For personal use only

Similar documents
For personal use only

ASX RELEASE. PAK receives drilling permit for Elko Coking coal project. Summary

Tlou Energy Limited. ("Tlou" or "the Company") Tlou announces development partner for CBM to Power Project

Welcome and Introduction June 2007

ENERGY STRATEGY FOR YUKON. Independent Power Production Policy

BURGEONING RESOURCES SECTOR POWERS PACIFIC ENERGY TO ANOTHER RECORD RESULT

GLOBAL ENERGY STORAGE MARKET UPDATE: AUSTRALIAN ENERGY STORAGE ASSOCIATION

Garden Well Gold Deposit Diamond Drilling Confirms Gold at Depth Highlights

Ronnie van Eeden. Senior Mining Engineer. Overview

For personal use only

For Immediate Release 31 August 2010

2015/16 AUSTRALIAN SALARY & EMPLOYMENT OUTLOOK ENGINEERING. Engineering /16 AUSTRALIA SALARY & EMPLOYMENT OUTLOOK

TABLE OF CONTENTS OECD/IEA, 2017

COMMERCIALISATION OF UGANDA S OIL AND GAS SECTOR: REFINERY AND ATTENDANT INFRASTRUCTURE DEVELOPMENT

Australian Biofuels

Submission to the Department of Foreign Affairs and Trade s Asian century country strategies

Merger of the generator interconnection processes of Valley Electric and the ISO;

20 th World Petroleum Congress

FIRESTONE ENERGY WATERBERG COAL PROJECT

Submission to the Transport and Public Works Committee s inquiry into the operations of toll roads in Queensland

126m strike length vein averaging 42.37g/t gold

Decision on Merced Irrigation District Transition Agreement

ELECTRICITY SUPPLY INDUSTRY OF BOTSWANA

Media Release FOR IMMEDIATE RELEASE

Judith Tanselle White Energy Company Limited

2000 TO 2015 AN INDUSTRY TRANSFORMED:

Yukon s Independent Power Production Policy

Challenges Facing the City of Cape Town in Meeting Renewable Energy Targets

SOLAR POWER SOLUTIONS

Strategies for Promoting CMM Project Development in India

Bald Hill on track to start lithium concentrate production this quarter

ADVANCED BRAKING TECHNOLOGY LTD MICRO-CAP CONFERENCE PRESENTATION

PHASE TWO WET PLANT POWER ENERGISED. Phase Two wet beneficiation plant grid power energised successfully.

Introduction to the Clean Vehicles Partnerships Awards. Andrew Chen Head of Emissions Strategy, Heathrow Airport

Laboratory worker at Goedgevonden Coal Mine

AGENDA Introduction: Artumas, Overview

SPP OVERVIEW. Mike Ross Senior Vice President, Government Affairs and Public Relations

Africa Australia Technology & Infrastructure Conference. John Davidson Executive Director Carnegie Clean Energy

For personal use only. Investor Presentation June 2011

Battery Grade Spherical Graphite Produced

Feasibility of Establishing an E85 Fuelling Station in Oshawa

PT Astra International Tbk 2009 Full Year Financial Statements

For personal use only

ASX Conference Singapore - Presentation. May 2010

Interconnecting with Ameren

Title of presentation

OPENING REMARKS BY SASOL S CHIEF EXECUTIVE OFFICER, DAVID E. CONSTABLE INAUGURATION OF THE THUBELISHA SHAFT, TWISTDRAAI COLLIERY

TOYOTA S MANUFACTURING SUPPLY CHAIN

Looking Towards the Future: Advantages of 765-kV Transmission Technology

City of Palo Alto (ID # 6416) City Council Staff Report

Quarterly Report to 30 June 2012

ASX/MEDIA RELEASE 5 February 2010 DIAMOND CORE TESTWORK CONFIRMS POTENTIAL FOR HIGH GRADE DIRECT REDUCTION IRON CONCENTRATE AT BEYONDIE IRON PROJECT

Steel In The News. A compilation of leading news items on Indian steel industry as reported in major national dailies. Highlight of the Week 2

Rwanda Biofuels Limited. Powering Rwanda s Development

Considerations for Municipal Solar Projects. Ben Frevert Larsen Engineers November 16, 2016

World Energy Investment 2017

The SAARC Power Grid Nepal s Perspective

The Grid Link Project. Summary of the Report for the Independent Expert Panel

IGE Business Model Presentation. FOYSON RESOURCES LIMITED EXTRAORDINARY GENERAL MEETING 31 st March 2015

Creating a zero-emissions shipping world

P. SUMMARY: The Southeastern Power Administration (SEPA) establishes Rate Schedules JW-

Overview of Electricity Trade Agreement between Québec and Ontario. May 10, 2017 For Information Purposes Only

In Bulgaria by. Continental Wind Bulgaria EOOD

Comhairle Cathrach Chorcaí Cork City Council

SASOL PRESIDENT AND CHIEF EXECUTIVE OFFICER DAVID E CONSTABLE

Amayo Project Summary

Review of Operations in FY2012

All-Energy 2016, Glasgow. Contributing funding partners:

REGIONAL TRANSMISSION ORGANIZATIONS / INDEPENDENT SYSTEM OPERATORS AND THE ENERGY IMBALANCE MARKET: AN OVERVIEW OF THE PICTURE IN THE WEST

Planning Distributed Generation for Transmission Savings 1 By Kenneth Sahm White and Stephanie Wang 2 March 19, 2014

For personal use only

WHERE WE VE COME FROM.

Quarterly Activities Report

The Gambia National Forum on

SunZia Southwest Transmission Project

PSE Attachment K Puget Sound Area Transmission Meeting

POLISH POTENTIAL TO SUPPORT AUSTRALIAN MINING AND ENERGY PROJECTS

PT Astra International Tbk 2012 Half Year Financial Statements

PROMOTING THE UPTAKE OF ELECTRIC AND OTHER LOW EMISSION VEHICLES

For personal use only

FOR IMMEDIATE RELEASE

TABLE OF CONTENTS 6 MEDIUM-TERM COAL MARKET REPORT 2012

LNG: Legal and regulatory framework. Canepa Monica World Maritime University

Electricity Access in Lao PDR

ESIA Study for 1,050MW Coal Fired Power Plant, Lamu County, Kenya Need for the Project. 3 Need for the project... 2

Developing North American Coal & Infrastructure

High Bridge Energy Development, LLC (HBED) Small Reactor Program

A strategic investment in Zimbabwe

TOD S S.p.A. Group s sales totalled million Euros in FY 2018 (958.2 million at constant rates)

Ethanol-blended Fuels Policy

PKC Group establishes Joint Venture with JAC. Matti Hyytiäinen, President & CEO

National Treasury Presentation to the Standing Committee on Finance: South African Airways SOC Ltd ( SAA )

Copyright Statement FPC International, Inc

Media Release. Strong growth driven by significant demand in key export markets & Increase in new value added products

best to you all Gail Carbiener Page 1 of 5

Mining the Past Powering the Future

Press Release. Alstom s orders remained sound whilst sales are gradually recovering

Joint Venture Agreement ( JVA ) with Nissan in respect of the establishment and operation of NVL ( Proposed Joint Venture ).

Creating A Greener Energy Future For the Commonwealth. Massachusetts RPS Solar Carve-Out: Overview & Program Basics.

Government of Canada Hopper Car Fleet 2011 Annual Report

Transcription:

ASX Announcement 12 January 2016 Dark Horse Resources Signs Significant Energy Development MoU with Sunset Power Pty Ltd Highlights Memorandum of Understanding executed with Sunset Power Pty Ltd for the development of a thermal power station in Argentina to supply low cost base load power to the local region and into the main Argentinian electricity supply network. Sunset Power successfully planned the development of six gas fired power stations in Australia over the last 15 years, forming ERM Power Limited to construct and operated them, and is the parent company of Sunset Power International, which has been involved overseas in new power station development planning, and recently acquired the Vales Point power station from the NSW Government. Dark Horse has access to significant thermal fuel resource targets in Argentina. Sunset Power and Dark Horse will endeavour to enter a Power Purchase Agreement with the government of Argentina, obtain all necessary development approvals and subsequently procure the construction and commissioning of all the power station facilities and finance for the power project. Introduction The Board of Directors of Dark Horse Resources Limited (ASX: DHR; formerly Navaho Gold) is pleased to announce the signing of a Memorandum of Understanding (MoU) to investigate the appointment for a mine mouth coal fired power station in Argentina with Sunset Power Pty Limited (Sunset). DHR and Sunset Venture The parties will work together to identify the opportunity for an ultra supercritical base load coal fired power station at the Pico Quemado coal project in Western Argentina to connect to existing 500kV transmission network serving the Argentinian national electricity network, which presently is reliant on imported LNG to meet a major portion of the country s base load power demand. The venture will scope the size and design, obtain all development and environment approvals, and negotiate the necessary power purchase and funding agreements with a view to future construction and development. The project will help service the country s increasing power demands, help utilise the existing resources and help reduce the need for importing expensive hydrocarbon, fuels and electricity. The next step in the process is to present a business case to the Argentine federal and provincial Governments. The development schedule is outlined in Table 1 (see below). Sunset plans to secure the development and financing for a coal fired power station. The two parties will work together to develop a mine mouth power operation located at the DHR s Pico Quemado Project (up to 75% DHR, 25% Trendix), in the Rio Negro province, Argentina.

Sunset will provide the necessary expertise for the identification of the most economic development to serve the needs of the interconnected Argentine electricity network, and for appropriate presentation to various Argentine Government and relevant electricity planning and development Agencies of the Argentine Government. Commenting on the MoU, Sunset s founder Mr Trevor St Baker said: With a change of Government in Argentina and devaluation of the currency, there is an increasing international interest in addressing Argentina s stretched and expensive electricity supply sector. And with similar low sulphur coal as in NSW, Australia has credibility in developing low cost domestic fuelled base load power for Argentina from this domestic coal resource in world best practice clean coal fired power plants. Commenting on the new relationship with Sunset Power, Dark Horse Resources Chairman Mr Nick Mather said: Bringing the Sunset experience to this project and combining it with a coal basin with the potential for export quality low sulphur thermal coal, and a clear need for cheap base load power generation for Argentina, provides Dark Horse with a great basis for a paradigm shift in the company s growth strategies. Cost Efficient, Ultra Supercritical Base Load Power Generator The construction of the power station would be based on state of the art Ultra Supercritical (USC) technology, which requires less coal per megawatt hour (lower carbon dioxide and sulphur emissions) and reduced fuel consumption, which results in lower overall operational expenses. The parties will look to utilising latest commercially viable technologies and equipment providers to minimise and control emissions, and will also investigate carbon capture and sequestration and offsetting strategies including fertiliser generation through algae farming. Sunset Power (Sunset) Sunset Power is led by Trevor St Baker, who has more than 50 years experience in the energy industry including 20 years in planning and leadership roles within New South Wales and Queensland Government owned electricity companies. Sunset Power, under Mr St Baker s leadership, founded ERM Power Limited and developed it into the successful energy provider that it is today. The Sunset Power Group recently acquired from New South Wales Government the business and assets of Delta Electricity, associated with the Vales Point Power Station, located in Lake Macquarie. Sunset Power personnel were also separately part of the business development team of CS Energy who planned and procured the 750 MW Kogan Creek power station in Queensland, a current world best practice clean coal fired Queensland power station, the latest engineered version of which will be considered for a possible Argentinian power station development by the DHR and Sunset. Power Purchase Agreement DHR and Sunset will negotiate a Power Purchase Agreement with Argentine energy authorities for using the coal from the Pico Quemado Coal Project as the fuel source for the proposed new major base load power station.

Coal Characteristics at Pico Quemado Previous coal analyses from Pico Quemado (Announced 26 th August 2015) shows the Pico Quemado coal is high volatile bituminous with good thermal, and potential metallurgical, properties with general quality ranges as follows: Moisture 2 5% Ash 10 25% Volatiles 24 33% Calorific Value 6000 7400 Kcals/kg Sulphur 0.2 0.6% Crucible Swelling Index up to 5 Mean Maximum Reflectance 0.56 0.68% A total of six thick seams have been identified in the sedimentary sequence (in parts showing a cumulative thickness of 12m coal), each exposed from the surface to shallow depths affording potential for easy development. DHR envisages that the Pico Quemado product coal will have similar qualities to the New South Wales export standard thermal coals. The coal is high in energy, with moderate ash and low sulphur, which presents the parties with an outstanding opportunity to generate base load electricity and supply power to Argentina using an experienced Australian power generation company. As outlined in its ASX release of 26 August 2015, DHR has an Exploration Target for the Pico Quemado and Basin projects of approximately 75 million tonnes to approximately 125 million tonnes of coal with an energy (calorific) range of approximately 6,000 Kcals/kg to approximately 7,400 Kcals/kg. Demand for Electricity in Argentina Electricity demand in Argentina is growing at approximately 1 2% per annum. The lack of foreign investment adding to the struggle for Argentineans to access cost efficient energy, with peak demand reaching 24,000MW with limited to no spare capacity. Coal Mining Joint Venture Dark Horse Resources Trendix Power Generation Venture Dark Horse Resources Sunset Power Pty Ltd Proposed structure of the elements of the overall Pico Quemado Coal Project and Mine Mouth Coal Fired Power Plant. As outlined in detail in the ASX release of 26 August 2015, DHR has the option to earn up to 75% of the Pico Quemado Coal project.

Table 1 Indicative Timetable

Clockwise: From top left: Pico Quemado, meetings in Rio Negro from left to right Mr. Juan Pablo Espanola the Secretary of Mines, Mr Neil Stuart Dark Horse Resources Director, the Honourable Alberto Weretilneck Rio Negro Governor, Mr David Mason Dark Horse Resources Director, Mr Tomas Heredia Trendix Director.

On behalf of the Board Mr Karl Schlobohm Company Secretary For further information contact: Mr Nicholas Mather Pru Maclean Chairman, Dark Horse Resources Ltd Investor Relations, Dark Horse Resources Ltd Ph: 07 3303 0650 Ph: 07 3303 0650