shim) Conductor Insulation 5 layers of interleaved polyimide and fiberglass with 50% overlapping + 1 layer of 50% overlapped fiberglass. Pancake insulation Conductor insulation SS Jacket Superconducting strands Cable wrapping Turn shim 2.7 1 Turn shim Shims to compensate for mechanical tolerances Central spriral Subcable wrapping PF Coils Information Meeting, Barcelona - 15th October 2012 6

DPs: 2-in-hand winding 2 conductors (Yellow and Red) wound in parallel in a DP DP-joint connects one end of each conductor to the another DPs PJ joint connects the 2 conductors in the middle of the DP PF Coils Information Meeting, Barcelona - 15th October 2012 7

Winding of DPs Conductor pre-treatment #1 Conductor pre-treatment #2 PF Coils Information Meeting, Barcelona - 15th October 2012 8

Winding of DPs PF Coils Information Meeting, Barcelona - 15th October 2012 9

Winding of DPs PF Coils Information Meeting, Barcelona - 15th October 2012 10

PF Winding Pack Typical PF Coil Winding Pack: PF Coils Information Meeting, Barcelona - 15th October 2012 11

He Inlets He inlets are in the inner turn of each DP, in the middle of the vertical joggle They are embedded in a longitudinal 450 mm long machined groove Cover with tube welded on the groove Groove Conductor Cover with tube PF Coils Information Meeting, Barcelona - 15th October 2012 12

Winding of DPs He Inlets PF Coils Information Meeting, Barcelona - 15th October 2012 13

PF Coil Fabrication CICC preparation DP Impregnation Winding & Insulation Clamping & Covering VPI(vacuum Pressure Impregnation) DP Stacking & Ground Wrapping PF Coils Information Meeting, Barcelona - 15 th October 2012 14

DP impregnation DP impregnation preparation (in Clean Area) Protect the conductor ends from impregnation Assembly of the impregnation vessel DP impregnation: Control of the leak tightness of the vessel Impregnation Cleaning the excess of resin Geometrical control HV test between conductors PF Coils Information Meeting, Barcelona - 15th October 2012 15

VPI Configuration Resin Stirring Motor Hardener + Accelerator Trap Trap Heater Flow Meter F Static Mixer F Thermal Insulation Heater Flow Control Pump F Argon Trap Accumulation Chamber Vacuum Pump Vacuum Pump Heater Coil Mould Vacuum Pump PF Coils Information Meeting, Barcelona - 15th October 2012 16

DP impregnation PF Coils Information Meeting, Barcelona - 15th October 2012 17

WP Impregnation PF Coils Information Meeting, Barcelona - 15th October 2012 18

He Inlets (Qualification) He inlets are in the inner turn of each DP, in the middle of the vertical joggle They are embedded in a longitudinal 450 mm long machined groove Cover with tube welded on the groove Groove Conductor Cover with tube PF Coils Information Meeting, Barcelona - 15th October 2012 19

He Inlet Qualification Dummy conductor to be used 4 samples for each conductor type 4-metre conductor formed to coil ID radius Secure the formed piece in a fixture which mimics the installation on WT Machine the slot in the conduit Check there is no visible damage to the superconducting strands Remove the outer wrap and the subscale wraps visible through the slot Plant the thermocouples in at least six places under the weld Fit the cover plate Weld the cover plate All samples shall be leak tested All samples carry out several (at least 5) cool down cycles to 77⁰K One sample will be sectioned to verify the full penetration defect free welds One sample is used for cutting samples for fatigue tests at 77⁰K One sample will be full-size tested against fatigue at 77⁰K PF Coils Information Meeting, Barcelona - 15th October 2012 20

Insulation Qualification Tensile & Shear tests of samples @ 77⁰K 70.0 R 60.0 4.0 ± 0.2 3.0 ± 0.05 6.4 = l P 23.0 = t = 4.0 ± 0.2 10.0 Tensile strength sample For information only: relation l/t has to be adjusted for achieving interlaminar shear failure: l/t = 4 5 Shear strength sample Bonding to the St Steel on samples testing shear/compression strength at 45 @ 77⁰K High Voltage test between conductors @ 77⁰K High Voltage test to ground @ 77⁰K PF Coils Information Meeting, Barcelona - 15th October 2012 21

Tail Qualification To qualify the manufacturing process of a bonded tail in a PF coil; To verify the mechanical performance of a bonded tail; To verify the electrical performance of the tail insulation. Weld Qualification and cool-down tests to 77⁰K Bonding qualification fatigue test @ 77⁰K Electrical Insulation qualification @RT PF Coils Information Meeting, Barcelona - 15th October 2012 22

Joint Qualification Dummy joint sample - fatigue test @ 77⁰K Three samples to establish the manufacturing process Weld Procedure Qualification Soldering Procedure Qualification Steel box Steel-copper explosion-bonded joint Solder interface Compacted superconducting cable Copper sole PF Coils Information Meeting, Barcelona - 15th October 2012 23

Dummy Double Pancake Manufacture Qualify the tooling and critical fabrication processes: winding process, transitions forming, insulation application, inlets installation, joint terminations preparation, installation of the spacers to maintain tight tolerances, assembly of the internal joints VPI process For PF6 the dummy double pancake is type A For PF5 (incl. PF2) and PF4 (incl. PF3) it is 5 turns Coil PF6 PF5 PF4 DP pattern A F K Number of turns Full DP 5 turns 5 turns PF Coils Information Meeting, Barcelona - 15th October 2012 24

Coil assembly and Ground insulation Coil assembly is done in a Clean Area Operations: DP stacking Ground Insulation wrapping, The ground insulation covers the winding pack Excludes the joints that have their own ground insulation Joint connection, assembly of the joint supports Joint Ground insulation PF Coils Information Meeting, Barcelona - 15th October 2012 25

Final Coil Assembly Coil assembly not needed to be done in Clean Area. Operations: Coil impregnation together with the joints Cleaning the excess of resin and geometrical control Pipe, terminal and instrumentation installation Wrapping of the coil with a conductive tape (ground surface) Clamp installation Protection cover installation HV and leak tests Delivery to cold test facility Attendance at the Cold Tests (carried out under another contract) Delivery to transport PF Coils Information Meeting, Barcelona - 15th October 2012 26

Final Coil assembly PF Coils Information Meeting, Barcelona - 15th October 2012 27

Follow us on: www.f4e.europa.eu www.twitter.com/fusionforenergy www.youtube.com/fusionforenergy