SLIDING GATE OPENER USER MANUAL

Similar documents
ARTICULATED ARM GATE OPENER USER MANUAL

is250/is250d/is250solar SWING GATE OPENER MANUAL

HYDRAULIC SWING GATE OPENER

MASTIFF 300/300M SWING GATE OPENER USER MANUAL

Swing Gate Kits AUTOMATIC GATE KITS & ACCESSORIES SECURING GATES SINCE Control Cards. Accessories 2017 / Gate & Door Controls Catalogue

HIGH SPEED SLIDING GATE OPENER

Sliding Gate Operator User's Manual

Sliding Gate Operator User's Manual

FITTING AND CONNECTION INSTRUCTIONS

Instruction Manual for the. E-SL 450 Series

MOUNTING AND CONNECTING INSTRUCTIONS 1. GATE ARRANGEMENT ENGLISH

Installation manual. English. mystrike OPENER FOR RACK-DRIVEN SLIDING MOTOR

MEKO OPENER FOR RACK-DRIVEN SLIDING MOTOR

BARRY BARRIER GATE AUTOMATION

Table of Contents. General Safety Preparation for Installation Parts List Optional Accessories Part List... 5

DKC400Y AC Sliding Gate Installation Manual. Sliding Gate Opener. Model: DKC400Y. Installation Manual WARNING

Gate & Door Controller with LCD and Intelligent Technology

Letron Auto Gates (Australia) Pty. Ltd. User s Installation Manual

INSTALLATION AND OWNER S MANUAL MODEL ASW Actuator Swing Gate Operator

DESIGNED FOR RESIDENTIAL APPLICATION KIT PL600/PL1000 SLIDING GATE OPENERS

Gate Operators, Inc. Model 7100UL Residential & Medium Duty Commercial Slide Gate Operator INSTALLATION MANUAL

EC MACHINE DIRECTIVE COMPLIANCE DECLARATION

INDUSTRIAL STACKING DOOR USER/INSTALLER MANUAL

IRREVERSIBLE OPERATOR FOR SWING GATES AND DOORS

PW320/PW330 USER MANUAL SWING GATE OPENERS 24V DC GEAR MOTOR FOR RESIDENTIAL. Flashing Light. Push Button. Control box. Gate 2.

VEHICULAR DC SWING GATE OPERATORS. Residential Light Industrial. Rev. 3/17

TMT Boxer 24v slider motor installation notes from EasyGate

MODEL D-SBG Single Arm Barrier Gate Operator

UNDERGROUND OPERATOR FOR SWINGING GATES. WARNING!! Before installing, thoroughly read this manual that is an integral part of the pack

MODEL D-WBG Wishbone Arm Barrier Gate Operator

Installation and a Maintenancee Manual

SWING GATE OPENERS 24V DC GEAR MOTOR

KVM 25 OPERATION MANUAL / INSTALLER

PW150/PW200 USER MANUAL SWING GATE OPENERS 24V DC GEAR MOTOR

contents Installation Maintenance DOOR OPERATOR SLIDING-1300/2100 Installation and Operating Manual DoorHan, 2012

EC MACHINE DIRECTIVE COMPLIANCE DECLARATION

EC DECLARATION OF CONFORMITY FOR MACHINES (DIRECTIVE 98/37/EC) WARNINGS FOR THE INSTALLER

VEHICULAR AC & DC. Residential Apartment/College Residence Halls Gated Communities Mixed Use Buildings Commercial/Industrial Parking Self Storage

MOOVY AUTOMATIONS FOR SLIDING GATES (230/110/24V)

APOLLO Gate Operators, Inc.

L /2012 rev 0 BISON 45 OTI UNIONE NAZIONALE COSTRUTTORI AUTOMATISMI PER CANCELLI, PORTE SERRANDE ED AFFINI

Installation and Maintenancee Manual

BULL 5M - BULL 5M.S BULL 8M - BULL 8 M.S BULL 8 OM - BULL 8 OM.S

GENERAL SAFETY... 3 PARTS LIST...

F ERNI K I T THE FERNI-S KIT CONSISTS OF:

L /2012 rev 0 BISON 30 OTI UNIONE NAZIONALE COSTRUTTORI AUTOMATISMI PER CANCELLI, PORTE SERRANDE ED AFFINI

PowerMaster MODEL MBG. Installation Manual U L R UL 325 AND UL 991 LISTED MEDIUM DUTY BARRIER GATE OPERATOR TABLE OF CONTENTS

FORCE SPD 800/1500/2000

BULL 424 ESA BULL 624 ESA

SKC400U SLIDING GATE OPENER OWNER S MANUAL

LIFTMASTER MAGIC BUTTON FS10 & LPK5 FAST SLIDER

Sliding Gate Opener User s Manual

INSTALLATION & OWNERS MANUAL

Single or Double 240VAC motor control for domestic and industrial gates and doors.

BISON 20 OM BISON 25 OTI

Typical Installation Schematic

SLIDE & OL USER'S AND INSTALLER'S MANUAL V1.0 REV. 06/2017

JOINT INSTALLATION MANUALS AND SAFETY INFORMATION

L /2013 rev 0 BISON 35 OTI UNIONE NAZIONALE COSTRUTTORI AUTOMATISMI PER CANCELLI, PORTE SERRANDE ED AFFINI

Automation Swing Gate Opener

SL100DCx series Sliding gate system Installation guide

SKC-500DC SLIDING GATE OPENER OWNER S MANUAL

Intelli-Park Series Barrier Arms. Intelli-Park 9. Intelli-Park 14. Intelli-Park 18. Intelli-Park 32

Installation and Set Up Instructions

E-SL 450BD Series INSTRUCTION MANUAL WARNING USER DRIVEN MANUAL*

Corso Principi di Piemonte, 65/ RACCONIGI (CN) ITALY tel fax

Installation and Set Up Instructions

TURBO 40 TURBO 80 TURBO 120 TURBO 160

Porte 150 Users Manual Swing Gate Opener 24V DC

Installing the gate post bracket with the cardboard arm template

INSTALLATION MANUAL ENGLISH ALPHA 200 ALPHA 330. L C (stroke) 960 mm 1160 mm

Sliding Gate Operator. User's Manual WARNING THIS PRODUCT MUST BE INSTALLED BY A QUALIFIED ELECTRICIAN

DTS SECURITY P.O.BOX 3399 EDENVALE 1610 Base plate-mounting instructions TELEPHONE

USER MANUAL. Automated Vehicular Boom Gate. Version: 1.0 Date: March, 2015

Electric Lock Part List

Saimatic Aster Gate Operator, Automation System Manual. 110V or 220V

MOTOR REDUCER 120 V~ FOR SLIDING GATES

INSTRUCTION MANUAL L WIND CONE

EC DECLARATION OF CONFORMITY FOR MACHINES WARNINGS FOR THE INSTALLER

Visit our website or download the latest version of your instruction manual: or

6-TON DOUBLE LOCKING JACK STANDS OWNER S MANUAL

FBD-NT Press Brake Installation Guide

Enelion Vertica. Installation manual. 22 kw. for the specialists

Electromechanical gear motor for sliding gates ACHILLES

SLIDING DOOR OPERATOR INSTRUCTION MANUAL

Porte 300 Users Manual Swing Gate Opener 24V DC for residential use only

SARGON S - M - L. All rights reserved INSTALLATION MANUAL

The House of Gate Automation

Index. COMPACT domestic gate operator

Installation manual ASTER AUTOMATION FOR SWING GATES 11_16

PY600AC Sliding Gate Opener User Manual

COOKSON OWNER S MANUAL

3-TON DOUBLE LOCKING JACK STANDS OWNER S MANUAL

Eazipole Cordless. Installation & Set Up Instructions. Electric Blinds & Curtains

SUBWING 700 USER S AND INSTALLER S MANUAL V1.0 REV. 04/2017

Installation and Set Up Instructions

GARAGE DOOR OPENER OWNER S MANUAL S3/S4

CONTENTS INTRODUCTION

D Vers. 03 ELECTROMECHANICAL AUTOMATION FOR SWING GATES

FEATURES AND SPECIFICATIONS

Transcription:

is600 / is900solar24 SLIDING GATE OPENER USER MANUAL Bluetooth charge monitoring app

INDEX 1.1 GENERAL SAFETY PRECAUTION 1.2 KIT CONTENTS.. P.1 P.2 1.3 DIMENSION... P.3 1.4 TECHNICAL FEATURES P.4 1.5 INSTALLATION A. INSTALLATION CHECK. B. INSTALLATION ON NEW FOUNDATION... C. INSTALLATION ON EXISTING FOUNDATION.. D. OPERATOR MOUNTING. E. GEAR RACK INSTALLATION F. CHECK GEAR RACK INSTALLATION. G. LIMIT SWITCH ADJUSTMENT.. H. MANUAL RELEASE. I. ELECTRICAL CONNECTION...... J. BLUETOOTH CHARGE MONITORING*. P.4 P.5 P.5 P.6 P.8 P.8 P.9 P.10 P.10 P.10 1.6 MAINTENANCE P.11

1.1 GENERAL PRECAUTION WARNING: This user manual is only for qualified technicians who are specialized in installations and automations. 1) All installations, electrical connections, adjustments and testing must be performed only after reading and understanding of all instructions carefully. 2) Before carrying out any installation or maintenance operation, disconnect the electrical power supply by turning off the mains switch connected upstream and apply the hazard area notice required by applicable regulations. 3) Make sure the existing structure is up to standard in terms of strength and stability. 4) When necessary, connect the motorized gate to reliable earth system during electricity connection phase. 5) Installation requires qualified personnel with mechanical and electrical skills. 6) Keep the automatic controls (remote, push buttons, key selectors.etc) placed properly and way from children. 7) For replace or repair of motorized system, only original parts must be used. Any damage caused by incorrect parts and methods cannot be claimed on motor manufacturer. 8) Never operate the drive if you suspect that it might be faulty or will cause damage to the system. 9) The motors are exclusively designed for gate opening and closing application, any other usage is deem inappropriate. The manufacturer will not be liable for any damage resulting from the improper use. Improper usage should void all warranty, and the user accepts sole responsibility for any risks thereby may accrue. 10) The system may be operated in proper working order. Always follow the standard procedures by following the instructions in this installation and operating manual. 11) Only operate the remote when you have the full view of the gate. 12) The Smart solar charge controller has been already optimised for the Li-ion battery pack. No further adjustment is needed. Any changes to the solar controller will void the warranty. ELSEMA PTY LTD shall not be liable for any injury, damage, or any claim to any person or property which may result from improper use or installation of this system. Please keep this installation manual for future reference. 1

1.2 Kit Contents 1 Sliding gate motor with Smart solar controller and Li-ion Battery pack 2 3 x PentaFOB Remotes 3 Fastener Pack 4 Motor base plate 5 4 x Gear rack kit with mounting screws GR-4 6 Long range reflector type photo electric beam. PE-1500 7 1 x 24 Volt, 40W Solar panel 670 x 570 x 35 mm 2

1.3 Dimensions 3

1.4 TECHNICAL FEATURES: is600solar24 is900solar24 Motor Voltage 24Volts DC motor 24Volts DC motor Max Absorbed Power 80 Watts 120 Watts Nominal Thrust 220N 330N Power Supply 240 Volts AC 240 Volts AC Nominal Input Current 2 Amps 3 Amps Motor Speed 15 m/min 15 m/min Maximum Gate Weight 600 kg 900 kg Duty Cycle 60% over 12 min 60% over 12 min Operating Temperature -20 c - +50 c -20 c - +50 c Solar Panel 670 x 570 x 35 mm 670 x 570 x 35 mm Gate Weight Up to 600Kg on level ground Up to 900Kg on level ground 1.5 Installation A. CHECKS BEFORE INSTALLATION Before proceeding with the installation check the following: 1. The structure of the gate should be suitable for automation. 2. The gate should be supported by upper guides. 3. Mechanical end stoppers must be provided to prevent the gate from running off the track. 4. The foundation should be strong enough to support the operator. 5. There are no cables or pipes in the path of the operator and the gate. 6. Be sure that gate moves freely. 7. There are no obstacles in the moving gate area. 8. The operator is not in a position where it can be easily or accidently damaged by passing vehicles. 9. The 2 x limit magnets should have different marking on them. One should have a and the other should have a.you cannot use the limit magnets if they have the same marking. The magnets can be installed on either side (open or close). Please see the diagram below to locate the marking on the magnets. 4

B. INSTALLATION WITH CONCRETE Assemble the base plate bracket as shown in fig 1. Fig 1 Run Conduit and power cables, accessories and sensor cables through the slot in the base plate before pouring concrete. Make sure you have enough length on the cable to wire into the control card. While pouring the concrete, make sure that the base plate is level horizontally and straight with respect to the gate. After pouring concrete, make sure that the threaded part of the anchor bolts are clean. Do not work on it until the concrete is hard. C. INSTALLATION ON EXISTING FOUNDATION Use M10 Dynabolts to secure the base plate on solid concrete surface. Making sure that the distance from both edges of the base plate to the gate should be the same. 5

D. Mount the operator on to the base plate with the screws provided as shown below. 6

7

E. GEAR RACK INSTALLATION 1. Move the Gate leaf to fully closed position. 2. Place the first piece of the rack over the pinion leaving about 1.5mm gap and mark the drilling point on the gate, drill a pilot hole and screw the rack using the self-tapping screw with the reinforcing plate. 3. Move the gate manually, making sure that the rack is resting on the pinion and fix all other screws. 4. Bring the next rack and join it to the previous one by slotting it into inter-connecting slots. 5. Repeat this process until the gate is fully covered from fully open to fully close positions. F. CHECK GEAR RACK INSTALLATION Make sure that the rack is constantly in full contact with the pinion for the full open and close travel cycle. Manually check if the gate reaches the mechanical stop limits and make sure there is no friction during gate travel. Do not use grease or other lubricants between rack and pinion 8

G. LIMIT SWITCH ADJUSTMENT Install the limit switch magnets as shown in fig 6. The limit switch magnets should be initially installed at least 50mm before the end of travel on both sides. Final adjustment should be done after successful travel learning with the control card. Adjustments of the limit switch should be done after all other components are installed securely. Fig 6 When steel gear rack is used (or gear rack which are much slimmer), you will have to use the packing block which comes with the limit switches. Please see the diagram below 9

H. Manual Release The operator has an unlocking mechanism. Once it s unlocked, the gate can be operated manually in both directions. The unlocking key is needed to unlock the motor. Please keep the key in a safe place for later use. The manual release lever is located towards the bottom of the operator. (See pictures below). Use the key to unlock the manual release lever. Once unlocked pull the lever so that it s perpendicular to the motor. The gate can now be used manually. I. ELECTRICAL CONNECTION After successful motor installation, refer to the user manual of the control card for automatic operation setup. J. SOLAR CHARGE MONITORING APP* Once the gate is fully commissioned and operational, the solar charging monitoring app can be downloaded from the app store. This app will show the user the battery status in real time, charging current, battery voltage and the output of the solar panel. To download the app, go to the app store and search for VictronConnect. *Do not change any setting of the solar controller. It has already been optimised for the Liion battery. Any changes will void the warranty and can cause damage to the battery and the solar changer. 10

1.6 MAINTENANCE: Maintenance should be performed at least every six months. If it is used in high traffic area, a more regular maintenance should be performed. Disconnect the power supply: (1) Clean and lubricate the screws, the wheels of the gate with grease. (2) Check limit magnets position and fixture. (3) Check the fastening points are properly tightened. (4) Check and make sure that the wire connections are in good condition. Connect the power supply: (1) Check the power adjustments. (2) Check the function of the manual release (3) Check the photocells or other safety device. 11

Notes 12

Service History Date Maintenance Installer

Swing Gate Kits Solar Kits Solar panels Backup batteries Vehicle Loop Detectors Photo electric beams Magnetic locks Wireless keypads Pre formed loop Visit www.elsema.com to see our full range of Gate and Door Automation products