Our charging statement for Scotland 2018/19. Non-primary and other charges. 03/04/2018 non-primary charging statement 2018/19 version 5 Page 1

Similar documents
SCOTTISH WATER CHARGES SCHEME

Wholesale Developer Services Charges

FREE 5 * WEEKS HOME ELECTRICITY AND NATURAL GAS! IT S LIKE GETTING. Get cheaper energy when you choose ebilling and Direct Debit.

Green Drive Nov 2020

FREE 5 * WEEKS NATURAL GAS! SAVE UP TO 10% * ON GAS RATES GAS IT S LIKE GETTING GAS. Call us on Visit our website at Airtricity.

EL PASO ELECTRIC COMPANY SCHEDULE NO. 99 MISCELLANEOUS SERVICE CHARGES

Solar Net Metering and Billing FAQ

BACS APPROVED BUREAU SCHEME SUPPORT GUIDELINES

Charter Township of Plymouth ~ Comprehensive Fee Schedule ~ Effective July 24, 2018 WATER AND SEWER SYSTEM

How much does it cost for water, sewerage and electricity?

DIRECTIONS ISSUED TO LICENSED PROVIDERS PURSUANT TO STANDARD LICENCE CONDITION B1 THE WATER INDUSTRY COMMISSION FOR SCOTLAND.

Code of Practice on Leakage for Domestic Customers

The Vehicle Identity Check (VIC) Scheme

EDF Energy s small business products and services

University of Leeds Car Parking Terms & Conditions


Charges Scheme 2017/18

BACS APPROVED BUREAU SCHEME SUPPORT GUIDELINES

RESIDENTIAL SERVICE. CHARACTER OF SERVICE: This Schedule is for single phase, alternating current at standard voltage as designated by the Utility.

LTU Car Parking Policy AY 2018/19

Standard retail electricity supply

Electrical District No. 3 SOLAR Q & A

Electric Rates. for residential and farm customers. January 2016

Please Refer to Attached Sample Form

PWC SCHEDULE OF DEPOSITS, FEES AND CHARGES. Table of Contents

PWC SCHEDULE OF DEPOSITS, FEES AND CHARGES. Table of Contents

Citizens Advice financial capability

March 13, 2000 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. Modification to Power Factor Adjustment Special Condition

GM Specification Annual Test Data

Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No.

Energetics Gas Limited Metering Charges Statement. From 1 st May Page 1 of 8 Energetics Gas Metering Charges

GM Specification Annual Test Data

Application for a New / Augmented Connection

MONROE COUNTY WATER AUTHORITY. Current Rate Schedule

Exhibit A BUILDING AND CONSTRUCTION

Solar*Rewards Frequently asked questions system size and customer usage

New Jersey Motor Vehicle Commission

COMMERCIAL RATE SCHEDULES

401 KAR 42:020. UST systems: design, construction, installation, and registration.

Dropped Crossing Service

RESIDENTIAL NEW CONSTRUCTION PACKET CITY OF VERO BEACH UTILITIES. Important Notice to Builders/Contractors/Developers From Electrical Engineering

Peak Demand Saver plan. Unlocking solar s potential

ROAD TRAFFIC OFFENCES Moving forward together

Panola-Harrison Electric Cooperative, Inc. Louisiana Tariff Effective: March 3, 2004

PG&E - MCE Joint Rate Comparisons

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT COMPRESSED NATURAL GAS TRANSIT FLEET UPDATE

ELECTRICITY SERVICE PRICE LIST

Leakage Code of Practice Commercial Customers

COMMUNITY SOLAR PROGRAM

Please Read Carefully

Georgia Department of Revenue Policy Bulletin - MVD HB 170 Transportation Funding Act of 2015

Utilities Kingston Report to Council Report Number

What exactly are next-generation meters?

Guide to Wisconsin Community Solar Welcome to Solar*Connect Community SM

YOUR ELECTRIC RATES AND OTHER HANDY INFORMATION ABOUT YOUR ELECTRIC SERVICE. Non-residential Customers See supplemental sheet for current charges

CITY OF WESTON, a municipal corporation SEWERAGE AND SEWAGE DISPOSAL SERVICE

SPRINGFIELD UTILITY BOARD ELECTRIC RATE SCHEDULES

New connections charges Our latest proposals. December 2017.

All Dealer Principals, General Managers, Service Managers, and Parts Managers

I aaunited. Relocating your household water meter 2018/2019. ~ \:, Utilities. &~Ing life f\ow smoothly

Zero Emission Bus Impact on Infrastructure

ELECTRIC SCHEDULE E-1 Sheet 1 RESIDENTIAL SERVICES

PG&E - MCE Joint Rate Comparisons

OKLAHOMA CORPORATION COMMISSION PETROLEUM STORAGE TANK DIVISION THE ABC S OF AST S AN OVERVIEW OF ABOVEGROUND STORAGE TANK REQUIREMENTS

YOUR ELECTRIC RATES. ComEd powering lives An Exelon Company AND OTHER HANDY INFORMATION ABOUT YOUR ELECTRIC SERVICE

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

Agreement for Use of the Hokkaido Expressway Pass

Reliance Infrastructure Limited Reg. Office: H Block, 1 st Floor, Dhirubhai Ambani Knowledge City, Navi Mumbai Website:

You are just TWO signatures away from savings on your fuel bill.

EXHIBIT SUMMARY. Exhibit Summary. Effective: 10/1/2016 Customer Class

SSEFITAPP 2012_08_07 v2.1. FeeD-In TArIFF APPlICATIon ForM

2015 Proposed Fees and Charges. Schedule of Proposed Fees and Charges to be Considered by Council of the Town of East Gwillimbury

ExtraEnergy TEST IT TRACK at TAIPEI CYCLE SHOW 2016

Mobilehome Park Utility Upgrade Program

Energy Forum: Demand Side Management & May 6, 2010

CHAPTER 2 HOW TO APPLY FOR ELECTRICITY

Contents. 1.0 Introduction. 1.0 Introduction 1. Welcome to Toyota Fleet Management (TFM) 2.0 Vehicle servicing and repairs 2. 3.

City Transfer Stations: Loading Services and Fees

31 st January Page 1

Georgia s Alternative Fuel Vehicle Incentives

Tariff Guide - 1st February 2018

Electric Rates & Tariffs

Revised Cal. P.U.C. Sheet No E Cancelling Original Cal. P.U.C. Sheet No E

Show Name: Anaheim Home & Garden Show 2018 ELECTRICAL

Columbia Water & Light Interconnection & Net Metering Agreement Electrical Facility

PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

Solar Storage Solutions

Western Virginia Water Authority Schedule of Monthly Water Rates Botetourt County Customers

Changing your vehicle

CHAPTER 22 SOLID WASTE AND RECYCLABLE COLLECTION. (with amendments through )

Docket 50-ER-108 Algoma Utilities. Final Form Rate and Rule Tariff Sheets Amendment 78. Filed By: Public Service Commission of Wisconsin

Utility Rates October 1, 2018

You are just TWO signatures away from savings on your fuel bill.

March 30, 2005 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. 1% Franchise Surcharge for City of Santa Barbara Residents

Woodlane Car Parking Policy 2012/2013

TRANSMISSION CONNECTION CHARGING METHODOLOGY STATEMENT

Fees and Charges Schedule - Miscellaneous Fees and Charges

Rancho Villas Community Association Vehicle & Parking Rules and Regulations

DIVISION VI FINANCIAL MATTERS HYDRANT METER ACCOUNTS

New Rate Structure Encouraging greater efficiency

Transcription:

Our charging statement for Scotland 2018/19 Non-primary and other s 03/04/2018 non-primary charging statement 2018/19 version 5 Page 1

Charges for Premises in Scotland 1 Temporary consents for trade effluent dis A temporary consent will be valid for six months, after which time it will automatically terminate. Category of dis Charge per consent Low strength/risk 204.40 Medium strength/risk 408.91 High strength/risk 681.52 2 Verification of services 2.1 De-registration requests Verification using Scottish Water systems 23.29 N/A Visit during standard hours (two person service) first hour 213.92 178.08 Visit during standard hours (two person service) per hour thereafter Visit out-with standard hours (two person service) first hour Visit out-with standard hours (two person service) per hour thereafter Visit requiring additional resources during or out-with standard hours 142.68 281.34 234.30 187.26 Based on actual cost 2.2 Verification of meter details Visit during standard hours first hour 106.96 89.04 Visit during standard hours per hour thereafter 71.34 Visit out-with standard hours first hour 140.67 117.15 Visit out-with standard hours per hour thereafter 93.63 Visit requiring additional resources during or out-with standard hours Based on actual cost 03/04/2018 non-primary charging statement 2018/19 version 5 Page 2

2.3 Verification of water service configuration Verification using Scottish Water systems 23. 29 N/A Visit during standard hours (two person service) first hour 213.92 178.08 Visit during standard hours (two person service) per hour thereafter 142.68 Visit out-with standard hours (two person service) first hour 281.34 234.30 Visit out-with standard hours (two person service) per hour thereafter Visit requiring additional resources during or out-with standard hours 187.26 Based on actual cost 2.4 Legal Review Activity Charge Legal (property ownership) review fee 78.40 3 Water shut off and reconnection 3.1 Disconnection surveys for temporary and permanent disconnections The first hour of an in-hours standard disconnection survey 213.92 178.08 For each hour thereafter of an in-hours standard survey 142.69 The first hour of an out-of-hours standard disconnection survey 281.34 234.30 For each hour thereafter of an out-of-hours standard survey 187.26 Survey requiring additional resources during or out-with standard hours Based on actual cost If you can commit to going through with a temporary disconnection before the survey is even carried out, and the survey shows that a standard disconnection is possible, we ll reduce your s by the amounts below. Charge Abortive visit In-hours advanced commitment standard disconnection - 142.68-178.08 Out-of-hours advanced commitment standard disconnection - 187.26-234.30 Costs incurred to secure access to allow the survey to be undertaken, such as legal costs, may be recovered in addition to the above s. 03/04/2018 non-primary charging statement 2018/19 version 5 Page 3

3.2 Temporary disconnection The first hour of an in-hours standard temporary disconnection where no pipework modification is required For each hour thereafter of an in-hours standard temporary disconnection The first hour of an out-of-hours standard temporary disconnection where no pipework modification is required For each hour thereafter of an out-of-hours standard temporary disconnection Non-standard temporary disconnection 213.92 178.08 142.68 281.34 234.30 187.26 Based on actual cost Costs incurred to secure access to allow the disconnection to be undertaken, such as legal costs, may be recovered in addition to the above s. 3.3 Permanent disconnection Permanent disconnection during standard hours 560.00 224.00 Permanent disconnection out-with standard hours 728.00 291.20 Permanent disconnection inspection fee (based on one hour 15 minutes) 71.00 3.4 Discontinuation and Re-establishment of Trade Effluent Service Activity Survey to establish if TE service can be discontinued Discontinuation of TE services Re-establishment of TE services Abortive visits Charge Reasonable Costs Incurred Reasonable Costs Incurred Reasonable Costs Incurred Reasonable Costs Incurred 3.5 Reconnection s following a temporary disconnection In-hours reconnection 106.96 89.04 Out-of-hours reconnection 140.67 117.15 Reconnection requiring pipe work alteration Based on actual cost 3.6 Service removal verification survey 03/04/2018 non-primary charging statement 2018/19 version 5 Page 4

Survey during standard hours for the first hour 106.96 89.04 For each hour thereafter during standard hours 71.34 Survey out-with standard hours for the first hour 140.67 117.15 For each hour thereafter out-with hours 93.63 Survey requiring additional resources during or out-with standard hours Based on actual cost 4 Metering services 4.1 Survey for change of meter In-hours meter survey 213.92 178.08 Out-of-hours meter survey 281.34 234.30 Meter surveys requiring additional resources Reasonable costs incurred Reasonable costs incurred 4.2 Survey for meter accuracy test Survey during standard hours first hour 106.96 89.04 Survey during standard hours per hour thereafter 71.34 Survey out-with standard hours first hour 140.67 117.15 Survey out-with standard hours per hour thereafter 93.63 Survey requiring additional resources during or out-with standard hours Based on actual cost 03/04/2018 non-primary charging statement 2018/19 version 5 Page 5

4.3 Meter installation Meter Size (mm) 15 20 25 30 40 50 80 100 150 Above ground/internal meter 329.58 345.27 397.59 476.05 810.87 1043.67 1179.68 1422.95 1692.37 Below ground meter (no dig up) 517.90 533.59 585.93 664.39 708.87 1323.55 1459.56 1702.83 1974.86 Below ground dig-up and rebuild chamber in verge 1067.20 1082.90 1101.2 1135.22 1213.69 1634.82 1770.84 2014.09 2283.52 Below ground dig-up and rebuild chamber in surfaced footpath 1067.20 1082.90 1101.2 1135.22 1213.69 1634.82 1770.84 2014.09 2283.52 Below ground dig-up and rebuild chamber in surfaced road 1430.78 1446.49 1532.56 1577.27 1621.72 1854.55 1990.56 2233.81 2503.23 Below ground, no dig-up + MSM meter in verge 196.00 208.32 221.31 Below ground, dig-up and install ebco box + MSM meter in verge 740.25 745.48 792.56 Below ground, dig-up and install ebco box + MSM meter in surfaced footpath Below ground, dig up and install ebco box + MSM meter in road 824.88 837.31 923.44 1056.57 1061.97 1109.06 Meter Size (mm) 200 250 300 350 400 450 500 600 Above ground/internal meter 763.84 1,111.37 1,298.41 1,798.49 2,235.52 2,511.15 3,047.63 3,810.01 Below ground meter (no dig up) 782.99 1,130.41 1,317.56 2,146.03 2,626.84 2,902.48 3,504.48 4,310.65 Below ground dig-up and rebuild chamber in verge 1,955.96 2,307.31 2,544.41 5,251.90 6,013.39 6,288.91 6,891.02 7,697.20 Below ground dig-up and rebuild chamber in surfaced footpath 2,035.60 2,383.24 2,570.40 5,372.08 6,098.84 6,374.48 6,976.36 7,782.65 Below ground dig-up and rebuild chamber in surfaced road 2,324.22 2,549.56 2,870.67 5,674.25 6,855.40 7,251.10 7,852.99 8,659.28 Charge for abortive visit 89.04 03/04/2018 non-primary charging statement 2018/19 version 5 Page 6

4.4 Changing meter sizes Meter Size (mm) 15 20 25 30 40 50 80 100 150 Above ground 217.61 244.94 278.65 322.67 541.63 595.16 678.27 763.84 904.17 Below ground meter (no dig up) 229.04 256.36 289.96 334.20 560.67 614.20 697.42 737.63 923.21 Below ground dig-up and rebuild chamber in verge 799.00 826.33 914.48 958.38 1,074.97 1,303.56 1,392.60 1,432.92 1,915.31 Below ground dig-up and rebuild chamber in surfaced footpath 861.61 888.94 973.05 1,017.29 1,148.78 1,356.43 1,458.68 1,498.89 1,996.51 Below ground dig-up and rebuild chamber in surfaced road 1,008.33 1,035.66 1,123.80 1,167.82 1,305.36 1,512.89 1,622.99 1,663.42 2,166.97 Below ground, no dig-up + MSM meter in verge 382.92 395.36 485.40 Below ground, dig-up and install ebco box + MSM meter in verge 811.77 827.23 914.48 Below ground, dig-up and install ebco box + MSM meter in surfaced footpath 874.38 889.84 973.05 Below ground, dig up and install ebco box + MSM meter in road 1,021.32 1,036.78 1,123.80 Meter Size (mm) 200 250 300 350 400 450 500 600 Above ground/internal meter 1,600.36 1,950.36 3,018.51 4,552.12 5,343.29 6,389.37 8,518.27 Below ground meter (no dig up) 1,638.56 1,988.56 3,396.06 4,929.56 5,764.64 6,810.60 9,005.24 Below ground dig-up and rebuild chamber in verge 2,792.49 3,146.41 4,597.26 8,165.92 9,121.05 10,167.02 12,361.77 Below ground dig-up and rebuild chamber in surfaced footpath 2,872.35 3,222.35 4,717.44 8,251.37 9,206.40 10,252.48 12,447.00 Below ground dig-up and rebuild chamber in surfaced road 3,160.75 3,388.56 4,959.36 9,008.04 9,962.96 11,129.10 13,323.74 Charge for abortive visit 89.04 03/04/2018 non-primary charging statement 2018/19 version 5 Page 7

4.5 Replacing or repairing a damaged meter Meter Size (mm) 15 20 25 30 40 50 80 100 150 Above ground 183.12 210.44 244.27 288.28 449.90 477.68 591.69 615.21 646.12 Below ground meter (no dig up) 206.08 233.40 267.12 311.24 487.98 515.87 629.77 653.40 684.32 Below ground dig-up and rebuild chamber in verge 745.47 772.80 860.94 904.96 979.21 1,182.16 1,303.90 1,327.53 1,653.34 Below ground dig-up and rebuild chamber in surfaced footpath 812.00 839.32 923.44 967.56 1,056.94 1,238.94 1,372.00 1,395.52 1,738.46 Below ground dig-up and rebuild chamber in surfaced road 954.80 982.12 1,070.27 1,114.40 1,209.71 1,391.71 1,534.40 1,557.92 1,904.78 Below ground, no dig-up + MSM meter in verge 196.00 208.32 221.31 Below ground, dig-up and install ebco box + MSM meter in verge 758.35 770.67 860.94 Below ground, dig-up and install ebco box + MSM meter in surfaced footpath 824.88 837.31 923.44 Below ground, dig up and install ebco box + MSM meter in road 967.79 980.22 1,070.27 Above ground replace Helix 4000 mechanism 284.92 291.64 355.37 381.13 406.89 Below ground replace Helix 4000 mechanism 304.08 310.68 374.52 400.28 426.04 03/04/2018 non-primary charging statement 2018/19 version 5 Page 8

Replacing or repairing a damaged meter (continued) Meter Size (mm) 200 250 300 350 400 450 500 600 Above ground/internal meter 744.80 1,092.22 1,279.37 1,779.45 2,216.48 2,492.22 3,028.48 3,790.86 Below ground dig-up and rebuild chamber in surfaced road 782.99 1,130.41 1,317.56 2,146.03 2,626.84 2,902.48 3,504.48 4,310.65 Below ground meter (no dig up) 1,955.96 2,307.31 2,544.41 5,251.90 6,013.39 6,288.91 6,891.02 7,697.20 Below ground dig-up and rebuild chamber in verge 2,035.60 2,383.24 2,570.40 5,372.08 6,098.84 6,374.48 6,976.36 7,782.65 Below ground dig-up and rebuild chamber in surfaced footpath 2,324.22 2,549.56 2,870.67 5,674.25 6,855.40 7,251.10 7,852.99 8,659.28 Above ground replace Helix 4000 mechanism 527.96 572.76 655.76 Below ground replace Helix 4000 mechanism 547.00 630.00 674.68 Charge for abortive visit 89.04 4.6 Meter accuracy test If you believe that your water meter is not registering correctly, then we can arrange for it to be tested by Scottish Water. If the meter is found to be recording your usage accurately (within 5%), you will be d for the testing, as per below. If it has been recording your usage inaccurately, this will be corrected at no cost to you. Meter Size (mm) 15 20 25 30 40 50 80 100 150 Meter accuracy test 540.71 540.71 540.71 540.71 540.71 540.71 872.59 936.76 1030.40 Meter size (mm) 200 250 300 350 400 450 500 600 Meter accuracy test 1,376.59 1,724.12 1,911.28 3,067.45 3,548.38 3,976.78 4,578.89 5,690.83 Charge for abortive visit 89.04 03/04/2018 non-primary charging statement 2018/19 version 5 Page 9

5 New connections There is an application fee of 101.36+VAT that applies to all new connection applications. If you decide not to proceed with the connection, it will not be refunded. 5.1 Infrastructure Water Sewerage 393.23 per property or sub unit 393.23 per property or sub unit 5.2 Connection s Connection to live water mains (32mm outside diameter and below) Connection to live water mains Greater than 32mm Sewerage connection Part 2 (non-trunk main) Part 3 (trunk main) 333.64 Reasonable costs incurred Reasonable costs incurred Based on actual cost Reasonable costs incurred hour 15 minutes Abortive visit hour 15 minutes hour 15 minutes hour 15 minutes 5.3 Inspection s Inspection fee (water) 71.00 hour 15 minutes Inspection fee (sewerage) 71.00 hour 15 minutes Sewer CCTV (Where faults are detected) 125.21 N/A 03/04/2018 non-primary charging statement 2018/19 version 5 Page 10

6 Building Water 6.1 Water for business and industrial developments Construction type (based on construction costs) All traditional work with a contract price of up to 500,000 (excluding costs of ready-mix concrete) All traditional work with a contract price greater than 500,000 (excluding costs of ready-mix concrete) All non-traditional work, modernisation and cost, rehabilitation contracts (excluding costs of ready-mix concrete) Additional for providing and removing the water supply Charge 0.3% of the total estimated contract price 0.3% for the first 500,000 of the total estimated contract price, 0.15% for the rest of the total estimated contract price 0.15% of the total estimated contract price Based on actual cost 6.2 Site accommodation water Where water and/or waste water supply to site accommodation is un-metered, fixed and volumetric s will apply in addition to any building water s. Fixed s will be based on the 20mm meter annual and the number of weeks the supply has been made available. Volumetric s will be applied using the current metered volumetric s and an assessment of the volume of water used. The assessment of the volume of water and waste water used will be calculated using the following formulas: Water: Number of people using site accommodation x Weeks onsite x PCC Waste water: Number of people using site accommodation x Weeks onsite x PCC PCC Per capita consumption for site accommodation s will be based on the procedure for calculating volume at re-assessed un-metered premises. Activity Charge Site accommodation s: fixed per week (water) Site accommodation s: fixed per week (waste) Volumetric s 1.73 per week 1.03 per week Same as the current volumetric s 7 Sampling and Laboratory Services The for sampling and laboratory services is based on actual cost 03/04/2018 non-primary charging statement 2018/19 version 5 Page 11

8 Water bylaws inspections or on site Advice In hours 106.96 89.04 For each hour thereafter in-hours 71.34 Out-of-hours repeat 140.67 117.15 For each hour thereafter out-of-hours 93.63 Additional resources (irrespective of time) Reasonable costs incurred hour 15 minutes 9 Copies of bills If you need a paper copy of a bill that we ve already sent to you and you don t want to sign up to ebilling there is a of 5+VAT for each bill you require. 10 Statement of account The for providing a statement of account is 10+VAT for each statement we produce. 11 Other goods and services The main services that Business Stream supplies are stated in this charging statement. Any other services will be provided at reasonable cost and these will be explained to you. 12 VAT VAT is not applicable on water s for all business customers, except those whose main business activity is within divisions 1 to 5 of the 1980 Standard Industrial Classification (VAT does not apply to any waste water or drainage s). Full details of the Standard Industrial Classifications can be obtained from HMSO. Where applicable, VAT will be added at the standard rate to the s shown. The s for all other services are also subject to VAT for all customers, regardless of their Standard Industrial Classification. All other s in this document are all zero rated for VAT. If you are in any doubt concerning the application of VAT, please contact us. 13 Cost of recovery s If we don t receive payment on time from you, we ll send you reminders to pay. If we still do not receive payment, we will issue a letter stating that we have applied a of 75+VAT to cover our costs of recovery. If you still continue to fail to pay your bill a second recovery of 100+ VAT will be applied to your account and the case will be passed on to one of our debt collection partners. We will inform you in advance if your account is going to incur this but to avoid running the risk of this being applied, we recommend that you set up a direct debit. Not only do you receive a discount while on direct debit, but you will be safe in the knowledge that your bills are being taken care of and no collection s will be applied while your direct debit is active. 03/04/2018 non-primary charging statement 2018/19 version 5 Page 12